MISSOULA FIELD OFFICE RENOVATION
Solicitation number
140L3626Q0048
Issued by

About this file

This is Amendment 0003 to a Bureau of Land Management (BLM) solicitation (140L3626Q0048) issued by the BLM MT-STATE Office in Billings, Montana. The amendment extends the solicitation due date to 16 September 2026 at 1:00 PM MDT and incorporates a new question and answer clarifying roofing tile specifications and installation requirements.

The project involves building improvements at Fort Missoula with a performance period from 28 September 2026 to 31 December 2027. Key scope clarifications include: the existing roof uses Monier Concrete Tiles in "Villa" profile (not Ludowici clay tiles as previously specified); the contractor will replace broken tiles using BLM-provided tiles per manufacturer specifications; ridge and hip tiles will be reinstalled without mortaring per manufacturer specifications; the contractor must identify moisture penetration areas and replace all flashing in valleys and ridges; fascia board replacement will be expressed as linear footage; downspout sizing can be reduced to match stormwater inlet or necked down at connection; carpet installation must be completed within 21 days with furniture moved by the contractor while BLM consolidates electronics and personal items; baseboard replacement throughout the building must match existing material; fire safe cabinets must be moved during carpet installation; and no plumbing improvements are included despite being mentioned on front documentation. The amendment also references 11 previous questions and answers addressing contractor responsibilities for damaged plywood painting, fascia replacement quantities, downspout sizing, roof tile replacement, BLM property removal, stucco repairs, carpet installation timeline, measurement approximations, and plan corrections regarding the front entrance flooring material.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing items 8 and 15, and returning or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

E. IMPORTANT: is not is required copies to the issuing office.

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE

2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)

7.ADMINISTERED BY (If other than Item 6) CODE

STANDARD FORM 30 (REV. 11/2016)

Prescribed by GSA FAR (48 CFR) 53.243

FACILITY CODE

9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED (SEE ITEM 11)

10A. MODIFICATION OF CONTRACT/ORDER NUMBER

10B. DATED (SEE ITEM 13)

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in Item 14. is extended. is not extended.

12. ACCOUNTING AND APPROPRIATION DATA (If required) copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER

NUMBER IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15C. DATE SIGNED

15A. NAME AND TITLE OF SIGNER (Type or print)

16C. DATE SIGNED

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

PAGE

6. ISSUED BY CODE

8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X)

CODE

15B. CONTRACTOR/OFFEROR

(Signature of person authorized to sign)

16B. UNITED STATES OF AMERICA

(Signature of Contracting Officer)

Previous edition unusable

PAGESOF

Contractor

The hour and date specified for receipt of Offers to sign this document and return

Jorge Alvarez

See continuation page

BLM MT-STATE OFC(MT935)

5001 SOUTHGATE DR.

BILLINGS MT 59101

BLM MT STATE OFC(MT935)

5001 SOUTHGATE DR.

BILLINGS MT 59101

LMA

LMA

140L3626Q0048

09/14/2026

08/04/2026

1 5

CONTINUATION SHEET

REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGES

NAME OF OFFEROR OR CONTRACTOR

SUPPLIES/SERVICES

(B)

UNIT

(D)

UNIT PRICE

(E)

AMOUNT

(F)

OPTIONAL FORM 336 (4-86)

Sponsored by GSA FAR (48 CFR) 53.110

ITEM NO.

(A)

QUANTITY

(C)

NSN 7540-01-152-8067

140L3626Q0048/0003

See Amendment information below:

Period of Performance: 09/28/2026 to

12/31/2027

Description of Changes - This amendment incorporates the following:

1. The Government is also extending the solicitation due date to 16 September 2026 at 1PM MDT.

2. The Government is providing a Question received from interested offeror and the associated Answer provided by the Government.

Acknowledgement - See Block 11 above regarding how to acknowledge this amendment. The Government must receive the acknowledgement at the place designated for receipt of offers (See Block 8 of the Standard Form 1442).

Third Party – If you have given a copy of the solicitation to someone else, please forward this amendment accordingly.

New Question and Answer

1Q: The current specification references Ludowici clay tiles, but the existing roof consists of Monier concrete tiles in the "Villa" profile. I do not recommend installing clay tiles on a concrete tile system. I can source matching ridge tiles from the original manufacturer and complete the scope of work accordingly.

Additionally, mortaring all the ridge and hip tiles is unnecessary when using the specified ridge and hip bracket system. This system uses a secondary sealant over the bracket to create a watertight seal, which also allows for individual tile replacement in the future without breaking mortar.

Could you please confirm if we may use the matching concrete tiles from the same manufacturer for this project, or if clay tiles are strictly required?

A: I apologize for the confusion. Yes, after looking closer, the existing tiles are Monier Concrete Tiles in the "Villa" profile. There is a discrepancy between this building and the other buildings at Fort Missoula which was missed. That said, the tiles will be provided by the BLM, as there are numerous replacement tiles on site for repairs.

The contractor will be responsible for identifying areas of concern for moisture penetration, replacing broken tiles with BLM provided tiles per the manufacturer's specifications (This should be Monier and not Ludowici), and resetting all ridge and hip tiles where flashing should be replaced. The contractor will not be expected to mortar the ridge and hip tiles, and will be expected to reinstall the tiles per the manufacturer's specifications.

Previous Questions and Answers

1Q: Is the contractor responsible for replacing the damaged plywood under the eave or will they just be responsible for painting?

A: The contractor will just be responsible for painting the plywood in the eaves. If it is deemed necessary to replace the plywood, it will be a modification to the contract. This will be reflected in the plans and specifications.

2Q: If the fascia replacement is a lump sum, what is the chances it will vary greatly from the estimates on the front page of the plans and is there a possibility the contractor will be expected to replace fascia boards if deemed necessary upon further inspection?

A: The bid will be rewritten to express fascia board replacement in a linear footage quantity to minimize confusion.

3Q: Will the downspout size be 6” if the outlet is still 5” from the previous system? This size differential could cause issues when the downspout exits to the stormwater system.

A: The downspout can either be sized down to match the stormwater inlet or it can be necked down at the connection point.

4Q: Will the roof tile be new or replaced?

A: The roof tile will not be new it will be replaced with existing tiles stored at the BLM Office. The contractor will be expected to perform a thorough inspection of the existing roofing system, replacing all flashing in the valleys and ridges, and reinstalling the ridge, valley, and field tiles (where necessary) per the manufacturer’s specifications. This will be reflected in the plans and bid schedule.

5Q: Will all BLM property adjacent to the building be removed prior to work that will be impacted?

A: Yes, the BLM will be responsible for moving all exterior materials adjacent to the building that will impede roofing, painting, or gutter installations.

6Q: Is there anything mounted that would be removed, and holes that need to be filled prior to painting?

A: No, there are sections of stucco that need to be repaired, but there are no holes that need to be filled prior to painting at this time. If there are discrepancies found, the contractor will be able to negotiate a change order for the changing conditions.

7Q: Can you give clarity on what percentage of the office can be impacted during carpet installation?

A: Yes, the contractor will be expected to move all furniture, perform all carpet removal/replacement, and reinstall furniture in a 21-day time period. This will be reflected in the plans and specifications. It is recommended that the contractor performs the installation across the entire building at the same time to minimize the time duration that employees are impacted. The BLM will be responsible for consolidating all electronics, books, and personal items to shelves and boxes prior to the contractor moving the furniture.

8Q: Are all measurements in the contract approximate?

A: Yes, they are an approximation of the government. If there are large discrepancies between what work is shown in the plans and what work is completed on the ground the contractor will be granted the ability to renegotiate the work through a change order.

9Q: The front entrance is shown as carpet in the plans, but is actually tile. Is this area planned to be carpeted?

A: No, this was an error in the plans and will be reflected in the revised documents

10Q: Is the contractor expected to replace the baseboard in the entire building and match the existing material?

A: Yes, the contractor is expected to replace the baseboard in the entire building, and match the existing material. This will be reflected in the plans and specifications.

11Q: Are the fire safe cabinets included in the moving efforts for carpet installation?

A: Yes, this will be reflected in the plans and specifications.

12Q: There are plumbing improvements mentioned on the front page. Are there plumbing improvements in this contract?

A: No, there are currently no plumbing improvements incorporated in this contract scope of work. This will be corrected in the plans.

Amendment of solicitation/modification of contract
Contract ID code
Amendment/modification number
Effective date
Requisition/purchase requisition number
Project number
Issued by
Code
Administered by
Code
Name and address of contractor
Code
Facility code
Amendment of solicitation number
Dated
Modification of contract/order number
Dated
This item only applies to amendments of solicitations
Accounting and appropriation data
This item applies only to modifications of contracts/orders.
This change order is issued pursuant to:
The above numbered contract/order is modified to reflect the administrative changes
This supplemental agreement is entered into pursuant to authority of:
Other
Important:
Description of amendment/modification
Name and title of signer
Contractor/offeror
Date signed
Name and title of contracting officer
Signature of Contracting Officer
Date signed
Previous edition unusable
Standard form 30 (rev. 11/2016)
Continuation sheet
Reference Number
Name of Offeror or Contractor
OPTIONAL FORM 336 (4-86))

Sponsored by GSA FAR (48 CFR) 53.110

File details come from the government source that posted it. Updated .