This is Standard Form 30, Amendment 0002 to a solicitation issued by the Bureau of Land Management (BLM) Montana State Office for renovation work at their facility located at 5001 Southgate Drive, Billings, Montana. The amendment extends the solicitation due date to September 15, 2026 at 1:00 PM Mountain Daylight Time and updates key contract documentation including Attachment 1 (Statement of Work), Attachment 2 (Drawings), and adds Attachment 4 (Updated Price Schedule). The contract is identified as 140L3626Q0048 with a period of performance from September 28, 2026 through December 31, 2027.
The scope of work includes roofing system replacement with thorough inspection and flashing replacement in valleys and ridges using existing tiles stored at the BLM Office; exterior painting of the building with stucco repair; gutter and downspout installation; carpet removal and replacement throughout the building with baseboard replacement to match existing material, completed within a 21-day timeframe; and roof tile reinstallation where necessary per manufacturer specifications. The BLM is responsible for removing adjacent property materials, consolidating electronics and personal items, and moving fire safe cabinets. All measurements in the contract are approximate with provisions for change orders if discrepancies exist between plans and actual conditions. The amendment clarifies that no plumbing improvements are included in this contract scope despite previous mention on planning documents.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing items 8 and 15, and returning or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
E. IMPORTANT: is not is required copies to the issuing office.
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE
2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)
7.ADMINISTERED BY (If other than Item 6) CODE
STANDARD FORM 30 (REV. 11/2016)
Prescribed by GSA FAR (48 CFR) 53.243
FACILITY CODE
9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED (SEE ITEM 11)
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED (SEE ITEM 13)
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. is extended. is not extended.
12. ACCOUNTING AND APPROPRIATION DATA (If required) copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER
NUMBER IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15C. DATE SIGNED
15A. NAME AND TITLE OF SIGNER (Type or print)
16C. DATE SIGNED
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
PAGE
6. ISSUED BY CODE
8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X)
CODE
15B. CONTRACTOR/OFFEROR
(Signature of person authorized to sign)
16B. UNITED STATES OF AMERICA
(Signature of Contracting Officer)
Previous edition unusable
PAGESOF
Contractor
The hour and date specified for receipt of Offers to sign this document and return
Jorge Alvarez
See continuation page
BLM MT-STATE OFC(MT935)
5001 SOUTHGATE DR.
BILLINGS MT 59101
BLM MT STATE OFC(MT935)
5001 SOUTHGATE DR.
BILLINGS MT 59101
LMA
LMA
140L3626Q0048
09/08/2026
08/04/2026
1 4
CONTINUATION SHEET
REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGES
NAME OF OFFEROR OR CONTRACTOR
SUPPLIES/SERVICES
(B)
UNIT
(D)
UNIT PRICE
(E)
AMOUNT
(F)
OPTIONAL FORM 336 (4-86)
Sponsored by GSA FAR (48 CFR) 53.110
ITEM NO.
(A)
QUANTITY
(C)
NSN 7540-01-152-8067
140L3626Q0048/0002
See Amendment information below:
Period of Performance: 09/28/2026 to
12/31/2027
Description of Changes - This amendment incorporates the following:
1. The Government is also extending the solicitation due date to 15 September 2026 at 1PM MDT.
2. Updates Attachment 1 – SOW.
3. Updates Attachment 2 – Drawings.
4. Adds Attachment 4 – Updated Price Schedule.
Acknowledgement - See Block 11 above regarding how to acknowledge this amendment. The Government must receive the acknowledgement at the place designated for receipt of offers (See Block 8 of the Standard Form 1442).
Third Party – If you have given a copy of the solicitation to someone else, please forward this amendment accordingly.
Previous Questions and Answers
1Q: Is the contractor responsible for replacing the damaged plywood under the eave or will they just be responsible for painting?
A: The contractor will just be responsible for painting the plywood in the eaves. If it is deemed necessary to replace the plywood, it will be a modification to the contract. This will be reflected in the plans and specifications.
2Q: If the fascia replacement is a lump sum, what is the chances it will vary greatly from the estimates on the front page of the plans and is there a possibility the contractor will be expected to replace fascia boards if deemed necessary upon further inspection?
A: The bid will be rewritten to express fascia board replacement in a linear footage quantity to minimize confusion.
3Q: Will the downspout size be 6” if the outlet is still 5” from the previous system? This size differential could cause issues when the downspout exits to the stormwater system.
A: The downspout can either be sized down to match the stormwater inlet or it can be necked down at the connection point.
4Q: Will the roof tile be new or replaced?
A: The roof tile will not be new it will be replaced with existing tiles stored at the BLM Office. The contractor will be expected to perform a thorough inspection of the existing roofing system, replacing all flashing in the valleys and ridges, and reinstalling the ridge, valley, and field tiles (where necessary) per the manufacturer’s specifications. This will be reflected in the plans and bid schedule.
5Q: Will all BLM property adjacent to the building be removed prior to work that will be impacted?
A: Yes, the BLM will be responsible for moving all exterior materials adjacent to the building that will impede roofing, painting, or gutter installations.
6Q: Is there anything mounted that would be removed, and holes that need to be filled prior to painting?
A: No, there are sections of stucco that need to be repaired, but there are no holes that need to be filled prior to painting at this time. If there are discrepancies found, the contractor will be able to negotiate a change order for the changing conditions.
7Q: Can you give clarity on what percentage of the office can be impacted during carpet installation?
A: Yes, the contractor will be expected to move all furniture, perform all carpet removal/replacement, and reinstall furniture in a 21-day time period. This will be reflected in the plans and specifications. It is recommended that the contractor performs the installation across the entire building at the same time to minimize the time duration that employees are impacted. The BLM will be responsible for consolidating all electronics, books, and personal items to shelves and boxes prior to the contractor moving the furniture.
8Q: Are all measurements in the contract approximate?
A: Yes, they are an approximation of the government. If there are large discrepancies between what work is shown in the plans and what work is completed on the ground the contractor will be granted the ability to renegotiate the work through a change order.
9Q: The front entrance is shown as carpet in the plans, but is actually tile. Is this area planned to be carpeted?
A: No, this was an error in the plans and will be reflected in the revised documents
10Q: Is the contractor expected to replace the baseboard in the entire building and match the existing material?
A: Yes, the contractor is expected to replace the baseboard in the entire building, and match the existing material. This will be reflected in the plans and specifications.
11Q: Are the fire safe cabinets included in the moving efforts for carpet installation?
A: Yes, this will be reflected in the plans and specifications.
12Q: There are plumbing improvements mentioned on the front page. Are there plumbing improvements in this contract?
A: No, there are currently no plumbing improvements incorporated in this contract scope of work. This will be corrected in the plans.
| Amendment of solicitation/modification of contract |
| Contract ID code |
| Amendment/modification number |
| Effective date |
| Requisition/purchase requisition number |
| Project number |
| Issued by |
| Code |
| Administered by |
| Code |
| Name and address of contractor |
| Code |
| Facility code |
| Amendment of solicitation number |
| Dated |
| Modification of contract/order number |
| Dated |
| This item only applies to amendments of solicitations |
| Accounting and appropriation data |
| This item applies only to modifications of contracts/orders. |
| This change order is issued pursuant to: |
| The above numbered contract/order is modified to reflect the administrative changes |
| This supplemental agreement is entered into pursuant to authority of: |
| Other |
| Important: |
| Description of amendment/modification |
| Name and title of signer |
| Contractor/offeror |
| Date signed |
| Name and title of contracting officer |
| Signature of Contracting Officer |
| Date signed |
| Previous edition unusable |
| Standard form 30 (rev. 11/2016) |
| Continuation sheet |
| Reference Number |
| Name of Offeror or Contractor |
| OPTIONAL FORM 336 (4-86)) |
Sponsored by GSA FAR (48 CFR) 53.110
File details come from the government source that posted it. Updated .