This document is a comprehensive set of design plans and specifications for the Fort Simcoe Water System Renovations project at the Fort Simcoe Job Corps Civilian Conservation Center in White Swan, Washington (Yakima County). The project is sponsored by the USDA Forest Service, Pacific Northwest Region, in collaboration with the Yakama Nation.

The project involves the replacement of the existing potable water distribution system, comprising approximately 8,798 linear feet of new 6-inch PVC C-900 waterline as the base bid, with an optional additional 828 linear feet of 6-inch waterline on Fort Simcoe Drive. The work includes approximately 3.2 miles of new 6-inch water pipe, installation of new water service connections to approximately 18 buildings, replacement of water service lines, installation of fire hydrants and backflow prevention valves, water sampling stations, and improvements to three existing wells and one storage reservoir. The project also includes instrumentation and control system upgrades with new PLCs, electromagnetic flow meters, pressure indicators, and level sensors at each well and the storage reservoir. Key specifications require all construction to comply with current state, federal, and USDA Forest Service standards and industry best practices; adherence to OSHA and WISHA safety requirements; coordination with DIG ALERT for utility locating; and maintenance of redline as-built drawings. Contractor responsibilities include erosion control measures, traffic management for public road closures (scheduled seven days in advance), utility verification prior to excavation, and restoration of all disturbed areas. The estimated quantities include 7 fire hydrant assemblies, 37 gate valves with restrained joints, 9 backflow prevention valves, and 2 double check valve assemblies for irrigation, along with pavement and sidewalk restoration totaling approximately 2,430 square feet.

View the file

Other files

Show all 11

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

JOB CORPS

NATIONAL OFFICE

FORT SIMCOE WATER

SYSTEM RENOVATIONS

FORT SIMCOE JOB CORPS

CIVILIAN CONSERVATION

CENTER

YAKAMA NATION

08/2025 20

UNITED STATES

DEPARTMENT OF AGRICULTURE

FOREST SERVICE

DATENO. REVISION / ISSUE

TITLE SHEET

AKANA

D. VALLES

C1.0

AKG 09/2025

PROJECT ADDRESS

40 Abella Ln, White Swan, WA 98952

(NO SCALE)

PROJECT LOCATION

UNITED STATES DEPARTMENT OF AGRICULTURE

FOREST SERVICE

PACIFIC NORTHWEST REGION

YAKAMA NATION

FORT SIMCOE JOB

CORPS CENTER

YAKIMA COUNTY,

WASHINGTON

FORT SIMCOE WATER

SYSTEM RENOVATIONS

U.S. LOCATION MAP

PROJECT

LOCATION

DESIGN BY AKANA ENGINEERING, REVISIONS MADE BY USDA ENGINEERING

STAFF TO CLARIFY REQUIREMENTS BASED ON QUESTIONS RECEIVED FROM

PROSPECTIVE VENDORS AND ADDITIONAL LIMITED FIELD VERIFICATION OF

EXISTING CONDITIONS.

SOURCE: GOOGLE, 2025

INDEX OF SHEETS

NO. DESCRIPTION

C01 COVER SHEET

C02 GENERAL NOTES

C03 ESTIMATED QUANTITIES

C03.1 PIPE QUANTITY TAKEOFF

C04 EROSION CONTROL PLAN AND DETAILS

C05 EXISTING CONTOUR PLAN - NORTHEAST

C06 EXISTING CONTOUR PLAN - NORTHWEST

C07 EXISTING CONTOUR PLAN - SOUTHWEST

C08 EXISTING CONTOUR PLAN - SOUTHEAST

C09 WATER SITE PLAN - NORTHEAST

C10 WATER SITE PLAN - NORTHWEST

C11 WATER SITE PLAN - SOUTHWEST

C12 WATER SITE PLAN - SOUTHEAST

C13 FIRE HYDRANT AND BACKFLOW PREVENTION

VALVE SCHEDULE

C14 DETAILS

C15 DETAILS

C16 DETAILS

C17 DETAILS

E01 INSTRUMENTATION AND CONTROL PLAN

E01.1 INSTRUMENTATION DIAGRAM

AutoCAD SHX Text 10/16/25 14:50 AGARRISON C:\USERS\AGARRISON\BOX\JCENG_PROJECTS\FORTSIMCOE\02_SITE\_WATERSYSTEM\2024WATERSYSTEMIMP\DWGS\USFS-BDR-JCC-COVER.DWG; 14:50 AGARRISON C:\USERS\AGARRISON\BOX\JCENG_PROJECTS\FORTSIMCOE\02_SITE\_WATERSYSTEM\2024WATERSYSTEMIMP\DWGS\USFS-BDR-JCC-COVER.DWG;14:50 AGARRISON C:\USERS\AGARRISON\BOX\JCENG_PROJECTS\FORTSIMCOE\02_SITE\_WATERSYSTEM\2024WATERSYSTEMIMP\DWGS\USFS-BDR-JCC-COVER.DWG; AGARRISON C:\USERS\AGARRISON\BOX\JCENG_PROJECTS\FORTSIMCOE\02_SITE\_WATERSYSTEM\2024WATERSYSTEMIMP\DWGS\USFS-BDR-JCC-COVER.DWG;AGARRISON C:\USERS\AGARRISON\BOX\JCENG_PROJECTS\FORTSIMCOE\02_SITE\_WATERSYSTEM\2024WATERSYSTEMIMP\DWGS\USFS-BDR-JCC-COVER.DWG; C:\USERS\AGARRISON\BOX\JCENG_PROJECTS\FORTSIMCOE\02_SITE\_WATERSYSTEM\2024WATERSYSTEMIMP\DWGS\USFS-BDR-JCC-COVER.DWG;C:\USERS\AGARRISON\BOX\JCENG_PROJECTS\FORTSIMCOE\02_SITE\_WATERSYSTEM\2024WATERSYSTEMIMP\DWGS\USFS-BDR-JCC-COVER.DWG;;

AutoCAD SHX Text

SHEET

AutoCAD SHX Text

OF

AutoCAD SHX Text

DESIGNER

AutoCAD SHX Text

STAMPS, LOGOS, AND SEALS

AutoCAD SHX Text

PROJECT NAME

AutoCAD SHX Text

DRAWING TITLE

AutoCAD SHX Text

CHECKED

AutoCAD SHX Text

ARCHIVE NO.

AutoCAD SHX Text

SUB SHEET NO.

AutoCAD SHX Text F

AutoCAD SHX Text O

AutoCAD SHX Text R

AutoCAD SHX Text E

AutoCAD SHX Text S

AutoCAD SHX Text T

AutoCAD SHX Text S

AutoCAD SHX Text E

AutoCAD SHX Text R

AutoCAD SHX Text V

AutoCAD SHX Text I

AutoCAD SHX Text C

AutoCAD SHX Text E

AutoCAD SHX Text D

AutoCAD SHX Text E

AutoCAD SHX Text P

AutoCAD SHX Text A

AutoCAD SHX Text R

AutoCAD SHX Text T

AutoCAD SHX Text M

AutoCAD SHX Text E

AutoCAD SHX Text N

AutoCAD SHX Text T

AutoCAD SHX Text O

AutoCAD SHX Text F

AutoCAD SHX Text A

AutoCAD SHX Text G

AutoCAD SHX Text R

AutoCAD SHX Text I

AutoCAD SHX Text C

AutoCAD SHX Text U

AutoCAD SHX Text L

AutoCAD SHX Text T

AutoCAD SHX Text U

AutoCAD SHX Text R

AutoCAD SHX Text E

AutoCAD SHX Text

DATE

TRAFFIC CONTROL:

THE NEW WATER LINE CROSSES SEVERAL EXISTING ROADS. CONTRACTOR SHALL PROVIDE A TRAFFIC CONTROL PLAN FOR

REVIEW/APPROVAL BY THE FOREST SERVICE. ALL WORK THAT WILL IMPACT VEHICULAR AND PEDESTRIAN TRAFFIC SHALL BE

COORDINATED WITH SITE PERSONNEL A MINIMUM OF 5 WORKING DAYS PRIOR TO COMMENCING WORK.

GENERAL NOTES:

1. ALL WATER SYSTEM CONSTRUCTION WILL BE IN COMPLIANCE WITH CURRENT STATE, FEDERAL, AND USDA FOREST SERVICE RULES, REGULATIONS, AND STANDARDS AND SHALL BE IN ACCORDANCE WITH INDUSTRY 'BEST PRACTICES'. WHERE CONTRADICTION OCCURS

BETWEEN THESE PLANS AND RULES, REGULATIONS, AND STANDARDS, NOTIFY THE USDA FOREST SERVICE CONTRACTING OFFICER (CO)

IMMEDIATELY.

2. ALL TRENCHING SHALL CONFORM TO FEDERAL OSHA AND WISHA SAFETY REQUIREMENTS INCLUDING COMPETENT PERSON SUPERVISION

AND CAVE-IN PROTECTION.

3. MAINTAIN ORANGE SAFETY FENCING AROUND OPEN EXCAVATIONS WHEN WORK IS NOT ACTIVELY IN PROGRESS AND DURING NON-WORK

HOURS.

4. CONDUCT ACTIVITIES SO THAT INTERFERENCE WITH THE PUBLIC AND/ OR GOVERNMENT PERSONNEL SHALL BE KEPT TO A MINIMUM.

SCHEDULE ACTIVITIES REQUIRING CLOSURE TO THE PUBLIC AND/ OR GOVERNMENT PERSONNEL WITH THE CO AT LEAST 7 DAYS IN

ADVANCE.

5. CONTRACTOR SHALL CONTACT DIG ALERT (1-800-424-5555) AND SHALL GIVE ADEQUATE NOTICE TO THE RESIDENT FACILITIES MANAGER TO

ALLOW LOCATING AND MARKING. CONTRACTOR SHALL FIELD VERIFY ALL UTILITIES PRIOR TO EXCAVATION.

6. A STORAGE AND LAYOUT AREA IS SHOWN ON THE PLANS FOR USE BY THE CONTRACTOR. COORDINATE WITH SITE USFS REPRESENTATIVES

PRIOR TO ARRIVING ON SITE.

7. EXISTING CONSTRUCTION INDICATED IS BASED ON LIMITED FIELD INVESTIGATIONS AND GOVERNMENT-SUPPLIED INFORMATION AVAILABLE

AT TIME OF DESIGN. VERIFY ALL EXISTING CONDITIONS, INCLUDING THE ELEVATIONS AND LOCATION OF EXISTING UTILITIES AND OTHER

UNDERGROUND OBSTRUCTIONS BEFORE CONSTRUCTING NEW WORK. POTHOLING IS INCIDENTAL TO PAYMENT AND MEASUREMENT OF THE

WORK PERFORMED. NOTIFY THE CO IF ANY SIGNIFICANT DISCREPANCIES ARE DISCOVERED.

8. WHEN A DETAIL IS IDENTIFIED AS "TYP", SHORT FOR "TYPICAL", APPLY DETAIL FOR CONSTRUCTION OF EVERY LIKE CONDITION, EVEN IF

REFERENCE TO THE DETAIL IS NOT REPEATED IN EVERY INSTANCE. IN CASES OF CONFLICT BETWEEN A SPECIFICALLY REFERENCED DETAIL

AND A TYPICAL DETAIL, THE SPECIFICALLY REFERENCED DETAIL SHALL GOVERN.

9. PROTECT EXISTING WORK WHICH IS TO REMAIN IN PLACE, BE REUSED, OR REMAIN THE PROPERTY OF THE GOVERNMENT.

10. MINIMIZE CONSTRUCTION IMPACTS TO SOILS, WATER, PLANTS, ANIMALS, AND OTHER NATURAL RESOURCES DURING CONSTRUCTION.

CONFINE CONSTRUCTION OPERATIONS TO MINIMUM PRACTICAL AREA AS REQUIRED TO COMPLETE CONSTRUCTION AND/OR DEMOLITION

WITHIN EACH DEFINED WORK AREA.

11. CONTRACTOR SHALL UNCOVER ALL TIE-IN, PIPE CROSSINGS, AND POTENTIAL CONFLICT LOCATIONS BEFORE PIPE INSTALLATION.

12. THE CONTRACTOR IS RESPONSIBLE FOR MAINTAINING REDLINE "AS-BUILT" DRAWINGS DURING CONSTRUCTION. THE REDLINE DRAWINGS

SHALL NOTE THE POSITION OF THE NEW UTILITY LINES WITH RESPECT TO EXISTING STRUCTURES; THE DEPTH OF THE LINES; LOCATIONS OF

ALL NEW APPURTENANCES; LOCATION OF ALL UTILITIES ENCOUNTERED DURING THE INSTALLATION OF THE NEW LINES; LOCATIONS OF

ABANDONED LINES; LOCATIONS OF ANY CONTAMINATED SOILS; AND ALL OTHER STRUCTURES ENCOUNTERED DURING CONSTRUCTION. AT

THE COMPLETION OF THE PROJECT, THE CONTRACTOR SHALL SUBMIT THE REDLINE DRAWINGS TO THE CO FOR APPROVAL BEFORE

PREPARING PROFESSIONAL CAD AS-BUILTS DRAWINGS.

13. THE CONTRACTOR IS RESPONSIBLE FOR IMPLEMENTING WHATEVER MEASURES ARE NECESSARY FOR THE PROTECTION OF ALL EXISTING

FACILITIES, INCLUDING THOSE ASSOCIATED WITH TEMPORARY ACCESS OR STAGING ON ADJOINING PROPERTIES, DURING THE COURSE OF

THE CONSTRUCTION. ANY REPAIRS, REPLACEMENTS OR RESTORATION MEASURES MADE NECESSARY BY THE CONTRACTOR'S ACTIVITIES

WILL BE MADE AT THE CONTRACTOR'S EXPENSE.

14. THE CONTRACTOR SHALL VERIFY ALL ON-SITE MEASUREMENTS OF EXISTING STRUCTURES PRIOR TO SUBMISSION OF SHOP DRAWINGS, COMMENCING WITH ANY STRUCTURAL FABRICATION, AND COMMENCEMENT OF ON-SITE WORK. CONTRACTOR TO NOTIFY CO IMMEDIATELY

OF ANY DISCREPANCIES FOUND THAT MAY AFFECT THE INTENDED WORK.

15. THE SAFETY OF ALL ON-SITE WORKERS SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR. CONFORM TO ALL LAWS AND CODES

REGARDING CONSTRUCTION SAFETY. THE CONTRACTOR SHALL COMPLY WITH ALL SAFETY REQUIREMENTS FOR WORKING WITH ASBESTOS

PIPE INCLUDING OFFSITE DISPOSAL.

16. THE CONTRACTOR SHALL THOROUGHLY FAMILIARIZE THEMSELVES WITH THE EXISTING SOIL CONDITIONS AT THE SITE BY PERSONAL

EXAMINATION OF THE SITE PRIOR TO COMMENCEMENT OF WORK.

17. A WASTE SITE FOR EXCESS AND UNSUITABLE MATERIAL WILL BE LOCATED BY THE CO WITHIN APPROXIMATELY 1 MILE OF THE PROJECT

SITE.

DESIGN NOTES:

SPECIFICATIONS

CONSTRUCTION: MATERIALS AND CONSTRUCTION OF THE PROJECT SHALL BE IN ACCORDANCE WITH THE PROJECT CSI

SPECIFICATIONS WITH APPLICABLE FOREST SERVICE SUPPLEMENTAL SPECIFICATIONS (FSSS).

PROJECT DESCRIPTION:

THIS PROJECT INCLUDES THE REPLACEMENT OF THE EXISTING POTABLE WATER DISTRIBUTION SYSTEM (PRIMARILY 4-INCH

ASBESTOS CEMENT PIPE,FITTINGS, AND APPURTENANCES) FROM THE EXISTING WELLS (NO. 1, 2, AND 3) TO THE STORAGE

TANK AND THROUGHOUT THE SITE. THERE WILL BE APPROXIMATELY 9,256 LF OF NEW 6 INCH WATER PIPE (BASE +

OPTIONAL). NEW WATER PIPE LOCATION IS SHOWN RUNNING PARALLEL TO THE EXISTING WATER DISTRIBUTION SYSTEM ON

THE DRAWINGS FOR CLARITY. ONE NEW FIRE HYDRANT AND 6 FIRE HYDRANT REPLACEMENTS WILL BE INSTALLED. 9 NEW

BACKFLOW PREVENTION VALVES AND 2 NEW 4-INCH DOUBLE CHECK VALVE ASSEMBLY WILL BE INSTALLED WHERE THE

POTABLE WATER SYSTEM CONNECTS TO THE EXISTING IRRIGATION SYSTEM. INSTRUMENTATION UPGRADES WILL BE MADE

AT THE EXISTING WELLS AND STORAGE TANKS.

CONTRACTOR SHALL DETERMINE WHETHER INSTALLATION WILL BE BY OPEN TRENCH OR OTHER METHOD - SUBJECT TO

FINAL APPROVAL BY THE CONTRACTING OFFICER - CONTRACTOR SHALL INCLUDE INTENDED METHOD IN THEIR TECHNICAL

APPROVAL WITH BID PRICING.

THE DRAWINGS ARE ORGANIZED BY WORK AREA; THERE ARE FOUR DISTINCT WORK AREAS.

S

FIRE HYDRANT

SEWER MANHOLE

DECIDUOUS TREE/SHRUB

METAL SIGN, AS NOTED

4X6 INCH DECORATIVE BOLLARD,

FENCE GATE POST

UTILITY POLE W/ LIGHT

UTILITY POLE

GUY ANCHOR

CONIFER TREE

BARB WIRE FENCE

WATER VALVE

GP

WOOD SIGN, AS NOTED

GPS SURVEY CONTROL POINT

UNDERGROUND TELEPHONE

OVERHEAD POWER

EDGE OF GRAVEL

UNDERGROUND SANITARY

UNDERGROUND WATER

SEWER CLEANOUT

WATER VAULT

HOSE BIB

WATER METER

DECORATIVE SIDEWALK LIGHT

TELEPHONE RISE

TELEPHONE VAULT

PROPANE TANK

WHEELCHAIR RAMPWCR

UNDERGROUND POWER

WITH OVERHEAD TELEPHONEW/OT

FINISHED FLOOR ELEVATIONFF

VEGETATION LIMITS

EXCEPT AS NOTED

PROPOSED WATER LINE

HB

SSCO

PROPOSED WATER VALVE

PROPOSED FIRE HYDRANT

PROPOSED BACKWATER FLOW

PREVENTOR

ABANDONED LINE

EXISTING 1' CONTOUR

EXISTING 5' CONTOUR

PROPOSED OPTIONAL WATER LINE

UNITED STATES

DEPARTMENT OF AGRICULTURE

FOREST SERVICE

DATENO. REVISION / ISSUE

GENERAL NOTES

AKANA

D. VALLES, PE

C02

A. GARRISON ,PE 08/2025

JOB CORPS

NATIONAL OFFICE

FORT SIMCOE WATER

SYSTEM

IMPROVEMENTS

FORT SIMCOE JOB CORPS

CIVILIAN CONSERVATION

CENTER

YAKAMA NATION

08/2025 20

TEMPORARY WATER SERVICE:

1. WATER SERVICE SHALL BE MAINTAINED TO THE DORMITORIES AND DINING HALL ALL TIMES WITH THE EXCEPTION OF

SHORT DURATION OUTAGES SCHEDULED IN ADVANCE WITH THE CO AND CENTER STAFF, THE MAXIMUM OUTAGE TO

THESE BUILDINGS IS 12 HOURS.

2. OUTAGES FOR OTHER BUILDINGS SHALL NOT EXCEED 72 HOURS AND SHALL BE COORDINATED IN ADVANCE WITH

THE CO AND CENTER STAFF, NOTE THAT THE CO MAY AUTHORIZE OUTAGES BEYOND THIS LIMIT ON A CASE BY CASE

BASIS.

3. IF THE CONTRACTORS ACTIVITIES WILL EXCEED THE 12 & 72 HOUR RESTRICTIONS ON OUTAGES THEY SHALL BE

RESPONSIBLE FOR THE PROVISION OF AN ALTERNATIVE TEMPORARY POTABLE WATER SOURCE/SERVICE IN

ACCORDANCE WITH STATE OF WASHINGTON AND EPA REQUIREMENTS. TEMPORARY WATER SERVICE PLAN SHALL

BE SUBMITTED FOR APPROVAL PRIOR TO THE OUTAGE PERIOD START.

COORDINATION WITH EXISTING SITE OBSTRUCTION AND SITE RESTORATION:

1. NOT ALL MINOR STRUCTURES SUCH AS SHEDS, FENCES, SIDEWALKS, RETAINING WALLS ARE SHOWN ON THE BASE

DRAWINGS. CONTRACTOR SHALL BE RESPONSIBLE FOR COORDINATION WITH SITE OBSTRUCTIONS AND FINAL

LAYOUT OF WORK. THIS MAY INCLUDE OFFSETTING PIPE AROUND OBSTRUCTION OR SELECTIVE DEMOLITION OF

SIDEWALKS, FENCES, AND SIMILAR FEATURES FOR PIPE INSTALLATIONS, WHEN SELECTIVE DEMOLITION OCCURS, THE CONTRACTOR SHALL BE RESPONSIBLE FOR RECONSTRUCTION TO MATCH THE ORIGINAL CONSTRUCTION.

2. THE CONTRACTORS IS RESPONSIBLE FOR RESTORATION OF AREAS DISTURBED BY CONSTRUCTION ACTIVITIES TO

INCLUDE PAVEMENTS, GRAVEL SURFACES, LAWN/TURF. RESTORATION INCLUDES REPAIR RUTS,

CRACKED/CRUSHED PAVEMENT, SUBSIDENCE DUE TO IMPROPER BACKFILL/COMPACTION,, AND REPLACEMENT OF

SURFACES SUCH AS THOSE MENTIONED IN PREVIOUS SENTENCE.

AutoCAD SHX Text

GPS

AutoCAD SHX Text

PROPANE

AutoCAD SHX Text T

AutoCAD SHX Text

WV

AutoCAD SHX Text H

AutoCAD SHX Text Y

AutoCAD SHX Text D

AutoCAD SHX Text

%%ULEGEND

AutoCAD SHX Text 10/23/25 11:37 AGARRISON C:\USERS\AGARRISON\BOX\JCENG_PROJECTS\FORTSIMCOE\02_SITE\_WATERSYSTEM\2024WATERSYSTEMIMP\DWGS\C02 -NOTES_LEGEND.DWG; 11:37 AGARRISON C:\USERS\AGARRISON\BOX\JCENG_PROJECTS\FORTSIMCOE\02_SITE\_WATERSYSTEM\2024WATERSYSTEMIMP\DWGS\C02 -NOTES_LEGEND.DWG;11:37 AGARRISON C:\USERS\AGARRISON\BOX\JCENG_PROJECTS\FORTSIMCOE\02_SITE\_WATERSYSTEM\2024WATERSYSTEMIMP\DWGS\C02 -NOTES_LEGEND.DWG; AGARRISON C:\USERS\AGARRISON\BOX\JCENG_PROJECTS\FORTSIMCOE\02_SITE\_WATERSYSTEM\2024WATERSYSTEMIMP\DWGS\C02 -NOTES_LEGEND.DWG;AGARRISON C:\USERS\AGARRISON\BOX\JCENG_PROJECTS\FORTSIMCOE\02_SITE\_WATERSYSTEM\2024WATERSYSTEMIMP\DWGS\C02 -NOTES_LEGEND.DWG; C:\USERS\AGARRISON\BOX\JCENG_PROJECTS\FORTSIMCOE\02_SITE\_WATERSYSTEM\2024WATERSYSTEMIMP\DWGS\C02 -NOTES_LEGEND.DWG;C:\USERS\AGARRISON\BOX\JCENG_PROJECTS\FORTSIMCOE\02_SITE\_WATERSYSTEM\2024WATERSYSTEMIMP\DWGS\C02 -NOTES_LEGEND.DWG;;

AutoCAD SHX Text

SHEET

AutoCAD SHX Text

OF

AutoCAD SHX Text

DESIGNER

AutoCAD SHX Text

STAMPS, LOGOS, AND SEALS

AutoCAD SHX Text

PROJECT NAME

AutoCAD SHX Text

DRAWING TITLE

AutoCAD SHX Text

CHECKED

AutoCAD SHX Text

ARCHIVE NO.

AutoCAD SHX Text

SUB SHEET NO.

AutoCAD SHX Text F

AutoCAD SHX Text O

AutoCAD SHX Text R

AutoCAD SHX Text E

AutoCAD SHX Text S

AutoCAD SHX Text T

AutoCAD SHX Text S

AutoCAD SHX Text E

AutoCAD SHX Text R

AutoCAD SHX Text V

AutoCAD SHX Text I

AutoCAD SHX Text C

AutoCAD SHX Text E

AutoCAD SHX Text D

AutoCAD SHX Text E

AutoCAD SHX Text P

AutoCAD SHX Text A

AutoCAD SHX Text R

AutoCAD SHX Text T

AutoCAD SHX Text M

AutoCAD SHX Text E

AutoCAD SHX Text N

AutoCAD SHX Text T

AutoCAD SHX Text O

AutoCAD SHX Text F

AutoCAD SHX Text A

AutoCAD SHX Text G

AutoCAD SHX Text R

AutoCAD SHX Text I

AutoCAD SHX Text C

AutoCAD SHX Text U

AutoCAD SHX Text L

AutoCAD SHX Text T

AutoCAD SHX Text U

AutoCAD SHX Text R

AutoCAD SHX Text E

SUMMARY OF ESTIMATED QUANTITIES

ITEM NO. ITEM DESCRIPTION PAY UNIT

ESTIMATED

QUANTITY

REMARKS

1 Mobilization

Lump Sum

All

2 Erosion Controls

Lump Sum

All

Utility Locates Lump Sum

All

Construction Signage Lump Sum

All

5 Construct 6" PVC C-900 Waterline

Lump Sum 8,798 Lin. Ft.

Includes trench excavation, pipe, backfill, fittings, thrust blocks, disinfection and testing, and other miscellaneous work associated with installation and interconnection of new water main with existing and new lines.

Not Used Not Used Not Used

Water Service Replacement - Building (All Sizes)

Each 18

Includes verification of existing location, connection to water main, indicated pipe sizes, corporation stops & boxes, connection to existing building service entrance, and when indicated curb valves & boxes. 2 duplexes, Nation Hall, Student Services, Student Health, Education, Gym, Maintenance, Brick Trade, WPO, Dental Storage, Auto, Fuel

Bldg, Heavy Equipment, Trucking, Warehouse, Admin, Carpentry

8 Pavement Restoration

Lump Sum

2450 SF

Quantity is based upon open excavation pipe installation.

Sidewalk Replacement Lump Sum

80 SF

Quantity is based upon open excavation pipe installation.

Fire Hydrant Assembly

Each 7

Includes connection to main, pipe, joints, gate valve, valve box, hydrant.

11 6" Gate Valve With Restrained Joints Each 37

Valves for hydrants are included in fire hydrant assembly item.

Backflow Prevention Valve for Irrigation - up to 3-inch

Each 9

Includes all pipe, elbows, restraints and appurtenances

Double Check Valve Assembly for Irrigation - 4-inch

Each 2

(Includes all pipe, elbows, restraints and appurtenances)

Asbestos Cement Pipe Removal and Disposal Lump Sum

All

Instrumentation Upgrades Lump Sum

All

Water Sampling Stations

Each 2

Includes connection to main, curb valve & box,indicated fittings, riser, vent, housing, and tap.

Well 1 Upgrades Lump Sum

All

Well 2 Upgrades Lump Sum

All

Well 3 Upgrades Lump Sum

All

Reservoir Improvements Lump Sum

All

Fill Station Improvements Lump Sum

All

Includes replacement of valves and valve boxes, connection of existing, fire fill to new water main, and installation of discharge screen.

22 Not Used Not Used Not Used

23 8" Gate Valve With Restrained Joints Each 4

24 TERO Fee

Lump Sum

3 %

BID OPTION A - COMPLETE WATERLINE LOOP ON FORT SIMCOE DRIVE

ITEM NO. ITEM DESCRIPTION PAY UNIT

ESTIMATED

QUANTITY

REMARKS

A1

Construct 6" PVC C-900 Waterline (Includes trench excavation, backfill, fittings, thrust blocks, disinfection and testing)

Lump Sum

828 LINEAR FT.

A2 6" Gate Valve with Restrained Joints Each 1

A3 Pavement Restoration

Lump Sum

81 SF

UNITED STATES

DEPARTMENT OF AGRICULTURE

FOREST SERVICE

DATENO. REVISION / ISSUE

ESTIMATED QUANTITIES

AKANA

D. VALLES, PE

C03

A. GARRISON ,PE 08/2025

JOB CORPS

NATIONAL OFFICE

FORT SIMCOE WATER

SYSTEM

IMPROVEMENTS

FORT SIMCOE JOB CORPS

CIVILIAN CONSERVATION

CENTER

YAKAMA NATION

08/2025 18

AutoCAD SHX Text 10/27/25 12:03 AGARRISON C:\USERS\AGARRISON\BOX\JCENG_PROJECTS\FORTSIMCOE\02_SITE\_WATERSYSTEM\2024WATERSYSTEMIMP\DWGS\C03 -ESTIMATED QUANTITIES.DWG; 12:03 AGARRISON C:\USERS\AGARRISON\BOX\JCENG_PROJECTS\FORTSIMCOE\02_SITE\_WATERSYSTEM\2024WATERSYSTEMIMP\DWGS\C03 -ESTIMATED QUANTITIES.DWG;12:03 AGARRISON C:\USERS\AGARRISON\BOX\JCENG_PROJECTS\FORTSIMCOE\02_SITE\_WATERSYSTEM\2024WATERSYSTEMIMP\DWGS\C03 -ESTIMATED QUANTITIES.DWG; AGARRISON C:\USERS\AGARRISON\BOX\JCENG_PROJECTS\FORTSIMCOE\02_SITE\_WATERSYSTEM\2024WATERSYSTEMIMP\DWGS\C03 -ESTIMATED QUANTITIES.DWG;AGARRISON C:\USERS\AGARRISON\BOX\JCENG_PROJECTS\FORTSIMCOE\02_SITE\_WATERSYSTEM\2024WATERSYSTEMIMP\DWGS\C03 -ESTIMATED QUANTITIES.DWG; C:\USERS\AGARRISON\BOX\JCENG_PROJECTS\FORTSIMCOE\02_SITE\_WATERSYSTEM\2024WATERSYSTEMIMP\DWGS\C03 -ESTIMATED QUANTITIES.DWG;C:\USERS\AGARRISON\BOX\JCENG_PROJECTS\FORTSIMCOE\02_SITE\_WATERSYSTEM\2024WATERSYSTEMIMP\DWGS\C03 -ESTIMATED QUANTITIES.DWG;;

AutoCAD SHX Text

SHEET

AutoCAD SHX Text

OF

AutoCAD SHX Text

DESIGNER

AutoCAD SHX Text

STAMPS, LOGOS, AND SEALS

AutoCAD SHX Text

PROJECT NAME

AutoCAD SHX Text

DRAWING TITLE

AutoCAD SHX Text

CHECKED

AutoCAD SHX Text

ARCHIVE NO.

AutoCAD SHX Text

SUB SHEET NO.

AutoCAD SHX Text F

AutoCAD SHX Text O

AutoCAD SHX Text R

AutoCAD SHX Text E

AutoCAD SHX Text S

AutoCAD SHX Text T

AutoCAD SHX Text S

AutoCAD SHX Text E

AutoCAD SHX Text R

AutoCAD SHX Text V

AutoCAD SHX Text I

AutoCAD SHX Text C

AutoCAD SHX Text E

AutoCAD SHX Text D

AutoCAD SHX Text E

AutoCAD SHX Text P

AutoCAD SHX Text A

AutoCAD SHX Text R

AutoCAD SHX Text T

AutoCAD SHX Text M

AutoCAD SHX Text E

AutoCAD SHX Text N

AutoCAD SHX Text T

AutoCAD SHX Text O

AutoCAD SHX Text F

AutoCAD SHX Text A

AutoCAD SHX Text G

AutoCAD SHX Text R

AutoCAD SHX Text I

AutoCAD SHX Text C

AutoCAD SHX Text U

AutoCAD SHX Text L

AutoCAD SHX Text T

AutoCAD SHX Text U

AutoCAD SHX Text R

AutoCAD SHX Text E

UNITED STATES

DEPARTMENT OF AGRICULTURE

FOREST SERVICE

DATENO. REVISION / ISSUE

PIPE QUANTITY

TAKEOFF

A.G.

D. VALLES, PE

C03.1

A. GARRISON ,PE 08/2025

JOB CORPS

NATIONAL OFFICE

FORT SIMCOE WATER

SYSTEM

IMPROVEMENTS

FORT SIMCOE JOB CORPS

CIVILIAN CONSERVATION

CENTER

YAKAMA NATION

08/2025 20

NEW WATERLINE SCHEMATIC

NO SCALE, EXISTING PIPES/BUILDINGS NOT

SHOWN

NEW 6" WATERLINE (BASE BID), 8,798 LF

HYDRANT, IRRIGATION, AND BUILDING SERVICE CONNECTIONS,

2,020 LF (BUILDING SERVICES), 453 LF (IRRIGATION CONNECTIONS) VARIOUS

SIZES, SEE OTHER SHEETS FOR INDICATED SIZES OR WHERE VERIFICATION IS REQUIRED.

NEW 6" WATERLINE (OPTIONAL BID), 828 LF

GENERAL NOTES

1. DIMENSIONS ARE APPROXIMATE AND TO BE USED FOR CONTRACTOR SCOPING, MINOR DEVIATIONS

TO FOLLOW EXISTING WATER LINE ROUTE, OBSTRUCTION (OTHER UTILITY, SMALL

STRUCTURES/LANDSCAPING, OR OTHER SITE FEATURES) AVOIDANCE, AND OTHER WORK

REQUIRED FOR PROJECT COORDINATION WILL AFFECT FINAL LENGTH OF PIPE REQUIRED.

2. SHORT LINE SEGMENTS NOT SPECIFICALLY DIMENSIONED ARE INCLUDED IN ASSOCIATED LARGER

LINE SEGMENT LENGTH.

3. WATER LINE LOCATED OUTSIDE OF THE DEVELOPED CAMPUS AREA (BETWEEN RESERVOIR AND

WELLS/BUILDINGS, AND ALONG) SHALL FOLLOW EXISTING WATER LINE ROUTE (MINOR OFFSET

ALLOWED) - CONTRACTOR TO VERIFY/LOCATE; AND DISPOSE OF ACM PIPE DISTURBED BY WORK.

4. BUILDING, IRRIGATION, AND TIE IN'S TO EXISTING WATER LINES SHALL BE FIELD VERIFIED AND

ADJUSTED TO ACTUAL CONDITIONS.

1061 LF

905 LF

266 LF

1015 LF

161 LF

265 LF

423 LF

289 LF

422 LF

309 LF

272 LF

235 LF

232 LF

289 LF

279 LF

48 LF

305 LF

130 LF

135 LF

411 LF

276 LF

658 LF

412 LF

208 LF

51 LF

569 LF

20 LF

26 LF

28 LF

38 LF

34 LF

77 LF

82 LF

236 LF

29 LF

90 LF

217 LF

70 LF

26 LF

34 LF

32 LF

22 LF

23 LF

40 LF

148 LF

43 LF

26 LF

105 LF

21 LF

232 LF

17 LF

255 LF

14 LF

10 LF

233 LF

( IN FEET )

GRAPHIC SCALE

250250 500

( IN FEET )

GRAPHIC SCALE

250250 500

( IN FEET )

GRAPHIC SCALE

250250 500

WELL 1

WELL 2

WELL 3

RESERVOIR

(TANKS)

EXISTING 8"

95 LF

37 LF

160 LF

AutoCAD SHX Text H

AutoCAD SHX Text Y

AutoCAD SHX Text D

AutoCAD SHX Text H

AutoCAD SHX Text Y

AutoCAD SHX Text D

AutoCAD SHX Text H

AutoCAD SHX Text Y

AutoCAD SHX Text D

AutoCAD SHX Text H

AutoCAD SHX Text Y

AutoCAD SHX Text D

AutoCAD SHX Text H

AutoCAD SHX Text Y

AutoCAD SHX Text D

AutoCAD SHX Text H

AutoCAD SHX Text Y

AutoCAD SHX Text D

AutoCAD SHX Text H

AutoCAD SHX Text Y

AutoCAD SHX Text D

AutoCAD SHX Text

MAGNETIC

AutoCAD SHX Text 9/15/25 16:28 AGARRISON C:\USERS\AGARRISON\BOX\JCENG_PROJECTS\FORTSIMCOE\02_SITE\_WATERSYSTEM\2024WATERSYSTEMIMP\DWGS\C13 - FIRE HYDRANT AND BACKFLOW PREVENTION VALVE SCHEDULE.DWG; 16:28 AGARRISON C:\USERS\AGARRISON\BOX\JCENG_PROJECTS\FORTSIMCOE\02_SITE\_WATERSYSTEM\2024WATERSYSTEMIMP\DWGS\C13 - FIRE HYDRANT AND BACKFLOW PREVENTION VALVE SCHEDULE.DWG;16:28 AGARRISON C:\USERS\AGARRISON\BOX\JCENG_PROJECTS\FORTSIMCOE\02_SITE\_WATERSYSTEM\2024WATERSYSTEMIMP\DWGS\C13 - FIRE HYDRANT AND BACKFLOW PREVENTION VALVE SCHEDULE.DWG; AGARRISON C:\USERS\AGARRISON\BOX\JCENG_PROJECTS\FORTSIMCOE\02_SITE\_WATERSYSTEM\2024WATERSYSTEMIMP\DWGS\C13 - FIRE HYDRANT AND BACKFLOW PREVENTION VALVE SCHEDULE.DWG;AGARRISON C:\USERS\AGARRISON\BOX\JCENG_PROJECTS\FORTSIMCOE\02_SITE\_WATERSYSTEM\2024WATERSYSTEMIMP\DWGS\C13 - FIRE HYDRANT AND BACKFLOW PREVENTION VALVE SCHEDULE.DWG; C:\USERS\AGARRISON\BOX\JCENG_PROJECTS\FORTSIMCOE\02_SITE\_WATERSYSTEM\2024WATERSYSTEMIMP\DWGS\C13 - FIRE HYDRANT AND BACKFLOW PREVENTION VALVE SCHEDULE.DWG;C:\USERS\AGARRISON\BOX\JCENG_PROJECTS\FORTSIMCOE\02_SITE\_WATERSYSTEM\2024WATERSYSTEMIMP\DWGS\C13 - FIRE HYDRANT AND BACKFLOW PREVENTION VALVE SCHEDULE.DWG;;

AutoCAD SHX Text

SHEET

AutoCAD SHX Text

OF

AutoCAD SHX Text

DESIGNER

AutoCAD SHX Text

STAMPS, LOGOS, AND SEALS

AutoCAD SHX Text

PROJECT NAME

AutoCAD SHX Text

DRAWING TITLE

AutoCAD SHX Text

CHECKED

AutoCAD SHX Text

ARCHIVE NO.

AutoCAD SHX Text

SUB SHEET NO.

AutoCAD SHX Text F

AutoCAD SHX Text O

AutoCAD SHX Text R

AutoCAD SHX Text E

AutoCAD SHX Text S

AutoCAD SHX Text T

AutoCAD SHX Text S

AutoCAD SHX Text E

AutoCAD SHX Text R

AutoCAD SHX Text V

AutoCAD SHX Text I

AutoCAD SHX Text C

AutoCAD SHX Text E

AutoCAD SHX Text D

AutoCAD SHX Text E

AutoCAD SHX Text P

AutoCAD SHX Text A

AutoCAD SHX Text R

AutoCAD SHX Text T

AutoCAD SHX Text M

AutoCAD SHX Text E

AutoCAD SHX Text N

AutoCAD SHX Text T

AutoCAD SHX Text O

AutoCAD SHX Text F

AutoCAD SHX Text A

AutoCAD SHX Text G

AutoCAD SHX Text R

AutoCAD SHX Text I

AutoCAD SHX Text C

AutoCAD SHX Text U

AutoCAD SHX Text L

AutoCAD SHX Text T

AutoCAD SHX Text U

AutoCAD SHX Text R

AutoCAD SHX Text E

GP

GP

GP

S

HB

SSCO

S

GP

GP

S

S

S

S

EM

S

S

S

FP

W

C

R

WCR WCR

WCR

WCR

W

C

R

W

C

R

W

C

R

W

C

R

W

C

R

W

C

R

W

C

R

W

C

R

W

C

R

F

O

R

T

S

I

M

C

O

E

R

O

A

D

U

N

D

E

R

C

O

N

S

T

R

U

C

T

I

O

N

M

A

Y

S

E

E

N

O

T

E

D

R

I

V

E

C

U

T

F

O

R

T

S

I

M

C

O

E

R

O

A

D

B

L

A

N

L

A

N

E

J

O

B

R

P

N

E

V

O

C

A

T

I

O

N

N

E

J

N

E

B

L

A

N

E

J

N

E

J

N

E

F

O

R

T

S

I

M

C

O

E

R

O

A

D

U

N

D

E

R

C

O

N

S

T

R

U

C

T

I

O

N

M

A

Y

S

E

E

N

O

T

E

F

O

R

T

S

I

M

C

O

E

R

O

A

D

U

N

D

E

R

C

O

N

S

T

R

U

C

T

I

O

N

M

A

Y

S

E

E

N

O

T

E

ELECTRIC

METER

F

O

R

T

S

I

M

C

O

E

R

O

A

D

U

N

D

E

R

C

O

N

S

T

R

U

C

T

I

O

N

M

A

Y

S

E

E

N

O

T

E

G

A

T

E

GATE

GRAVEL

PARKING

GRAVEL

PARKING

W

C

R

W

C

R

BLOW-OFF

VALVE

D R I V E

C U

T

D

R

I

V

E

C

U

T

PRV

HEAVY EQUIPMENT

OPERATOR / HEAVY

EQUIPMENT REPAIR

BUILDING

TRUCKING

WAREHOUSE

ADMIN

OFFICE

FUEL

STATION

CARPENTRY

BUILDING

DENTAL

STORAGE

WPO

BUILDING

BRICK TRADE

BUILDING

MAINTENANCE

BUILDING

BUILDING

GYM

BUILDING

STUDENT

SERVICES

CENTER

STUDENT

HEALTH

SERVICES

NATION

HALL

BUILDING

BUILDING

BUILDING

BUILDING

BUILDING

DORM

DORM

FOOD SERVICE

BUILDING

EDUCATION

BUILDING

SHED

FENCE

FUEL

TANKS

STORAGE

OIL SHED

TRACK

COMBINATION SOCCER /

BASEBALL FIELD

HB

HB

BUILDING

AUTO

BUILDING

SSCO

S

S

HB

HB

HB

HB

PIV

''W

''W

''W

''W

''W

''W

''W

''W

''W

''W

''W

''W

''W

''W

''W

''W

''W

''W

''W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W6

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

6''W

6''W

6''W

6''W

6''W

6''W

6''W

6''W

W

W

W

W

W

W

W

W

W

W

W

W

6''W 6''W 6''W

6''W

6''W 6''W

6''W

6''W 6''W 6''W

6''W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W6

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

6''W

6''W

6''W

6''W

6''W

6''W

6''W

6''W

6''W

6''W

6''W

6''W

6''W

6''W

6''W

6''W

6''W

6''W

6''W

6''W

6''W

6''W

6''W

6''W

W

W

W

W

W

W

EROSION CONTROL PLAN

( IN FEET )

GRAPHIC SCALE

150150 300

STABILIZED CONSTRUCTION ENTRANCE

RADIUS =

25' MIN.

SUBGRADE REINFORCEMENT

GEOTEXTILE, AS REQUIRED

QUARRY SPALLS

4" TO 8"

E

X

I

S

T

I

G

V

E

M

E

N

T

P

R

O

V

E

D

A

C

C

E

S

I

N

T

M

I

N

P

R

O

V

I

D

E

F

U

W

D

T

H

O

F

I

N

G

R

E

S

S

E

G

R

E

S

S

A

R

E

A

12" MIN.

DEPTH

N.T.S.

LEGEND:

STRAW WATTLES

CONSTRUCTION NOTES:

STABILIZED CONSTRUCTION ENTRANCE, SEE DETAIL THIS SHEET

STRAW WATTLES PLACED ALONG THE DOWNSTREAM SIDE OF THE

TRENCH OR SOIL STOCKPILE, SEE DETAIL THIS SHEET

CONTRACTOR

STAGING

AREA (10,000

Square Foot)

STRAW WATTLE

N.T.S.

TO BE USED AS THE CONSTRUCTION

ACCESS FOR PROJECT

CONTRACTOR

STAGING

AREA (5,000

Square Foot)

EXISTING WELL HOUSE

AND WELL NO.1

EXISTING WELL HOUSE

AND WELL NO.2 EXISTING BUILDING WITH

ELECTRICAL CONTROLS

EXISTING WELL HOUSE

AND WELL NO.3

UNITED STATES

DEPARTMENT OF AGRICULTURE

FOREST SERVICE

DATENO. REVISION / ISSUE

EROSION CONTROL

AKANA

D. VALLES, PE

C04

A. GARRISON ,PE 08/2025

JOB CORPS

NATIONAL OFFICE

FORT SIMCOE WATER

SYSTEM

IMPROVEMENTS

FORT SIMCOE JOB CORPS

CIVILIAN CONSERVATION

CENTER

YAKAMA NATION

08/2025 18

EROSION CONTROL NOTES:

CONTRACTOR SHALL MONITOR AND MAINTAINE EROSION CONTROL

MEASURES AND EXTEND, MODIFY, AND REPAIR EROSION CONTROL

MEASURES AS REQUIRED TO PROVIDE EFFECTIVE CONTROL OF

EROSION AND SEDIMENTATION.

AutoCAD SHX Text

GPS

AutoCAD SHX Text

GPS

AutoCAD SHX Text

GPS

AutoCAD SHX Text

WV

AutoCAD SHX Text

PROPANE

AutoCAD SHX Text

WV

AutoCAD SHX Text

WV

AutoCAD SHX Text

WV

AutoCAD SHX Text

PROPANE

AutoCAD SHX Text P

AutoCAD SHX Text P

AutoCAD SHX Text P

AutoCAD SHX Text

PROPANE

AutoCAD SHX Text

PROPANE

AutoCAD SHX Text

PROPANE

AutoCAD SHX Text

PROPANE

AutoCAD SHX Text

PROPANE

AutoCAD SHX Text T

AutoCAD SHX Text T

AutoCAD SHX Text T

AutoCAD SHX Text

PROPANE

AutoCAD SHX Text

WV

AutoCAD SHX Text

WV

AutoCAD SHX Text

WV

AutoCAD SHX Text

WV

AutoCAD SHX Text

WV

AutoCAD SHX Text

WV

AutoCAD SHX Text

WV

AutoCAD SHX Text W

AutoCAD SHX Text H

AutoCAD SHX Text Y

AutoCAD SHX Text D

AutoCAD SHX Text H

AutoCAD SHX Text Y

AutoCAD SHX Text D

AutoCAD SHX Text H

AutoCAD SHX Text Y

AutoCAD SHX Text D

AutoCAD SHX Text H

AutoCAD SHX Text Y

AutoCAD SHX Text D

AutoCAD SHX Text H

AutoCAD SHX Text Y

AutoCAD SHX Text D

AutoCAD SHX Text H

AutoCAD SHX Text Y

AutoCAD SHX Text D

AutoCAD SHX Text H

AutoCAD SHX Text Y

AutoCAD SHX Text D

AutoCAD SHX Text

MAGNETIC

AutoCAD SHX Text 10/31/25 11:01 AGARRISON C:\USERS\AGARRISON\BOX\JCENG_PROJECTS\FORTSIMCOE\02_SITE\_WATERSYSTEM\2024WATERSYSTEMIMP\DWGS\C04 - EROSION CONTROL.DWG; 11:01 AGARRISON C:\USERS\AGARRISON\BOX\JCENG_PROJECTS\FORTSIMCOE\02_SITE\_WATERSYSTEM\2024WATERSYSTEMIMP\DWGS\C04 - EROSION CONTROL.DWG;11:01 AGARRISON C:\USERS\AGARRISON\BOX\JCENG_PROJECTS\FORTSIMCOE\02_SITE\_WATERSYSTEM\2024WATERSYSTEMIMP\DWGS\C04 - EROSION CONTROL.DWG; AGARRISON C:\USERS\AGARRISON\BOX\JCENG_PROJECTS\FORTSIMCOE\02_SITE\_WATERSYSTEM\2024WATERSYSTEMIMP\DWGS\C04 - EROSION CONTROL.DWG;AGARRISON C:\USERS\AGARRISON\BOX\JCENG_PROJECTS\FORTSIMCOE\02_SITE\_WATERSYSTEM\2024WATERSYSTEMIMP\DWGS\C04 - EROSION CONTROL.DWG; C:\USERS\AGARRISON\BOX\JCENG_PROJECTS\FORTSIMCOE\02_SITE\_WATERSYSTEM\2024WATERSYSTEMIMP\DWGS\C04 - EROSION CONTROL.DWG;C:\USERS\AGARRISON\BOX\JCENG_PROJECTS\FORTSIMCOE\02_SITE\_WATERSYSTEM\2024WATERSYSTEMIMP\DWGS\C04 - EROSION CONTROL.DWG;;

AutoCAD SHX Text

SHEET

AutoCAD SHX Text

OF

AutoCAD SHX Text

DESIGNER

AutoCAD SHX Text

STAMPS, LOGOS, AND SEALS

AutoCAD SHX Text

PROJECT NAME

AutoCAD SHX Text

DRAWING TITLE

AutoCAD SHX Text

CHECKED

AutoCAD SHX Text

ARCHIVE NO.

AutoCAD SHX Text

SUB SHEET NO.

AutoCAD SHX Text F

AutoCAD SHX Text O

AutoCAD SHX Text R

AutoCAD SHX Text E

AutoCAD SHX Text S

AutoCAD SHX Text T

AutoCAD SHX Text S

AutoCAD SHX Text E

AutoCAD SHX Text R

AutoCAD SHX Text V

AutoCAD SHX Text I

AutoCAD SHX Text C

AutoCAD SHX Text E

AutoCAD SHX Text D

AutoCAD SHX Text E

AutoCAD SHX Text P

AutoCAD SHX Text A

AutoCAD SHX Text R

AutoCAD SHX Text T

AutoCAD SHX Text M

AutoCAD SHX Text E

AutoCAD SHX Text N

AutoCAD SHX Text T

AutoCAD SHX Text O

AutoCAD SHX Text F

AutoCAD SHX Text A

AutoCAD SHX Text G

AutoCAD SHX Text R

AutoCAD SHX Text I

AutoCAD SHX Text C

AutoCAD SHX Text U

AutoCAD SHX Text L

AutoCAD SHX Text T

AutoCAD SHX Text U

AutoCAD SHX Text R

AutoCAD SHX Text E

HB

SSCO

S

GP

GP

S

S

EM

S

S

S

FP

W

C

R

S I D

E W

A L K

SIDEWALK

SIDEWALK

WCR

WCR

W

C

R

W

C

R

W

C

R

W

C

R

W

C

R

W

C

R

W

C

R

W

C

R

W

C

R

W

C

R

S

I

D

E

W

A

L

K

S

I

D

E

W

A

L

K

S

I

D

E

W

A

L

K

S

T

E

P

S

S

I

D

E

W

A

L

K

ASPHALT

SIDEWALK

S

I

D

E

W

A

L

K

SIDEWALK

A

S

P

H

A

T

A

D

F

O

M

C

A

D

B

L

A

N

E

J

N

E

V

O

C

A

T

I

O

N

N

E

S

I

D

E

W

A

L

K

SIDEWALK

S I D

E W

A L K

SIDEWALK

S

I

D

E

W

A

L

K

S

I

D

E

W

A

L

K

A

S

P

H

A

L

T

J

N

E

A

S

P

H

A

L

T

B

L

A

N

E

A

S

P

H

A

L

T

A

S

P

H

A

L

T

A

S

P

H

A

L

T

ASPHALT

ASPHALT

ASPHALT

A

S

P

H

A

L

T

A

S

P

H

A

L

T

S

I

D

E

W

A

K

M

P

S

I

D

E

W

A

L

K

"STOP"

"STOP"

"STOP"

H

TBM W-2

ELEVATION:

1515.64

L

O

A

D

I

N

G

A

R

E

A

A S P H

A L T

S

I

D

E

W

A

L

K

WSI 106

WSI

WSI 108

FLAG

POLE

ELECTRIC

METER

A

S

P

H

A

L

T

S I D

E W

A L K

G

A

TE

"STOP"

W

C

R

W

C

R

BLOW-OFF

VALVE

U

N

K

N

O

W

N

U

T

I

L

I

Y

T

BOLLARDS

D R I V E

C U

T

D

R

I

T

HEAVY EQUIPMENT

OPERATOR / HEAVY

EQUIPMENT REPAIR

BUILDING

TRUCKING

WAREHOUSE

ADMIN

OFFICE

FUEL

STATION

CARPENTRY

BUILDING

DENTAL

STORAGE

WPO

BUILDING

BRICK TRADE

BUILDING

MAINTENANCE

BUILDING

BUILDING

GYM

BUILDING

STUDENT

HEALTH

SERVICES

NATION

HALL

FOOD SERVICE

BUILDING

EDUCATION

BUILDING

SHED

FENCE

FUEL

TANKS

STORAGE

OIL SHED

HB

HB

BUILDING

AUTO

BUILDING

HB

HB

HB

W

W

W

W

W

W

W

''W

''W

''W

''W

''W

''W

''W

''W

W

W

W

W

W

W

W

W

W

W

W

W

6''W 6''W

6''W 6''W

6''W 6''W

6''W 6''W

6''W 6''W

6''W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W6

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

GP

GP

GP

GP

S

HB

SSCO

S

GP

GP

S

S

S

S

EM

S

S

S

FP

W

CR

WCR WCR

WCR

WCR

W

CR

W

CR

W

C

R

W

C

R

W

C

R

W

CR

W

CR

W

CR

W

CR

FORT SIMCOE ROAD

UNDER CONSTRUCTION MAY 2009

SEE NOTE 7

D

R

IV

E

C

U

T

FORT SIM

COE ROAD

BLA

NE L

ANE

JO

B

C

O

R

P

LA

N

E

V

O

C

A

T

IO

N

A

L

L

A

N

E

J

N

E

BLANE LANE

JO

B CO

RP LANE

J

O

B

C

O

R

P

L

A

N

E

FORT SIMCOE ROAD

UNDER CONSTRUCTION MAY 2009

SEE NOTE 7

FORT SIMCOE ROAD

UNDER CONSTRUCTION MAY 2009

SEE NOTE 7

ELECTRIC

METER

FORT SIMCOE ROAD

UNDER CONSTRUCTION MAY 2009

SEE NOTE 7

G

A

T

E

GATE

GRAVEL

PARKING

GRAVEL

PARKING

W

CR

W

C

R

BLOW-OFF

VALVE

D R I V E C

U T

DRIVE CUT

PRV

HEAVY EQUIPMENT

OPERATOR / HEAVY

EQUIPMENT REPAIR

BUILDING

TRUCKING

WAREHOUSE

ADMIN

OFFICE

FUEL

STATION

CARPENTRY

BUILDING

DENTAL

STORAGE

WPO

BUILDING

BRICK TRADE

BUILDING

MAINTENANCE

BUILDING

BUILDING

GYM

BUILDING

STUDENT

SERVICES

CENTER

STUDENT

HEALTH

SERVICES

NATION

HALL

BUILDING

BUILDING

BUILDING

BUILDING

BUILDING

DORM

DORM

FOOD SERVICE

BUILDING

EDUCATION

BUILDING

SHED

FENCE

FUEL

TANKS

STORAGE

OIL SHED

TRACK

COMBINATION SOCCER /

BASEBALL FIELD

HB

HB

BUILDING

AUTO

BUILDING

SSCO

S

S

HB

HB

HB

HB

PIV

8''W

8''W

8''W

8''W

8''W

8''W

8''W

8''W

8''W

8''W

8''W

8''W

8''W

8''W

8''W

8''W

8''W

8''W

8''W

''W

''W

''W

''W

''W

''W

''W

''W

''W

''W

''W

''W

''W

''W

''W

''W

''W

''W

''W

''W

''W

''W

''W

''W

''W

''W

''W

''W

''W6

W

W

W

W

W

W

W

W

W

W

6''W

6''W

6''W

6''W

W

W

W

W

W

W

W

''W

''W

''W

''W

''W

''W

''W

''W

''W

''W

6''W

6''W

6''W

6''W

6''W

6''W

6''W

6''W

''W

''W

''W

''W

''W

''W

''W

W

W

W

W

W

6''W 6''W 6''W 6''W 6''W 6''W 6''W 6''W 6''W 6''W 6''W

''W

''W

''W

''W

''W

''W

''W

''W

''W

''W

''W

''W

''W

''W

''W

''W

''W

''W

''W

''W

''W

''W

''W

''W

''W6

W

W

W

W

W

W

W

W

W

W

W

''W

''W

''W

''W

''W

''W

''W

''W

''W

''W

''W

''W

''W

''W

''W

''W

''W

''W

''W

''W

''W

''W

''W

''W

''W

''W

''W

''W

''W

''W

''W

''W

''W

''W

''W

''W

''W

''W

''W

''W

''W

''W

''W

''W

''W

''W

''W

''W

''W

''W

''W

''W

''W

''W

''W

W

W

W

W

''W

''W

''W

8''W

''W

''W

''W

8''W

''W

''W

8''W

8''W

''W

''W

''W

''W

''W

''W

''W

''W

W

''W

''W

''W

''W

W

W

W

W

6''W

''W

''W

''W

6''W

''W

''W

''W

6''W

''W

''W

''W

''W

6''W

6''W

6''W

6''W

6''W

6''W

6''W

6''W

6''W

6''W

6''W

6''W

6''W

6''W

6''W

6''W

6''W

6''W

6''W

6''W

6''W

6''W

6''W

6''W

''W

''W

''W

''W

''W

''W

EXISTING CONTOUR PLAN - NORTHEAST

( IN FEET )

GRAPHIC SCALE

6060 120

SITE PLAN KEY

( IN FEET )

GRAPHIC SCALE

500500 1000

M A

T C

H L

I N

E

S

MATCHLINE, SEE C08

NEW 6" WATERLINE. SEE

SHEETS C09 THROUGH C12.

EXISTING WELL

HOUSE AND

WELL NO. 3

NEW 6" OPTIONAL WATER LINE

EXTENT OF OPTIONAL 6"

WATER LINE

NOTE: SHEETS C05 THROUGH C08 ARE INTENDED TO SHOW THE OVERALL

SITE AND NEW WATER LINES WITH EXISTING CONTOURS FOR BACKGROUND

INFORMATION PURPOSES. PLEASE SEE SHEETS C09 THROUGH C12 FOR

CONSTRUCTION NOTES REGARDING WATER WORK FOR THIS PROJECT.

UNITED STATES

DEPARTMENT OF AGRICULTURE

FOREST SERVICE

DATENO. REVISION / ISSUE

EXISTING CONTOUR

PLAN - NORTHEAST

AKANA

D. VALLES, PE

C05

A. GARRISON ,PE 08/2025

JOB CORPS

NATIONAL OFFICE

FORT SIMCOE WATER

SYSTEM

IMPROVEMENTS

FORT SIMCOE JOB CORPS

CIVILIAN CONSERVATION

CENTER

YAKAMA NATION

08/2025 20

AutoCAD SHX Text

GPS

AutoCAD SHX Text

GPS

AutoCAD SHX Text

GPS

AutoCAD SHX Text

WV

AutoCAD SHX Text

PROPANE

AutoCAD SHX Text

WV

AutoCAD SHX Text

WV

AutoCAD SHX Text

WV

AutoCAD SHX Text

PROPANE

AutoCAD SHX Text P

AutoCAD SHX Text P

AutoCAD SHX Text P

AutoCAD SHX Text

PROPANE

AutoCAD SHX Text

PROPANE

AutoCAD SHX Text

PROPANE

AutoCAD SHX Text

PROPANE

AutoCAD SHX Text

PROPANE

AutoCAD SHX Text T

AutoCAD SHX Text T

AutoCAD SHX Text

PROPANE

AutoCAD SHX Text

JOB CORP LN.

AutoCAD SHX Text H

AutoCAD SHX Text Y

AutoCAD SHX Text D

AutoCAD SHX Text H

AutoCAD SHX Text Y

AutoCAD SHX Text D

AutoCAD SHX Text H

AutoCAD SHX Text Y

AutoCAD SHX Text D

AutoCAD SHX Text H

AutoCAD SHX Text Y

AutoCAD SHX Text D

AutoCAD SHX Text H

AutoCAD SHX Text Y

AutoCAD SHX Text D

AutoCAD SHX Text H

AutoCAD SHX Text Y

AutoCAD SHX Text D

AutoCAD SHX Text H

AutoCAD SHX Text Y

AutoCAD SHX Text D

AutoCAD SHX Text

GPS

AutoCAD SHX Text

GPS

AutoCAD SHX Text

GPS

AutoCAD SHX Text

WV

AutoCAD SHX Text

PROPANE

AutoCAD SHX Text

WV

AutoCAD SHX Text

WV

AutoCAD SHX Text

WV

AutoCAD SHX Text

PROPANE

AutoCAD SHX Text P

AutoCAD SHX Text P

AutoCAD SHX Text P

AutoCAD SHX Text

PROPANE

AutoCAD SHX Text

PROPANE

AutoCAD SHX Text

PROPANE

AutoCAD SHX Text

PROPANE

AutoCAD SHX Text

PROPANE

AutoCAD SHX Text T

AutoCAD SHX Text T

AutoCAD SHX Text T

AutoCAD SHX Text

PROPANE

AutoCAD SHX Text

WV

AutoCAD SHX Text

WV

AutoCAD SHX Text

WV

AutoCAD SHX Text

WV

AutoCAD SHX Text

WV

AutoCAD SHX Text

WV

AutoCAD SHX Text

WV

AutoCAD SHX Text W

AutoCAD SHX Text H

AutoCAD SHX Text Y

AutoCAD SHX Text D

AutoCAD SHX Text H

AutoCAD SHX Text Y

AutoCAD SHX Text D

AutoCAD SHX Text H

AutoCAD SHX Text Y

AutoCAD SHX Text D

AutoCAD SHX Text H

AutoCAD SHX Text Y

AutoCAD SHX Text D

AutoCAD SHX Text H

AutoCAD SHX Text Y

AutoCAD SHX Text D

AutoCAD SHX Text H

AutoCAD SHX Text Y

AutoCAD SHX Text D

AutoCAD SHX Text H

AutoCAD SHX Text Y

AutoCAD SHX Text D

AutoCAD SHX Text

MAGNETIC

AutoCAD SHX Text 8/28/25 15:58 AGARRISON C:\USERS\AGARRISON\BOX\JCENG_PROJECTS\FORTSIMCOE\02_SITE\_WATERSYSTEM\2024WATERSYSTEMIMP\DWGS\C05-C08 - EXISTING CONTOUR PLANS.DWG; 15:58 AGARRISON C:\USERS\AGARRISON\BOX\JCENG_PROJECTS\FORTSIMCOE\02_SITE\_WATERSYSTEM\2024WATERSYSTEMIMP\DWGS\C05-C08 - EXISTING CONTOUR PLANS.DWG;15:58 AGARRISON C:\USERS\AGARRISON\BOX\JCENG_PROJECTS\FORTSIMCOE\02_SITE\_WATERSYSTEM\2024WATERSYSTEMIMP\DWGS\C05-C08 - EXISTING CONTOUR PLANS.DWG; AGARRISON C:\USERS\AGARRISON\BOX\JCENG_PROJECTS\FORTSIMCOE\02_SITE\_WATERSYSTEM\2024WATERSYSTEMIMP\DWGS\C05-C08 - EXISTING CONTOUR PLANS.DWG;AGARRISON C:\USERS\AGARRISON\BOX\JCENG_PROJECTS\FORTSIMCOE\02_SITE\_WATERSYSTEM\2024WATERSYSTEMIMP\DWGS\C05-C08 - EXISTING CONTOUR PLANS.DWG; C:\USERS\AGARRISON\BOX\JCENG_PROJECTS\FORTSIMCOE\02_SITE\_WATERSYSTEM\2024WATERSYSTEMIMP\DWGS\C05-C08 - EXISTING CONTOUR PLANS.DWG;C:\USERS\AGARRISON\BOX\JCENG_PROJECTS\FORTSIMCOE\02_SITE\_WATERSYSTEM\2024WATERSYSTEMIMP\DWGS\C05-C08 - EXISTING CONTOUR PLANS.DWG;;

AutoCAD SHX Text

SHEET

AutoCAD SHX Text

OF

AutoCAD SHX Text

DESIGNER

AutoCAD SHX Text

STAMPS, LOGOS, AND SEALS

AutoCAD SHX Text

PROJECT NAME

AutoCAD SHX Text

DRAWING TITLE

AutoCAD SHX Text

CHECKED

AutoCAD SHX Text

ARCHIVE NO.

AutoCAD SHX Text

SUB SHEET NO.

AutoCAD SHX Text F

AutoCAD SHX Text O

AutoCAD SHX Text R

AutoCAD SHX Text E

AutoCAD SHX Text S

AutoCAD SHX Text T

AutoCAD SHX Text S

AutoCAD SHX Text E

AutoCAD SHX Text R

AutoCAD SHX Text V

AutoCAD SHX Text I

AutoCAD SHX Text C

AutoCAD SHX Text E

AutoCAD SHX Text D

AutoCAD SHX Text E

AutoCAD SHX Text P

AutoCAD SHX Text A

AutoCAD SHX Text R

AutoCAD SHX Text T

AutoCAD SHX Text M

AutoCAD SHX Text E

AutoCAD SHX Text N

AutoCAD SHX Text T

AutoCAD SHX Text O

AutoCAD SHX Text F

AutoCAD SHX Text A

AutoCAD SHX Text G

AutoCAD SHX Text R

AutoCAD SHX Text I

AutoCAD SHX Text C

AutoCAD SHX Text U

AutoCAD SHX Text L

AutoCAD SHX Text T

AutoCAD SHX Text U

AutoCAD SHX Text R

AutoCAD SHX Text E

GP

GP

S

S

W

C

R

D

R

I

T

C

O

N

C

R

E

T

E

CONCRETE

PAD

A

S

P

H

A

L

T

"STOP"

"STOP"

"35 MPH"

H

C

O

N

C

R

E

T

E

A

S

P

H

A

L

T

A

S

P

H

A

L

T

C

O

N

C

R

E

T

E

P

A

R

K

I

N

G

I

C

K

W

A

L

L

J

N

E

A

S

P

H

A

L

T

J

N

E

A S P H

A L T

S E R V I C E

R O

A D

F

O

M

C

A

D

U

N

D

N

S

T

R

U

C

T

I

S

A

T

E

BUILDING

BUILDING

DORM

DORM

HB

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

GP

GP

GP

GP

S

HB

SSCO

S

GP GP

S

S

S

S

S

S

S

FP

W

CR

WCR WCR

WCR

WCR

W

CR

W

CR

W

C

R

W

C

R

W

C

R

W

CR

W

CR

W

CR

W

CR

FORT SIMCOE ROAD

UNDER CONSTRUCTION MAY 2009

SEE NOTE 7

D

R

IV

E

C

U

T

DECORATIVE

BOULDERS

"STOP"

"STOP"

"35 MPH"

"STOP"

"STOP"

"STOP"

"1

5 M

PH

TBM W-2

ELEVATION:

1515.64

FORT SIMCOE ROAD

UNDER CONSTRUCTION MAY 2009

SEE NOTE 7

FORT SIMCOE ROAD

UNDER CONSTRUCTION MAY 2009

SEE NOTE 7

WSI 106

WSI

WSI 108

16 MAIL BOXES ON

MASONRY POSTS

FLAG

POLE

ELECTRIC

METER

SEE N

OTE 9

FORT SIMCOE ROAD

UNDER CONSTRUCTION MAY 2009

SEE NOTE 7

G

A

T

E

GATE

PROPOSED IR

RIGATION

LINE TO BE IN

STALLED IN

THE FIELD AREA

GRAVEL

PARKING

"STOP"

GRAVEL

PARKING

W

CR

W

C

R

BLOW-OFF

VALVE

S E E N

O T E

U

N

K

N

O

W

N

U

T

IL

IT

Y

C

U

T

EXTENSIVE CONSTRUCTION, "136 BED MALE

& 102 BED CO-ED DORMITORIES, FORT

SIMCOE CIVILIAN CONSERVATION CENTER"

AREA NOT A PART OF THIS SURVEY

LOCATION SHOWN FROM

FEBRUARY 2009 ASBUILTS

EXTENSIVE CONSTRUCTION, "136 BED MALE

& 102 BED CO-ED DORMITORIES, FORT

SIMCOE CIVILIAN CONSERVATION CENTER"

AREA NOT A PART OF THIS SURVEY

LOCATION SHOWN FROM

FEBRUARY 2009 ASBUILTS

S

E

E

N

O

T

E

S

E

E

N

O

T

E

BOLLARDS ~

D R I V E C

U T

DRIVE CUT

WELL NO. 1

STORAGE TANKS

WELL NO. 2

PRV

WELL NO. 3

HEAVY EQUIPMENT

OPERATOR / HEAVY

EQUIPMENT REPAIR

BUILDING

TRUCKING

WAREHOUSE

ADMIN

OFFICE

FUEL

STATION

CARPENTRY

BUILDING

DENTAL

STORAGE

WPO

BUILDING

BRICK TRADE

BUILDING

MAINTENANCE

BUILDING

BUILDING

GYM

BUILDING

STUDENT

SERVICES

CENTER

STUDENT

HEALTH

SERVICES

NATION

HALL

BUILDING

BUILDING

BUILDING

BUILDING

BUILDING

DORM

DORM

FOOD SERVICE

BUILDING

EDUCATION

BUILDING

SHED

FENCE

FUEL

TANKS

STORAGE

OIL SHED

TRACK

COMBINATION SOCCER /

BASEBALL FIELD

HB

HB

BUILDING

AUTO

BUILDING

8''W

8''W

8''W

8''W

8''W

8''W

8''W

8''W

8''W

8''W

8''W

8''W

8''W

8''W

8''W

8''W

8''W

8''W

8''W

''W

''W

''W

''W

''W

''W

''W

''W

''W

''W

''W

''W

''W

''W

''W

''W

''W

''W

''W

''W

''W

''W

''W

''W

''W

''W

''W

''W

''W6

W

W

W

W

W

W

W

W

W

W

6''W

6''W

6''W

6''W

W

W

W

W

W

W

W

''W

''W

''W

''W

''W

''W

''W

''W

''W

''W

6''W

6''W

6''W

6''W

6''W

6''W

6''W

6''W

''W

''W

''W

''W

''W

''W

''W

W

W

W

W

W

6''W 6''W 6''W 6''W 6''W 6''W 6''W 6''W 6''W 6''W 6''W

''W

''W

''W

''W

''W

''W

''W

''W

''W

''W

''W

''W

''W

''W

''W

''W

''W

''W

''W

''W

''W

''W

''W

''W

''W6

W

W

W

W

W

W

W

W

W

W

W

''W

''W

''W

''W

''W

''W

''W

''W

''W

''W

''W

''W

''W

''W

''W

''W

''W

''W

''W

''W

''W

''W

''W

''W

''W

''W

''W

''W

''W

''W

''W

''W

''W

''W

''W

''W

''W

''W

''W

''W

''W

''W

''W

''W

''W

''W

''W

''W

''W

''W

''W

''W

''W

''W

''W

W

W

W

W

''W

''W

8''W

''W

''W

''W

8''W

''W

''W

8''W

8''W

''W

''W

''W

''W

''W

''W

''W

''W

''W

W

''W

''W

''W

''W

W

W

W

W

''W

6''W

6''W

''W

''W

6''W

''W

''W

''W

6''W

''W

''W

''W

6''W

6''W

6''W

6''W

6''W

6''W

6''W

6''W

6''W

6''W

6''W

6''W

6''W

6''W

6''W

6''W

6''W

6''W

6''W

6''W

6''W

6''W

6''W

6''W

''W

''W

''W

''W

''W

''W

EXISTING CONTOUR PLAN - NORTHWEST

( IN FEET )

GRAPHIC SCALE

6060 120

SITE PLAN KEY

( IN FEET )

GRAPHIC SCALE

500500 1000

M A

T C

H L

I N

E

S

MATCHLINE, SEE C07

NEW 6" WATERLINE. SEE

SHEETS C09 THROUGH C12.

EXISTING WELL HOUSE AND

WELL NO. 1

NOTE: SHEETS C05 THROUGH C08 ARE INTENDED TO SHOW THE OVERALL

SITE AND NEW WATER LINES WITH EXISTING CONTOURS FOR BACKGROUND

INFORMATION PURPOSES. PLEASE SEE SHEETS C09 THROUGH C12 FOR

CONSTRUCTION NOTES REGARDING WATER WORK FOR THIS PROJECT.

UNITED STATES

DEPARTMENT OF AGRICULTURE

FOREST SERVICE

DATENO. REVISION / ISSUE

EXISTING CONTOUR

PLAN - NORTHWEST

AKANA

D. VALLES, PE

C06

A. GARRISON ,PE 08/2025

JOB CORPS

NATIONAL OFFICE

FORT SIMCOE WATER

SYSTEM

IMPROVEMENTS

FORT SIMCOE JOB CORPS

CIVILIAN CONSERVATION

CENTER

YAKAMA NATION

08/2025 20

AutoCAD SHX Text T

AutoCAD SHX Text

GPS

AutoCAD SHX Text

GPS

AutoCAD SHX Text

GPS

AutoCAD SHX Text

WV

AutoCAD SHX Text

PROPANE

AutoCAD SHX Text

WV

AutoCAD SHX Text

WV

AutoCAD SHX Text

WV

AutoCAD SHX Text

PROPANE

AutoCAD SHX Text

PROPANE

AutoCAD SHX Text

PROPANE

AutoCAD SHX Text

PROPANE

AutoCAD SHX Text

PROPANE

AutoCAD SHX Text

PROPANE

AutoCAD SHX Text T

AutoCAD SHX Text T

AutoCAD SHX Text T

AutoCAD SHX Text

PROPANE

AutoCAD SHX Text

WV

AutoCAD SHX Text

WV

AutoCAD SHX Text

WV

AutoCAD SHX Text

WV

AutoCAD SHX Text

WV

AutoCAD SHX Text

WV

AutoCAD SHX Text

WV

AutoCAD SHX Text H

AutoCAD SHX Text Y

AutoCAD SHX Text D

AutoCAD SHX Text H

AutoCAD SHX Text Y

AutoCAD SHX Text D

AutoCAD SHX Text H

AutoCAD SHX Text Y

AutoCAD SHX Text D

AutoCAD SHX Text H

AutoCAD SHX Text Y

AutoCAD SHX Text D

AutoCAD SHX Text H

AutoCAD SHX Text Y

AutoCAD SHX Text D

AutoCAD SHX Text H

AutoCAD SHX Text Y

AutoCAD SHX Text D

AutoCAD SHX Text H

AutoCAD SHX Text Y

AutoCAD SHX Text D

AutoCAD SHX Text

MAGNETIC

AutoCAD SHX Text 8/28/25 15:58 AGARRISON C:\USERS\AGARRISON\BOX\JCENG_PROJECTS\FORTSIMCOE\02_SITE\_WATERSYSTEM\2024WATERSYSTEMIMP\DWGS\C05-C08 - EXISTING CONTOUR PLANS.DWG; 15:58 AGARRISON C:\USERS\AGARRISON\BOX\JCENG_PROJECTS\FORTSIMCOE\02_SITE\_WATERSYSTEM\2024WATERSYSTEMIMP\DWGS\C05-C08 - EXISTING CONTOUR PLANS.DWG;15:58 AGARRISON C:\USERS\AGARRISON\BOX\JCENG_PROJECTS\FORTSIMCOE\02_SITE\_WATERSYSTEM\2024WATERSYSTEMIMP\DWGS\C05-C08 - EXISTING CONTOUR PLANS.DWG; AGARRISON C:\USERS\AGARRISON\BOX\JCENG_PROJECTS\FORTSIMCOE\02_SITE\_WATERSYSTEM\2024WATERSYSTEMIMP\DWGS\C05-C08 - EXISTING CONTOUR PLANS.DWG;AGARRISON C:\USERS\AGARRISON\BOX\JCENG_PROJECTS\FORTSIMCOE\02_SITE\_WATERSYSTEM\2024WATERSYSTEMIMP\DWGS\C05-C08 - EXISTING CONTOUR PLANS.DWG; C:\USERS\AGARRISON\BOX\JCENG_PROJECTS\FORTSIMCOE\02_SITE\_WATERSYSTEM\2024WATERSYSTEMIMP\DWGS\C05-C08 - EXISTING CONTOUR PLANS.DWG;C:\USERS\AGARRISON\BOX\JCENG_PROJECTS\FORTSIMCOE\02_SITE\_WATERSYSTEM\2024WATERSYSTEMIMP\DWGS\C05-C08 - EXISTING CONTOUR PLANS.DWG;;

AutoCAD SHX Text

SHEET

AutoCAD SHX Text

OF

AutoCAD SHX Text

DESIGNER

AutoCAD SHX Text

STAMPS, LOGOS, AND SEALS

AutoCAD SHX Text

PROJECT NAME

AutoCAD SHX Text

DRAWING TITLE

AutoCAD SHX Text

CHECKED

AutoCAD SHX Text

ARCHIVE NO.

AutoCAD SHX Text

SUB SHEET NO.

AutoCAD SHX Text F

AutoCAD SHX Text O

AutoCAD SHX Text R

AutoCAD SHX Text E

AutoCAD SHX Text S

AutoCAD SHX Text T

AutoCAD SHX Text S

AutoCAD SHX Text E

AutoCAD SHX Text R

AutoCAD SHX Text V

AutoCAD SHX Text I

AutoCAD SHX Text C

AutoCAD SHX Text E

AutoCAD SHX Text D

AutoCAD SHX Text E

AutoCAD SHX Text P

AutoCAD SHX Text A

AutoCAD SHX Text R

AutoCAD SHX Text T

AutoCAD SHX Text M

AutoCAD SHX Text E

AutoCAD SHX Text N

AutoCAD SHX Text T

AutoCAD SHX Text O

AutoCAD SHX Text F

AutoCAD SHX Text A

AutoCAD SHX Text G

AutoCAD SHX Text R

AutoCAD SHX Text I

AutoCAD SHX Text C

AutoCAD SHX Text U

AutoCAD SHX Text L

AutoCAD SHX Text T

AutoCAD SHX Text U

AutoCAD SHX Text R

AutoCAD SHX Text E

PR

BUILDING

BUILDING

BUILDING

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

''W

''W

''W

''W

''W

''W

''W

''W

''W

''W

''W

''W

''W

''W

''W

''W

''W

''W

''W

''W

''W

''W

''W

''W

W

W

W

W

W

W

GP

GP

GP

GP

S

HB

SSCO

S

GP GP

S

S

S

S

EM

S

S

S

FP

W

CR

C O

N C R E T E

WCR WCR

WCR

WCR

W

CR

W

CR

W

C

R

W

C

R

W

C

R

W

CR

W

CR

W

CR

W

CR

FORT SIMCOE ROAD

UNDER CONSTRUCTION MAY 2009

SEE NOTE 7

D

R

IV

E

C

U

T

C

O

N

C

R

E

T

E

SCATTERED

CONCRETE SLABS

FOR PICNIC TABLES

CONCRETE

PAD

DECORATIVE

BOULDERS

C

O

N

C

R

E

T

E

CONCRETE

ASPHALT

C

O

N

C

R

E

T

E

P

A

D

ASPHALT ROADFORT SIM

COE ROAD

BLA

NE L

ANE

JO

B

C

O

R

P

LA

N

E

V

O

C

A

T

IO

N

A

L

L

A

N

E

CONCRETE

CONCRETE

C

O

N

C

R

E

T

E

CONCRETE

CONCRETE

CONCRETE

C

O

N

C

R

ET

E

C

O

N

C

R

E

T

E

C

O

N

C

R

E

T

E

ASPH

ALT

J

N

E

A

S

P

H

A

L

T

CONCRETE

BLA

NE LA

NE

ASPHALT

ASPHALT

ASPHALTASPHALT

CONCRETE

CONCRETE

CONCRETE

CONCRETE

ASPH

ALT

ASPHALT

ASPHALT

ASPH

ALT

ASPH

ALT

CONCRETE

PATIO

CONCRETE

CO

NCRET

E

CONCRETE

PATIO

HVAC WITH

CYCLONE

ENCLOSURE

CONCRETE

PAD WITH POWER

TRANSFORMER

CONCRETE

PAD

"STOP"

"STOP"

"35 MPH"

"STOP"

"STOP"

"STOP"

"1

5 M

PH

TBM W-2

ELEVATION:

1515.64

CONCRETE

A

S

P

H

A

LT

A

S

P

H

A

L

T

C

O

N

C

R

E

T

E

P

A

R

K

IN

G

JO

B CO

RP LANE

ASPHALT

J

O

B

C

O

R

P

L

A

N

E

FORT SIMCOE ROAD

UNDER CONSTRUCTION MAY 2009

SEE NOTE 7

FORT SIMCOE ROAD

UNDER CONSTRUCTION MAY 2009

SEE NOTE 7

L

O

A

D

IN

G

A

R

E

A

A S P H

A L T

CONCRETE

A S P H

A L T S

E R V I C E

R O

A D

CONCRETE

PAD

CONCRETE

CONCRETE

CONCRETE

WSI 106

WSI

WSI 108

16 MAIL BOXES ON

MASONRY POSTS

FLAG

POLE

ELECTRIC

METER

CONCRETE

PATIO PAD

SEE N

OTE

C

O

N

C

R

E

T

E

ASPH

ALT

FORT SIMCOE ROAD

UNDER CONSTRUCTION MAY 2009

SEE NOTE 7

G

A

T

E

GATE

PROPOSED IR

RIGATION

LINE TO BE IN

STALLED IN

THE FIELD AREA

GRAVEL

PARKING

"STOP"

GRAVEL

PARKING

W

CR

W

C

R

BLOW-OFF

VALVE

S E E N

O T E

U

N

K

N

O

W

N

U

T

IL

IT

Y

C

U

T

EXTENSIVE CONSTRUCTION, "136 BED MALE

& 102 BED CO-ED DORMITORIES, FORT

SIMCOE CIVILIAN CONSERVATION CENTER"

AREA NOT A PART OF THIS SURVEY

LOCATION SHOWN FROM

FEBRUARY 2009 ASBUILTS

EXTENSIVE CONSTRUCTION, "136 BED MALE

& 102 BED CO-ED DORMITORIES, FORT

SIMCOE CIVILIAN CONSERVATION CENTER"

AREA NOT A PART OF THIS SURVEY

LOCATION SHOWN FROM

FEBRUARY 2009 ASBUILTS

S

E

E

N

O

T

E

S

E

E

N

O

T

E

CONCRETE

BOLLARDS

D R I V E C

U T

DRIVE CUT

CONCRETE

WELL NO. 1

STORAGE TANKS

WELL NO. 2

PRV

WELL NO. 3

HEAVY EQUIPMENT

OPERATOR / HEAVY

EQUIPMENT REPAIR

BUILDING

TRUCKING

WAREHOUSE

ADMIN

OFFICE

FUEL

STATION

CARPENTRY

BUILDING

DENTAL

STORAGE

WPO

BUILDING

BRICK TRADE

BUILDING

MAINTENANCE

BUILDING

BUILDING

GYM

BUILDING

STUDENT

SERVICES

CENTER

STUDENT

HEALTH

SERVICES

NATION

HALL

BUILDING

BUILDING

BUILDING

BUILDING

BUILDING

DORM

DORM

FOOD SERVICE

BUILDING

EDUCATION

BUILDING

SHED

FENCE

FUEL

TANKS

STORAGE

OIL SHED

TRACK

COMBINATION SOCCER /

BASEBALL FIELD

HB

HB

BUILDING

AUTO

BUILDING

SSCO

S

S

HB

HB

HB

HB

PIV

8''W

8''W

8''W

8''W

8''W

8''W

8''W

8''W

8''W

8''W

8''W

8''W

8''W

8''W

8''W

8''W

8''W

8''W

8''W

''W

''W

''W

''W

''W

''W

''W

''W

''W

''W

''W

''W

''W

''W

''W

''W

''W

''W

''W

''W

''W

''W

''W

''W

''W

''W

''W

''W

''W6

W

W

W

W

W

W

W

W

W

W

6''W

6''W

6''W

6''W

W

W

W

W

W

W

W

''W

''W

''W

''W

''W

''W

''W

''W

''W

''W

6''W

6''W

6''W

6''W

6''W

6''W

6''W

6''W

''W

''W

''W

''W

''W

''W

''W

W

W

W

W

W

6''W 6''W 6''W 6''W 6''W 6''W 6''W 6''W 6''W 6''W 6''W

''W

''W

''W

''W

''W

''W

''W

''W

''W

''W

''W

''W

''W

''W

''W

''W

''W

''W

''W

''W

''W

''W

''W

''W

''W6

W

W

W

W

W

W

W

W

W

W

W

''W

''W

''W

''W

''W

''W

''W

''W

''W

''W

''W

''W

''W

''W

''W

''W

''W

''W

''W

''W

''W

''W

''W

''W

''W

''W

''W

''W

''W

''W

''W

''W

''W

''W

''W

''W

''W

''W

''W

''W

''W

''W

''W

''W

''W

''W

''W

''W

''W

''W

''W

''W

''W

''W

''W

W

W

W

W

''W

''W

8''W

''W

''W

8''W

8''W

''W

''W

8''W

''W

''W

''W

''W

''W

''W

''W

''W

''W

''W

W

''W

''W

''W

''W

W

W

W

W

''W

''W

6''W

''W

''W

''W

6''W

''W

''W

6''W

6''W

''W

''W

6''W

6''W

6''W

6''W

6''W

6''W

6''W

6''W

6''W

6''W

6''W

6''W

6''W

6''W

6''W

6''W

6''W

6''W

6''W

6''W

6''W

6''W

6''W

6''W

''W

''W

''W

''W

''W

''W

EXISTING CONTOUR PLAN - SOUTHWEST

( IN FEET )

GRAPHIC SCALE

5050 100

SITE PLAN KEY

( IN FEET )

GRAPHIC SCALE

500500 1000

M A

T C

H L

I N

E

S

MATCHLINE, SEE C06

EXISTING

STORAGE

RESERVOIR

NEW 6" WATERLINE. SEE

SHEETS C09 THROUGH C12.

EXISTING WELL HOUSE AND WELL NO. 2

NOTE: SHEETS C05 THROUGH C08 ARE INTENDED TO SHOW THE OVERALL

SITE AND NEW WATER LINES WITH EXISTING CONTOURS FOR BACKGROUND

INFORMATION PURPOSES. PLEASE SEE SHEETS C09 THROUGH C12 FOR

CONSTRUCTION NOTES REGARDING WATER WORK FOR THIS PROJECT.

EXISTING BUILDING WITH ELECTRICAL

CONTROLS

UNITED STATES

DEPARTMENT OF AGRICULTURE

FOREST SERVICE

DATENO. REVISION / ISSUE

EXISTING CONTOUR

PLAN - SOUTHWEST

AKANA

D. VALLES, PE

C07

A. GARRISON ,PE 08/2025

JOB CORPS

NATIONAL OFFICE

FORT SIMCOE WATER

SYSTEM

IMPROVEMENTS

FORT SIMCOE JOB CORPS

CIVILIAN CONSERVATION

CENTER

YAKAMA NATION

08/2025 20

AutoCAD SHX Text

WV

AutoCAD SHX Text

WV

AutoCAD SHX Text

WV

AutoCAD SHX Text

WV

AutoCAD SHX Text

WV

AutoCAD SHX Text

WV

AutoCAD SHX Text

WV

AutoCAD SHX Text W

AutoCAD SHX Text

GPS

AutoCAD SHX Text

GPS

AutoCAD SHX Text

GPS

AutoCAD SHX Text

WV

AutoCAD SHX Text

WV

AutoCAD SHX Text

WV

AutoCAD SHX Text

WV

AutoCAD SHX Text P

AutoCAD SHX Text P

AutoCAD SHX Text P

AutoCAD SHX Text T

AutoCAD SHX Text T

AutoCAD SHX Text T

AutoCAD SHX Text

WV

AutoCAD SHX Text

WV

AutoCAD SHX Text

WV

AutoCAD SHX Text

WV

AutoCAD SHX Text

WV

AutoCAD SHX Text

WV

AutoCAD SHX Text

WV

AutoCAD SHX Text W

AutoCAD SHX Text

JOB CORP LN.

AutoCAD SHX Text

ABELLA LN.

AutoCAD SHX Text H

AutoCAD SHX Text Y

AutoCAD SHX Text D

AutoCAD SHX Text H

AutoCAD SHX Text Y

AutoCAD SHX Text D

AutoCAD SHX Text H

AutoCAD SHX Text Y

AutoCAD SHX Text D

AutoCAD SHX Text H

AutoCAD SHX Text Y

AutoCAD SHX Text D

AutoCAD SHX Text H

AutoCAD SHX Text Y

AutoCAD SHX Text D

AutoCAD SHX Text H

AutoCAD SHX Text Y

AutoCAD SHX Text D

AutoCAD SHX Text H

AutoCAD SHX Text Y

AutoCAD SHX Text D

AutoCAD SHX Text

MAGNETIC

AutoCAD SHX Text 8/28/25 15:58 AGARRISON C:\USERS\AGARRISON\BOX\JCENG_PROJECTS\FORTSIMCOE\02_SITE\_WATERSYSTEM\2024WATERSYSTEMIMP\DWGS\C05-C08 - EXISTING CONTOUR PLANS.DWG; 15:58 AGARRISON C:\USERS\AGARRISON\BOX\JCENG_PROJECTS\FORTSIMCOE\02_SITE\_WATERSYSTEM\2024WATERSYSTEMIMP\DWGS\C05-C08 - EXISTING CONTOUR PLANS.DWG;15:58 AGARRISON C:\USERS\AGARRISON\BOX\JCENG_PROJECTS\FORTSIMCOE\02_SITE\_WATERSYSTEM\2024WATERSYSTEMIMP\DWGS\C05-C08 - EXISTING CONTOUR PLANS.DWG; AGARRISON C:\USERS\AGARRISON\BOX\JCENG_PROJECTS\FORTSIMCOE\02_SITE\_WATERSYSTEM\2024WATERSYSTEMIMP\DWGS\C05-C08 - EXISTING CONTOUR PLANS.DWG;AGARRISON C:\USERS\AGARRISON\BOX\JCENG_PROJECTS\FORTSIMCOE\02_SITE\_WATERSYSTEM\2024WATERSYSTEMIMP\DWGS\C05-C08 - EXISTING CONTOUR PLANS.DWG; C:\USERS\AGARRISON\BOX\JCENG_PROJECTS\FORTSIMCOE\02_SITE\_WATERSYSTEM\2024WATERSYSTEMIMP\DWGS\C05-C08 - EXISTING CONTOUR PLANS.DWG;C:\USERS\AGARRISON\BOX\JCENG_PROJECTS\FORTSIMCOE\02_SITE\_WATERSYSTEM\2024WATERSYSTEMIMP\DWGS\C05-C08 - EXISTING CONTOUR PLANS.DWG;;

AutoCAD SHX Text

SHEET

AutoCAD SHX Text

OF

AutoCAD SHX Text

DESIGNER

AutoCAD SHX Text

STAMPS, LOGOS, AND SEALS

AutoCAD SHX Text

PROJECT NAME

AutoCAD SHX Text

DRAWING TITLE

AutoCAD SHX Text

CHECKED

AutoCAD SHX Text

ARCHIVE NO.

AutoCAD SHX Text

SUB SHEET NO.

AutoCAD SHX Text F

AutoCAD SHX Text O

AutoCAD SHX Text R

AutoCAD SHX Text E

AutoCAD SHX Text S

AutoCAD SHX Text T

AutoCAD SHX Text S

AutoCAD SHX Text E

AutoCAD SHX Text R

AutoCAD SHX Text V

AutoCAD SHX Text I

AutoCAD SHX Text C

AutoCAD SHX Text E

AutoCAD SHX Text D

AutoCAD SHX Text E

AutoCAD SHX Text P

AutoCAD SHX Text A

AutoCAD SHX Text R

AutoCAD SHX Text T

AutoCAD SHX Text M

AutoCAD SHX Text E

AutoCAD SHX Text N

AutoCAD SHX Text T

AutoCAD SHX Text O

AutoCAD SHX Text F

AutoCAD SHX Text A

AutoCAD SHX Text G

AutoCAD SHX Text R

AutoCAD SHX Text I

AutoCAD SHX Text C

AutoCAD SHX Text U

AutoCAD SHX Text L

AutoCAD SHX Text T

AutoCAD SHX Text U

AutoCAD SHX Text R

AutoCAD SHX Text E

PAD

GYM

BUILDING

STUDENT

SERVICES

CENTER

SERVICES

NATION

HALL

TRACK

COMBINATION SOCCER /

BASEBALL FIELD

PIV

W

W

W

W

W

W

W

W

W

GP

GP

GP

GP

S

HB

SSCO

S

GP

GP

S

S

S

S

EM

S

S

S

FP

FORT SIMCOE ROAD

BLA

NE L

ANE

JO

B

C

O

R

P

LA

N

E

V

O

C

A

T

IO

N

A

L

L

A

N

E

J

N

E

BLANE LANE

JO

B CO

RP LANE

J

O

B

C

O

R

P

L

A

N

E

ELECTRIC

METER

G

A

T

E

GATE

BLOW-OFF

VALVE

PRV

HEAVY EQUIPMENT

OPERATOR / HEAVY

EQUIPMENT REPAIR

BUILDING

TRUCKING

WAREHOUSE

ADMIN

OFFICE

FUEL

STATION

CARPENTRY

BUILDING

DENTAL

STORAGE

WPO

BUILDING

BRICK TRADE

BUILDING

MAINTENANCE

BUILDING

BUILDING

GYM

BUILDING

STUDENT

SERVICES

CENTER

STUDENT

HEALTH

SERVICES

NATION

HALL

BUILDING

BUILDING

BUILDING

BUILDING

BUILDING

DORM

DORM

FOOD SERVICE

BUILDING

EDUCATION

BUILDING

SHED

FENCE

FUEL

TANKS

STORAGE

OIL SHED

TRACK

COMBINATION SOCCER /

BASEBALL FIELD

HB

HB

BUILDING

AUTO

BUILDING

SSCO

S

S

HB

HB

HB

HB

PIV

8''W

8''W

8''W

8''W

8''W

8''W

8''W

8''W

8''W

8''W

8''W

8''W

8''W

8''W

8''W

8''W

8''W

8''W

8''W

''W

''W

''W

''W

''W

''W

''W

''W

''W

''W

''W

''W

''W

''W

''W

''W

''W

''W

''W

''W

''W

''W

''W

''W

''W

''W

''W

''W

''W6

W

W

W

W

W

W

W

W

W

W

6''W

6''W

6''W

6''W

W

W

W

W

W

W

W

''W

''W

''W

''W

''W

''W

''W

''W

''W

''W

6''W

6''W

6''W

6''W

6''W

6''W

6''W

6''W

''W

''W

''W

''W

''W

''W

''W

W

W

W

W

W

6''W 6''W 6''W 6''W 6''W 6''W 6''W 6''W 6''W 6''W 6''W

''W

''W

''W

''W

''W

''W

''W

''W

''W

''W

''W

''W

''W

''W

''W

''W

''W

''W

''W

''W

''W

''W

''W

''W

''W6

W

W

W

W

W

W

W

W

W

W

W

''W

''W

''W

''W

''W

''W

''W

''W

''W

''W

''W

''W

''W

''W

''W

''W

''W

''W

''W

''W

''W

''W

''W

''W

''W

''W

''W

''W

''W

''W

''W

''W

''W

''W

''W

''W

''W

''W

''W

''W

''W

''W

''W

''W

''W

''W

''W

''W

''W

''W

''W

''W

''W

''W

''W

W

W

W

W

8''W

''W

''W

''W

8''W

''W

''W

8''W

8''W

''W

''W

8''W

''W

''W

''W

''W

''W

''W

''W

''W

W

''W

''W

''W

''W

W

W

W

W

6''W

''W

''W

6''W

''W

''W

''W

6''W

''W

''W

''W

6''W

''W

6''W

6''W

6''W

6''W

6''W

6''W

6''W

6''W

6''W

6''W

6''W

6''W

6''W

6''W

6''W

6''W

6''W

6''W

6''W

6''W

6''W

6''W

6''W

6''W

''W

''W

''W

''W

''W

''W

EXISTING CONTOUR PLAN - SOUTHEAST

( IN FEET )

GRAPHIC SCALE

5050 100

SITE PLAN KEY

( IN FEET )

GRAPHIC SCALE

500500 1000

M A

T C

H L

I N

E

S

MATCHLINE, SEE C05

IRRIGATION

CONNECTIONS,

TYP.

PRESSURE

INDICATOR VALVE

EXISTING ATHLETIC TRACK

EXISTING BASEBALL FIELD

AND OPEN ATHLETIC FIELD

NEW 6" WATERLINE. SEE

SH…