Attachment 2 - DRAWINGS - Combined.pdf
PDF 11 MB Posted
- Solicitation number
- 36C24724R0083
About this file
This document is a set of drawings titled "Attachment 2 - DRAWINGS - Combined.pdf" related to the federal contract opportunity "Z1DA--PROJECT 544-21-119 INSTALL B10 PORCHES & CHARGING STATIONS", Solicitation Number 36C24724R0083.
The contract opportunity is for the installation of porches and charging stations at facility B10, issued by the Department of Veterans Affairs Veterans Health Administration, Veterans Integrated Service Network 7. The drawings provide detailed specifications and layouts for the project requirements. No other details about the contract opportunity or pricing information are provided in this document.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C24724R0083 0003.docx | DOCX document | |
| PRICE SCHEDULE 02.docx | DOCX document | |
| 36C24724R0083 0002.docx | DOCX document | |
| Answers to RFIs as of - 25 July 2024.docx | DOCX document | |
| 36C24724R0083 0001.docx | DOCX document | |
| Attachment 7 - Two Story Porch Assembly Spec.pdf | ||
| Attachment 1 - STATEMENT OF WORK - SOW.docx | DOCX document | |
| Attachment 6 - Wage Determination .pdf | ||
| Attachment 3 - SPECIFICATIONS - 544-21-119.pdf | ||
| Attachment 5 - Environmental Record Evaluation .docx | DOCX document | |
| 36C24724R0083_1.docx | DOCX document | |
| Attachment 4 - Performance Relevancy Questions.pdf |
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Architects/Engineers/Planners
KMG
1201 Main Street, Suite 2100
Columbia, South Carolina 29201 tel. 803-256-0000 fax 803-255-7243
A S S O C I A T E S, I N C.
Prepared by:
02/20/2024
W.J.B. DORN VA MEDICAL CENTER BLDG 10
REPAIR PORCH SYSTEM AND CHARGING
STATIONS
Project No.: 544-21-119
COLUMBIA, SOUTH CAROLINA
DEPARTMENT OF VETERAN'S AFFAIRS
100% CONSTRUCTION DOCUMENTS FINAL
DRAWING INDEX
CIVIL (NOT USED)
ARCHITECTURAL
FIRE PROTECTION (NOT USED)
MECHANICAL
ELECTRICAL
STRUCTURAL
PLUMBING (NOT USED)
VICINITY MAP
A000 SYMBOLS AND LEGENDS
AS-000 BASEMENT LIFE SAFETY PLAN
AS-011 FIRST FLOOR LIFE SAFETY PLAN
AS-012 SECOND FLOOR LIFE SAFETY PLAN
AS-013 THIRD FLOOR LIFE SAFETY PLAN
AS-201 FIRST FLOOR RENOVATION PLAN
AS-201A ARCHITECTURAL SITE PLAN
AS-202 SECOND FLOOR RENOVATION PLAN
AS-203 THIRD FLOOR RENOVATION PLAN
AS-301 EXTERIOR BUILDING ELEVATIONS
AS-302 EXTERIOR BUILDING ELEVATIONS
AS-303 ENLARGED CANOPY PLAN, ELEVATIONS & SECTIONS
AS-304 ENLARGED CANOPY PLAN, ELEVATIONS & SECTIONS
AS-701 FIRST FLOOR REFLECTED CEILING PLAN & DETAILS
AS-702 SECOND FLOOR REFLECTED CEILING PLANS & DETAILS
M001 MECHANICAL - LEGENDS, NOTES AND DRAWINGS INDEX
M002 MECHANICAL - DETAILS
M003A MECHANICAL - SCHEDULES AND SCHEMATICS
MD100A BASEMENT DEMOLITION PLAN - MECHANICAL
MP100A BASEMENT RENOVATION PLAN - MECHANICAL
E001 ELECTRICAL - SYMBOLS, LEGEND, NOTES AND DRAWING INDEX
E002 ELECTRICAL - DETAILS
E003 ELECTRICAL - RISER DIAGRAM AND PANEL SCHEDULE
EP100 ELECTRICAL - BASEMENT - NEW WORK
EP110 ELECTRICAL - FIRST FLOOR - NEW WORK
S001 GENERAL NOTES & DESIGN CRITERIA
S101 FIRST FLOOR FOUNDATION/ SLAB/ FRAMING PLAN
S103 THIRD FLOOR PLAN
S300 SECTIONS
WJB DORN VERTERANS AFFAIRS MEDICAL CENTER:
6439 GARNERS FERRY RD. COLUMBIA, SC 29209
JSimons Stamp
JSimons Stamp
JSimons Text Box 2/19/24
06100 ROUGH CARPENTRY:
1. See Project Manual
01000 GENERAL
1. The structure reflected on the drawings is structurally sound in its completed condition only. The design of any and all temporary shoring and bracing prior to the completed condition shall be the contractor's responsibility. The Structural Engineer of Record (EOR) shall not be responsible for the means, methods, techniques, sequences, procedures nor safety programs which are empolyed by the contractor to build the completed structure. Any deviations from the completed structure represented in the drawings must be submitted to the EOR for approval in writing.
2. The Contractor shall verify all conditions including exsisting structures (above and below grade) and shall notify of the EOR of any discrepancies. The Contractor shall perform all required field measurements.
3. The Sections and Details shown shall be considered to be typical for all similar conditions. The Contractor shall submit written Requests for Information for areas in question.
Building Code 2021 International Building Code
Building Use Business
Risk Category II
Vertical Loads
Roof Dead Loads (On New Roof) Single-ply membrane/insulation 3 psf Steel Framing 4 psf Suspended Items 5 psf
Live Loads at Roof Occupancy 20 psf Live Load may not be reduced.
Live Loads at Floors Partitions 20 psf Occupancy 100 psf
Snow Loads Ground Snow Load 10 psf Importance Factor 1.0
LATERAL LOADS
Wind Loads Velocity (Ultimate Strength Design) 115 MPH Exposure B Enclosed Building Internal Pressure Coefficient +/-0.18
Components and Cladding (Strength Level Pressures) Wall Components Loads
Zone 4 (Interior Zone) 10 sf -26 psf 50 sf -24 psf 200 sf -22 psf
Zone 5 (Corner Zone) 10 sf -32psf 50 sf -27 psf 200 sf -23 psf
Roof Components Loads (8'-0" band) Zone 1 (Field)
10 sf -26 psf 100sf -24 psf
Zone 2 (Perimeter) 10 sf -43 psf 100sf -33 psf
Zone 3 (Corners) 10 sf -66 psf 100sf -40 psf
Seismic Loads Importance Factor 1.0 Risk Factor Ss, Short Term Spectral Response 0.430 g S1, 1 second Spectral Response 0.146 g Response Modification Coefficient 3 Site Class (Assumed) D Design Category D Sds 0.416 g Sd1 0.215 g
This notes sheet serves to supplement the Project Manual. Any discrepancy between the general notes here and the specifications in the Project Manual should be brought to the attention of the Architect/Engineer in writing.
a r r o w o o d a r r o w o o d
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
CONSTRUCTION
DOCUMENTS
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT
GMK Associates, Inc.
1201 Main Street, Suite 2100 Columbia, SC 29201 803-256-0000 Jerome K. Simons, AIA
STAMPPROGRAM MANAGER
321 4 5 6 7 8 9 10
Odell International 129 Fast Lane, Suite 200 Mooresville, NC 28117 704-401-2040 C. Harmon Reed, Jr. AIA
CONSULTANT
Arrowood & Arrowood, PC 412-B Pettigru Street Greenville, SC 29601 864.233.9383 John Arrowood, PE
N A
A \P ro je c ts
\G M
K A rc h it e c ts
\1
-G M
K -5
V
A B u ild in g \0
P O
R C
H R
E N
O V
A T
IO
N
\S T
R U
C T
P
O R
C H
D
O R
N V
A B
L D
G
B
N
E W
R
.r v t
/1
/2
:4
:3
A
M
S001
GENERAL NOTES & DESIGN
CRITERIA
W.J.B. DORN VA MEDICAL CENTER
BLDG 10 REPAIR PORCH SYSTEM
AND CHARGING STATIONS
COLUMBIA, SOUTH CAROLINA
544-21-119
BUILDING 10
100% CONSTRUCTION
DOCUMENTS FINAL
02/20/2024 AJA SBRevisions: Date:
(L
EXISTING REPAIRED COLUMNS TO
BE REINSTALLED
EXISTING REPAIRED COLUMNS TO
BE REINSTALLED
EXISTING REPAIRED COLUMNS TO
BE REINSTALLED
(MATCH ORIGINAL PLACEMENT)
FIELD DETERMINE
S300 a r r o w o o d a r r o w o o d
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
CONSTRUCTION
DOCUMENTS
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT
GMK Associates, Inc.
1201 Main Street, Suite 2100 Columbia, SC 29201 803-256-0000 Jerome K. Simons, AIA
STAMPPROGRAM MANAGER
321 4 5 6 7 8 9 10
Odell International 129 Fast Lane, Suite 200 Mooresville, NC 28117 704-401-2040 C. Harmon Reed, Jr. AIA
CONSULTANT
Arrowood & Arrowood, PC 412-B Pettigru Street Greenville, SC 29601 864.233.9383 John Arrowood, PE
N A
A \P ro je c ts
\G M
K A rc h it e c ts
\1
-G M
K -5
V
A B u ild in g \0
P O
R C
H R
E N
O V
A T
IO
N
\S T
R U
C T
P
O R
C H
D
O R
N V
A B
L D
G
B
N
E W
R
.r v t
/1
/2
:4
:4
A
M
S101
FIRST FLOOR FOUNDATION/
SLAB/FRAMING PLAN
W.J.B. DORN VA MEDICAL CENTER
BLDG 10 REPAIR PORCH SYSTEM
AND CHARGING STATIONS
COLUMBIA, SOUTH CAROLINA
544-21-119
BUILDING 10
100% CONSTRUCTION
DOCUMENTS FINAL
1/8" = 1'-0"S101
A FIRST FLOOR FOUNDATION/SLAB/FRAMING PLAN
x
R O
O F
C
E
IL
IN
G
J O
IS
T
S
(4)2x10 x
R O
O F
C
E
IL
IN
G
J O
IS
T
S
(4)2x10
2x8 ROOF & CEILING JOISTS
(4)2x10
S300
S300
S300
(4)2x10 BEAM AT SIDES OF PORCHES TO
POCKET INTO WALL. PROVIDE 4" DEEP POCKET.
(TYPICAL)
S300
SIMILAR
S300
SIM.
S300
SIM
2x8 @ 16" O.C.
DOUBLE JOISTS
2x8 @ 16" O.C.
DOUBLE JOISTS
2x8 @ 16" O.C.
DOUBLE JOISTS
2x8 @ 16" O.C.
DOUBLE JOISTS
2x8 @ 16" O.C.
DOUBLE JOISTS
2x8 @ 16" O.C.
DOUBLE JOISTS
PLAN NOTES
1. TOP OF FLOOR SLAB REFERENCE ELEVATION = 23' - 0"
a r r o w o o d a r r o w o o d
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
CONSTRUCTION
DOCUMENTS
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT
GMK Associates, Inc.
1201 Main Street, Suite 2100 Columbia, SC 29201 803-256-0000 Jerome K. Simons, AIA
STAMPPROGRAM MANAGER
321 4 5 6 7 8 9 10
Odell International 129 Fast Lane, Suite 200 Mooresville, NC 28117 704-401-2040 C. Harmon Reed, Jr. AIA
CONSULTANT
Arrowood & Arrowood, PC 412-B Pettigru Street Greenville, SC 29601 864.233.9383 John Arrowood, PE
N A
A \P ro je c ts
\G M
K A rc h it e c ts
\1
-G M
K -5
V
A B u ild in g \0
P O
R C
H R
E N
O V
A T
IO
N
\S T
R U
C T
P
O R
C H
D
O R
N V
A B
L D
G
B
N
E W
R
.r v t
/1
/2
:4
:4
A
M
S103
THIRD FLOOR PLAN W.J.B. DORN VA MEDICAL CENTER
BLDG 10 REPAIR PORCH SYSTEM
AND CHARGING STATIONS
COLUMBIA, SOUTH CAROLINA
544-21-119
BUILDING 10
100% CONSTRUCTION
DOCUMENTS FINAL
1/8" = 1'-0"S103
1 THIRD FLOOR FRAMING PLAN (PORCH ROOF FRAMING PLAN)
(6)16d NAILS (TYPICAL)
2x8 @ 16" O.C.
SIMPSON L70 CLIP ON SIDE OF
EACH JOIST. USE (2) 3/16" TAPCON
SCREWS INTO BRICK @ EACH CLIP.
EXISTING BRICK & CLAY WALL
FRAMING TO ALIGN WITH
AND BEAR IN EXISTING
POCKETS. WRAP ENDS
OF JOISTS WITH 15# FELT.
END PROFILES TO MATCH
EXISTING CONSTRUCTION
AND CATALOGUED TRIM
(4)2x10 SCREWED TO CAP OF COLUMN
W/ 6" TIMBERLOCK SCREW ON EACH
SIDE OF 2x10 CAP.
5/8" WOOD SHEATHING w/ 10d
NAILS @ 6" O.C.
2x6 WALL FROM T/2x10 BEAM TO BASE OF BALLISTRADE. (2x6 @ 16"). ALSO PROVIDE 2x6 BLOCKING UNDER JOISTS
NAILED TO CRIPPLE STUDS
"PAD-OUT" FRAMING SO THAT
FINISHED TRUM WIDTH MATCHES
ORIGINAL WIDTH. SCREW TO 2x6
STUDS W/ (2)#12 SCREWS @ EACH
STUD.
NOTE:
CONTRACTOR, PLEASE REFER TO DRAWING
10-4 FROM ORIGINAL ARCHITECTURAL
SET DATED OCTOBER 1931 FOR REFERENCE
ON MATCHING EXISTING. SEE 2/S300.
BASE TRIM TO BE REPLACED AS REQUIRED
PER PROJECT SPECIFICATIONS.
EXISTING PLINTH
BLOCK
TREATED FOR IN GROUND CONTACT SYP SOLE
PLATE 3" THICKNESS BOLTED TO PLINTH W/ (8)1/2"x6"
LDT ANCHORS (4" EMBEDMENT INTO BLOCK). SCREW
COLUMN TO SOLE PLATE WITH 6" LONG TIMBER
LOK SCREWS (10 SCREWS MINIMUM). SOME SEQUENCING
DISCUSSIONS WITH THE CONTRACTOR WILL BE REQUIRED.
30# FELT ON PLINTH UNDER SOLE PL
6" LONG TIMBERLOCK SCREW
R E
P A
IR
E
D C
O L U
M N
T
O B
E R
E
IN
S T
A L L E
D
REPAIRED COLUMN
2x6 at 16" o.c.
REQUIREMENTS
WIDTH TO MATCH CATALOGUED TRIM
(2) 16D NAILS 2x8 BLOCKING a r r o w o o d a r r o w o o d
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
CONSTRUCTION
DOCUMENTS
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT
GMK Associates, Inc.
1201 Main Street, Suite 2100 Columbia, SC 29201 803-256-0000 Jerome K. Simons, AIA
STAMPPROGRAM MANAGER
321 4 5 6 7 8 9 10
Odell International 129 Fast Lane, Suite 200 Mooresville, NC 28117 704-401-2040 C. Harmon Reed, Jr. AIA
CONSULTANT
Arrowood & Arrowood, PC 412-B Pettigru Street Greenville, SC 29601 864.233.9383 John Arrowood, PE
N A
A \P ro je c ts
\G M
K A rc h it e c ts
\1
-G M
K -5
V
A B u ild in g \0
P O
R C
H R
E N
O V
A T
IO
N
\S T
R U
C T
P
O R
C H
D
O R
N V
A B
L D
G
B
N
E W
R
.r v t
/1
/2
:4
:4
A
M
S300
SECTIONS W.J.B. DORN VA MEDICAL CENTER
BLDG 10 REPAIR PORCH SYSTEM
AND CHARGING STATIONS
COLUMBIA, SOUTH CAROLINA
544-21-119
BUILDING 10
100% CONSTRUCTION
DOCUMENTS FINAL
1" = 1'-0"S300
1 SECTION AT PORCH
02/20/2024 AJA SB
1 1/2" = 1'-0"S300
2 SECTION AT PORCH - ORIGINAL DRAWING FOR REFERENCE
Revisions: Date:
C EQ
B A
A2.1
7' -2
6" 4"
CABINET WIDTH (INCHES)
CABINET WIDTH (INCHES)
LENGTH OF MILLWORK
S T
A N
D A
R D
H E
IG
H
T U
N
LE
S S
O T
H E
R W
IS
E
N O
T E
D
8'-1" MWU
T.O. SEAT
3"=1'-0"3"=1'-0"
A6.025
N.T.S. N.T.S.
N.T.S. 3/8" = 1'-0"
N.T.S.
3/8" = 1'-0"
N.T.S.
1 1/2" = 1'-0"
N.T.S.
REFERENCE SYSTEM
PARTITION SYMBOLS
REFLECTED CEILING PLAN SYMBOLSAND A 1HOUR/NON-RATED WALL
DETAIL AT INTERSECTION OF A 2 HOUR
1 HOUR AND A NON-RATED WALL
DETAIL AT INTERSECTION OF A
FLOOR DIVISION DETAILS TYPICAL BASE DETAILS
ELEVATION CONVENTIONS
INTERIOR
BARRIER-FREE FIXTURE MOUNTING HEIGHTS
DOORS & VIEW WINDOWS
INTERIOR OPENING SYMBOLS
CLOSET MOUNTING HEIGHTS
BARRIER-FREE WATER
GRID CONVENTIONS
STRUCTURAL
PLAN DETAIL
DIMENSION CONVENTIONS
ROOM IDENTIFICATION
WINDOW
SYMBOLS
LOUVER
SYMBOLS
ELEVATION SYMBOL
(LOOKING IN DIRECTION OF ARROW)
OR SLIDING DOOR SYMBOL
ALUMINUM ENTRANCE
THE REFERENCE SYSTEM USES
A NUMBER FOR EACH DETAIL OR
ITEM ON A SHEET COMBINED WITH
THE SHEET NUMBER ON WHICH
IT IS LOCATED. EACH DETAIL OR
ITEM ON A SHEET WILL BE NUMBERED.
E
VIEW WINDOW SYMBOLS (ON PLANS)
COL
COL
COL
TOILET
ROOM NUMBER
CEILING HEIGHT
SURFACE MTD.
LIGHT FIXTURE
8'-0"
1 HOUR FIRE
METAL STUDS
AND/OR SMOKE
WALL CONSTRUCTION
MAINTAIN 1 HOUR
CONSTRUCTION AT
INTERSECTIONS
NON-RATED WALL
CONSTRUCTION
METAL STUDS
AND/OR SMOKE
1 HOUR FIRE
INTERSECTIONS
CONSTRUCTION AT
MAINTAIN 2 HOUR
WALL CONSTRUCTION
AND/OR SMOKE
2 HOUR FIRE
WALL CONSTRUCTION
SECTION
NO.4 ON
SHEET A9.0
A4.0
SECTION
ON SHEET
NO.8
A4.0
A3.0
NO.2
SECTION
A3.0
ON SHEET
A8.0
LARGE SCALE BLOW
UP OF PLAN AREA
LOCATION OF
LARGE SCALE PLAN
INTERIOR
ELEVATION
NO.25
ON SHEET
A6.0
A
ROOM
NAME
ACCESSORY
GROUP
ROOM
NUMBER
WINDOW LOUVERALUMINUM
DOOR NUMBER
A-01
CAP COVE
S.V.
S.V.
SEE SCHEDULE
WALL:
FLOOR:
BASE:
MASONRY
RES. (COVE)
RUBBER
BASE:
FLOOR:
WALL:
C.T.
C.T.
C.T.
BASE:
FLOOR:
WALL:
RES. (FLAT)
CARPET
GWB
LOCKERS
RES. (COVE)
VCT
MILLWORK
RES. (COVE)
VCT
COVE
SUPPORT
BINDING
EDGE
MATCHING
SUPPORT
COVE
CARPET
CARPET
SEE SCHEDULE
RES. (COVE)
GWB/M.B.
VCT
C.T.
GWB
C.T.
NUMBER NUMBER
DETAIL TITLE
FROM THIS SHEET
DETAIL NUMBER
GYP. BD. FASCIA
TYP.
U/C LIGHT
1" FILLER
1" FILLER
ADJUSTABLE SHELVES
COUNTER SINK
THRESHOLD
DOOR
DOOR
CARP.
MARBLE
TAPERED VINYL
EDGE STRIP
CONC. FL.
SEAM UNDER
DOOR
VINYL EDGE
STRIP
CARP. TYPE 2
VCT/SHT.V./
DOOR
RUBBER
VCT/SHT.V./
RUBBER
CARP. TYPE 1
NOTE:
DOOR
UNDER DOOR UNLESS OTHERWISE NOTED.
CENTER SEAMS AND/OR VINYL EDGE STRIPS
L - LEADED
C - CLEAR
VIEW WINDOW FRAME TYPE
GLASS TYPE
M - MIRROR
N - NONE
T - TEMPERED
W - WIRE
SLIDING
WINDOW
Divisions (width of glass)
EQ - ENTIRE WINDOW DIVIDED INTO
Finished Frame Dimensions
LIGHTS OF EQUAL WIDTH
FW - ONE LITE FULL WIDTH OF
AVAILABLE SPACE
ALL GLASS TO BE 1/4"
NOTED:
UNLESS OTHERWISE
(SP) SPECIAL-SEE INTERIOR ELEV.
F - FIRE LITE
ELEVATIONS
SP - SPECIAL - SEE INTERIOR
NUMBERING IS SHOWN ON PLAN.
DETAIL SCALEDETAIL TAKEN
RUBBER
DOOR
VCT/SHT.V./
VCT
UNDER DOOR
TRANSITION STRIP
EXIST. FL.
SHT.V./RUBBER
DOOR
TRANSITION STRIP
UNDER DOOR
FIRE EXTINGUISHER
DENOTES GENERAL PROJECT AREA. SOME WORK MAY OCCUR OUTSIDE
CG-2
2 HOUR FIRE RESISTIVE CONSTRUCTION & SMOKE BARRIER
2 HOUR FIRE RESISTIVE CONSTRUCTION
1 HOUR FIRE RESISTIVE CONSTRUCTION & SMOKE BARRIER
CG-1
PARTITION TYPE (SEE PARTITION SCHEDULE DWG. A8.1)
THICKNESS AND HEIGHT ON SCHEDULE.
LEAD LINED PARTITION. NOTE : NUMBER TO INDICATE
PARTITION:
INDICATED FOR INSTRUCTIONS (ON DEMOLITION PLAN).
EXISTING PARTITION TO BE REMOVED. REFER TO NOTE
1 HOUR FIRE RESISTIVE CONSTRUCTION
SMOKE TIGHT PARTITION (BUT NOT SMOKE RATED.)
MATCH LINE
CORNER GUARD
EXISTING PARTITION TO REMAIN
BG
Lead lined side
CT
BEVEL
RES.
EDGE
(Bumper guard)
PROJECT AREA AS IT IS INDICATED ON FLOOR PLAN.
4/ A
9.
4 HOUR FIRE RESISTIVE CONSTRUCTION
HOUR RATING
FIRE RATING
FIRE / SMOKE RATING
E S
DISPENSER
TOILET PAPER
COMBINATION
DISPENSER/WASTE
PAPER TOWEL
RECEPTACLE
FINISH CEILING
DISPENSER
SOAP
DISPENSER
PAPER TOWEL
REFLECTIVE
BOTTOM OF
SURFACE
MIRROR
DEEP TOE CLEARANCE
9" MIN. HIGH X 6" MIN.
54" MAX. SIDE REACH
HAND DRYER
DISPOSAL
SANITARY
NAPKIN FOUNTAIN
WATER
44" MAX. FORWARD REACH
URINAL
SINK
AS INDICATED.
36" MIN. WIDE AND SIDE
TO APPEAR ON BACK
THAN 36", GRAB BAR
TOILET PART. GREATER
TOILET PART. OF 36" WIDE.,
BOTH SIDE WALLS OF
GRAB BARS TO BE ONNOTE:
DISPENSER
NAPKIN/TAMPON
EXISTING STRUCTURAL
GRID LINE
GRID LINE
NEW STRUCTURAL
NEW STRUCTURE ON
EXISTING STRUCTURAL GRID LINE
HOLD DIMENSION
CLEAR FINISH DIMENSION OR
DIMENSION TO CENTER LINE OF AN
OBJECT OR THE FACE OF A PARTITION
DIMENSION TO STRUCTURAL GRID
CALL
NURSE
GRAB BAR
DISPENSER
TOILET PAPER
FINISH CEILING
4"
4" o r 6"
4" o r 6"
4" o r 6"
4" o r 6"
4" o r 6"
4"
4" o r 6"
4"
1" 3" m ax to
8"59
/2
" 38 to
8"
" 38 m ax
K N
E E
C
LE
A R m in
"34 m ax
P.T.D.
S.D.
6'-4"
6'-4"
6'-4"
12'-0"
12" 42" min.
to
7" min.to 9" max. to p of b ar
3" t o
39" to 41" to
1" m in m in
. t o m ax m in
K N
E E
C
LE
A R
W-1 L-1
3 4 5
6 7 8 9
11 12 13 14
DOOR & FRAME PLAN SYMBOLS
DOOR NUMBERING LEGEND
TOILET
JANITOR
FRAME TO
REMAIN
REPLACE EXIST.
DOOR & FRAME
WITH NEW DOOR
& FRAME.
NEW DOOR
& FRAME IN
NEW OPENING
EXIST DOOR &
ROOMS WITH MULTIPLE DOORS
HAVE "A", "B", ETC. DESIGNATIONS
DOORS SHOWN AT THE RIGHT WOULD
BE SCHEDULED AS "102A" AND
"102B", RELATED TO THE ROOM
WHERE 102A AND 102B
ARE SHOWN.
102A 102B 103
2'-0" x 2'-0" ACOUSTICAL CEILING
24" X 24" MECH. DIFFUSERS AND RETURNS,
SEE MECHANICAL
EXPOSED CONCRETE FLOOR
OR DECK ABOVE, PAINTED
GYPSUM BOARD CEILING
FAUX WOOD ACOUSTIC CEILING
RECESSED LIGHT FIXTURE,
SEE ELECTRICAL
PENDANT LIGHT,
SEE ELECTRICAL
EXIT LIGHT
PROJECT AREA
EXISTING ELEMENT TO BE REMOVED. REFER TO NOTE
INDICATED FOR INSTRUCTIONS (ON DEMOLITION PLAN).
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
CONSTRUCTION
DOCUMENTS
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT
GMK Associates, Inc.
1201 Main Street, Suite 2100 Columbia, SC 29201 803-256-0000 Jerome K. Simons, AIA
STAMPPROGRAM MANAGER
321 4 5 6 7 8 9 10
Odell International 129 Fast Lane, Suite 200 Mooresville, NC 28117 704-401-2040 C. Harmon Reed, Jr. AIA
CONSULTANT
F
.0
O d e ll
W
J B
D o rn B
P o rc h I n s ta lla ti o n a n d
E V
C h a rg in g
S ta ti o n s \D ra w in g s \A rc h
\D O
R N
V A
B L D
G
B
S ta n d
A lo n e
R
.r v t
/1
/2
:2
:3
P
M
A000
SYMBOLS AND LEGENDS W.J.B. DORN VA MEDICAL CENTER
BLDG 10 REPAIR PORCH SYSTEM
AND CHARGING STATIONS
COLUMBIA, SOUTH CAROLINA
544-21-119
BUILDING 10
02/20/2024 JKS
100% CONSTRUCTION
DOCUMENTS FINAL
Rev. No. Revisions: Date:
JSimons Stamp
JSimons Stamp
JSimons
FD
FD
FD
FD
UP
ELECTRICAL
ELEV #2
MECHANICAL
ROOM
CRAWL SPACE
CRAWL SPACE
CRAWL SPACE
AREAWAY
ELEVATOR PIT
AREAWAY
INACCESSIBLE
CRAWL SPACE
INACCESSIBLE
CRAWL SPACE
INACCESSIBLE
CRAWL SPACE
SLAB ON GRADE
CODE DATA :
· VA Directives, Design Manuals, Master Specifications, VA National CAD Standard Application Guide, and other Guidance on the Technical Information Library (TIL) (http://www.cfm.va.gov/til/).
· International Building Code (IBC 2021) (Only when specifically referenced in VA Design Documents. IBC 2021 requirements met when most stringent.)
· NFPA 101 Life Safety Code (see notes below)
· NFPA National Fire Codes with the exception of NFPA 5000 and NFPA 900
· VA Seismic Design Requirements, H-18-8
· National Electrical Code (NEC)
· International Plumbing Code (IPC)
· Safety Code for Elevators and Escalators, American Society of Mechanical Engineers (ASME) A 17.1.
· ASME Boiler and Pressure Vessel Code
· ASME Code for Pressure Piping
· Architectural Barriers Act Accessibility Standards (ABAAS) including VA supplement, Barrier Free Design Guide (PG-18-13)
· Building Code Requirements for Reinforced Concrete, American Concrete Institute and Commentary (ACI 318)
· Manual of Steel Construction, Load and Resistance Factor Design Specifications for Structural Steel Buildings, American Institute of Steel Construction (AISC)
· Energy policy Act of 2005 (EPAct)
· DOE Interim Final Rule: Energy Conservation Standards for New Federal, Commercial and Multi-Family High-Rise Residential Buildings and New Low-Rise Residential Buildings, 10 CFR Parts 433, 434 and 435.
· Ventilation for Acceptable Indoor Air Quality - ASHRAE Standard 62.1- 2004.
· Safety Standard for Refrigeration Systems - ASHRAE Standard 15 - 2007.
Local Codes: As an agency of the federal government, VA is not subject to local imposition of code enforcement procedures (drawing reviews, building permits, inspections, fees, etc.). VA must function as the Authority Having Jurisdiction (AHJ) and thus has the responsibility to guard public health and safety through enforcing its adopted codes. However, local authorities should be notified about planned projects and given opportunity to review drawings provided that VA does not pay for review or inspection fees.
100 GROSS 59.0 (59 PEOPLE)
MEANS OF EGRESS
CORRIDOR WIDTH
(PER IBC SECTION 1005.3.2)
REQUIREDCODE ITEM PROVIDED NOTES
STAIR WIDTH
(PER IBC SECTION 1005.3.1)
MAXIMUM EXIT TRAVEL DISTANCE
(PER IBC TABLE 1017.2)
18" 68" 90 (PEOPLE) X 0.2 = 18"
90 (PEOPLE) X 0.3 = 27"27" 80"
300'
FIRE RESISTANCE RATING OF BLDG ELEMENTS
STRUCTURAL FRAME
(PER IBC TABLE 601)
BEARING WALLS
RATING AS REQUIRED
(IN HOURS)
BUILDING ELEMENT RATING AS DESIGNED
(IN HOURS)
(PER IBC TABLE 601)
EXTERIOR
INTERIOR
NONBEARING WALLS & PARTITIONS
(PER IBC TABLE 601)
EXTERIOR
INTERIOR
FLOOR CONSTRUCTION INCLUDING
SUPPORTING BEAMS & JOISTS
(PER IBC TABLE 601)
ROOF CONSTRUCTION INCLUDING
SUPPORTING BEAMS & JOISTS
(PER IBC TABLE 601)
SHAFT ENCLOSURES
(PER IBC TABLE 713)
NA HR NA HR
0 HR 0 HR
NA HR NA HR
0 HR 0 HR
0 HR 0 HR
0 HR 0 HR
0 HR 0 HR
1 HR 1 HR
BASIC BUILDING CODE INFORMATION
CONSTRUCTION CLASSIFICATION TYPE:
OCCUPANCY GROUP:
VB (SPRINKLED)
B - BUSINESS
BUILDING CODE ANALYSIS
2021 INTERNATIONAL BUILDING CODE
BUILDING GROSS AREA CALCULATION
SUMMARY OF ALL STORIES
1 ST FLOOR (BUSINESS)
2 ND FLOOR (BUSINESS)
3 RD FLOOR (BUSINESS)
TOTAL AREA : (SUMMARY OF ALL STORIES)
8,984 SF
5,902 SF
5,902 SF
BUILDING HEIGHT AND BUILDING AREA
AS DESIGNED
MAX. NO. OF STORIES
IN FEET IN STORIES
AS ALLOWED BY IBC
IN FEET IN STORIES
BLDG. AREA
(PER IBC 504.3 & 506.2)
50' 360' 3
27,000 SF PER STORY 8,984 SF (1ST FLOOR)
20,788 SF
BUILDING DESIGN OCCUPANT LOAD (PER IBC TABLE 1004.5)
1 ST FLOOR (BUSINESS OCCUPANCY) 8,984 SF 100 GROSS
TOTAL
89.8 - (90 PEOPLE)
2 ND FLOOR (BUSINESS OCCUPANCY) 5,902 SF 100 GROSS 59.0 (59 PEOPLE)
208 PEOPLE76, 475 SF
3 RD FLOOR (BUSINESS OCCUPANCY) 5,902 SF
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
CONSTRUCTION
DOCUMENTS
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT
GMK Associates, Inc.
1201 Main Street, Suite 2100 Columbia, SC 29201 803-256-0000 Jerome K. Simons, AIA
STAMPPROGRAM MANAGER
321 4 5 6 7 8 9 10
Odell International 129 Fast Lane, Suite 200 Mooresville, NC 28117 704-401-2040 C. Harmon Reed, Jr. AIA
CONSULTANT
F
.0
O d e ll
W
J B
D o rn B
P o rc h I n s ta lla ti o n a n d
E V
C h a rg in g
S ta ti o n s \D ra w in g s \A rc h
\D O
R N
V A
B L D
G
B
S ta n d
A lo n e
R
.r v t
/1
/2
:2
:3
P
M
AS-000
BASEMENT LIFE SAFETY PLAN W.J.B. DORN VA MEDICAL CENTER
BLDG 10 REPAIR PORCH SYSTEM
AND CHARGING STATIONS
COLUMBIA, SOUTH CAROLINA
544-21-119
BUILDING 10
02/20/2024 JKS
100% CONSTRUCTION
DOCUMENTS FINAL
3/16" = 1'-0"
BASEMENT LIFE SAFETY PLAN
Rev. No. Revisions: Date:
JSimons Stamp
JSimons Stamp
JSimons
UP
VESTIBULE
WC ALCOVE
WAITING
STAIR #1
STAIR #2
TOILET
TOILET
GROUP CARE
NURSE MGR OFFICE
EXT TEAM
CORRIDOR
PHARM D
EXAM EXAM
COMMEXAM
EXAM
TRIAGETRIAGE
PATIENT TLT
BEHAVIORALIST
WORKROOM
CLEAN UTILITY
SOILED UTILITY
EXAMEXAM
STAFF BREAK
STAFF TLT
EXAM EXAM EXAM EXAM SOCIAL WORK
PATIENT TLT
HAC
ELEC
VENDING
LINEN
STORAGE
ELEV #1
REC
PIPE CHASE
BARI SCALE
WORK STATION
AND KIOSK
RECEPTION
KIOSK KIOSK
LOGISTICS
WKSTN
WKSTN
WKSTN
WKSTNWKSTN
WKSTN
WKSTN
WKSTNWKSTN
WKSTN
MEDS
WKSTN
ELEV LOBBY
WC ALCOVE
VESTIBULE
VESTIBULE
HALL
VESTIBULE
ELEV HALL
HALL
RISER
STORAGE
STORAGE
WKSTN
FIRE PUMP
HOUSECHILLER
GENERATOR
EGRESS TUNNELEGRESS TUNNEL
(TRAVEL DISTANCE: (102'-0")
CODE DATA :
· VA Directives, Design Manuals, Master Specifications, VA National CAD Standard Application Guide, and other Guidance on the Technical Information Library (TIL) (http://www.cfm.va.gov/til/).
· International Building Code (IBC 2021) (Only when specifically referenced in VA Design Documents. IBC 2021 requirements met when most stringent.)
· NFPA 101 Life Safety Code (see notes below)
· NFPA National Fire Codes with the exception of NFPA 5000 and NFPA 900
· VA Seismic Design Requirements, H-18-8
· National Electrical Code (NEC)
· International Plumbing Code (IPC)
· Safety Code for Elevators and Escalators, American Society of Mechanical Engineers (ASME) A 17.1.
· ASME Boiler and Pressure Vessel Code
· ASME Code for Pressure Piping
· Architectural Barriers Act Accessibility Standards (ABAAS) including VA supplement, Barrier Free Design Guide (PG-18-13)
· Building Code Requirements for Reinforced Concrete, American Concrete Institute and Commentary (ACI 318)
· Manual of Steel Construction, Load and Resistance Factor Design Specifications for Structural Steel Buildings, American Institute of Steel Construction (AISC)
· Energy policy Act of 2005 (EPAct)
· DOE Interim Final Rule: Energy Conservation Standards for New Federal, Commercial and Multi-Family High-Rise Residential Buildings and New Low-Rise Residential Buildings, 10 CFR Parts 433, 434 and 435.
· Ventilation for Acceptable Indoor Air Quality - ASHRAE Standard 62.1- 2004.
· Safety Standard for Refrigeration Systems - ASHRAE Standard 15 - 2007.
Local Codes: As an agency of the federal government, VA is not subject to local imposition of code enforcement procedures (drawing reviews, building permits, inspections, fees, etc.). VA must function as the Authority Having Jurisdiction (AHJ) and thus has the responsibility to guard public health and safety through enforcing its adopted codes. However, local authorities should be notified about planned projects and given opportunity to review drawings provided that VA does not pay for review or inspection fees.
100 GROSS 59.0 (59 PEOPLE)
MEANS OF EGRESS
CORRIDOR WIDTH
(PER IBC SECTION 1005.3.2)
REQUIREDCODE ITEM PROVIDED NOTES
STAIR WIDTH
(PER IBC SECTION 1005.3.1)
MAXIMUM EXIT TRAVEL DISTANCE
(PER IBC TABLE 1017.2)
18" 68" 90 (PEOPLE) X 0.2 = 18"
90 (PEOPLE) X 0.3 = 27"27" 80"
300'
FIRE RESISTANCE RATING OF BLDG ELEMENTS
STRUCTURAL FRAME
(PER IBC TABLE 601)
BEARING WALLS
RATING AS REQUIRED
(IN HOURS)
BUILDING ELEMENT RATING AS DESIGNED
(IN HOURS)
(PER IBC TABLE 601)
EXTERIOR
INTERIOR
NONBEARING WALLS & PARTITIONS
(PER IBC TABLE 601)
EXTERIOR
INTERIOR
FLOOR CONSTRUCTION INCLUDING
SUPPORTING BEAMS & JOISTS
(PER IBC TABLE 601)
ROOF CONSTRUCTION INCLUDING
SUPPORTING BEAMS & JOISTS
(PER IBC TABLE 601)
SHAFT ENCLOSURES
(PER IBC TABLE 713)
NA HR NA HR
0 HR 0 HR
NA HR NA HR
0 HR 0 HR
0 HR 0 HR
0 HR 0 HR
0 HR 0 HR
1 HR 1 HR
BASIC BUILDING CODE INFORMATION
CONSTRUCTION CLASSIFICATION TYPE:
OCCUPANCY GROUP:
VB (SPRINKLED)
B - BUSINESS
BUILDING CODE ANALYSIS
2021 INTERNATIONAL BUILDING CODE
BUILDING GROSS AREA CALCULATION
SUMMARY OF ALL STORIES
1 ST FLOOR (BUSINESS)
2 ND FLOOR (BUSINESS)
3 RD FLOOR (BUSINESS)
TOTAL AREA : (SUMMARY OF ALL STORIES)
8,984 SF
5,902 SF
5,902 SF
BUILDING HEIGHT AND BUILDING AREA
AS DESIGNED
MAX. NO. OF STORIES
IN FEET IN STORIES
AS ALLOWED BY IBC
IN FEET IN STORIES
BLDG. AREA
(PER IBC 504.3 & 506.2)
50' 360' 3
27,000 SF PER STORY 8,984 SF (1ST FLOOR)
20,788 SF
BUILDING DESIGN OCCUPANT LOAD (PER IBC TABLE 1004.5)
1 ST FLOOR (BUSINESS OCCUPANCY) 8,984 SF 100 GROSS
TOTAL
89.8 - (90 PEOPLE)
2 ND FLOOR (BUSINESS OCCUPANCY) 5,902 SF 100 GROSS 59.0 (59 PEOPLE)
208 PEOPLE76, 475 SF
3 RD FLOOR (BUSINESS OCCUPANCY) 5,902 SF
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
CONSTRUCTION
DOCUMENTS
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT
GMK Associates, Inc.
1201 Main Street, Suite 2100 Columbia, SC 29201 803-256-0000 Jerome K. Simons, AIA
STAMPPROGRAM MANAGER
321 4 5 6 7 8 9 10
Odell International 129 Fast Lane, Suite 200 Mooresville, NC 28117 704-401-2040 C. Harmon Reed, Jr. AIA
CONSULTANT
F
.0
O d e ll
W
J B
D o rn B
P o rc h I n s ta lla ti o n a n d
E V
C h a rg in g
S ta ti o n s \D ra w in g s \A rc h
\D O
R N
V A
B L D
G
B
S ta n d
A lo n e
R
.r v t
/1
/2
:2
:4
P
M
AS-011
FIRST FLOOR LIFE SAFETY PLAN W.J.B. DORN VA MEDICAL CENTER
BLDG 10 REPAIR PORCH SYSTEM
AND CHARGING STATIONS
COLUMBIA, SOUTH CAROLINA
544-21-119
BUILDING 10
02/20/2024 JKS
100% CONSTRUCTION
DOCUMENTS FINAL
3/16" = 1'-0"
FIRST FLOOR LIFE SAFETY PLAN
Rev. No. Revisions: Date:
JSimons Stamp
JSimons Stamp
JSimons
STAIR #1EXAM
STAIR #2
SUBWAIT
CORRIDOR
EXAM
ELEV #1
EXAM
PATIENT TLT
COMM
EXAMEXAMTRIAGE
LINEN
TRIAGE
BEHAVIORALIST
WORKROOM
STAFF TOILET
CLEAN UTILITY
PHARM D
EXAM
EXAM
EXAMEXAM
PATIENT TLT
HAC
EXAM
EXAM
EXAM
SOCIAL WORK
ELEC
SOILED UTILITY
CHUTE
MECH/PIPE
CHASE
REC SCALE
ELEV LOBBY
WKSTN
WKSTN
WKSTN
WKSTN
WKSTN
WKSTN
WKSTN
WKSTN
WKSTNWKSTN
WKSTN
MEDS
ELEV HALL
RISER
(TRAVEL DISTANCE: (102'-0")
ROOF
ROOF
ROOF
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
CONSTRUCTION
DOCUMENTS
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT
GMK Associates, Inc.
1201 Main Street, Suite 2100 Columbia, SC 29201 803-256-0000 Jerome K. Simons, AIA
STAMPPROGRAM MANAGER
321 4 5 6 7 8 9 10
Odell International 129 Fast Lane, Suite 200 Mooresville, NC 28117 704-401-2040 C. Harmon Reed, Jr. AIA
CONSULTANT
F
.0
O d e ll
W
J B
D o rn B
P o rc h I n s ta lla ti o n a n d
E V
C h a rg in g
S ta ti o n s \D ra w in g s \A rc h
\D O
R N
V A
B L D
G
B
S ta n d
A lo n e
R
.r v t
/1
/2
:2
:4
P
M
AS-012
SECOND FLOOR LIFE SAFETY
PLAN
W.J.B. DORN VA MEDICAL CENTER
BLDG 10 REPAIR PORCH SYSTEM
AND CHARGING STATIONS
COLUMBIA, SOUTH CAROLINA
544-21-119
BUILDING 10
02/20/2024 JKS
100% CONSTRUCTION
DOCUMENTS FINAL
3/16" = 1'-0"
SECOND FLOOR LIFE SAFETY PLAN
Rev. No. Revisions: Date:
JSimons Stamp
JSimons Stamp
JSimons
ROOF BELOW
STAIR #1
COMM
STAIR #2
CORRIDOR
SUBWAIT
EXAM
ELEV #1
EXAM
PATIENT TLT
EXAMEXAMTRIAGE
LINEN
TRIAGE
BEHAVIORALIST
WORKROOM
STAFF TOILET
CLEAN UTILITY
PHARM DEXAM
EXAM
EXAMEXAM
PATIENT TLT
HAC
EXAM
EXAM
EXAM EXAM SOCIAL WORK
ELEC
SOILED UTILITY
CHUTE
MECH/PIPE
CHASE
REC SCALE
WKSTN
WKSTN
MEDS
WKSTN
WKSTN
WKSTN
WKSTN
WKSTN
WKSTN
WKSTNWKSTN
WKSTN
ELEV LOBBY
ELEV HALL
RISER
HALL
(TRAVEL DISTANCE: (102'-0")
ROOF BELOW
NEW ROOF BELOW
NEW ROOF BELOW
NEW ROOF BELOW
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
CONSTRUCTION
DOCUMENTS
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT
GMK Associates, Inc.
1201 Main Street, Suite 2100 Columbia, SC 29201 803-256-0000 Jerome K. Simons, AIA
STAMPPROGRAM MANAGER
321 4 5 6 7 8 9 10
Odell International 129 Fast Lane, Suite 200 Mooresville, NC 28117 704-401-2040 C. Harmon Reed, Jr. AIA
CONSULTANT
F
.0
O d e ll
W
J B
D o rn B
P o rc h I n s ta lla ti o n a n d
E V
C h a rg in g
S ta ti o n s \D ra w in g s \A rc h
\D O
R N
V A
B L D
G
B
S ta n d
A lo n e
R
.r v t
/1
/2
:2
:4
P
M
AS-013
THIRD FLOOR LIFE SAFETY PLAN W.J.B. DORN VA MEDICAL CENTER
BLDG 10 REPAIR PORCH SYSTEM
AND CHARGING STATIONS
COLUMBIA, SOUTH CAROLINA
544-21-119
BUILDING 10
02/20/2024 JKS
100% CONSTRUCTION
DOCUMENTS FINAL
3/16" = 1'-0"
THIRD FLOOR LIFE SAFETY PLAN
Rev. No. Revisions: Date:
JSimons Stamp
JSimons Stamp
JSimons
UPUP
12368910
GG
FF
DD
HH
AA
B B
CC
1213141516
EE
PC3
PC2
PC1
PC4 PC5 PC6 PC7
B.4
B.1
C.4
C.9
12.8 12.5 12.4 12.2 12.1 11.1
PCB
PCA
PCA
AS-302 2
AS-301
AS-302
AS-301
VESTIBULE
WC ALCOVE
WAITING
STAIR #1
STAIR #2
TOILET
TOILET
GROUP CARE
NURSE MGR OFFICE
EXT TEAM
CORRIDOR
PHARM D
EXAM EXAM
COMMEXAM
EXAM
TRIAGETRIAGE
PATIENT TLT
BEHAVIORALIST
WORKROOM
CLEAN UTILITY
SOILED UTILITY
EXAMEXAM
STAFF BREAK
STAFF TLT
EXAM EXAM EXAM EXAM SOCIAL WORK
PATIENT TLT
HAC
ELEC
VENDING
LINEN
STORAGE
ELEV #1
ELEV #2
REC
BARI SCALE
WORK STATION
AND KIOSK
RECEPTION
KIOSK KIOSK
LOGISTICS
WKSTN
WKSTN
WKSTN
WKSTNWKSTN
WKSTN
WKSTN
WKSTNWKSTN
WKSTN
MEDS
WKSTN
ELEV LOBBY
WC ALCOVE
VESTIBULE
VESTIBULE
HALL
VESTIBULE
ELEV HALL
HALL
RISER
STORAGE
STORAGE
WKSTN
C
C
C
C
54444
5 4
FIRE PUMP
HOUSECHILLER
GENERATOR
AS-303
AS-303
AS-303
1. REFER TO SHEET A000 FOR GENERAL NOTES, SYMBOLS, LEGENDS AND
DETAILS.
2. PROVIDE PROTECTED EGRESS PATH FROM EAST AND WEST EXITS AS
INDICATED. CONTRACTOR IS TO INSURE COVERED PATH PROVIDES
ENOUGH PROTECTION THROUGH WORK AREA
3. SEE SHEET AS-304 FOR WALL TYPES.
GENERAL NOTES:
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
CONSTRUCTION
DOCUMENTS
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT
GMK Associates, Inc.
1201 Main Street, Suite 2100 Columbia, SC 29201 803-256-0000 Jerome K. Simons, AIA
STAMPPROGRAM MANAGER
321 4 5 6 7 8 9 10
Odell International 129 Fast Lane, Suite 200 Mooresville, NC 28117 704-401-2040 C. Harmon Reed, Jr. AIA
CONSULTANT
F
.0
O d e ll
W
J B
D o rn B
P o rc h I n s ta lla ti o n a n d
E V
C h a rg in g
S ta ti o n s \D ra w in g s \A rc h
\D O
R N
V A
B L D
G
B
S ta n d
A lo n e
R
.r v t
/1
/2
:2
:5
P
M
AS-201
FIRST FLOOR RENOVATION PLAN W.J.B. DORN VA MEDICAL CENTER
BLDG 10 REPAIR PORCH SYSTEM
AND CHARGING STATIONS
COLUMBIA, SOUTH CAROLINA
544-21-119
BUILDING 10
02/20/2024 JKS
100% CONSTRUCTION
DOCUMENTS FINAL
3/16" = 1'-0"
FIRST FLOOR RENOVATION PLAN
RENOVATION KEYED NOTES
KEY NUMBER DESCRIPTION
1 NOT USED
2 NOT USED
3 REINSTALL FAUX WOOD PILASTER. PREPARE WOOD SUBSTRATE
AS NECESSARY FOR FINISH PAINTING. SEAL ALL JOINTS. FILL
ALL NAIL HOLES AND APPLY TWO COATS OF PAINT. INSTALL PER
OWNER PROVIDED INVENTORY. PROVIDE TREATED WOOD
NAILERS AS NECESSARY FOR INSTALLTION
4 REINSTALL HISTORIC STRUCTURAL WOOD COLUMNS. SEAL ALL
JOINTS. FILL ALL NAIL HOLES AND APPLY TO COATS OF PAINT.
5 REINSTALL ORNAMENTAL RAIL. REMOVE PEELING/FLAKING
PAINT, PRIME AND PAINT COLOR AS SELECTED BY ARCHITECT
6 TEMPORARY WOOD FRAMED AND PLYWOOD COVERED
CONSTRUCTION ENTRANCE. APPLY PEEL AND STICK TO
PLYWOOD ROOF
7 CONTRACTOR LAYDOWN SPACE. PLACE PLYWOOD OVER ALL
PORTIONS OF NEW PARKING LOT BEING USED AS PART OF
LAYDOWN AREA
8 CONCRETE CURB, GUTTER AND SIDEWALK TO REMAIN. BORE
UNDER CURB TO ALLOW INSTALLATION OF ELECTRICAL
CONDUITS
9 CUT ASPHALT AS INDICATED TO ALLOW INSTALLATION OF NEW
ELECTRICAL. REFER TO ELECTRICAL DRAWINGS FOR DETAILS.
PATCH ASPHALT AS DETAILED. INSTALL ASPHALT SEALER OVER
ENTIRE AREA
10 STRIPE PARKING LOT AS INDICATED
AND TO MATCH EXISTING.
11 NOT USED
12 COPPER COPING CAP SLOPED TO OUTSIDE FACE OF ROOF AREA
13 REINSTALL HISTORIC WOOD BALLUSTRADE.PREPARE WOOD
SUBSTRATE AS NECESSARY FOR FINISH PAINTING. SEAL ALL
JOINTS. FILL ALL NAIL HOLES AND APPLY TO COATS OF PAINT.
14 NEW SINGLE PLY TPO ROOF MEMBRANE. SLOPE TO SCUPPERS
AS INDICATED.
15 REINSTALL HISTORIC WOOD CORNICE TRIM AND MOLDING.
PREPARE WOOD SUBSTRATE AS NECESSARY FOR FINISH
PAINTING. SEAL ALL JOINTS. FILL ALL NAIL HOLES AND APPLY
TWO COATS OF PAINT. INSTALL TRIM AS DIRECTED BY OWNER
PROVIDED INVENTORY OF HISTORIC WOOD TRIM
16 PAINTED SMOOTH FINISHED PORTLAND CEMENT PLASTER
CEILING ON METAL LATH
17 NEW COPPER SCUPPER. OUTFALL TO DOWNSPOUT COLLECTOR,
SEE 3/AS-304.
18 PENDANT LIGHT, CONTRACTOR TO PROVIDE TEMPORARY
POWER AS NECESSARY
Rev. No. Revisions: Date:
JSimons Stamp
JSimons Stamp
JSimons
VESTIBULE
WC ALCOVE
WAITING
STAIR #1STAIR #2
TOILET
TOILET
GROUP CARE
NURSE MGR OFFICE
EXT TEAM
CORRIDOR
PHARM D
EXAM EXAM
COMMEXAM
EXAMTRIAGETRIAGE
PATIENT TLT
BEHAVIORALIST
WORKROOM
CLEAN UTILITY
SOILED UTILITY
EXAMEXAMSTAFF BREAK
STAFF TLT
EXAM EXAM EXAM EXAM SOCIAL WORK
PATIENT TLT
HAC
ELEC
VENDING
LINEN
STORAGE
ELEV #1
ELEV #2
REC
BARI SCALE
RECEPTION
LOGISTICS
WKSTN
WKSTN
WKSTN
WKSTNWKSTN
WKSTN
MEDS
WKSTN
ELEV LOBBY
WC ALCOVE
VESTIBULE
VESTIBULE
HALL
VESTIBULE
ELEV HALL
HALL
RISER
STORAGE
STORAGE
'-6
/4
AS-201A
FIRE PUMP
HOUSECHILLER
GENERATOR23'-7 3/4" 5'-11"
1. REFER TO SHEET A000 FOR GENERAL NOTES, SYMBOLS, LEGENDS AND
DETAILS.
2. PROVIDE PROTECTED EGRESS PATH FROM EAST AND WEST EXITS AS
INDICATED. CONTRACTOR IS TO INSURE COVERED PATH PROVIDES
ENOUGH PROTECTION THROUGH WORK AREA
3. SEE SHEET AS-304 FOR WALL TYPES.
GENERAL NOTES:
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
CONSTRUCTION
DOCUMENTS
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT
GMK Associates, Inc.
1201 Main Street, Suite 2100 Columbia, SC 29201 803-256-0000 Jerome K. Simons, AIA
STAMPPROGRAM MANAGER
321 4 5 6 7 8 9 10
Odell International 129 Fast Lane, Suite 200 Mooresville, NC 28117 704-401-2040 C. Harmon Reed, Jr. AIA
CONSULTANT
F
.0
O d e ll
W
J B
D o rn B
P o rc h I n s ta lla ti o n a n d
E V
C h a rg in g
S ta ti o n s \D ra w in g s \A rc h
\D O
R N
V A
B L D
G
B
S ta n d
A lo n e
R
.r v t
/1
/2
:2
:2
P
M
AS-201A
ARCHITECTURAL SITE PLAN W.J.B. DORN VA MEDICAL CENTER
BLDG 10 REPAIR PORCH SYSTEM
AND CHARGING STATIONS
COLUMBIA, SOUTH CAROLINA
544-21-119
BUILDING 10
02/20/2024 JKS
100% CONSTRUCTION
DOCUMENTS FINAL
3/32" = 1'-0"
ARCHITECTURAL SITE PLAN
1/8" = 1'-0"
ASPHALT PATCH DETAIL AND NOTES
RENOVATION KEYED NOTES
KEY NUMBER DESCRIPTION
1 NOT USED
2 NOT USED
3 REINSTALL FAUX WOOD PILASTER. PREPARE WOOD SUBSTRATE
AS NECESSARY FOR FINISH PAINTING. SEAL ALL JOINTS. FILL
ALL NAIL HOLES AND APPLY TWO COATS OF PAINT. INSTALL PER
OWNER PROVIDED INVENTORY. PROVIDE TREATED WOOD
NAILERS AS NECESSARY FOR INSTALLTION
4 REINSTALL HISTORIC STRUCTURAL WOOD COLUMNS. SEAL ALL
JOINTS. FILL ALL NAIL HOLES AND APPLY TO COATS OF PAINT.
5 REINSTALL ORNAMENTAL RAIL. REMOVE PEELING/FLAKING
PAINT, PRIME AND PAINT COLOR AS SELECTED BY ARCHITECT
6 TEMPORARY WOOD FRAMED AND PLYWOOD COVERED
CONSTRUCTION ENTRANCE. APPLY PEEL AND STICK TO
PLYWOOD ROOF
7 CONTRACTOR LAYDOWN SPACE. PLACE PLYWOOD OVER ALL
PORTIONS OF NEW PARKING LOT BEING USED AS PART OF
LAYDOWN AREA
8 CONCRETE CURB, GUTTER AND SIDEWALK TO REMAIN. BORE
UNDER CURB TO ALLOW INSTALLATION OF ELECTRICAL
CONDUITS
9 CUT ASPHALT AS INDICATED TO ALLOW INSTALLATION OF NEW
ELECTRICAL. REFER TO ELECTRICAL DRAWINGS FOR DETAILS.
PATCH ASPHALT AS DETAILED. INSTALL ASPHALT SEALER OVER
ENTIRE AREA
10 STRIPE PARKING LOT AS INDICATED
AND TO MATCH EXISTING.
11 NOT USED
12 COPPER COPING CAP SLOPED TO OUTSIDE FACE OF ROOF AREA
13 REINSTALL HISTORIC WOOD BALLUSTRADE.PREPARE WOOD
SUBSTRATE AS NECESSARY FOR FINISH PAINTING. SEAL ALL
JOINTS. FILL ALL NAIL HOLES AND APPLY TO COATS OF PAINT.
14 NEW SINGLE PLY TPO ROOF MEMBRANE. SLOPE TO SCUPPERS
AS INDICATED.
15 REINSTALL HISTORIC WOOD CORNICE TRIM AND MOLDING.
PREPARE WOOD SUBSTRATE AS NECESSARY FOR FINISH
PAINTING. SEAL ALL JOINTS. FILL ALL NAIL HOLES AND APPLY
TWO COATS OF PAINT. INSTALL TRIM AS DIRECTED BY OWNER
PROVIDED INVENTORY OF HISTORIC WOOD TRIM
16 PAINTED SMOOTH FINISHED PORTLAND CEMENT PLASTER
CEILING ON METAL LATH
17 NEW COPPER SCUPPER. OUTFALL TO DOWNSPOUT COLLECTOR,
SEE 3/AS-304.
18 PENDANT LIGHT, CONTRACTOR TO PROVIDE TEMPORARY
POWER AS NECESSARY
Rev. No. Revisions: Date:
EXISTING LIGHT POLE
EXISTING LIGHT POLE
JSimons Stamp
JSimons Stamp
JSimons
12368910
GG
FF
DD
HH
AA
B B
CC
1213141516
EE
PC3
PC2
PC1
PC4 PC5 PC6 PC7
B.4 B.4
B.1 B.1
C.4 C.4
C.9 C.9
12.8 12.5 12.4 12.2 12.1 11.1
PCB
PCA
AS-302 2
AS-301
AS-302
AS-301
STAIR #1EXAM
STAIR #2
SUBWAIT
CORRIDOR
EXAM
ELEV #1
EXAM
PATIENT TLT
COMM
EXAMEXAMTRIAGE
LINEN
TRIAGE
BEHAVIORALIST
WORKROOM
STAFF TOILET
CLEAN UTILITY
PHARM D
EXAM
EXAM
EXAMEXAM
PATIENT TLT
HAC
EXAM
EXAM
EXAM
SOCIAL WORK
ELEC
SOILED UTILITY
CHUTE
MECH/PIPE
CHASE
REC SCALE
ELEV LOBBY
WKSTN
WKSTN
WKSTN
WKSTN
WKSTN
WKSTN
WKSTN
WKSTN
WKSTNWKSTN
WKSTN
MEDS
ELEV HALL
RISER
AS-303
AS-303
AS-303
1. REFER TO SHEET A000 FOR GENERAL NOTES, SYMBOLS, LEGENDS AND
DETAILS.
2. PROVIDE PROTECTED EGRESS PATH FROM EAST AND WEST EXITS AS
INDICATED. CONTRACTOR IS TO INSURE COVERED PATH PROVIDES
ENOUGH PROTECTION THROUGH WORK AREA
3. SEE SHEET AS-304 FOR WALL TYPES.
GENERAL NOTES:
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
CONSTRUCTION
DOCUMENTS
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT
GMK Associates, Inc.
1201 Main Street, Suite 2100 Columbia, SC 29201 803-256-0000 Jerome K. Simons, AIA
STAMPPROGRAM MANAGER
321 4 5 6 7 8 9 10
Odell International 129 Fast Lane, Suite 200 Mooresville, NC 28117 704-401-2040 C. Harmon Reed, Jr. AIA
CONSULTANT
F
.0
O d e ll
W
J B
D o rn B
P o rc h I n s ta lla ti o n a n d
E V
C h a rg in g
S ta ti o n s \D ra w in g s \A rc h
\D O
R N
V A
B L D
G
B
S ta n d
A lo n e
R
.r v t
/1
/2
:2
:3
P
M
AS-202
SECOND FLOOR RENOVATION
PLAN
W.J.B. DORN VA MEDICAL CENTER
BLDG 10 REPAIR PORCH SYSTEM
AND CHARGING STATIONS
COLUMBIA, SOUTH CAROLINA
544-21-119
BUILDING 10
02/20/2024 JKS
100% CONSTRUCTION
DOCUMENTS FINAL
1/11/2019
3/16" = 1'-0"
SECOND FLOOR RENOVATION PLAN
RENOVATION KEYED NOTES
KEY NUMBER DESCRIPTION
1 NOT USED
2 NOT USED
3 REINSTALL FAUX WOOD PILASTER. PREPARE WOOD SUBSTRATE
AS NECESSARY FOR FINISH PAINTING. SEAL ALL JOINTS. FILL
ALL NAIL HOLES AND APPLY TWO COATS OF PAINT. INSTALL PER
OWNER PROVIDED INVENTORY. PROVIDE TREATED WOOD
NAILERS AS NECESSARY FOR INSTALLTION
4 REINSTALL HISTORIC STRUCTURAL WOOD COLUMNS. SEAL ALL
JOINTS. FILL ALL NAIL HOLES AND APPLY TO COATS OF PAINT.
5 REINSTALL ORNAMENTAL RAIL. REMOVE PEELING/FLAKING
PAINT, PRIME AND PAINT COLOR AS SELECTED BY ARCHITECT
6 TEMPORARY WOOD FRAMED AND PLYWOOD COVERED
CONSTRUCTION ENTRANCE. APPLY PEEL AND STICK TO
PLYWOOD ROOF
7 CONTRACTOR LAYDOWN SPACE. PLACE PLYWOOD OVER ALL
PORTIONS OF NEW PARKING LOT BEING USED AS PART OF
LAYDOWN AREA
8 CONCRETE CURB, GUTTER AND SIDEWALK TO REMAIN. BORE
UNDER CURB TO ALLOW INSTALLATION OF ELECTRICAL
CONDUITS
9 CUT ASPHALT AS INDICATED TO ALLOW INSTALLATION OF NEW
ELECTRICAL. REFER TO ELECTRICAL DRAWINGS FOR DETAILS.
PATCH ASPHALT AS DETAILED. INSTALL ASPHALT SEALER OVER
ENTIRE AREA
10 STRIPE PARKING LOT AS INDICATED
AND TO MATCH EXISTING.
11 NOT USED
12 COPPER COPING CAP SLOPED TO OUTSIDE FACE OF ROOF AREA
13 REINSTALL HISTORIC WOOD BALLUSTRADE.PREPARE WOOD
SUBSTRATE AS NECESSARY FOR FINISH PAINTING. SEAL ALL
JOINTS. FILL ALL NAIL HOLES AND APPLY TO COATS OF PAINT.
14 NEW SINGLE PLY TPO ROOF MEMBRANE. SLOPE TO SCUPPERS
AS INDICATED.
15 REINSTALL HISTORIC WOOD CORNICE TRIM AND MOLDING.
PREPARE WOOD SUBSTRATE AS NECESSARY FOR FINISH
PAINTING. SEAL ALL JOINTS. FILL ALL NAIL HOLES AND APPLY
TWO COATS OF PAINT. INSTALL TRIM AS DIRECTED BY OWNER
PROVIDED INVENTORY OF HISTORIC WOOD TRIM
16 PAINTED SMOOTH FINISHED PORTLAND CEMENT PLASTER
CEILING ON METAL LATH
17 NEW COPPER SCUPPER. OUTFALL TO DOWNSPOUT COLLECTOR,
SEE 3/AS-304.
18 PENDANT LIGHT, CONTRACTOR TO PROVIDE TEMPORARY
POWER AS NECESSARY
Rev. No. Revisions: Date:
JSimons Stamp
JSimons Stamp
JSimons
12368910
GG
FF
DD
HH
EE
B.4
B.1
C.4
C.9 C.9
12.8 12.5 12.4 12.2 12.1 11.1
AS-302 2
AS-301
AS-302
AS-301
TRIAGE
STAIR #1
COMM
STAIR #2
CORRIDOR
SUBWAIT
EXAM
ELEV #1
EXAM
PATIENT TLT
EXAMEXAMTRIAGE
LINEN
TRIAGE
BEHAVIORALIST
WORKROOM
STAFF TOILET
CLEAN UTILITY
PHARM DEXAM
EXAM
EXAMEXAM
PATIENT TLT
HAC
EXAM
EXAM
EXAM EXAM SOCIAL WORK
ELEC
SOILED UTILITY
CHUTE
MECH/PIPE
CHASE
REC SCALE
WKSTN
WKSTN
MEDS
WKSTN
WKSTN
WKSTN
WKSTN
WKSTN
WKSTN
WKSTNWKSTN
WKSTN
ELEV LOBBY
ELEV HALL
RISER
HALL
SLOPE 1/4": 1'-0"
MINIMUM
SLOPE 1/4": 1'-0"
MINIMUM
SLOPE 1/4": 1'-0"
MINIMUM
SLOPE 1/4": 1'-0"
MINIMUM
SLOPE 1/4": 1'-0"
MINIMUM
SLOPE 1/4": 1'-0"
MINIMUM
AS-304
AS-304
Sim
AS-304
Sim
AS-303
AS-303
AS-303
VALLEY
RIDGE
VALLEY
VALLEY
RIDGE
VALLEY
V A
LL
E
Y
R
ID
G E
V A
LLE
Y
12 13
12 13
1. REFER TO SHEET A000 FOR GENERAL NOTES, SYMBOLS, LEGENDS AND
DETAILS.
2. PROVIDE PROTECTED EGRESS PATH FROM EAST AND WEST EXITS AS
INDICATED. CONTRACTOR IS TO INSURE COVERED PATH PROVIDES
ENOUGH PROTECTION THROUGH WORK AREA
3. SEE SHEET AS-304 FOR WALL TYPES.
GENERAL NOTES:
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
CONSTRUCTION
DOCUMENTS
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT
GMK Associates, Inc.
1201 Main Street, Suite 2100 Columbia, SC 29201 803-256-0000 Jerome K. Simons, AIA
STAMPPROGRAM MANAGER
321 4 5 6 7 8 9 10
Odell International 129 Fast Lane, Suite 200 Mooresville, NC 28117 704-401-2040 C. Harmon Reed, Jr. AIA
CONSULTANT
F
.0
O d e ll
W
J B
D o rn B
P o rc h I n s ta lla ti o n a n d
E V
C h a rg in g
S ta ti o n s \D ra w in g s \A rc h
\D O
R N
V A
B L D
G
B
S ta n d
A lo n e
R
.r v t
/1
/2
:2
:3
P
M
AS-203
THIRD FLOOR RENOVATION PLAN W.J.B. DORN VA MEDICAL CENTER
BLDG 10 REPAIR PORCH SYSTEM
AND CHARGING STATIONS
COLUMBIA, SOUTH CAROLINA
544-21-119
BUILDING 10
02/20/2024 JKS
100% CONSTRUCTION
DOCUMENTS FINAL
3/16" = 1'-0"
THIRD FLOOR RENOVATION PLAN
RENOVATION KEYED NOTES
KEY NUMBER DESCRIPTION
1 NOT USED
2 NOT USED
3 REINSTALL FAUX WOOD PILASTER. PREPARE WOOD SUBSTRATE
AS NECESSARY FOR FINISH PAINTING. SEAL ALL JOINTS. FILL
ALL NAIL HOLES AND APPLY TWO COATS OF PAINT. INSTALL PER
OWNER PROVIDED INVENTORY. PROVIDE TREATED WOOD
NAILERS AS NECESSARY FOR INSTALLTION
4 REINSTALL HISTORIC STRUCTURAL WOOD COLUMNS. SEAL ALL
JOINTS. FILL ALL NAIL HOLES AND APPLY TO COATS OF PAINT.
5 REINSTALL ORNAMENTAL RAIL. REMOVE PEELING/FLAKING
PAINT, PRIME AND PAINT COLOR AS SELECTED BY ARCHITECT
6 TEMPORARY WOOD FRAMED AND PLYWOOD COVERED
CONSTRUCTION ENTRANCE. APPLY PEEL AND STICK TO
PLYWOOD ROOF
7 CONTRACTOR LAYDOWN SPACE. PLACE PLYWOOD OVER ALL
PORTIONS OF NEW PARKING LOT BEING USED AS PART OF
LAYDOWN AREA
8 CONCRETE CURB, GUTTER AND SIDEWALK TO REMAIN. BORE
UNDER CURB TO ALLOW INSTALLATION OF ELECTRICAL
CONDUITS
9 CUT ASPHALT AS INDICATED TO ALLOW INSTALLATION OF NEW
ELECTRICAL. REFER TO ELECTRICAL DRAWINGS FOR DETAILS.
PATCH ASPHALT AS DETAILED. INSTALL ASPHALT SEALER OVER
ENTIRE AREA
10 STRIPE PARKING LOT AS INDICATED
AND TO MATCH EXISTING.
11 NOT USED
12 COPPER COPING CAP SLOPED TO OUTSIDE FACE OF ROOF AREA
13 REINSTALL HISTORIC WOOD BALLUSTRADE.PREPARE WOOD
SUBSTRATE AS NECESSARY FOR FINISH PAINTING. SEAL ALL
JOINTS. FILL ALL NAIL HOLES AND APPLY TO COATS OF PAINT.
14 NEW SINGLE PLY TPO ROOF MEMBRANE. SLOPE TO SCUPPERS
AS INDICATED.
15 REINSTALL HISTORIC WOOD CORNICE TRIM AND MOLDING.
PREPARE WOOD SUBSTRATE AS NECESSARY FOR FINISH
PAINTING. SEAL ALL JOINTS. FILL ALL NAIL HOLES AND APPLY
TWO COATS OF PAINT. INSTALL TRIM AS DIRECTED BY OWNER
PROVIDED INVENTORY OF HISTORIC WOOD TRIM
16 PAINTED SMOOTH FINISHED PORTLAND CEMENT PLASTER
CEILING ON METAL LATH
17 NEW COPPER SCUPPER. OUTFALL TO DOWNSPOUT COLLECTOR,
SEE 3/AS-304.
18 PENDANT LIGHT, CONTRACTOR TO PROVIDE TEMPORARY
POWER AS NECESSARY
Rev. No. Revisions: Date:
JSimons Stamp
JSimons Stamp
JSimons
FIRST FLOOR
0' - 0"
SECOND FLOOR
12' - 0"
THIRD FLOOR
23' - 0"
ATTIC FLOOR
35' - 0"
MAIN ROOF
48' - 0"
INSTALL BALUSTRADE AS INDICATED AND AS
DIRECTED BY OWNER PROVIDED INVENTORY OF
HISTORIC WOOD TRIM. PREPARE WOOD
SUBSTRATE AS NECESSARY FOR FINISH PAINTING.
SEAL ALL JOINTS, FILL ALL NAIL HOLES, AND
APPLY TO COATS OF PAINT TO PRIMED SURFACE
INSTALL NEW COPPER CORNICE CAP AND
FLASHING PROVIDE SCUPPER AT EXISTING
LOCATION. TIE TO DOWNSPOUT AND BOOT.
INSTALL FRIEZE AND ARCHITRAVE FASCIA BOARDS AS INDICATED
AND AS DIRECTED BY OWNER PROVIDED INVENTORY OF HISTORIC
PORCH COMPONENTS. PREPARE WOOD SUBSTRATE AS NECESSARY
FOR FINISH PAINTING. SEAL ALL JOINTS, FILL ALL NAIL HOLES AND
APPLY 2 COATS OF PAINT OVER PRIMED WOOD SURFACE.
INSTALL HISTORIC STRUCTURAL WOOD COLUMNS. REFER TO
STRUCTURAL DRAWINGS FOR ATTACHMENT. PREPARE WOOD
SUBSTRATE AS NECESSARY FOR FINISH PAINTING ALL JOINTS,
FILL ALL NAIL HOLES AND APPLY 2 COATS OF PAINT OVER
PRIMED WOOD SURFACE
NOTE: THE CONTRACTOR IS RESPONSIBLE FOR INSTALLING ALL
HISTORIC COMPONENTS AND ENSURING THE COMPONENTS ARE
INSTALLED FLUSH, LEVEL AND PLUMB. ANY MISSING
COMPONENTS. COMPONENTS NEEDING MODIFICATION FOR
FITMENT, MATERIALS AND LABOR TO ACHIEVE FINISHED STATE
SHALL BE INCLUDED IN BID AND ANY ADDITIONAL NECESSARY
MODIFICATION WILL BE AT CONTRACTOR'S EXPENSE.
CONTRACTOR VERIFY SPECIES OF EXISTING HISTORIC
ELEMENTS PRIOR TO FABRICATION OF NEW MATERIALS.
CONTRACTOR SHALL PROVIDE ALL SHORING, BRACING,
TEMPORARY SUPPORTS, ETC. DURING INSTALLATION OF
COLUMNS AND OTHER PORCH COMPONENTS. COLUMNS ARE A
STRUCTURAL COMPONENT OF THE PORCH ROOF FRAMING
SUPPORT AND ARE NOT AN AESTHETIC FEATURE.
INSTALL CORNICE TRIM AS INDICATED AND AS DIRECTED BY
OWNER PROVIDED INVENTORY OF HISTORIC PORCH
COMPONENTS. PREPARE WOOD SUBSTRATE AS NECESSARY FOR
FINISH PAINTING. SEAL ALL JOINTS, FILL ALL NAIL HOLES AND
APPLY 2 COATS OF PAINT OVER PRIMED WOOD SURFACE.
EXISTING ORNAMENTAL RAIL INSTALLED IN ORIGINAL LOCATION.
REMOVE RUST, ANY LOOSE OR FLAKING PAINT. PRIME RAIL AND
APPLY TWO COATS OF FINISHED PAINT
EXISTING ORNAMENTAL RAIL INSTALLED IN ORIGINAL
LOCATION. REMOVE RUST, ANY LOOSE OR FLAKING PAINT.
PRIME RAIL AND APPLY TWO COATS OF FINISHED PAINT
EXISTING ORNAMENTAL RAIL INSTALLED IN ORIGINAL
LOCATION. REMOVE RUST, ANY LOOSE OR FLAKING
PAINT. PRIME RAIL AND APPLY TWO COATS OF
FINISHED PAINT
INSTALL BALUSTRADE AS INDICATED AND AS
DIRECTED BY OWNER PROVIDED INVENTORY OF
HISTORIC WOOD TRIM. PREPARE WOOD
SUBSTRATE AS NECESSARY FOR FINISH PAINTING.
SEAL ALL JOINTS, FILL ALL NAIL HOLES, AND
APPLY TO COATS OF PAINT TO PRIMED SURFACE
INSTALL NEW COPPER CORNICE CAP AND
FLASHING PROVIDE SCUPPER AT EXISTING
LOCATION. TIE TO DOWNSPOUT AND BOOT.
INSTALL FRIEZE AND ARCHITRAVE FASCIA BOARDS AS
INDICATED AND AS DIRECTED BY OWNER PROVIDED
INVENTORY OF HISTORIC PORCH COMPONENTS.
PREPARE WOOD SUBSTRATE AS NECESSARY FOR
FINISH PAINTING. SEAL ALL JOINTS, FILL ALL NAIL
HOLES AND APPLY 2 COATS OF PAINT OVER PRIMED
WOOD SURFACE.
INSTALL HISTORIC STRUCTURAL WOOD COLUMNS. REFER TO
STRUCTURAL DRAWINGS FOR ATTACHMENT. PREPARE WOOD
SUBSTRATE AS NECESSARY FOR FINISH PAINTING ALL JOINTS,
FILL ALL NAIL HOLES AND APPLY 2 COATS OF PAINT OVER
PRIMED WOOD SURFACE
INSTALL CORNICE TRIM AS INDICATED AND AS
DIRECTED BY OWNER PROVIDED INVENTORY OF
HISTORIC PORCH COMPONENTS. PREPARE WOOD
SUBSTRATE AS NECESSARY FOR FINISH PAINTING.
SEAL ALL JOINTS, FILL ALL NAIL HOLES AND APPLY 2
COATS OF PAINT OVER PRIMED WOOD SURFACE.
FIRST FLOOR
0' - 0"
SECOND FLOOR
12' - 0"
THIRD FLOOR
23' - 0"
ATTIC FLOOR
35' - 0"
MAIN ROOF
48' - 0"
INSTALL BALUSTRADE AS INDICATED AND AS DIRECTED BY
OWNER PROVIDED INVENTORY OF HISTORIC WOOD TRIM.
PREPARE WOOD SUBSTRATE AS NECESSARY FOR FINISH
PAINTING. SEAL ALL JOINTS, FILL ALL NAIL HOLES, AND
APPLY TO COATS OF PAINT TO PRIMED SURFACE
INSTALL NEW COPPER CORNICE CAP AND
FLASHING PROVIDE SCUPPER AT EXISTING
LOCATION. TIE TO DOWNSPOUT AND BOOT.
INSTALL FRIEZE AND ARCHITRAVE FASCIA BOARDS AS INDICATED AND
AS DIRECTED BY OWNER PROVIDED INVENTORY OF HISTORIC PORCH
COMPONENTS WOOD SUBSTRATE AS NECESSARY FOR FINISH PAINTING.
SEAL ALL JOINTS, FILL ALL NAIL HOLES AND APPLY 2 COATS OF PAINT
OVER PRIMED WOOD SURFACE.
INSTALL HISTORIC STRUCTURAL WOOD COLUMNS. REFER TO STRUCTURAL
DRAWINGS FOR ATTACHMENT. PREPARE WOOD SUBSTRATE AS NECESSARY
FOR FINISH PAINTING. SEAL ALL JOINTS, FILL ALL NAIL HOLES AND APPLY 2
COATS OF PAINT OVER PRIMED WOOD SURFACE
INSTALL CORNICE TRIM AS INDICATED AND AS DIRECTED BY
OWNER PROVIDED INVENTORY OF HISTORIC PORCH COMPONENTS.
PREPARE WOOD SUBSTRATE AS NECESSARY FOR FINISH PAINTING.
SEAL ALL JOINTS, FILL ALL NAIL HOLES AND APPLY 2 COATS OF
PAINT OVER PRIMED WOOD SURFACE.
EXISTING ORNAMENTAL RAIL INSTALLED IN ORIGINAL LOCATION.
REMOVE RUST, ANY LOOSE OR FLAKING PAINT. PRIME RAIL AND
APPLY TWO COATS OF FINISHED PAINT
INSTALL BALUSTRADE AS INDICATED AND
AS DIRECTED BY OWNER PROVIDED
INVENTORY OF HISTORIC WOOD TRIM.
PREPARE WOOD SUBSTRATE AS
NECESSARY FOR FINISH PAINTING. SEAL
ALL JOINTS, FILL ALL NAIL HOLES, AND
APPLY TO COATS OF PAINT TO PRIMED
SURFACE
INSTALL BALUSTRADE AS INDICATED AND AS
DIRECTED BY OWNER PROVIDED INVENTORY OF
HISTORIC WOOD TRIM. PREPARE WOOD
SUBSTRATE AS NECESSARY FOR FINISH PAINTING
ALL JOINTS, FILL ALL NAIL HOLES, AND APPLY TO
COATS OF PAINT TO PRIMED SURFACE
INSTALL NEW COPPER CORNICE CAP AND
FLASHING PROVIDE SCUPPER AT EXISTING
LOCATION. TIE TO DOWNSPOUT AND BOOT.
INSTALL FRIEZE AND ARCHITRAVE FASCIA BOARDS AS
INDICATED AND AS DIRECTED BY OWNER PROVIDED
INVENTORY OF HISTORIC PORCH COMPONENTS. PREPARE
WOOD SUBSTRATE AS NECESSARY FOR FINISH PAINTING.
SEAL ALL JOINTS, FILL ALL NAIL HOLES AND APPLY 2 COATS
OF PAINT OVER PRIMED WOOD SURFACE.
INSTALL HISTORIC STRUCTURAL WOOD COLUMNS. REFER TO
STRUCTURAL DRAWINGS FOR ATTACHMENT. PREPARE WOOD SUBSTRATE
AS NECESSARY FOR FINISH PAINTING ALL JOINTS, FILL ALL NAIL HOLES
AND APPLY 2 COATS OF PAINT OVER PRIMED WOOD SURFACE
INSTALL CORNICE TRIM AS INDICATED AND AS DIRECTED BY
OWNER PROVIDED INVENTORY OF HISTORIC PORCH
COMPONENTS. PREPARE WOOD SUBSTRATE AS NECESSARY
FOR FINISH PAINTING ALL JOINTS, FILL ALL NAIL HOLES AND
APPLY 2 COATS OF PAINT OVER PRIMED WOOD SURFACE.
EXISTING ORNAMENTAL RAIL INSTALLED IN ORIGINAL LOCATION.
REMOVE RUST, ANY LOOSE OR FLAKING PAINT. PRIME RAIL AND
APPLY TWO COATS OF FINISHED…
This is the start of the file's text. The full file is on GovTribe.