This document is an amendment to Solicitation 36C24724R0083 for the Construct B10 Porches and Charging Stations project. The key details are:

The purpose of this amendment is to post the responses to Part II of the Request for Information (RFI). The amendments address several questions from offerors, including clarifying the EMR form requirements, removing the 10-page limit on the Price Volume, providing a revised Pricing Schedule to include a Deductive Alternate, allowing subcontractor experience for the Charging Station requirements, and confirming the required personnel qualifications. The amendment also clarifies that the mechanical drawings are not included in the base bid. Regarding the historic trim work, the contractor will be required to reinstall and finish the ornamental railing, including any necessary repairs to decorative components.

The overall federal contract opportunity is for the Install B10 Porches & Charging Stations project, solicitation number 36C24724R0083, issued by the Department of Veterans Affairs, Veterans Health Administration, Veterans Integrated Service Network 7.

View the file

Other files

File Type Posted
PRICE SCHEDULE 02.docx DOCX document
36C24724R0083 0002.docx DOCX document
Answers to RFIs as of - 25 July 2024.docx DOCX document
36C24724R0083 0001.docx DOCX document
Attachment 7 - Two Story Porch Assembly Spec.pdf PDF
Attachment 1 - STATEMENT OF WORK - SOW.docx DOCX document
Attachment 2 - DRAWINGS - Combined.pdf PDF
Attachment 6 - Wage Determination .pdf PDF
Attachment 3 - SPECIFICATIONS - 544-21-119.pdf PDF
Attachment 5 - Environmental Record Evaluation .docx DOCX document
36C24724R0083_1.docx DOCX document
Attachment 4 - Performance Relevancy Questions.pdf PDF
Show all 12

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Response to RFI’s – Part II Solicitation 36C24724R0083

5. PROJECT NUMBER (if applicable)

CODE

7. ADMINISTERED BY

2. AMENDMENT/MODIFICATION NUMBER

CODE

6. ISSUED BY

8. NAME AND ADDRESS OF CONTRACTOR

4. REQUISITION/PURCHASE REQ. NUMBER

3. EFFECTIVE DATE

9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED

PAGE OF PAGES

10A. MODIFICATION OF CONTRACT/ORDER NUMBER

10B. DATED

BPA NO.

1. CONTRACT ID CODE

FACILITY CODE

CODE

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

E. IMPORTANT:

is extended,

(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.

12. ACCOUNTING AND APPROPRIATION DATA

(REV. 11/2016)

is required to sign this document and return ___________ copies to the issuing office.

is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.

15C. DATE SIGNED

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER

Contractor

16C. DATE SIGNED

14. DESCRIPTION OF AMENDMENT/MODIFICATION

16B. UNITED STATES OF AMERICA

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER

16A. NAME AND TITLE OF CONTRACTING OFFICER

15B. CONTRACTOR/OFFEROR

STANDARD FORM 30

PREVIOUS EDITION NOT USABLE

Prescribed by GSA - FAR (48 CFR) 53.243 (Type or print) (Type or print) (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

(Number, street, county, State and ZIP Code) (If other than Item 6) (Specify type of modification and authority) (such as changes in paying office, appropriation date, etc.)

(If required)

(SEE ITEM 11)

(SEE ITEM 13)

(X)

CHECK

ONE

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

(Signature of person authorized to sign) (Signature of Contracting Officer) 544-24-3-5139-0069 544-21-119 Department of Veterans Affairs W.J.B. Dorn VA Medical Center 6439 Garners Ferry Road Columbia

SC

29209-1639 Department of Veterans Affairs W.J.B. Dorn VA Medical Center 6439 Garners Ferry Road Columbia

SC

29209-1639 To all Offerors/Bidders

36C24724R0083 07-31-2024

X X X

6 August 2024, 4:00PM (EST)

The purpose of this amendment is to:

1.) Post the attached responses to RFI's Part II.

Zaire Naylor Contracting Officer Solicitation 36C24724R0083 0003 – Amendment Project Title: Construct B10 Porches and Charging Stations Project Number: 544-21-119

1.) Question: The EMR Form provided includes the year 2024. Shouldn't this end with 2023 as 2024 isn't a complete year?

Answer: As stated in the solicitation, the past 3 years will be reviewed. The form has years 2021,2022, and 2023. Do not use the 2024 block if you have not received 2024 EMR related information.

2.) Question: The Price Volume is limited to 10 pages. The SF1442 is two pages, the Price Schedule is one page, the Breakdown of Division Pricing is one page, and the Bid Guarantee SF 24 is seven pages. That is 11 pages. Will this requirement be corrected?

Answer: This amendment removes this restriction. The Price Volume page limit is now unlimited.

3.) Question: The Pricing Schedule shows a base bid price amount. The SOW mentions a Deductive Alternate. Will a corrected Pricing Schedule be provided?

Answer: A revised pricing schedule has been added and attached to this amendment to include the deductive alternative option.

4.) Question: Regarding the Charging Station experience, can the prime contractor use a subcontractor's experience for the Technical Proposal?

Answer: The electrical experience can be provided by the sub. However, this experience must be documented in the offeror’s proposal.

5.) Question: Please confirm the minimum number of qualified individuals that will be required on site for the Superintendent, SSHO and QCM roles. The specifications state that the SSHO must be a separate individual, but given the limited scope overall, a superintendent with the necessary qualifications should suffice for all these roles.

Answer: Specification section 01 35 26 the SSHO has to be a separate qualified individual from the prime contractor's superintendent and / or Quality Control Manager with duties only as the SSHO.

6.) Please clarify the purpose for including the mechanical drawings in the RFP package, as all drawing pages are noted “…not included in the base bid.” Is there an alternate associated with this work?

Answer: The AE’s Mechanical Drawings notes on the various mechanical pages are correct as stated “ not included in this RFP”

7.) During our assessment of the historic trim work being stored outside, it appeared that the majority seemed to be in sound condition. However, per note 5 on AS-202, we are to reinstall the ornamental railing. This railing is missing key decorative components that could be costly to replace. Please confirm that any damaged or missing historic components are not part of the scope of work to repair or replace.

Answer: The note on sheet AS -202 is correct, the contractor will be required to reinstall and finish the ornamental railing. This should include all decorative components as specified in the specifications, drawings and Two-Story Porch Assembly Spec.