Attachment_2_Drawings_and_Maps.pdf
PDF 2 MB Posted
- Attached to
- WESTON HILLS GRADING AND RECLAMATION Federal contract opportunity
- Solicitation number
- 140L6222R0023
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| SOW_Revisions_0001.doc | DOC document | |
| Questions_Addressed_0001.docx | DOCX document | |
| Pre_Bid_Conference_0001.pdf | ||
| Sol_140L6222R0023_Amd_0001.pdf | ||
| Sol_140L6222R0023.pdf | ||
| Attachment_5_SF_1442_Completion_Instructions.pdf | ||
| Attachment_6_Limitations_on_Subcontracting_Breakout.pdf | ||
| Attachment_1_Statement_of_Work.pdf | ||
| Attachment_4_Pricing_Worksheet.pdf | ||
| Attachment_3_Wage_Determination_WY20220043.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
£¤14
£¤16
Gillette¬«50 ¬«51
¬«59
124 128 129 132 141
Weston Hills Grading and Drainage Project
Weston Hills Recreation Area _̂ Weston Turnoff
Weston Hills Grading and Drainage Project:
Exit 124 of Interstate-90 Turn East on HWY. 59, 3.6 miles N. of Gillette Airport Approximately: 30.3 miles +/- North of Gillette on HWY.
GPS Coordinates: 105°3'21.94"W 44°12'37.899"N
Airport
Weston Hills Recreation Area
0 4 8 12 Miles
WHEN SHOWN ON DRAWINGS,
PLACE SUBGRADE REINFORCEMENT
TO A DEPTH OF 1 FT.
Cf_ GRADE pROFILE
EXISTING
G� it--.
G3
� \ � H AVERAGE i..--- ---
B
CREST
ROLLING DIP CONSTRUCT/ON NOTES:
1. THE CROSS SLOPE OF THE ROADBED SHALL BE
MAINTAINED THROUGH THE DIP.
2. THE DRAIN LINE SHALL BE PERPENDICULAR TO
THE CENTER LINE OF THE ROADBED.
3. PLACE CLASS II OUTLET RIPRAP WHEN SHOWN ON
THE DRAWINGS. REFER TO OUTLET RIPRAP DETAIL
BELOW.
4. FOR DIPS ON AGGREGATE SURFACED ROADS,
REDUCE (H) DEPTH BY 0.2 FT.
5. WATERBAR AND DIP CONSTRUCT/ON TOLERANCES
SHALL BE IN ACCORDANCE FP-03
SUPPLEMENTAL SPECIFICATION 204.13(d);
TOLERANCE CLASS A.
6. SUBGRADE REINFORCEMENT MATERIAL SHALL BE
CONSIDERED INCIDENTAL TO DIP CONSTRUCT/ON.
" H .,c:,z,...-
E
A A
DRAIN LINE
PROFILE VIEW
t
B
ROLLING DIP CONSTRUCT/ON
DIMENSIONS
TYPE H (DRIVEABLE WATERBAR)
% LENGTH DEPTH (H)
PROFILE
OUTSIDE INSIDE
GRADE A B EDGE EDGE
0 TO 4 6' 10' 1.5' 0.8'
5 TO 8 6' 10' 1.5' 0.8'
9 TO 12 6' 12' 1.5 0.8'
13 TO 16 7' 15' 1.0' 0.8'
17 & OVER 7' 20' 1.0' 0.8'
OUTLET RIPRAP
1 FT. DEPTH IN AREAS WITHOUT A
(3.0 C.Y.)
FILL SLOPE, EXTEND
RIPRAP TO DAYLIGHT.
A� MINIMUM GRADIENT SHALL
L_ �
BE 6 % OUTSLOPE.
...__ _ __,""">ll7:====-____;:�.� �-L -6,:t
�''(,A�/// /2
�1.5:1 OR
1//////'-'/('<,� , AS EXISTS
SUBGRADE
CROSS SECTTON �EW PLAN VIEW
ROLLING DIP AND
WATER BAR TYPICAL
., r
DESIGNED:
DRAWN:
CHECKED:
ROLLING DIP CONSTRUCT/ON DIMENSIONS
PROFILE
GRADE
0 TO 4
5 TO 6
7 TO 8
9 TO 10
1.
CONST. GRADE DEPTH REINFORCEMENT
LENGTH CUBIC
G1 G2 G3 (H) (E) YARDS
-7 2 -6 0.6' 20'
-10 2 -9 0.6' 20'
-13 2 -12 0.5' 20'
-16 2 -15 0.5' 30'
OVER 10 % NOT RECOMMENDED
REINFORCEMENT GRADATION
SIEVE SIZE
12" 2"
3/4" # 200
% PASSING
100% 20-80% 0-40% 0-10%
WATERBAR CONSTRUCT/ON NOTES:
WATERBARS ARE USUALLY CONSTRUCTED BY
ANGLE DOZERS. WATERBARS SHALL HAVE A
CLEAN OUTLET AND BE CONSTRUCTED SO THEY
WILL NOT FAIL THROUGH ALL WEATHER USE.
2. THE WATERBAR DRAIN LINE SHALL BE SKEWED
5· TO 25".
3. WATERBARS SHALL BE CONSTRUCTED SO THAT
ORA/NL/NE EXCAVATION IS APPROXIMATELY 6"
INTO SOLID SOIL AND THE TOP OF COMPACTED
WATERBAR IS 12" ABOVE THE ORA/NL/NE.
4. THE TOTAL LENGTH OF THE WATERBAR SHALL
NOT BE LESS THAN SIXTEEN FEET (16') .
5. CROSS SLOPE OF THE DRAIN LINE SHALL BE
EQUIVALENT TO TO THE CROSS SLOPE OF THE
ROAD PLUS TWO PERCENT (2%).
| Engineering_WestonHills_Gravel (1).pdf |
| Weston Hills gravel site.pdf |
| FS water bar.pdf |
| Water Bar abrupt.pdf |
File details come from the government source that posted it. Updated .