SOW_Revisions_0001.doc
DOC document 46 KB Posted
- Attached to
- WESTON HILLS GRADING AND RECLAMATION Federal contract opportunity
- Solicitation number
- 140L6222R0023
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Questions_Addressed_0001.docx | DOCX document | |
| Pre_Bid_Conference_0001.pdf | ||
| Sol_140L6222R0023_Amd_0001.pdf | ||
| Attachment_5_SF_1442_Completion_Instructions.pdf | ||
| Attachment_6_Limitations_on_Subcontracting_Breakout.pdf | ||
| Attachment_2_Drawings_and_Maps.pdf | ||
| Sol_140L6222R0023.pdf | ||
| Attachment_1_Statement_of_Work.pdf | ||
| Attachment_4_Pricing_Worksheet.pdf | ||
| Attachment_3_Wage_Determination_WY20220043.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SECTION 01009 – GENERAL INFORMATION AND REQUIREMENTS
SECTION 01009 – GENERAL INFORMATION AND REQUIREMENTS
PART 1: GENERAL
1.1
SUMMARY:
A.
Description of Work: Furnishing labor, equipment, supplies, and materials to blade approximately 5.0 miles (entire roadway) on Weston Road. Road blading shall be performed in the spring of 2023. The Contractor shall coordinate the blading of the road with BLM to allow for temporary road closure if necessary. Blading (roadway surface and ditch slopes), filling all ruts and mud holes, building water bars using BLM provided borrow source -3” fill material, and +/- 300 linear feet of road reclamation. The borrow area need not be screened but aggregate greater than 3” diameter will be removed from roadways. The contractor shall provide at least one week notice to the BLM before starting work on the road. The road has both aggregate and natural surfacing. A Pre-award site visit will occur at the Weston Road.
B.
Location: Work under this Contract is located in Campbell County, Wyoming. The blading/grading work locations are referenced by latitude and longitude coordinates. Estimate actual grading up to 5.0 miles to include future winter and spring erosion.
44.63560, -105.36981 to 44.64218, -105. 38370 = ~5744 feet 44.64272, -105.38568 to 44.62373, -105.38093 = ~8337 feet 44.62568, -105.38729 to 44.62823, -105.38457 = ~1500 feet 44.64404, -105.38548 to 44.66125, -105.38381 = ~7040 feet Water Bar Locations (15) 44.65190, -105.38429; 44.64474, -105.38393; 44.64405, -105.38548; 44.64272, -105.38568
44.64052, -105.38429; 44.62208, -105.38409; 44.62387, -105.38233; 44.62373, -105.38093 44.63738, -105.38124; 44.63713, -105.38002; 44.63694, -105.37959; 44.63641, -105.37904
44.63645, -105.37779; 44.63667, -105.37676; 44.63696, -105.37523.
Reclamation Area
44.62358, -105.38640 to 44.62211, -105.38662 (road segment).
1.2 REFERENCES:
A.
Referenced Specifications/Standards with Abbreviations and/or Acronyms: Wherever the following acronyms are used in these specifications or on the drawings, they are to be construed the same as the respective expressions represented. Copies of the referenced specifications/standards referred to herein may be procured by the Contractor, from the following:
MUTCD
Manual on Uniform Traffic Control Devices for Streets and Highways
Superintendent of Documents
Government Printing Office
Washington, DC 20402
OSHA
Occupational Safety and Health Administration's Standards
U.S. Department of Labor
Occupational Safety and Health Administration
Denver Area Office
333 West Colfax Avenue
Denver, CO 80204
1.3 QUALITY ASSURANCE:
A.
Codes and Standards: The work shall comply with codes and standards applicable to each type of work and as listed in the individual sections of these specifications. This Contract incorporates materials, applications, and tests by reference, with the same force and effect as when they were given in full text.
B.
Conflict: Where a conflict occurs between reference documents and project specifications, the project specifications shall govern.
1.4 PROJECT/SITE CONDITIONS:
A.
Access to the Work: Access is via Wyoming State Highway 59.
1.5 SEQUENCING AND SCHEDULING:
A.
Work Schedule: The schedule for the upcoming season shall be submitted at the pre‑work conference. When requested, the Contractor shall submit an updated schedule within 3 calendar days.
PART 2: PRODUCTS
(There are no applicable requirements.)
PART 3: EXECUTION
3.1 PROJECT MEETINGS:
A.
Pre‑Work Conference:
1.
A pre‑work conference will be held prior to the start of work. The Contractor will be notified in advance of meeting time, date, and place. The purpose will be to review required work, project drawings and specifications, construction schedules, payroll and payments, and administrative provisions of the Contract.
2.
The Contractor and the persons responsible for coordination of the work shall be present at the meeting.
3.
The Contractor shall be prepared to summarize and explain procedures planned for the project [and present the submittals requested in the specifications].
B.
Progress Meetings:
1.
Meetings shall be held at the project site, or as determined by the Contracting Officer.
2.
Meetings may be called by either the Contracting Officer or the Contractor. Request shall state who should attend and include an agenda.
C.
Final Inspection:
1.
Meeting shall be held at the project site, or as determined by the Contracting Officer.
2. The Contractor shall notify the Contracting Officer in writing at least 3 working days before the completion date so the Government can schedule final inspection.
3. The Contractor shall require the superintendent to be present during this inspection.
3.2 PREPARATION:
A.
Work Layout: If requested, the Government will set construction stakes to give the Contractor measurements, lines, and grades necessary for the work executed under the Contract. Baseline monuments or benchmarks disturbed or removed during construction shall be reset by the Contractor at the Contractor's expense.
B.
Work Limits and Control Points: None needed.
PART 4: MEASUREMENT AND PAYMENT
4.1 METHOD OF MEASUREMENT:
A.
Units: The work described in this section will not be measured for payment.
4.2 BASIS OF PAYMENT:
A.
Payment: No direct payment for the work described under this section will be made. The Contractor shall include consideration for this item in the bid price for other items of the Contract.
END OF SECTION
Weston Hills Road Grading and Reclamation 2022 01009-1
Weston Hills Road Grading and Reclamation 2022 01009-3