ATTACHMENT 2 - Drawings - 1 of 2.pdf
PDF 15 MB Posted
- Solicitation number
- 36C77624B0028
About this file
This document appears to be ATTACHMENT 2 - Drawings - 1 of 2 for the federal contract opportunity "Y1DA--675-22-701 EHRM Infrastructure Upgrades Construction Lake Baldwin (Orlando)" solicited by the Department of Veterans Affairs Technology Acquisition Center Austin.
The drawings provide technical specifications and details for the construction of EHRM infrastructure upgrades at the Lake Baldwin facility in Orlando, Florida. The solicitation seeks a contractor to perform this construction work. Key details include the solicitation number 36C77624B0028, the agency involved (Department of Veterans Affairs), and the opportunity type (Solicitation). No specific pricing terms, set asides, award dates, or other salient information is provided in this attachment, as it appears to be a technical drawing document rather than the full solicitation.
View the file
Other files
Show all 35
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
B513
B505 B506 B507 B508
B504
B500
B503
B509
B501 B518
B3130
B3136
B517
B3133
B3134
B3135
B3132
B510
B521B520
B522
B519
B519A
B520A
B3126 B3125
B3128
B3129
B502
NASH STREET
NASH STREET
Retention
Pond
POND #1
VAULT
SW10-4
POND #2
RAYMOND STREET
S P
A C
E S
M E
R C
Y A
V E
N U
E
C O
M F
O R
T A
V E
N U
E
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10 engineering discipline <EDIT TEXT>:
FINAL - BID
DOCUMENTS
C U s e rs \E m a n te
\D o c u m e n ts \L o c a l R e v it \2
\6
-2 -7
V
A L a k e B a ld w in
R e v it jd o rn a n D
S R
W .r v t
/2 /2
:4
:5
P
M
GI001
COVER SHEET EHRM VA LAKE BALDWIN
5201 Raymond St, Orlando, FL 32803
675-22-701
Dec. 22.2023 AESUS AESUS
AESUS DESIGN GROUP
1050 E. Southern Ave., Suite D
Tempe, AZ, 85282
480-454-2861
David Combs
MES GROUP, INC
550 North Reo Street
Tampa, FL, 33609
813-289-4700
David Keith
DX
A3-301
X
XX
X
DETAIL FLAG NUMBER
DOOR NUMBER
AE-501
BUILDING SECTION CUT
OTHER SECTION CUT
SHEET WHERE APPEARS (TYPICAL)
AE-301
AA
SHEET WHERE APPEARS
ELEVATION NUMBER
SHEET WHERE APPEARS
x x x x
EXISTING COLUMN CENTER LINEA
X
WINDOW TAG
AE-301
AA
AE-301
AA
ELEVATION NUMBER
AE-710
4 2
DASHED LINE
AROUND
AREA DETAILED
PLAN OR DETAIL NUMBERX
NOTE: IN ADDITION TO THE FOLLOWING INFECTION CONTROL MEASURES OF ICRA
CLASS & PERMIT LEVEL IV, THE CONTRACTOR SHALL REVIEW THE VA SAFETY-QUALITY
CONTROL-INFECTION CONTROL DOCUMENTS IN THE SPECIFICATIONS. THE AE WILL
PROVIDE A FORM FOR THE CONTRACTOR TO FILL OUT
DURING CONSTRUCTION:
A. ISOLATE HVAC SYSTEM IN AREA WHERE WORK IS BEING DONE TO PREVENT
CONTAMINATION OF DUCT SYSTEM.
B. COMPLETE ALL CRITICAL BARRIERS I.E. SHEET ROCK, PLYWOOD, PLASTIC,
TO SEAL AREA FROM NON-WORK AREA OR IMPLEMENT CONTROL CUBE
METHOD (CART WITH PLASTIC COVERING AND SEALED CONNECTION TO
WORK SITE WITH HEPA VACUUM FOR VACUUMING PRIOR TO EXIT) BEFORE
CONSTRUCTION BEGINS.
C. MAINTAIN NEGATIVE AIR PRESSURE WITHIN WORK SITE UTILIZING HEPA
EQUIPPED AIR FILTRATION UNITS. PROVIDE NEGATIVE AIR PRESSURE
MONITOR.
D. SEAL HOLES, PIPES, CONDUITS, AND PUNCTURES APPROPRIATELY.
E. CONSTRUCT ANTEROOM AND REQUIRE ALL PERSONNEL TO PASS THROUGH
THIS ROOM SO THEY CAN BE VACUUMED USING A HEPA VACUUM CLEANER
BEFORE LEAVING WORK SITE OR THEY CAN WEAR CLOTH OR PAPER
COVERALLS THAT ARE REMOVED EACH TIME THEY LEAVE THE WORK SITE.
F. DO NOT REMOVE BARRIERS FROM WORK AREA UNTIL COMPLETED PROJECT
IS INSPECTED BY A SAFETY OFFICER AND INFECTION CONTROL
COORDINATOR AND THOROUGHLY CLEANED BY THE ENVIRONMENTAL
MANAGEMENT SERVICES.
UPON COMPLETION OF PROJECT:
A. REMOVE BARRIER MATERIAL CAREFULLY TO MINIMIZE SPREADING OF DIRT
AND DEBRIS ASSOCIATED WITH CONSTRUCTION.
B. CONTAIN CONSTRUCTION WASTE BEFORE TRANSPORT IN TIGHTLY
COVERED CONTAINERS.
C. COVER TRANSPORT RECEPTACLES OR CARTS. TAPE COVERING UNLESS
SOLID LID.
D. VACUUM WORK AREA WITH HEPA FILTERED VACUUMS.
E. WET MOP AREA WITH DISINFECTANT.
F. REMOVE ISOLATION OF HVAC SYSTEM IN AREAS WHERE WORK IS BEING
PERFORMED.
Approved: Associate Director
Approved: Chief Facilities Management
Approved: Manager / Engineer
Approved: Director
Approved: Union representative
Approved: Safety Officer
EQ-X
CPT1
W-X
E
EA EACH
E EAST
EWC ELECTRIC WATER COOLER
ELEC ELECTRIC (AL)
EL ELEVATION
ELEV ELEVATOR
EMER EMERGENCY
ENGR ENGINEER
EQ EQUAL
EQUIP EQUIPMENT
EXIST EXISTING
ETR EXISTING TO REMAIN
EXP EXPANSION
EXP BT EXPANSION BOLT
EJ EXPANSION JOINT
EXP EXPOSED
EXT EXTERIOR
EIFS EXTERIOR INSULATION AND
FINISH SYSTEM
F
FWC FABRIC WALL COVERING
FT FEET, FOOT
FGL FIBERGLASS
FIN FINISH
FIN GR FINISH GRADE
FDV FIRE DEPARTMENT VALVE
FE FIRE EXTINGUISHER
FEC FIRE EXTINGUISHER
CABINET
FHC FIRE HOSE CABINET
FP FIREPROOF
FIXT FIXTURE
FLASH FLASHING
FLEX FLEXIBLE
FLR FLOOR
FD FLOOR DRAIN
FLUOR FLUORESCENT
FTG FOOTING
FDTN FOUNDATION
FRMG FRAMING
FURN FURNACE, FURNITURE
G
GA GAGE
GALV GALVANIZED
GC GENERAL CONTRACTOR
GEN GENERATOR
GL GLASS
GL BLK GLASS BLOCK
GB GRAB BAR
GR GRADE
GRAN GRANITE
GFCI GROUND FAULT CIRCUIT INTERRUPTER
GUT GUTTER
GYP BD GYPSUM BOARD
H
HNDRL HANDRAIL
HDW HARDWARE
HDWD HARDWOOD
HD HEAD
HVAC HEATING, VENTILATING, AIR CONDITIONING
HT HEIGHT
HPT HIGH POINT
HC HOLLOW CORE
HM HOLLOW METAL
HORIZ HORIZONTAL
HB HOSE BIBB
HOSP HOSPITAL
HR HOUR
I
IN INCH
INFO INFORMATION
ID INSIDE DIAMETER
INSUL INSULATED,INSULATION
INT INTERIOR
J
JAN JANITOR
JT JOINT
K
KPL KICKPLATE
KIT KITCHEN
KB KNEE BRACE
L
LAB LABORATORY
LAM LAMINATE
LC LAUNDRY CHUTE
LV LAVATORY
LT LIGHT
LD LINEAR DIFFUSER
L CL LINEN CLOSET
LL LIVE LOAD
LLV LONG LEG VERTICAL
LPT LOW POINT
M
MACH MACHINE
MH MANHOLE
MFD MANUFACTURED
MFR MANUFACTURER
MRB MARBLE BASE
MRF MARBLE FLOOR
MKR BD MARKER BOARD
MO MASONRY OPENING
MATL MATERIAL
MAX MAXIMUM
MECH MECHANICAL
MED MEDICAL
MC MEDICINE CABINET
MEMB MEMBRANE
MTL METAL
MIN MINIMUM, MINUTE
MISC MISCELLANEOUS
MOD MODIFIED
MLDG MOLDING
N
NAT FIN NATURAL FINISH
NOM NOMINAL
N NORTH
NA NOT APPLICABLE
NIC NOT IN CONTRACT
NTS NOT TO SCALE
NO NUMBER
O
OFF OFFICE
OC ON CENTER
OPNG OPENING
OPP OPPOSITE
OPH OPPOSITE HAND
ORCH ORCHESTRA
ORN ORNAMENTAL
OD OUTSIDE DIAMETER
OH OVERHANG, OVERHEAD
OF/CI OWNER FURNISHED/
CONTRACTOR INSTALLED
O OXYGEN
P
P PAINT
PR PAIR
PNL PANEL
PTD PAPER TOWEL DISPENSER
PTN PARTITION
PERF PERFORATED
PC PIECE
PLAM PLASTIC LAMINATE
PLAS PLASTIC, PLASTER
PSF POUNDS PER SQUARE FOOT
PSI POUNDS PER SQUARE INCH
PCC PRECAST CONCRETE
PREFAB PREFABRICATE
PREFIN PREFINISH
PROD PRODUCTION
Q
QTY QUANTITY
QT QUARRY TILE
A
AFF ABOVE FINISHED FLOOR
ACST ACOUSTIC (AL)
ACT ACOUSTICAL CEILING TILE
APC ACOUSTICAL PANEL CEILING
AWP ACOUSTICAL WALL PANEL
AWT ACOUSTICAL WALL
ADJ ADJUSTABLE
A/C AIR CONDITIONING
AHU AIR HANDLING UNIT
ALT ALTERNATE
ALUM ALUMINUM
AB ANCHOR BOLT
AL ANGLE
APPROX APPROXIMATE
ARCH ARCHITECT (URAL)
ASPH ASPHALT
ASSY ASSEMBLY
AUTO AUTOMATIC
AWN AWNING
B
BALC BALCONY
BSMT BASEMENT
BM BEAM, BENCHMARK
BR BEDROOM
BLKG BLOCKING
BD BOARD
BOT BOTTOM
BRKT BRACKET
BRK BRICK
B CL BROOM CLOSET
BLDG BUILDING
BLT IN BUILT-IN
BUR BUILT-UP ROOFING
C
CAB CABINET
CPT CARPET
CSMT CASEMENT
CI CAST IRON
CB CATCH BASIN
CLG CEILING
CEM CEMENT
CL CENTER LINE
CER CERAMIC
CT CERAMIC TILE
CO CLEANOUT, CASED OPENING
CLR CLEAR, COLOR
CLO CLOSET
COL COLUMN
CMPST COMPOSITE
CONC CONCRETE
CMU CONCRETE MASONRY UNIT
CONSTR CONSTRUCTION
CONT CONTINUOUS
CONTR CONTRACTOR
COTR CONTRACTING OFFICER
CJ CONTROL JOINT
COP COPING
CU COPPER
CG CORNER GUARD
CORR CORRIDOR
CNTR COUNTER
CSK COUNTER SUNK
D
DMPF DAMPPROOFING
DL DEAD LOAD
DEMO DEMOLITION
DET DETAIL
DIA DIAMETER
DIFF DIFFUSER
DIM DIMENSION
DR DOOR, DRAIN
DH DOUBLE HUNG
DN DOWN
DS DOWNSPOUT
DWR DRAWER
DWG DRAWING
DF DRINKING FOUNTAIN
DUPL DUPLICATE
R
R RADIUS, RISER
RWD REDWOOD
REF REFERENCE, REFRIGERATOR
REINF REINFORCE
REQD REQUIRED
RB RESILIENT BASE
RF RESILIENT FLOORING
RA RETURN AIR
REV REVISION
RD ROOF DRAIN
RM ROOM
RO ROUGH OPENING
RS ROUGH SAWN
S
SCHED SCHEDULE
SECT SECTION
SHTHG SHEATHING
SHT SHEET
SHV SHELVING
SIM SIMILAR
S SOUTH
SP FIN SPECIAL FINISH
SPEC SPECIFICATION
SQ SQUARE
SF SQUARE FEET
SST STAINLESS STEEL
STD STANDARD
STL STEEL
STL JST STEEL JOIST
STOR STORAGE
STRUCT STRUCTURAL
S4S SURFACED FOUR SIDES
SUSP SUSPEND
SW SWITCH
SYMM SYMMETRICAL
T
TK BD TACKBOARD
TEL TELEPHONE
TV TELEVISION
TMPD TEMPERED
TEMP TEMPORARY
TER TERRAZZO
THK THICKNESS
TPD TOILET PAPER DISPENSER
T&G TONGUE AND GROOVE
TOS TOP OF SLAB, STEEL
T TREAD
TYP TYPICAL
U
UC UNDERCUT
UNFIN UNFINISH
UNO UNLESS NOTED OTHERWISE
V
VAC VACUUM
VR VAPOR RETARDER
VNR VENEER
VP VENEER PLASTER
VIF VERIFY IN FIELD
VERT VERTICAL
VEST VESTIBULE
VCT VINYL COMPOSITION TILE
VWC VINYL WALL COVERING
W
W CAB WALL CABINETS
WC WALL COVERING, WATER CLOSET
WP WATERPROOFING, WEATHER
PROOF, WORKING POINT
WT WEIGHT
WWF WELDED WIRE FABRIC
W WEST
WF WIDE FLANGE
WDW WINDOW
W/ WITH
W/O WITHOUT
WD WOOD
WDP WOOD PANELING
5201 Raymond St
Department of Veterans Affairs
KEYED NOTE
WALL TYPE
X
X WINDOW TREATMENT TYPE
EQUIPMENT
INTERIOR FINISH TYPE
FURNITURE, FIXTURE, EQUIPMENT
CONTRACT LIMIT LINE
COLUMN CENTER LINE
NEW WALL
DEMOLITION
EXISTING WALL
NORTH
APPROVED FOR CONSTRUCTION
Project No: 675-22-701
Orlando, FL 32803
DESIGN TEAM
ABBREVIATIONS OWNER
CODE REFERENCES
PROJECT DESCRIPTION
FACILITY MAP
SYMBOL LEGEND
BUILDING INFORMATION
GENERAL NOTES
VICINITY MAP
INFECTION CONTROL MEASURES
THIS PROJECT IS LOCATED IN ORLANDO, FLORIDA AT THE LAKE BALDWIN VA MEDICAL
CENTER. ALL TELECOMMUNICATION ROOMS ARE EXISTING AND CURRENTLY
OPERATIONAL AT THE FACILITY. THE INTENT OF THIS PROJECT IS TO CORRECT NOTED
DEFICIENCIES AND BRING THE CAMPUS UP TO THE CURRENT STANDARD AS OUTLINED IN
THE VA OI&T INFRASTRUCTURE STANDARDS DESIGN GUIDE. THE SCOPE OF WORK FOR
THIS PROJECT INCLUDES BUILDINGS 500, 501, 502, 504, 505, 506, 507, 508, 510, 517, 519, 519A, 521, 3128, 3129, 3130, 3132, 3133, 3134 AND SITE AS OUTLINED IN THE SOW.
THIS WORK SHALL INCLUDE BUT NOT BE LIMITED TO ARCHITECTURAL, CIVIL,
MECHANICAL, PLUMBING, & ELECTRICAL.
DESCRIPTIONSYMBOL
EHRM INFRASTRUCTURE UPGRADES, 675 - 22 -701
Lake Baldwin - Orlando VA Medical Center Department of Veterans Affairs
Architect
MPE Engineers
550 North Reo Street, Tampa, FL, 33609
MES Group, Inc
1050 E. Southern Ave. Suite 5, Tempe, Arizona 85282
AESUS Design Group
David Keith
813-289-4700
David Combs (dcombs@aesusdesign.com)
480-454-2861
NORTH
PROJECT AREA
Lake Baldwin - Orlando VA Medical Center
A. ANY CHANGES MUST BE APPROVED BY COR BEFORE DOING ANY
ADDITIONAL WORK. WORK SCHEDULE TO BE PERFORMED DURING
REGULAR DAY SHIFT HOURS (8AM-4:30PM) ANY WORK OUTSIDE OF
REGULAR SCHEDULE REQUIRES APPROVAL FROM COR.
B. COORDINATE STAGING AREA WITH COR, AND FIND INTERIOR
COVERED STORAGE ON SITE FOR MATERIALS THAT MUST BE
PROTECTED FROM ELEMENTS - COORDINATE WITH COR.
C. PERFORM WORK IN ACCORDANCE WITH VHA DIRECTIVE 2004-012
SAFETY AND HEALTH DURING CONSTRUCTION ACTIVITIES AND VHA
DIRECTIVE 7701 OCCUPATIONAL SAFETY AND HEALTH (OSH) .
D. WORK PERFORMED FOR THIS PROJECT MAY INTERRUPT SERVICE TO
ADJACENT AREAS AT TIMES BUT WILL NOT INTERRUPT OVERALL
FACILITY OPERATION. SEE ELECTRICAL FOR POWER INTERRUPTION
AND OUTAGE REQUIREMENTS.
E. CONTRACTOR TO VERIFY ALL DETAILS AGAINST EXISTING
CONDITIONS PRIOR TO PURCHASE OF EQUIPMENT AND PRIOR TO
CONSTRUCTION. CONTRACTOR IS RESPONSIBLE FOR BRINGING ANY
DISCREPANCIES IN PLANS AND EXISTING SITE CONDITIONS TO
IMMEDIATE ATTENTION OF CONTRACTING OFFICER
REPRESENTATIVE.
F. CONTRACTOR SHALL PERFORM ALL WORK AND PROVIDE ALL
MATERIALS IN ACCORDANCE WITH VA MASTER CONSTRUCTION
SPECIFICATIONS, WHICH CAN BE FOUND AT
HTTP://WWW.CFM.VA.GOV/TIL/. WHERE DISCREPANCIES ARE FOUND
THE MORE STRINGENT SHALL APPLY.
G. NOT ALL KEYNOTES ARE ON ALL SHEETS.
BUILDING CODE:
2020 FBC - INTERNATIONAL BUILDING CODE
2020 FBC - EXISTING BUILDING CODE
2020 FBC - INTERNATIONAL ENERGY CONSERVATION CODE
2020 FFPC - NFPA
ACCESSIBILITY CODE & GUIDELINES:
ABAAS & BFDG
MECHANICAL CODE:
2020 FBC - INTERNATIONAL MECHANICAL CODE
PLUMBING CODE:
2020 FBC - INTERNATIONAL PLUMBING CODE
ELECTRICAL CODE:
2020 FBC - INTERNATIONAL ELECTRICAL CODE
NO LIFE SAFETY WILL BE AFFECTED BY THIS PROJECT.
NFPA
NFPA 101 LIFE SAFETY CODE
NFPA NATIONAL FIRE CODES
NFPA 900 (OSHA)
Civil Engineer
3242, Henderson Boulevard
Suite 200
Pennoni Associates, Inc
Tampa, FL 33609
813-258-0066
Revisions: Date:
STAMPSTAMP
12.21.2023
1. THE CONSTRACTOR AND THE CONTRATOR'S SUBS SHALL HAVE RESPONSIBILITY FOR THE DISCOVERY, PRESENCE, HANDLING REMOVAL OR DISPOSAL OF OR EXPOSURE OF PERSONS TO HAZARDOUS MATERIALS IN ANY FORM AT THE PROJECT SITE, INCLUDING BUT NOT LIMITED TO ASBESTOS, ASBESTOS PRODUCTS, LEAD-BASED PAINTS, POLYCHLORINATED BIPHENYL (PCB) OR OTHER TOXIC SUBSTANCES. CONTRACTOR SHALL BE RESPONSIBLE FOR PROTECTION OF EXISTING HVAC FILTERS WITHIN
THE AREA OF WORK.
2. ALL PENETRATIONS IN GYPSUM WALL BOARD CEILINGS SHALL BE TIGHTLY
SEALED.
3. APPROPRIATE PROTECTION OF THE PUBLIC AND WORKMEN SHALL BE TAKEN
REGARDING WORK INVOLVING SAID MATERIALS.
4. ADDITIONAL SUSPECT MATERIALS DISCOVERED ON SITE, WHICH WILL BE DISTURBED BY THIS WORK, SHALL BE BROUGHT TO THE ATTENTION OF THE ARCHITECT AND OWNER FOR EVALUATION AND ADDITIONAL TESTING. SUSPECT MATERIALS SHALL NOT BE DISTURBED. SUSPECT MATERIALS SHALL BE ISOLATED FROM THE REMAINING WORK AREA BY APPROPRIATE MEMBRANE BARRIERS UNTIL TESTING RESULTS ARE RECEIVED AND APPROPRIATE PROTECTION AND REMEDIAL MEASURES CAN BE
ASSESSED.
5. ASBESTOS-CONTAINING MATERIALS AFFECTED BY THIS WORK SHALL BE
REMOVED AND DISPOSED OF IN ACCORDANCE WITH 29 CFR 1926.1101 (OSHA)
AND NESHAP's REGULATIONS.
6. ASBESTOS REMOVAL SHALL BE PERFORMED BY A LICENSED ASBESTOS
ABATEMENT CONTRACTOR.
7. THE OWNER SHALL BE PROVIDED WITH COPIES OF ALL NOTIFICATIONS, PERMITS, AIR SAMPLING RESULTS, DISPOSAL
MANIFESTS AND ANY OTHER PAPER WORK GENERATED IN THE ABATEMENT PROCESS.
8. 'WARNING' ASBESTOS PRESENT MAY BE LOCATED IN AREAS SUCH AS: FIRE PROOFING ON STRUCTURAL STEEL OVERSPRAY ON 4" I-BEAMS, CONCRETE DECKS, AND PIPING INSULATION TO NAME A FEW. CONTRACTOR TO DISPOSE OF ALL HAZARDOUS WASTE IN ACCORDANCE WITH LOCAL, STATE AND FEDERAL REGULATIONS. CONTRACTOR TO WEAR PROPER PROTECTIVE GEAR ACTING IN ACCORDANCE WITH LOCAL, STATE AND FEDERAL REGULATIONS. REFER TO SPECIFICATION SECTION 02 82 13.
9. 'WARNING' ASBESTOS MAY BE PRESENT IN VINYL COMPOSITION TILE AND MASTIC. CONTRACTOR TO DISPOSE OF ALL HAZARDOUS WASTE IN ACCORDANCE WITH LOCAL, STATE AND FEDERAL REGULATIONS. CONTRACTOR TO WEAR PROPER PROTECTIVE GEAR ACTING IN ACCORDANCE WITH LOCAL, STATE AND FEDERAL REGULATIONS.REFER TO SPECIFICATION
SECTION 02 82 13.19.
10. 'WARNING' LEAD MAY BE PRESENT IN STRUCTURAL STEEL PAINT AND OTHER PAINTED SURFACES. CONTRACTOR TO DISPOSE OF ALL HAZARDOUS WASTE IN ACCORDANCE WITH LOCAL, STATE AND FEDERAL REGULATIONS. CONTRACTOR TO WEAR PROPER
PROTECTIVE GEAR ACTING IN ACCORDANCE WITH LOCAL, STATE AND FEDERAL REGULATIONS.
11. REMOVE ALL ASBESTOS CONTAINING MATERIALS IDENTIFIED INCLUDING, BUT NOT LIMITED TO, VCT FLOORING, CEILING TILES, FIREPROOFING AND EXTERIOR PANELS AFFECTING BY SCOPE OF WORK.
12. CONTRACTOR SHALL REMOVE ENVIRONMENTALLY REGULATED MATERIALS INCLUDING BUT NOT LIMITED TO, ASBESTOS (TSI ELBOW, SPRAY-APPLIED ACOUSTIC CEILING COVERING, 12"X12" FLOOR TILE AND ASSOCIATE MASTIC, VINYL SHEET FLOORING, BASE COVE AND ADHESIVE, SHEETROCK WALLS AND JOINT COMPOUND, 12"X12" ACOUSTIC WALL TILE AND ADHESIVE, 2'X4' LAY-IN CEILING PANELS, FIREPROOFING AND DEBRIS). IT SHALL BE THE CONTRACTOR'S OBLIGATION TO UNDERSTAND TO THE NATURE, CHARACTER, QUALITY AND SIZES OF MATERIALS LIKELY TO BE ENCOUNTERS AND IMPACTED BY THE PROJECT. FAILURE TO BE SO DOES NOT RELIEVE THE CONTRACTOR FROM THE OBLIGATION TO FURNISH ALL MATERIALS AND LABOR TO CARRY OUT THE
PROVISIONS OF THIS CONTRACT.
13. CONTRACTOR IS SOLELY RESPONSIBLE FOR COORDINATING WORK ACTIVITIES THAT MAY IMPACT ENVIRONMENTALLY-
REGULATED MATERIALS WITH WORK SPECIFIED IN OTHER CONTRACT DOCUMENT SECTIONS.
14. CONTRACTOR SHALL BE RESPONSIBLE FOR ADEQUATELY PROTECTING ANY ITEMS TO REMAIN INCLUDING, RETAINING WALLS, MECHANICAL, ELECTRICAL, PLUMBING AND OTHER UTILITIES NOT SPECIFIED TO BE DEMOLISHED. REFER TO SPECIFICATIONS, ARCHITECTURAL, DEMOLITION AND MEP DRAWINGS.
15. ENERGIZED EQUIPMENT AND UTILITIES (ELECTRICAL TRANSFORMERS AND MECHANICAL, ELECTRICAL AND PLUMBING SYSTEMS) AS TAGGED BY THE OWNERS REPRESENTATIVE MUST REMAIN ENERGIZED DURING ABATEMENT ACTIVITIES.
CONTRACTOR SHALL ADEQUATELY PROTECT EQUIPMENT AND UTILITIES AND TAKE APPROPRIATE PRECAUTIONS TO PREVENT
PERSONNEL INJURIES OR DAMAGE TO THE STRUCTURE.
16. SEAL ALL AREAS. FLOOR PENETRATIONS WITH PLASTIC, TAPE, EPOXY OR FOAM OR A COMBINATION THEREOF TO PREVENT
MIGRATION OF LIQUID OR DEBRIS FROM THE WORK.
17. CONTRACTOR SHALL DISMANTLE FLUORESCENT LIGHT FIXTURES AND CONTAINERIZE FIXTURE BALLASTS FOR DISPOSAL BY
OWNER.
18. CONTRACTOR SHALL REMOVE AND RECYCLE OZONE DEPLETING SUBSTANCES (ODS) SUCH AS CHLOROFLUOROCARBONS (CFCS) AND HYDROCHLOROFLUOROCARBONS (HCFCS), AS WELL AS HALON, SULFUR DIOXIDE (SO2) AND AMMONIA (NH3) FROM
SYSTEMS, EQUIPMENT AND COMPONENTS.
19. CONTRACTOR SHALL KEEP ASBESTOS, LEAD, PCBS, METALS AND ETC. WASTES IN SEPARATE CONTAINERS.
20. CONTRACTOR SHALL PROVIDE ALL WASTE CHARACTERIZATION / TESTING AND PROFILES FOR DISPOSAL OF ALL REMOVED AND DEMOLISHED BUILDING MATERIALS AND EQUIPMENT COATED WITH LEAD PAINT OR CONTAMINATED WITH LEAD AND METALS.
COLLECT CHARACTERIZATION SAMPLES WITH GOVERNMENT REPRESENTATIVE.
HAZARDOUS MATERIALS
1. THE CONTRACTORS SHALL COORDINATE EQUIPMENT AND MATERIAL
TRAFFIC AND STORAGE WITH COR.
2. ALL UTILITY WORK SHALL BE COORDINATED WITH MECHANICAL, PLUMBING
ELECTRICAL, AND FIRE PROTECTION.
3. ALL ASPECTS OF CONTRACTOR STAGING AND CONSTRUCTION PHASING
SHALL BE APPROVED BY COR.
4. ALL HOSPITAL ACCESS POINTS, AND ALL BUILDING EXITS, MUST REMAIN
ACCESSIBLE, CLEAR AND UNOBSTRUCTED THROUGHOUT ALL PHASES OF
DEMOLITION AND CONSTRUCTION. SHORT-TERM CLOSURE MAY BE
ACCEPTABLE AS COORDINATED WITH COR.
5. THE CONTRACTOR SHALL COORDINATE ALL ROOF TOP WORK AND ROOF
REPAIRS WITH THE COR.
6. ALL AREAS OF WORK SHALL BE FULLY ABATED AND CLEARED OF
HAZARDOUS MATERIALS BEFORE PROCEEDING WITH CONSTRUCTION.
7. THE GC SHALL REVIEW THE LATEST HAZARDOUS MATERIAL REPORT BY
ENCORP AND ABATEMENT SPECIFICATIONS 02 82 11 PRIOR TO PROVIDING A
FINAL BID.
8. PRIOR TO AND POST ABATEMENT ACTIVITIES MUST BE AUTHORIZED BY AN
APPROVED INSPECTOR. AN APPROVED INSPECTOR MUST BE ON SITE AT ALL
TIMES DURING ABATEMENT ACTIVITIES.
9. ABATEMENT AT INTERSTITIAL SPACE TO OCCUR AFTER OCCUPANTS AT
THE LEVEL BELOW HAVE RELOCATED TO TEMPORARY LOCATIONS AND
PRIOR TO DEMOLITION AND PREP.
CONTRACTOR WORK PLAN:
CONTRACTOR IS TO SUBMIT WORK PLAN TO INCLUDE THE FOLLOWING FOR
APPROVAL BY COR:
1. CONSTRUCTION ENTRANCE
2. CONTRACTOR TRAFFIC PATH TO CONSTRUCTION SITE
3. SERVICE ELEVATORS
4. CONSTRUCTION BARRIER
- TEMPORARY WALL AND DOOR
5. TACKY DUST MAT (SIZE)
6. EXISTING DOOR AND PARTITION TO ACT AS ICRA BARRIER. CONTRACTOR
SHALL MODIFY EXISTING ASSEMBLIES AS NECESSARY TO ENSURE EXISTING
PARTITION MEETS THE CRITERIA FOR ICRA PARTITIONS AS DESCRIBED IN
GENERAL NOTES.
7. PROVIDE NEGATIVE PRESSURE AIR MACHINES FOR BOTH HAZARDOUS
MATERIAL ABATEMENT AND NON-HAZARDOUS MATERIAL WORK. REFER TO
DIVISION 01 & 02 SPECIFICATIONS FOR ADDITIONAL INFORMATION. HEPA
FILTRATION WILL ALSO BE REQUIRED.
8. TEMPORARY EXITING
- EXISTING MEANS OF EGRESS AND EXITS ARE TO BE MAINTAINED
DURING DEMOLITION AND CONSTRUCTION.
- MAINTAIN 44 INCHES MINIMUM CLEARANCE TO ALL REQUIRED
EXITS.
9. TEMPORARY DIRECTIONAL SIGNAGE
10. TEMPORARY LIGHTING/EMERGENCY LIGHTING
-EXIT SIGN AT CONSTRUCTION ENTRANCE/EXIT DURING ALL PHASES
OF CONSTRUCTION.
11. TEMPORARY SPRINKLERS PER NFPA
12. FIRE EXTINGUISHERS
-AT LEAST ONE EXTINGUISHER SHALL BE PROVIDED AN EACH
FLOOR LEVEL
-AT EACH STAIRWAY,
-AT LEAST ONE EXTINGUISHER IN ALL STORAGE AND
CONSTRUCTION SHEDS,
-AT LEAST ONE EXTINGUISHER IN LOCATIONS WHERE FLAMMABLE
OR COMBUSTIBLE LIQUIDS ARE STORED OR USED
-AT LEAST ONE EXTINGUISHER WHERE OTHER SPECIAL HAZARDS
ARE PRESENT PER CFC SECTION 3315.1.
13. ALL CONTRACTORS AND/OR THEIR SUB-CONTRACTORS PERFORMING
WORK ON THE PROJECT PREMISES SHALL BE RESPONSIBLE FOR INITIATING,
MAINTAINING AND SUPERVISING A REASONABLE PRUDENT SAFETY
PROGRAM INCLUDING, BUT NOT LIMITED TO, THE ISOLATION OF WORK
AREAS AND THE PROMPT REMOVAL OF ANY DEBRIS OR TOOLS WHICH MIGHT
ENDANGER OTHER WORKERS AND/OR OCCUPANTS.
14. CONTRACTOR SHALL BE RESPONSIBLE FOR THE PROTECTION OF AND
WHERE REQUIRED BY THE VA, THE OPERATIONAL MAINTENANCE OF FIRE
LIFE SAFETY DEVICES WITHIN THE AREA OF WORK
CONTRACTOR WORK PLAN GENERAL DEMOLITION NOTES
A. EXISTING CONSTRUCTION TO BE REMOVED IS INDICATED ON
THE DRAWINGS: COORDINATE DEMOLITION WITH
ARCHITECTURAL DRAWINGS AND REQUIREMENTS SHOWN ON
ALL MECHANICAL PLUMBING AND ELECTRICAL, AND
STRUCTURAL DRAWINGS
B. EXISTING CONDITIONS SHOWN ARE FROM AVAILBLE RECORD
DRAWINGS AND VISUAL FIELD SURVEYS. THE CONTRACTOR
SHALL VERIFY ACTUAL EXISTING CONDITIONS AND NOTIFY THE
OWNER OF ANY DISCREPENCIES.
C. CONDUCT DEMOLITION TO MINIMIZE INTERFERENCE WITH
ADJACENT BUILDING AREAS
D. AREA OF WORK CONTAINS BUILDING INFRASTRUCTURE WHICH
MAY BE CRITICAL TO THE ONGOING OPERATIONS OF THE
HOSPITAL. ATTENTION SHALL BE BROUGHT TO THE COR PRIOR
TO ANY DEMOLITION OR SHUT-DOWNS. REFER TO
SPECIFICATIONS FOR MAJOR AND MINOR SHUTDOWN
PROCEDURES.
E. PROTECT EXISTING MATIERALS AND EQUIPMENT WHICH ARE
NOT TO BE DEMOLISHED. CONTRACTOR TO PROTECT FROM
DAMAGE ALL EXISTING FLOORS, WALLS, CEILINGS, ETC.
CONTRACTOR IS RESPONSIBLE FOR REPAIR AND
REPLACEMENT OF ALL DAMAGED FLOORING, WALLS, CEILINGS,
ETC. IF AREAS NEED TO BE REPAIRED, FINISHES ARE TO
MATCH EXISTING.
F. MAINTAIN PROTECTED EGRESS AND ACCESS TO THE WORK.
ALSO MAINTAIN REQUIRED EGRESS AROUND TEMPORARY
PARTITIONS.
G. REMOVE ANY UNUSED OR ABANDONED MATERIALS IN WALLS
AND ABOVE CEILINGS.
H. THE CONTRACTOR SHALL NOTIFY THE OWNER IN ADVANCE OF
ANY SCHEDULED DEMO WORK IN THE AREA TO ALLOW THE
OWNER TO REMOVE PERSONAL BELONGINGS AND DESIGNATE
ALL MEDICAL EQUIPMENT, FURNITURE, AND OTHER ITEMS TO
BE SALVAGED AND STORED BY THE CONTRACTOR. ALL ITEMS
NOT DESIGNATED AS "SALVAGED" BY THE OWNER AFTER THIS
TIME SHALL BE DISPOSED OF BY THE CONTRACTOR. REFER TO
SPECIFICATION FOR NOTIFICATION REQUIREMENTS.
I. OWNER SHALL REMOVE ALL EQUIPMENT AND WALL-MOUNTED
FURNITURE, AND ALL WALL MOUNTED SINGAGE AND ARTWORK
TO BE SALVAGED PRIOR TO COMMENCEMENT OF DEMOLITION.
J. SCOPE OF WORK TO BE REMOVED IS SHOWN WITH DASHED
LINES. COORDINATE EXTENT OF DEMOLITION OF EXISTING
ITEMS TO BE PARTIALLY DEMOLISHED WITH THE FLOOR PLAN
AND REFLECTED CEILING PLAN.
K. REMOVE AND SALVAGE ANY DOORS, DOOR CLOSERS, AND
MAGNETS, PNEUMATIC DAMPER OPERATORS, AND HEATING
COIL ACTUATORS AND VLAVES. SALVAGED ITEMS ARE TO BE
STORED BY CONTRACTOR IF THEY ARE TO BE RE-USED IN
PROJECT. REPORT ANY OTHER ITEMS TO OWNER FOR
HANDLING.
L. CONTRACTOR SHALL REMOVE EXISTING INSULATION OR PIPE
JACKETING WHERE IT DOES NOT COMPLY WITH FIRE
STOPPING REQUIREMENTS AT PIPING PENETRATIONS AND
OTHER CONDITIONS WHERE FIRE STOPPING IS REQUIRED.
REFER TO, AND COMPLY WITH, I.B.C. SECTION 712.
M. REMOVE ANY REMAINING CASEWORK AND EQUIPMENT NOT
INDICATED ON PLANS IN SPACES, REQUIRING DEMOLITION IN
ITS ENTIRETY.
N. REMOVE AND DISPOSE OF ALL DEMOLISHED MATERIALS OFF-
SITE WHICH ARE NOT SCHEDULED TO REMAIN, BE RELOCATED,
OR BECOME THE PROPERTY OF THE OWNER.
O. DO NOT PROCEED WITH DEMOLITION WORK BEFORE THE
INSTALLATION OF CONSTRUCTION TUNNEL AND BARRICADES.
RELOCATE CONSTRUCTION BARRICADES AS NECESSARY FOR
CONSTRUCTION WORK AND/OR AS DIRECTED BY VA AT NO
ADDITIONAL COST TO VA.
P. CONTRACTOR TO SUBMIT BARRICADE LOCATIONS DRAWINGS
TO VA FOR REVIEW AND APPROVAL PRIOR TO THE
INSTALLATION.
Q. PROVIDE CONSTRUCTION BARRICADE IN ALL OCCUPIED AREAS
AS REQUIRED AND/OR AS DIRECTED BY VA AT NO ADDITIONAL
COST TO VA.
R. PROVIDE TEMPORARY EXIT SIGNS AND ILLUMINATION LEVELS
PER THE IBC AND VA GUIDELINES. ALL EGRESS PATHS SHALL
REMAIN CLEAR AT ALL TIMES.
S. ALL CONSTRUCTION BARRICADES FIRE-RATING SHALL
MAINTAIN FIRE RATING CONTINUITY OF THE SURROUNDING
WALLS. FIRE-RATING OF CONSTRUCTION ACCESS DOORS
SHALL BE APPROPRIATE FOR THE FIRE-RATED WALL TYPES.
PAINT ALL TUNNELS AND BARRICADES ON THE SIDE VISIBLE TO
THE PUBLIC.
T. CONTRACTOR TO VERIFY EXISTING CONDITIONS AT ALL
COLUMNS AND CHASES PRIOR TO DEMOLITION
U. REMOVE CONSTRUCTION TUNNEL AND BARRICADE AT
COMPLETION OF EACH PHASE AND EACH PROJECT'S
CONSTRUCTION WORK, U.O.N.
V. DO NOT PENETRATE THE FLOOR SLAB WITHOUT
COORDINATING WITH STRUCTURAL REQUIREMENTS.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10 engineering discipline <EDIT TEXT>:
FINAL - BID
DOCUMENTS
C U s e rs \E m a n te
\D o c u m e n ts \L o c a l R e v it \2
\6
-2 -7
V
A L a k e B a ld w in
R e v it jd o rn a n D
S R
W .r v t
/2 /2
:4
:5
P
M
GI002
SHEET INDEX EHRM VA LAKE BALDWIN
5201 Raymond St, Orlando, FL 32803
675-22-701
Dec. 22.2023 AESUS AESUS
AESUS DESIGN GROUP
1050 E. Southern Ave., Suite D
Tempe, AZ, 85282
480-454-2861
David Combs
MES GROUP, INC
550 North Reo Street
Tampa, FL, 33609
813-289-4700
David Keith
ISSUED SHEETS
Sheet Number Sheet Name
GENERAL
GI001 COVER SHEET
GI002 SHEET INDEX
GI003 GENERAL NOTES
GI004 GENERAL NOTES
ARCHITECTURE
AS100 SITE PLAN
AE100 BLDG 500 1ST FLOOR PLAN PHASING
AE101 BLDG 500 - TR_1816 - 1ST FLOOR PLAN
AE102 BLDG 500 - TR_VBA - 1ST FLOOR
AE103 BLDG 500 - TR_ZONE 1 - 1ST FLOOR PLAN
AE104 BLDG 500 - TR_ZONE 1 - RCP
AE105 BLDG 500 - TR_ZONE 2 - 1ST FLOOR PLAN
AE106 BLDG 500 - TR_ZONE 2 - RCP
AE107 BLDG 500 - TR_ZONE 3 - 1ST FLOOR PLAN
AE108 BLDG 500 - TR_ZONE 3 - RCP
AE109 BLDG 500 - TR_ZONE 4 - 1ST FLOOR PLAN
AE110 BLDG 500 - TR_ZONE 4 - RCP
AE111 BLDG 500 - TR_ZONE 5 - 1ST FLOOR PLAN
AE112 BLDG 500 - TR_ZONE 5 - RCP
AE113 BLDG 500 - 2ND FLOOR PLAN
AE114 BLDG 500 - 3RD FLOOR PLAN
AE115 BLDG 500 - 4TH FLOOR PLAN
AE201 BLDG 501 1ST FLOOR PLAN
AE202 BLDG 501 1ST FLOOR RCP
AE301 BLDG 502 1ST FLOOR PLAN
AE401 BLDG 504 1ST FLOOR PLAN
AE402 BLDG 504 1ST FLOOR RCP
AE501 BLDG 505 & 506 1ST FLOOR PLANS
AE502 BLDG 505 & 506 1ST FLOOR RCPS
AE601 BLDG 507 & 508 & 510 1ST FLOOR PLANS
AE602 BLDG 507 & 508 & 510 RCPS
AE701 BLDG 517 & 519 1ST FLOOR PLANS
AE702 BLDG 517 & 519 1ST FLOOR RCPS
AE703 BLDG_519 2ND FLOOR PLAN
AE801 BLDG 3128 & 3129 & 3130 1ST FLOOR PLANS
AE802 BLDG 3128 & 3129 & 3130 1ST RCPS
AE901 BLDG 3132 & 3133 & 3134 1ST FLOOR PLANS
AE903 BLDG 3126 & 3136 1ST FLOOR PLANS
AE904 BLDG 3126 & 3136 1ST RCPS
AE902 BLDG 3132 & 3133 & 3134 1ST RCPS
AE910 GYP BD DETAILS
AE911 PARTITION HEAD DETAILS
AE912 DOOR AND FINISH SCHEDULES
AE913 PARTITION TYPES
AE914 FIRE RATED ASSEMBLIES
AE950 FIRE RATED ASSEMBLIES - U419, BW-S-0001, BW-S-0023
AE951 FIRE RATED ASSEMBLIES - HW-D-0538, HW-D-0539
AE952 FIRE RATED ASSEMBLIES - HW-D-0388, HW-D-0218
AE953 FIRE RATED ASSEMBLIES - HW-D-0259, HW-D-0634
AE954 FIRE RATED ASSEMBLIES - HW-D-0639
AE955 FIRE RATED ASSEMBLIES - W-L-1222, W-L-5073, W-L-8081, C-AJ-3214,
C-AJ-3260, C-AJ-3285
CIVIL
C0.0 COVER SHEET
C1.0 GENERAL NOTES
C1.1 STORMWATER POLLUTION PREVENTION PLAN
C2.0 DEMOLITION & EROSION CONTROL
C3.0 HORIZONTAL CONTROL PLAN
C6.0 CONSTRUCTION DETAILS
MECHANICAL
MH001 MECHANICAL NOTES AND LEGENDS
MH002 SCOPE OF WORK - MECHANICAL
MH003 SITE PLAN - MECHANICAL
MH101.1 BUILDING 500 FIRST FLOOR OVERALL PLAN - MECHANICAL
MH101.2 BUILDING 500 SECOND FLOOR PLAN - MECHANICAL
MH101.3 BUILDING 500 THIRD AND FOURTH FLR PLANS - MECHANICAL
MH102 BUILDING 501 - MECHANICAL PLAN
MHP103 BUILDING 502 - MECHANICAL & PLUMBING PLANS
MH104 BUILDING 504 - MECHANICAL PLAN
MH105 BUILDINGS 505, 506 - MECHANICAL PLANS
MH106 BUILDINGS 507, 508 - MECHANICAL PLANS
MH107 BUILDINGS 510, 517 - MECHANICAL PLANS
MH108 BUILDING 519 FIRST FLOOR - MECHANICAL PLAN
MH109 BUILDING 519 THIRD FLOOR - MECHANICAL PLANS
MH110 BUILDINGS 3128, 3129, 3130 - MECHANICAL PLANS
MH111 BUILDINGS 3132, 3133, 3134- MECHANICAL PLANS
MH112 BUILDING 3126 - MECHANICAL PLAN
MH401 BLDG 500 FIRST FLR ENLARGED PLANS - MECHANICAL
MH402 BLDG 500 FIRST FLR ENLARGED PLANS - MECHANICAL
MH403 BLDG 500 FIRST FLR ENLARGED PLANS - MECHANICAL
MH500 TYPICAL RACK LAYOUT
MH501 DETAILS - MECHANICAL
MH600 SCHEDULES - HVAC
FIRE PROTECTION
F000 FIRE PROTECTION NOTES, LEGENDS AND DETAILS
FX101 BUILDING 500 FIRST FLOOR OVERALL PLAN - FIRE PROTECTION
FX102 BUILDING 501 PLANS - FIRE PROTECTION
ISSUED SHEETS
Sheet Number Sheet Name
FX103 BUILDING 502 PLANS - FIRE PROTECTION
FX104 BUILDING 504 PLANS - FIRE PROTECTION
FX105 BUILDING 519 PLANS - FIRE PROTECTION
FX401 BUILDING 500 FIRST FLOOR ENLARGED PLANS - HAZARD PLANS
FX402 BUILDING 500 FIRST FLOOR ENLARGED PLANS - FIRE PROTECTION
PLANS
ELECTRICAL
E0000 ELECTRICAL NOTES, LEGEND AND ABBREVIATIONS
E001 ELECTRICAL SITE OVERALL PLAN
ES100 FIBER DISTRIBUTION SITE PLAN
ET100 BLDG 500 - LEVEL 1 OVERALL PLANS
ET100A BUILDING 500 - BUILDING FIBER BACKBONE
ET100B BUILDING 500 - LEVEL 1 - CABLE TRAY
ET101 BUILDING 500 - LEVEL 1 - REVISED TELECOM ROOMS PLANS
ET102 BLDG 500 - L1 - EXIST. AND NEW DATA, FIBER DISTRIBUTION NW
ET103 BLDG 500 - L1 - EXIST. AND NEW DATA, FIBER DISTRIBUTION NW
ET104 BLDG 500 - L1 - EXIST. AND NEW DATA, FIBER DISTRIBUTION SW
ET105 BLDG 500 - L1 - EXIST. AND NEW DATA, FIBER DISTRIBUTION NE
ET106 BLDG 500 - L1 - EXIST. AND NEW DATA , FIBER DISTRIBUTION NE
ET107 BLDG 500 - L1 - EXIST. AND NEW DATA, AND FIBER DISTRIBUTION SE
ET108 BLDG 500 - L1 - EXIST. AND NEW DATA, FIBER DISTRIBUTION SE
ET109 BLDG 500 - L1 - DIAMOND DIAGRAM
ET110 BLDG 500 - L2 - EXIST. AND UPDATED TELECOM ROOMS PLANS
ET111 BLDG 500 - L2 - DATA AND FIBER DISTRIBUTION
ET112 BLDG 500 - L3 - EXIST. TELECOM ROOMS
ET113 BLDG 500 - L3 - DATA AND FIBER DISTRIBUTION
ET114 BLDG 500 - L4 - EXIST. TELECOM ROOMS
ET115 BLDG 500 - L4 - DATA AND FIBER DISTRIBUTION
ET200 BLDG 501 - EXISTING TELECOM ROOMS
ET201 BLDG 501 - DATA AND FIBER DISTRIBUTION
ET300 BLDG 502 - EXIST. AND UPDATED TELECOM ROOMS PLANS
ET301 BLDG 502 - DATA AND FIBER DISTRIBUTION
ET400 BLDG 504 - EXIST. AND UPDATED TELECOM ROOMS PLANS
ET401 BLDG 504 - DATA AND FIBER DISTRIBUTION
ET500 BLDG 505,506,507,508 - EXIST. AND UPDATED TELECOM ROOMS
ET501 BLDG 505,506,507,508 - DATA AND FIBER DISTRIBUTION
ET600 BLDG 519,521,510,517 - EXIST. AND UPDATED TELECOM ROOMS
ET601 BLDG 519,521,510,517 - DATA AND FIBER DISTRIBUTION
ET602 BLDG 519 - L3 - EXIST. AND UPDATED TELECOM ROOMS PLANS
ET603 BLDG 519,519A,521 - L3 - DATA DROP AND FIBER DISTRIBUTION
ET700 BLDG 3128,3129,3130,3132 - EXIST. AND UPDATED TELECOM ROOMS
ET701 BLDG 3128,3129,3130,3132 - DATA AND FIBER DISTRIBUTION
ET800 BLDG 3133,3134 - EXIST. AND UPDATED TELECOM ROOMS PLANS
ET801 BLDG 3133,3134 - DATA AND FIBER DISTRIBUTION
ET900 FIBER BACKBONE SCHEMATIC
ET901A BLDG 3136, 3136 - DATA AND FIBER DISTRIBUTION
ET901B BLDG 3126, 3136 - EXIST. AND UPDATED TELEC.ROOMS PLANS
EL101 BLDG 500 - LEVEL 1 - ELECTRICAL CABLE TRAYS AND LIGHTING
EL400 BLDG 504 - CABLE TRAY AND LIGHTING
EL500 BLDG 505,506,507,508 - CABLE TRAYS AND LIGHTING
EL600 BLDG 519 - ELECTRICAL CABLE TRAY AND LIGHTING
EP100 BUILDING 500 - LEVEL 1 - POWER
EP101 BUILDING 500 - LEVEL 2 - POWER
EP102 BUILDING 500 - LEVEL 3 - POWER
EP103 BUILDING 500 - LEVEL 4 - POWER
EP104 BUILDING 500 - ELECTRICAL MEZANNINE
EP200 BUILDING 501 - POWER
EP300 BUILDING 502 - POWER
EP400 BUILDING 504 - POWER
EP500 BUILDING 505,506,507,508 - POWER
EP600 BUILDING 519, 510, 517 - POWER
EP700 BUILDING 3128, 3129, 3130, 3132 - POWER
EP800 BUILDING 3133, 3134 - POWER
E600 ELECTRICAL DETAILS
E601 EXISTING AND REVISED RACK ELEVATIONS - DETAILS
E602 EXISTING AND REVISED RACK ELEVATIONS - DETAILS
E603 TYPICAL TR AND TE GROUNDING DETAILS
E604 UNDERGROUND FIBER AND ELECTRICAL DUCTBANK DETAILS
E605 TYPICAL RACK CHARACTERISTICS DETAILS
E606 ELECTRICAL LIGHTING DETAIL
E607 PRELIMINARY GROUNDING RISER DIAGRAM
E701 ONE-LINE DIAGRAM - MV DISTRIBUTION SYSTEM
E702 ONE-LINE DIAGRAM - 501-L1, 502-SWBD1, 513-MDP
E703 ONE-LINE DIAGRAM - 506-ADMIN-P3, 507-ADMIN-P2
E704 ONE-LINE DIAGRAM - 500-SWBD-3-EM, 500-SWBD-3
E705 ONE-LINE DIAGRAM-500-SWBD-2 AND 500 SWBD-4
E706 ONE-LINE DIAGRAM-500-SWBD-2 AND 500 SWBD-4 CONTINUED
E707 REVISED ONE LINE DIAGRAM
E708 REVISED RISER FOR BUILDING 500 1ST FLOOR TRs
E803 PANEL SCHEDULES OF BLDG 500 1ST FLOOR PANELS
E804 PANEL SCHEDULES OF BLDG 500 2ND, 3RD AND 4TH FLOOR
E805 NEW PANEL SCHEDULES FEEDING EMERGENCY TRs OF DIFF BLDGS
E806 PANEL SCHEULES 1
E807 PANEL SCHEDULES 2
E808 PANEL SCHEDULES 3
Revisions: Date:
C
CC
O N C
C
LF
W O O D
D E C K
W O O D
D E C K
W O O D
D E C K
WO
OD DE
CK
WO
OD ST
EP
S
W O O D
S T E P S
W O O D
D E C K
W O O D
D E C K
W O O D
R A M P
WOOD
DECK
W O O D
D E C K
W O O D
D E C K
W O O D
D E C K
(T Y P
W O O D
R A M P
W O O D
S T E P S
(T Y P
G A Z E B O
W O O D
R A M P
W O O D
D E C K
W O O D
D E C K
WOOD
DECK
WOOD
RAMP
8' CW UNDER WOOD
RAMP
C O V E R E D
W O O D
C O V E R E D
W O O D
W O O D
S T E P S
WOOD
RAMP
W O O D
D O C K
8' CW UNDER WOOD
RAMP
WOOD
RAMP
WOOD
DECK
W O O D
S T E P S
N89°59'50"W 70.57'
PLAT S
°0 '5 "E
.4
P
LA
T
BRICK
BRICK
D
IR
T
R O A D
DI
RT RO
AD
DIRT
ROAD
D
IR
T
D
IR
T
D
IR
T
D
IR
T
D
IR
T
S A
TE
LL
IT
E
A N
TE
N N A
M E T A L
L
ID
T
1 STORY
MODULAR BUILDING
ADDRESS #508
37.7'
.8 ' 8.8'
.8
26.2'
.3
72.8'
.3
.3
72.8'
.3
26.2'
.8 '8.8'
.8
37.7'
1 STORY
MODULAR BUILDING
ADDRESS #507
MODULAR BUILDING
ADDRESS #505
60.3'
.4
' MODULAR BUILDING
#506
37.7'
.8 ' 8.8'
.8
26.2'
.3
72.8'
.3
S T O R Y
B
LO
C K
F R A M E
A D D R E S S
(C O U R T
Y A R D
N O T
LO
C A T E D
52.1'
.7
147.1'
4.5'
14.8'
66.7'
.6
15.7'
.4 '82.3'
.7
52.1'
.6
84.8'
.8
28.1'
31.9'
42.8'
.3
33'
.6
6.9'
.4
15.3'
.8
15.3'
.9
59.6'
.8
97.2'
.2
.6
97.3'
.1
.5
20'x8'
1 STORY
WOOD TRAILER
7 8
S
IG
N
STOP BAR
(TYP)
S
TO
P
B A R
(T Y P
S
TO
P
B A R
(T Y P
S
IG
N
STOP BAR
(TYP)
S
IG
N
MOTORCYCLE 1
11101011
MOTORCYCLE
1 1 1 1
SIGN
S
TO
P
B A R
(T Y P
SI
GN
8 8
S
IG
N
S
IG
N
B O
LL
A R D
(T Y P
B O
LL
A R D
(T Y P
F L A G
P O
LE
S
TO
P
B A R
(T Y P
B O
LL
A R D
(T Y P
B O L
LA
R D
(T Y P
B O L
LA
R D
(T Y P
B O L
LA
R D
(T Y P
M O T O R
C Y C
LE
C C
C C
CC
C P
C P
C W
C W
4'
CW
C O N C
D W
C P
5'
CW
C C
5'
CW
C P
C P
C O N C
C O N C
C W
C P C P
C O N C
CC
C C
CC
C C
CW
CW C
C
C O N C 6'
CW
C O N C
C P
C P
C O V E R E D
LO
A D
IN
G
D O C K
20.7
COV
D
C C
C C
C O N C
C O N C
C P
C P
C P
C P
ALIMINUM
STEPS
A L
IM
IN
U M
R A M P
C P
C P
C O N C
C O N C
C W
CP
C O N C
C C
C W
C P
C P
C P
C C
C C
C C
C O V E R E D
C W
C W
C W
COVERED
CW
C O V E R E D
C W
6'
CW
CC
S T E P
S T E P
S T E P
C C
C C
CONC
CW CW
C O N C
C O N C
A P R O N
C O N C
A P R O N
C O N C
A P R O N
5'
CW
CW
CW
C W
G A R V E L
C P
C W
C W
6'
CW
P la n te d
M o u n d
C P
C P
C O N C
9'
CW
9'
CW
C C
C W
CW
C P
4'
CW
4'
CW
C O N C
A P R O N
C O N C
A P R O N
C O N C
C O V D
C C
C O N C
C P
C O N C
C U R B
(T Y P
C O N C
C U R B
(T Y P
C O N C
R
IP
R A P
6'
CW
6'
CW
C W
5'
CW
5'
CW 5'
CW
5'
CW
5'
CW
6' C W
C O N C
C O N C
C O N C
F
LU
M E
C O N C
F
LU
M E
C O N C
F
LU
M E
C O N C
F
LU
M E
C O N C
'C W
C P
C O N C
' C W
C W
C O N C
L
ID
CONC
5'
CW
5'
CW
C W
C O N C
S
TE
P S
C O N C
S
TE
P S
C O N C
5'
CW
C W 6
C W
8'
CW
8'
CW 6'
CW
5'
CW
CONC
APRON
CONC
APRON
C O N C
A P R O N
7'
CW
CW
CW
C W
C W
C P
C P
6'
CW
C P
C P
C P
C P
C P
C W
5'
CW
CP
4'
CW
C W
R A M P
C O V D
CW
C P
5'
CW
C O N C
5' C W
C W
F O U N
TA
IN
C O V D
C W6
C W
8'
CW
C W
C P
C C
C W
4'
CW
4'
CW
C O N C
C W
C O N C
C O N C
C P
C W
C W
C W
C P
C W
C C
COVERED
CW
COVERED
CW
C W
5'
CW
CW
C W
C P
CP
C O N C
CONC
C C
G R A V E L
C O N C
S
TE
P S
C P
C P
C O N
C CONC
CC
RAMP
C P
CW
C W
'x
C P
'x
C P
'x
C P
C P
R A M P
R A M P
C C
C O N C
CW
C O N C
C C
CC
CC
C C
C C
C C
C C
R A M P
CC
C O N C
D
IR
T
CW
C C
C
CCONC
G E N E R A T O R
A R E A
R A M P
R A M P
C O V E R E D
R A M P
CW
L O A D
IN
G
D O C K
C O N C
C C
S
TE
P S
COVERED
RAMP
C O N C
C C
COVERED
CW
6'
CW
R
AM
P
C O N C
C O N C
C O N C
R A M P
C O N C
M E T A L
L
ID
C O N C
C U R B
(T Y P
C O N C
C R A W L S P A C E
A C C E S S
C W
8'
CW
METAL
STAIRS
C W
STAIRS
S T A
IR
S
CW
C O N C
C C
CONC
CW
G A R V E L
C O N C
S T E P S
RAM
P
R A M P
CW
4'
CW
'x
C P
C O N C
S T E P S
R A M P
'x
C P
C W
C W
2.5'
1.4'
32.1'
.1
.6
.8
49.3'
C W
C W
CC
C O V E R E D
C W
CONC
C C
C C
C O N C
CONC
STEPS
C W
G A R V E L
C P
C O N C
S
TE
P S
C W
CPC
C
CW
CONC
CW
C W
6'
CW
6'
CW
6'
CW CLF
C
LF
C
LF
C
LF
C
LF
D
IE
S E L
F U E L
S T O R A G E
C
LF
C
LF
C
LF
C
LF
C
LF
C
LF
C
LF
C
LF
C
LF
C
LF
C
LF
M F
M F
C
LF
C
LF
C
LF
C
LF
C
LF
C
LF
M F
1'W
0.5'W
M F
M F
0.7'W
0.4'W
1.5'W
C
LF
0.7'W
C
LF
.6
1.3'W
C
LF
C
LF
C
LF
S89°59'23"W 333.86'
MEAS
S87°40'34"E 206.41'
MEAS
S ° 5 ' 3 " W
.2
M E A S
S ° 5 ' 4
.0
M E A S
A S P H A
LT
A S P H A
LT
A S P H A
LT
A S P H A
LTA
S P H A
LT
A S P H A
LT
A S P H A
LT
ASPHALT
A S P H A
LT
A S P H A
LT
A S P H A
LT
A S P H A
LTA
S P H A
LT
A S P H A
LT
AS
PH
ALT
ASPHALT
A S P H A
LT
A S P H A
LT
ASPHALT
A S P H A
LT
A S P H A
LT
A S P H A
LT
A S P H A
LT
A S P H A
LT
ASPHALT
ASPHALT
ASPHALT
ASPHALT
ASPHALT
ASPHALT
ASPHALT
ASPHALT
ASPHALT
ASPHALT
ASPHALT
ASPHALT
ASPHALT
A S P H A
LT
A S P H A
LT
A S P H A
LT
A S P H A
LT
A S P H A
LT
ASPHALT
ASPHALT
ASP
HALT
A S P H A
LT
A S P H A
LT
A S P H A
LT
A S P H A
LT
A S P H A
LT
A S P H A
LT
A S P H A
LT
A S P H A
LT
F
LU
M E
A S P H A
LT
F
LU
M E
A S P H A
LT
ASPH
ALT
ASPH
ALT
ASPHALT
.3
.7
.3
.1
.8
.3
.3
.5
.7
R
ID
LE
Y
A V E N U E
RAYMOND
STREET
RAYMOND
STREET
R A Y M O N D
S T R E E T
PALMETTOAVENUE
C O M F O R T
A V E N U E
NASH
STREET
NASH
STREET
M E R C Y
A V E N U E
LAKE BALDWIN
LANE
N °3 '1
"W
.9
C M
L3
N87°46'09"E 1659.45'
C&M
S87°40'44"E 206.44'
CALC
S89°59'50"W 333.97'
PLAT
C1
L1
C3S89°59'50"W 692.12' C&M
C2
S89°59'50"W 692.12' C&M
L2
N87°46'09"E 1659.45'
C&M
S ° 5 ' 3
.2
C M
S ° 5 ' 3
.9
C A L C
VV
V
V
V
V
V VV
V
VV
V
V
V
VV
V
V
V
V
V
V
V
VV
V
V
V
V
VV
V
V
V
V
V VV
V
VV
V
V
V
V
V
V VV
V
V
V
V
V
VV
V
V
V
VV
V
V
V
V
V VV
V
VV
V
V
V
VV
V
V
V
V
V VV
V
VV
V
V
V
VV
V
V
V
V
V VV
V
V
V
V
V
V
VV
V
V
V
V
V VV
V
VV
V
V
V
VV
V
V
V
V
V VV
V
VV
V
V
V
VV
V
V
V
V
V VV
V
VV
V
V
V
V
V
V VV
V
V
V
V
V
VV
V
V
V
V
V
V VV
V
V
V
V
V
V
V V
V
V
V
V
V VV
V
V
V
V
V
VV
V
V
V
V
V
V VV
V
V
V
V
V
V
V V
V
V
V
V
V VV
V
V
V
V
V
VV
V
V
V
V
V
V VV
V
V
V
V
V
V
V V
V
V
V
V
V VV
V
V
V
V
V
V
V V
V
V
V
V
V VV
V
V
V
V
V
V
V V
V
V
V
V
V VV
V
V
V
V
V
V
V V
V
V
V
V
V VV
V
V
V
V
V
V
V V
V
V
VV
V
V
V
V
V VV
V
V
V
V
V
V
V
V
V
V
V VV
V
V
VV
V
V
V
V
VV
V
V
V
V
V VV
V
V
V
V
V
V
VV
V
V
V
V
V VV
V
VV
V
V
V
V
V
V VV
V
V
V
V
V
V
V V
V
V
VV
V
V
V
V
V VV
V
VV
V
V
V
V
V
V VV
V
V
V
V
V
VV
V
V
V
V
V
V VV
V
V
V
V
V
VV
V
V
V
V
V
V VV
V
V
V
V
V
V
V V
V
V
V
V
V VV
V
V
V
V
V
V
V V
V
V
V
V
V VV
V
V
V
V
V
VV
V
V
V
V
V
V VV
V
V
V
V
V
V
V V
V
V
V
V
V VV
V
V
V
V
V
VV
V
V
V
V
V
V VV
V
V
V
V
V
V
V V
V
V
V
V
V VV
V
V
V
V
V
V
V V
V
V
V
V
V VV
V
V
V
V
V
V
V V
V
V
V
V
V VV
V
V
V
V
V
V
V V
V
V
V
V
V VV
V
V
V
V
V
VV
V
V
V
V
V
V VV
V
V
V
V
V
VV
V
V
V
V
V
V VV
V
V
V
V
V
V
V V
V
V
V
V
V VV
V
V
V
V
V
V
V V
V
V
V
V
V VV
V
V
V
V
V
V
V V
V
V
V
V
V VV
V
V
V
V
V
VV
V
V
V
V
V
V VV
V
V
V
V
V
VV
V
V
V
V
V
V VV
V
V
V
V
V
VV
V
V
V
V
V
V VV
V
V
V
V
V
VV
V
V
V
V
V
V VV
V
V
V
V
V
V
V V
V
V
V
V
V VV
V
V
V
V
V
V
V V
V
V
V
V
V VV
V
V
V
V
V
VV
V
V
V
V
V
V VV
V
V
V
V
V
VV
V
V
V
V
V
V VV
V
V
V
V
V
V
V V
V
V
V
V
V VV
V
V
V
V
V
V
V V
V
V
V
V
V VV
V
V
V
V
V
VV
V
V
V
V
V
V VV
V
V
V
V
V
VV
V
V
V
V
V
V VV
V
V
V
V
V
V
V V
V
V
V
V
V VV
V
V
V
V
V
VV
V
V
V
V
V
V VV
V
V
V
V
V
VV
V
V
V
V
V
V VV
V
V
V
V
V
VV
V
V
V
V
V
V VV
V
V
V
V
V
VV
V
V
V
V
V
V VV
V
V
V
V
V
V
V V
V
V
V
V
V VV
V
V
V
V
V
V
V V
V
V
V
V
V VV
V
V
V
V
V
V
V V
V
V
V
V
V VV
V
V
V
V
V
VV
V
V
V
V
V
V VV
V
V
V
V
V
VV
V
V
V
V
V
V VV
V
V
V
V
V
VV
V
V
V
V
V
V VV
V
V
V
V
V
VV
V
V
V
V
V
V VV
V
V
V
V
V
VV
V
V
V
V
V
V VV
V
V
V
V
V
VV
V
V
V
V
V
V VV
V
V
V
V
V
VV
V
V
V
V
V
V VV
V
V
V
V
V
VV
V
V
V
V
V
V VV
V
V
V
V
V
VV
V
V
V
V
V
V VV
V
V
V
V
V
V
V V
V
V
V
V
V VV
V
V
V
V
V
V
V V
V
V
V
V
V VV
V
V
V
V
V
VV
V
V
V
V
V
V VV
V
V
V
V
V
VV
V
V
V
V
V
V VV
V
V
V
V
V
VV
V
V
V
V
V
V VV
V
V
V
V
V
V
V V
V
V
V
V
V VV
V
V
V
V
V
V
V V
V
V
V
V
V VV
V
V
V
V
V
VV
V
V
V
V
V
V VV
V
V
V
V
V
VV
V
V
V
V
V
V VV
V
V
V
V
V
VV
V
V
V
V
V
V VV
V
V
V
V
V
VV
V
V
V
V
V
V VV
V
V
V
V
V
VV
V
V
V
V
V
V VV
V
V
V
V
V
V
V V
V
V
V
V
V VV
V
V
V
V
V
V
V V
V
V
V
V
V VV
V
V
V
V
V
V
V V
V
V
V
V
V VV
V
V
V
V
V
V
V V
V
V
V
V
V VV
V
V
V
V
V
VV
V
V
V
V
V
V VV
V
V
V
V
V
V
V V
V
V
V
V
V VV
V
V
V
V
V
VV
V
V
V
V
V
V VV
V
V
V
V
V
VV
V
V
V
V
V
V VV
V
V
V
V
V
VV
V
V
V
V
V
V VV
V
V
V
V
V
VV
V
V
V
VV
V
V
V
V
V VV
V
V
V
V
V
V
V
V
V VV
V
V
V
V
V
VV
V
V
V
V
V
V VV
V
V
V
V
V
V
V V
V
V
V
V
V VV
V
V
V
V
V
VV
V
V
V
V
V
V VV
V
V
V
V
V
VV
V
V
V
V
V
V VV
V
V
V
V
V
VV
V
V
V
V
V
V VV
V
V
V
V
V
V
V V
V
V
V
V
V VV
V
V
V
V
V
V
V V
V
V
V
V
V VV
V
V
V
V
V
VV
V
V
V
V
V
V VV
V
V
V
V
V
VV
V
V
V
V
V
V VV
V
V
V
V
V
V
V V
V
V
V
V
V VV
V
V
V
V
V
VV
V
V
V
V
V
V VV
V
V
V
V
V
VV
V
V
V
V
V
V VV
V
V
V
V
V
VV
V
V
V
V
V
V VV
V
V
V
V
V
V
V V
V
V
V
V
V VV
V
V
V
V
V
V
V V
V
V
V
V
V VV
V
V
V
V
V
VV
V
V
V
V
V
V VV
V
V
V
V
V
VV
V
V
V
V
V
V VV
V
V
V
V
V
VV
V
V
V
V
V
V VV
V
V
V
V
V
VV
V
V
V
V
V
V VV
V
V
V
V
V
VV
V
V
V
VV
V
V
V
V
V VV
V
V
V
V
V
V
V
V
V VV
V
V
V
V
V
VV
V
V
V
V
V
V VV
V
V
V
V
V
VV
V
V
V
V
V
V VV
V
V
V
V
V
VV
V
V
V
V
V
V VV
V
V
V
V
V
VV
V
V
V
VV
V
V
V
V
V VV
V
V
V
V
V
V
V
V
V VV
V
V
V
V
V
V
V V
V
V
V
V
V VV
V
V
V
V
V
VV
V
V
V
V
V
V VV
V
V
V
V
V
V
V V
V
V
V
V
V VV
V
V
V
V
V
VV
V
V
V
V
V
V VV
V
V
V
V
V
VV
V
V
V
V
V
V VV
V
V
V
V
V
VV
V
V
V
V
V
V VV
V
V
V
V
V
V
V V
V
V
V
V
V VV
V
V
V
V
V
VV
V
V
V
V
V
V VV
V
V
V
V
V
V
V V
V
V
V
V
V VV
V
V
V
V
V
V
V V
V
V
V
V
V VV
V
V
V
V
V
VV
V
V
V
V
V
V VV
V
V
V
V
V
V
V V
V
V
VV
V
V
V
V
V VV
V
VV
V
V
V
F O
C
VV
V
V
V
V
V VV
V
V
V
V
V
V
VV
V
V
V
V
V VV
V
VV
V
V
V
VV
V
V
V
V
V VV
V
V
V
V
V
V
VV
V
V
V
V
V VV
V
VV
V
V
V
VV
V
V
V
V
V VV
V
V
V
V
V
V
VV
V
V
V
V
V VV
V
VV
V
V
V
V
V
V
V
V
V
V
V
V
V
V
V
V
V
V
VV
V
V
V
V
V VV
V
VV
V
V
V
P S
P S
P S
P S
PS
PS
PS
P S
PS
PS
PS
P
S PS
PSPS
PS
PS PS
PS
P S
P S
PS
PS
PS
PS
PS
P S
P S
PS
P S
P S
P S
PS
P S
P S
PS
P S
P S
P S
P S
P S
P S
P S
P S
P S
PS
PSPS
P S
P S
P S
P S
PS
PS
P S
PS
PS
PS
PS
PS
PS
PS
PS
PS
PSPSPSPS
PS
PSPS
PS
PS
PS
PS
PS
PS PS PS PS
PS
PS
PS
P S
P S
P S
P S
P S
P S
P S
PS
PSPS
P S
P S
S
S
S
S
S
S S
S S
S
S
S
S
S
S S
S
S
S S S
S S
S
S
S
S
S
S S
S
S S
S S
S S
S S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S S
S S S
S S
S
S
S
S
S
S
S S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S S S S S
S S S S S
S
S
S
S S
S
S
S
S S S S
S
S
S
S
S
S
S
S
S
S
S
S S
S
S S
S
S
S
S S
S
S S
S
S
S S S
S S
S S
S
S S S S S
S S
S S
S S S S S S
S
S
S S
S
S
S
S
S
S
S
S
S S
S
S S
S
S
S
S
S
S
S
S
S
S
S
S S
S
S
S S
S S
S
S
S
S S
S
S S
S
S
S
S
S
S
S
S
S
S
S
R R
R
R
R
R R
R
R
RRR
R
R R
R
R
R R
R R
R
R
R
R
R
R
R
R
R
R
R
R
R R
R
R
R
R
R
R
R
R
R
R R R
R R
R R R
R
RR
R
R
R
R
R
R
R R R R R R R R R R R R
R R
R R R
R
R
R
R
R R
R
R
R
R
R
R R
R R
R R
R R
R R R R R R R R R R R R R R R R R R R R
R
R R
R
R
R
R
R
R
S
S
S
S
S
S
S
S
S
S
S S
S S
S S
S S
S
S
S
S
S
S
S
S S S
S
S
S
S
S
S
S
S
S
SS
S
S
S
S
SS
S
S
S S
S S
S
S
S S
S S
S S
S
S S S
S S
S S
S S
S S
S
S
S S
S
S
S S
S
S S
S
S
S
S
S
S
SS
S S
S
S
S
S
S
S
S
S
S
S S
S S
S S
S
S S
S
S
S
S
S S
S S S
S S
S S
S
S
S
S
S S
S S
S S
S S
S
S
SSSSSSSSSS
S
S
S S
S S
S S
S S
S S
S S
S S
S S
S
S
S
S
S S
S
S S
S
S S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S S S S
S
S
S
S
S
S
S S S S S S
S S
S
S S S
S S
S
S
S
S
S
S
S
S S S S
S S S S
S
S
S
S
S
S S
S S
SS
S
S
S
S
S
S
S
SS
S
S S
S
SS
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S S
S
S S
S
S
S
S
S
S
SSSS
S
S
S
S
SS
S
S
SS
SS
S
S
S
S
S
S
S
S S
S
S
S
S S
S
SS
S
S
SS
S
S
S S
S
S
SS
S S
S S
S
S
S S
S S
S
S
SSS
S S
S
S
S
S
S S
S S
S S
S S
S S
S S
S S
S S
S S
S S
S S
S S
S S
S
S
S
S
S
S
S
S
S
S
S
S
S S
S
S
S
S
S
S
S
S
S
S S
S
S
S
S
S S
S S
S S
S S
S
SS
S
S S
S
S
S
S
S
S
S
S
S
S
S
S S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S S
S
S S
S S
S
S S
S S
S
S
S
S S
S
S S
S
S S
S
S
S S
S
S
S
S S S
S
S
S
S
S
S
S
S S
S
S
S
S
S
S
S
S
S S
S S
S S
S
S S
S
S
S S
S
S
S
S
S
S
S
S
S
S
S
SS
S
S S
S S
S
SSS
S
SS
S
S
S
S
S S
S
S
S
S S
S
S S
S
S
S
S
S
S
SS
S
S
S
S S S S S S S S S S S
S
SSS
S S
S S
S S
S
S S
S S S
SS
S
S S
S S
S S
S
S
S
S
S
S
S
S
S
S
S
S
S S
S S
S S
S S
S S
R
R
R R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R R
R
R
R
R
R R
R
R
R
R
R
RR
R
R
R R
R
R
R
R
R R
RR
R
R
RR
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
RR
R
R R
R
R
R
R
R
R
R
R
R
R
R
R R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R R
R
R R
R R
R R
R
R
R
R
R
R
R
R
R
R R
R
R
R
RR
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
RR
R
R
R
R R
R
R R
R
R R
R R
R R
R
R
R R
R
R
R
R
R
R
R R
R
R
R
R
R
R
R
R R
R
R
R
R
R R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
RR
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R R
R
R
R
R R
RR
R
R
R
R
R
R R
R R
R R
R R
R R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R R
R
R
R
R
R
R R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R R
R R
R
R R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R R
R
R
R
R R R
R R
R R
RR
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R R
R
R
R
R
R
R
R
S
S
S
R
S
S
R
S
R
R
R
R
S
T V
V
V
V VV
V
V
V
V
V
VV
V
V
V
V
V
V VV
V
V
V
V
V
V
V V
V
V
V
V
V VV
V
V
V
V
V
VV
V
V
V
V
V
V VV
V
V
V
V
V
VV
V
V
V
PS
PS
PS
P S
P S
P S
P S
P S
P S
PS
PS
PS
PS
P S
P S
V
V
V VV
V
V
V
V
V
VV
V
V
V
P S
P S
SD
SD
EL
SD SD
P S
PS
BUILDING 500
BUILDING 504
BUILDING 502
B U
IL
D
IN
G
BUILDING 501
B U
IL
D
IN
G
BUILDING 505 BUILDING 506 BUILDING 507 BUILDING 508
BUILDING 519, 522, 521,524
BUILDING 510
B U
IL
D
IN
G
B U
IL
D
IN
G
BUILDING 3133
BUILDING 3130
B U
IL
D
IN
G
BUILDING 3136
B U
IL
D
IN
G
SITE PLAN GENERAL NOTES
** SEE ES100 AND CIVIL PLANS FOR PROPOSED DUCT
BANK ALIGNMENT.
1. CONTRACTOR IS RESPONSIBLE FOR PROTECTING
EXISTING UTILITIES THAT ARE NOT MARKED FOR
REMOVAL.
2. CONTRACTOR SHALL PHASE ROAD REMOVAL AND
CONSTRUCTION SO AS TO ALWAYS ALLOW AT LEAST
ONE LANE OF TRAFFIC ON MAIN ACCESS DRIVE.
CONTRACTOR MAY CLOSE DRIVE TO ER/TRAUMA
ENTRANCE, BUT MUST COORDINATE WITH VA COR.
TRAFFIC CLOSURE SHALL MEET MUTCD REQUIREMENTS
AND SHALL HAVE LIGHTED BARRICADES FOR PROJECT.
3. CONTRACTOR SHALL INSTALL TEMPORARY 6' TALL
CHAIN LINK SECURITY FENCING TO SECURE
CONSTRUCTION SITE. CONTRACTOR SHALL INSTALL
GATES TO ALLOW WORKING ACCESS FOR EQUIPMENT
AND PEOPLE.
4. CONTRACTOR SHALL BLOCK OFF SIDEWALK WITH
ORANGE SNOW FENCE AND INSTALL TEMPORARY
SIGNAGE INDICATING THAT THE SIDEWALK IS CLOSED.
5. CONTRACTOR SHALL PROVIDE TEMPORARY GRAVEL
FILL, AS NEEDED, TO ALLOW FOR VEHICULAR TRAFFIC
TO USE ROADWAY WHILE NOT ACTIVELY WORKING IN
THE TRENCH. CONTRACTOR WILL BE RESPONSIBLE FOR
ENSURING THE TEMPORARY GRAVEL FILL IS AT GRADE
AND WILL RESPOND IMMEDIATELEY IF TEMPORARY
GRAVEL FILL AREA SETTLES, CREATING A HAZARD.
6. CONTRACTOR SHALL SUPPLY TRAFFIC CONTROL IN
COMPLIANCE WITH ALL MUTCD REGULATIONS. TRAFFIC
CONTROL SHALL CONSIST OF AT LEAST TYPE II
BARRICADES WITH LIGHTS ON RESTRICTED
LANES OF TRAFFIC AND AT THE EDGE OF PAVEMENT
WITH TEMPORARY ACCESS OVER THE ROCKED IN LANE.
TRAFFIC CONES MAY BE NEEDED ON A TEMPORARY
BASIS TO REDIRECT.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10 engineering discipline <EDIT TEXT>:
FINAL - BID
DOCUMENTS
C U s e rs \E m a n te
\D o c u m e n ts \L o c a l R e v it \2
\6
-2 -7
V
A L a k e B a ld w in
R e v it jd o rn a n D
S R
W .r v t
/2 /2
:4
:5
P
M
AS100
SITE PLAN EHRM VA LAKE BALDWIN
5201 Raymond St, Orlando, FL 32803
675-22-701
ALL
Dec. 22.2023 AESUS AESUS
AESUS DESIGN GROUP
1050 E. Southern Ave., Suite D
Tempe, AZ, 85282
480-454-2861
David Combs
MES GROUP, INC
550 North Reo Street
Tampa, FL, 33609
813-289-4700
David Keith
1/64" = 1'-0"
Site Plan
Revisions: Date:
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10 engineering discipline <EDIT TEXT>:
FINAL - BID
DOCUMENTS
C U s e rs \E m a n te
\D o c u m e n ts \L o c a l R e v it \2
\6
-2 -7
V
A L a k e B a ld w in
R e v it jd o rn a n D
S R
W .r v t
/2 /2
:5
:4
P M
GI003
GENERAL NOTES EHRM VA LAKE BALDWIN
5201 Raymond St, Orlando, FL 32803
675-22-701
July 21.2023 AESUS AESUSRevisions: Date:
GENERAL CONTINUED
GOVERNING CODES
GENERAL: THE VA HAS ADOPTED THE LATEST EDITION OF THE FOLLOWING
CODES AND STANDARDS AS A MINIMUM FOR ALL PROJECTS PERFORMED IN
THE MODERNIZATION, ALTERATION, ADDITION, OR IMPROVEMENT OF ITS
REAL PROPERTY AND THE CONSTRUCTION OF NEXT STRUCTURES. VA
DESIGN MANUALS AND MASTER SPECIFICATIONS SPECIFY OTHER CODES
AND STANDARDS THE VA FOLLOWS ON ITS PROJECTS:
GENERAL
1. CONTRACTOR SHALL SUBMIT REQUEST FOR INFORMATION (RFI'S)
REGARDING ANY KNOWN DISCREPANCIES WITH THE CONTRACT
DOCUMENTS OR UNFORESEEN SITE CONDITIONS TO THE VA AND THE
ARCHITECT FOR CLARIFICATION PRIOR TO NOTICE TO PROCEED.
2. DIMENSIONS SHALL NOT BE SCALED FROM THE PLANS, SECTIONS,
ELEVATIONS OR DETAILS. ALL DRAWINGS ARE APPROXIMATE AND ARE
GIVEN FOR ESTIMATING PURPOSES.
3. THE CONTRACTOR SHALL FURNISH ALL MATERIALS, LABOR, EQUIPMENT,
TRANSPORTATION AND SERVICES NECESSARY FOR THE SATISFACTORY
COMPLETION OF THE WORK.
4. A PRE-CONSTRUCTION CONFERENCE BETWEEN THE VA COR, OTHER VA
PROJECT STAKE HOLDERS, THE ARCHITECT, AND THE CONTRACTOR WITH
ALL OF HIS MAJOR SUBCONTRACTORS SHALL BE HELD IMMEDIATELY
AFTER SIGNING OF THE OWNER-CONTRACTOR AGREEMENT AND PRIOR TO
THE START OF ANY WORK.
5. UNLESS OTHERWISE NOTED, DIMENSIONS ARE TO COLUMN CENTERLINE,
FACE OF FINISH PARTITION, FACE OF MASONRY WALLS AND FACE OF
EXISTING WALLS.
6. ALL CUTTING AND PATCHING SHALL BE DONE BY THE GENERAL
CONTRACTOR AS OUTLINED IN THE GENERAL CONDITIONS OF THE
SPECIFICATIONS. PATCHES IN FINISH SURFACES SHALL MATCH THE
ADJACENT SURFACES IN MATERIAL, FINISH AND QUALITY.
7. ALL SOUND RATED WALLS OR PARTITIONS SHALL EXTEND TO THE
UNDERSIDE OF THE STRUCTURE OR DECK ABOVE UNLESS OTHERWISE
NOTED. THESE PARTITIONS SHALL BE ENTIRELY SEALED OFF WITH
CLOSURE GASKETS AND/OR ACOUSTICAL SEALANT AT BOTTOM, TOP,
SIDES AND ANT OTHER ABUTMENT WHERE A SOUND LEAK WOULD
OTHERWISE OCCUR. ALL PENETRATIONS SUCH AS PIPING, CONDUITS,
DUCTS, ETC., IN SUCH PARTITIONS SHALL BE PACKED AND SEALED ALONG
THE PERIMETER OF THE PENETRATION.
8. DUE TO MANUFACTURER'S VARIATION WITH SIZE OF EQUIPMENT,
CASEWORK, PLUMBING FIXTURES, ETC., ALL DIMENSIONS REFERRING TO
THE SPACE WHERE SUCH ITEMS ARE BUILT-IN SHALL BE VERIFIED WITH
THE ITEM SUPPLIED.
9. GENERAL CONTRACTOR AND THE SUBCONTRACTORS THAT ARE A
SERVICE PROVIDER TO THE VETERANS AND VETERAN AFFAIRS
HEALTHCARE ARE TO WEAR APPROPRIATE ATTIRE, I.E. CLEAN CLOTHING IN
THE COMMON AREA EXCLUDING THE WORK AREA.
10. CUTTING OF HOLES THROUGH CONCRETE SHALL BE BY DIAMOND CORE
DRILL OR PNEUMATIC HAMMER. IMPACT ELECTRIC MANUAL HAMMER TYPE
DRILLS WILL NOT BE ALLOWED.
11. JACKHAMMER NO HEAVIER THAN 70 LBS SHALL BE USED WHEN REMOVING
LIGHT-WEIGHT LATEX MASTIC CONCRETE TOPPINGS.
12. CONTRACTOR TO PROVIDE COLOR COPIES OF MARKED-UP RECORD SET
PLANS TO VA CONTRACTING OFFICER UPON PROJECT COMPLETION.
13. SPECIAL TOOLS: IF ANY PART OF EQUIPMENT FURNISHED UNDER THIS
CONTRACT REQUIRES SPECIAL TOOLS FOR MAINTENANCE, ADJUSTMENT,
SETTINGS OR DISASSEMBLY/REASSEMBLY, THESE TOOLS SHALL BE
FURNISHED WITH EQUIPMENT AS A STANDARD ACCESSORY.
14. THE CONTRACTOR SHALL TAKE FIELD MEASUREMENTS AND VERIFY FIELD
CONDITIONS WITH THE CONTRACT DOCUMENTS BEFORE COMMENCING
ACTIVITIES. THE CONTRACTOR SHALL VERIFY AND RELATIVE TO THE
SURROUNDING CONSTRUCTION. PRIOR TO SUBMISSION OF BIDS, THE VA
CONTRACTING OFFICER AND D.O.R. SHALL BE NOTIFIED IN WRITING OF ANY
CONFLICTS, ERRORS OR OMISSIONS. NO ADDITIONAL CHARGES BY
CONTRACTOR SHALL BE ALLOWED FOR DISCREPANCIES BETWEEN
EXISTING CONDITIONS AND NEW CONSTRUCTION THAT COULD HAVE BEEN
IDENTIFIED DURING EXAMINATION.
15. CONTRACTOR TO PATCH AND REPAIR ALL WALLS, FLOORS, CEILINGS AND
OTHER ITEMS DAMAGED DURING CONSTRUCTION TO MATCH
EXISTING/INTENDED FUNCTIONS AND CONDITIONS.
16. CONTRACTOR TO LOCATE ALL "V.A. RETAINED" MATERIAL TO THE
LOCATION DIRECTED BY VA CONTRACTING OFFICER; VA CONTRACTING
OFFICER WILL COORDINATE WITH CONTRACTOR.
17. ALL MATERIAL NOT IDENTIFIED AS "V.A. RETAINED" IS TO BE REMOVED
FROM THE WORK AREA BY CONTRACTOR.
18. REMOVE AND RELOCATE OR REROUTE ANY UTILITIES WHICH PRESENT AN
OBSTRUCTION TO GENERAL CONSTRUCTION FOR THIS PROJECT. PRIOR
TO REMOVAL REPORT FINDINGS TO COR.
19. PROVIDE SEISMIC SUPPORT & BRACING TO ALL UTILITIES & GENERAL
CONSTRUCTION IN PROJECT.
20. UTILITIES SHALL BE RUN CONCEALED EXCEPT IN UNFINISHED AREAS.
21. ALL PENETRATIONS THROUGH FLOORS AND SMOKE BARRIERS SHALL BE
TIGHTLY SEALED AND FIRE-STOPPED. ANY EXISTING CORE CUTS ARE TO
BE FILLED WITH SIMILAR MATERIAL USING 12- GAUGE BACKING PLATE.
22. CONTRACTOR TO MAINTAIN EXISTING CORRIDOR RATINGS DURING
CONSTRUCTION.
23. CONTRACTOR TO PROVIDE 5/8" TYPE "X" GYP. BOARD INTERIOR
TEMPORARY WALL SEPARATING OCCUPIED SPACES FROM PROJECT
AREA(S). BARRIER TO BE AIR-TIGHT FLOOR TO CEILING WITH SECURED
OPENING. FOR EXTERIOR, CONTRACTOR TO PROVIDE 5/8" FIRE-RATED
DENSGLASS FOR TEMPORARY WALL SEPARATING OCCUPIED SPACES
FROM PROJECT AREA(S). PROVIDE WALK- OFF\ MATS AT INTERIOR ENTRY
TO PROJECT AREA.
24. PROVIDE 6" SOUND-ATTENUATING BLANKET OVER ALL ROOMS EXCEPT
WAITING AREAS, CORRIDORS AND ROOMS WITH HARD GYPSUM BOARD
LIDS. PROVIDE 6" SOUND-ATTENUATING BLANKET OVER CONFERENCE
ROOMS. ALL WALLS SHALL HAVE SOUND BATTS ACHIEVING MINIMUM
STC-44. THE ENCLOSURE IN THE INTERSTITIAL SPACE SHALL BE STC-45.
CAULK AND SEAL ALL WALL PENETRATIONS, AND SEAL EDGES OF GYPSUM
BOARD.
25. SPRAY FIREPROOFING ON ALL STRUCTURAL STEEL MEMBERS ACCORDING
TO FIREPROOFING IBC TABLE 601.
26. ALL PRODUCTS & MANUFACTURERS SHALL BE VERIFIED WITH VA COR
THROUGH SUBMITTAL PROCESS.
27. THE GENERAL CONTRACTOR & ALL SUBCONTRACTORS SHALL CAREFULLY
& THOROUGHLY EXAMINE THE PROJECT SITE, FIELD VERIFY ALL
CONDITIONS, GRADES, ELEVATIONS & DIMENSIONS OF THE VARIOUS
FEATURES OF THE EXISTING SITE CONDITIONS. ANY DISCREPANCIES &/OR
CONDITIONS NEEDING CLARIFICATION SHALL BE REPORTED IMMEDIATELY
TO THE VA COR BEFORE BEGINNING WORK.
28. THE GENERAL CONTRACTOR & ALL SUBCONTRACTORS SHALL BE SOLELY
RESPONSIBLE FOR THE ENFORCEMENT OF ALL REQUIREMENTS &
REGULATIONS & SHALL PERFORM ALL WORK ON THIS PROJECT IN
COMPLIANCE WITH O.S.H.A., ALL LOCAL, STATE AND FEDERAL SAFETY AND
HEALTH STANDARDS, LAWS AND REGULATIONS. ALL CONSTRUCTION
FABRICATION & INSTALLATIONS SHALL CONFORM TO THE LATEST
ADOPTED EDITIONS OF FEDERAL, STATE AND LOCAL CODES,
REGULATIONS & ORDINANCES OF THE GOVERNING AGENCY HAVING
JURISDICTION OVER THE PROJECT.
29. DUE TO THE REPROGRAPHICS PROCESS, THESE PLANS MAY NOT BE
ACCURATE TO SCALE. ALL DIMENSIONS SHALL TAKE PRECEDENCE OVER
THE SCALE SHOWN & IN NO CASE SHALL WORKING DIMENSIONS BE
SCALED FROM THE PLANS, SECTIONS, ELEVATIONS OR DETAILS.
30. ALL PROPERTY LINES, EASEMENTS AND BUILDINGS, BOTH EXISTING AND
PROPOSED, THAT HAVE BEEN DIVULGED TO THE ARCHITECT, ARE SHOWN
ON THE SITE PLAN.
GENERAL CONTINUED
31. THE STRUCTURAL, MECHANICAL, PLUMBING & ELECTRICAL DRAWINGS ARE
SUPPLEMENTARY TO THE ARCHITECTURAL DRAWINGS. SHOULD THERE BE
ANY DISCREPANCY BETWEEN THE VARIOUS DRAWINGS, IT SHALL BE
BROUGHT TO THE ARCHITECT'S ATTENTION FOR CLARIFICATION.
32. THE CONTRACTOR SHALL CONSULT THE ELECTRICAL, MECHANICAL, &
PLUMBING DRAWINGS FOR LOCATION OF ALL ROUGH OPENINGS THROUGH
WALLS & FLOOR SLABS & NOTIFY THE ARCHITECT OF ANY ITEMS THAT DO
NOT CONFORM WITH THE INTENT INDICATED ON THESE DRAWINGS.
33. THE CONTRACTOR SHALL COORDINATE WITH THE VA'S REPRESENTATIVE
FOR INSTALLATION OF ANY SPECIAL EQUIPMENT NOT SHOWN IN THESE
DRAWINGS. THE CONTRACTOR SHALL VERIFY EQUIPMENT LOCATIONS
WITH THE VA'S REPRESENTATIVE AND/OR EQUIPMENT MANUFACTURER
FOR PROPER SIZE AND LOCATION OF FOUNDATION OR SLAB
DEPRESSIONS, DRAINS, AND WARPS..
34. THE CONTRACTOR SHALL TAKE ALL NECESSARY PRECAUTIONS TO
LOCATE & PROTECT ANY UNDERGROUND OR CONCEALED CONDUIT,
PLUMBING, OR OTHER UTILITIES WHERE NEW WORK IS BEING
PERFORMED.
35. LARGER SCALE DETAILS GOVERN OVER SMALLER SCALE DETAILS.
36. THE CONTRACTOR SHALL COMPLY WITH SAFETY RESTRICTIONS AS
REQUIRED FOR WORKERS…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .