Attachment 2 - Dowel Locations.pdf
PDF 78 KB Posted
- Attached to
- DNR Dixon Springs - Stream Bank Stabilization
- Solicitation number
- 22-422DNR-REALT-B-30330
- Issued by
- Richland County, Illinois
About this file
Attachment 2 - Dowel Locations.pdf is a document that provides details on the dowel locations for a state and local contract opportunity. The document outlines the specific locations and quantities of dowels required for the project. It includes a detailed map and schedule outlining the placement of the dowels across multiple sites within the jurisdiction. The document specifies the dimensions, materials, and installation requirements for the dowels. No additional details are provided regarding the overall project scope, response deadlines, award criteria, or contract terms.
The pricing terms, set asides, incumbents, funding sources, and other salient commercial details are not included in this attachment. This document appears to be a technical specification focused solely on the dowel locations and requirements, rather than the broader commercial aspects of the contract opportunity.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Attachment 3 - Rebar Locations.pdf | ||
| Dixon Springs Stream Bank QUESTIONS AND ANSWERS 1.docx | DOCX document | |
| Scope of Work - Small~89.docx | DOCX document | |
| 2SMALL CONSTRUCTION BID FORM~1.docx | DOCX document | |
| Attachment 4 - Detail Views.pdf | ||
| 1Standard Terms and Conditions1~90.pdf | ||
| Attachment 1 - Dixon Springs Map.pdf | ||
| 1Standard CertificationsV.18.1~53.doc | DOC document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .