This document is a comprehensive 100% Final Specifications package for the Bessey Recreation Area Irrigation Improvements project, located west of Halsey, Nebraska at the Bessey Day-Use Site and Group Site facilities. The specifications detail construction requirements across multiple divisions including general requirements, site clearing and demolition, plumbing systems, electrical work, earthwork, exterior improvements, and site utilities. The project encompasses replacement of existing well pumps, installation of automated irrigation systems with weather sensors across 14 zones at the day-use site and multiple zones at the group site, installation of 2-inch diameter irrigation mainlines and lateral lines with remote control valves and sprinkler heads, pressure tanks, controllers, and associated trenching and backfill work. Base items include mobilization and surveying (lump sum), demolition and clearing (lump sum), well and pump replacement with controllers (lump sum), irrigation mainline and valves for zones 1-9 (lump sum), and irrigation lateral lines for zones 1-9 (designed quantity per linear foot). Optional items address additional zones 10-11 and 12-14, plus irrigation improvements for the group site.

The contract establishes detailed execution requirements including accident prevention plans with weekly safety meetings, quality control and quality assurance provisions, as-built drawing documentation in AutoCAD and PDF formats, daily construction reporting, and comprehensive closeout procedures. Contractor responsibilities include utility location identification, site restoration and revegetation, damage repair, protection of existing vegetation and trees, and compliance with OSHA requirements. Payment is made by lump sum for most items and by designed quantities for linear footage of lateral lines. The project site is located at elevation 2,720 feet with moderate summer temperatures (56-86°F) and cold winters (7-34°F), approximately 23.3 inches annual rainfall. Contractors must conduct construction staking under professional engineer or surveyor direction, submit preconstruction submittals including insurance certificates and surety bonds, maintain electronic and paper as-built documentation, and complete final cleaning and inspection before substantial and final completion certification by the Contracting Officer.

View the file

Other files

File Type Posted
Questions_Answers.pdf PDF
Attachment 3. Drawing and Diagrams.pdf PDF
Attachment 1. Schedule of Items.pdf PDF
Attahment 4. Wage Determinations.pdf PDF
12441926Q0032.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

United States Department of

Agriculture

Forest Service

Region 2

Nebraska National Forest &

National Grassland

Bessey Ranger District

May 2024

BESSEY

RECREATION AREA

IRRIGATION

IMPROVEMENTS

100% Final Specifications

BESSEY REC. SITE IRRIGATION IMPROVEMENTS 010100-1

NEBRASKA NATIONAL FOREST & GRASSLANDS LIST OF DRAWINGS & SPECS

SECTION 010100

LIST OF DRAWINGS AND SPECIFICATIONS

PART 1 – GENERAL

1.1 DESCRIPTION

A. LIST OF CONTRACT DRAWINGS

B. LIST OF CONTRACT SPECIFICATIONS

a. Index of Specifications:

DIVISION 01 - GENERAL REQUIREMENTS

Section 010100 LIST OF DRAWINGS AND SPECIFICATIONS Section 010150 GENERAL REQUIREMENTS Section 010200 Section 010250 Section 013200 Section 013223 Section 013300 Section 014420 Section 015050 Section 015100 Section 016000 Section 017100

CONTROL OF MATERIALS

MEASUREMENT AND PAYMENT

CONSTRUCTION PROGRESS DOCUMENTATION

CONSTRUCTION SURVEY & STAKING

SUBMITTAL PROCEEDURES

QUALITY CONTROL & QUANTITY MEASUREMENTS

MOBILIZATION

GOVERNMENT FURNISHED MATERIALS

MATERIAL AND EQUIPMENT

CLEAN UP AND DISPOSAL

BESSEY REC. SITE IRRIGATION IMPROVEMENTS 010100-2

NEBRASKA NATIONAL FOREST & GRASSLANDS LIST OF DRAWINGS & SPECS

DIVISION 02 - EXISTING CONDITIONS

Section 024119

SELECTIVE DEMOLITION

DIVISION 22 - PUMBING

Section 220500

Section 220523.12 Section 220523.14

Section 221116 Section 221119 Section 221120

COMMON WORK RESULTS FOR PLUMBING

BALL VALVES

CHECK VALVES

DOMESTIC WATER PIPING

DOMESTIC WATER PIPING – SPECIALTIES

SUBMERSIBLE WELL PUMPS

DIVISION 26 - ELECTRIC

Section 260100 Section 260519

Section 260533.13 Section 262923

COMMON WORK RESULTS FOR ELECTRICAL

LOW-VOLTAGE ELEC. POWER CONDUCTORS & CABLES

CONDUITS FOR ELECTICAL SYSTEMS

VARIABLE FREQUENCY MOTOR CONTROLERS

DIVISION 31 – EARTHWORK

Section 311100 Section 312317 Section 312500

SITE CLEARING & GRUBBING

TRENCHING, BEDDING, & BACKFILL FOR UTILITIES

TEMPORARY EROSION CONTROL

DIVISION 32 – EXTERIOR IMPROVEMENTS

Section 328400

PLANTING IRRIGATION

DIVISION 33 – SITE UTILITIES

Section 330500 Section 331112

COMMON WORK RESULTS FOR UTILITIES

WATER DISTRIBUTION

END OF SECTION 010100

BESSEY REC. SITE IRRIGATION IMPROVEMENTS 010150 – 1

NEBRASKA NATIONAL FOREST & GRASSLANDS GENERAL REQUIREMENTS

SECTION 010150

GENERAL REQUIREMENTS

PART 1 – SUMMARY OF WORK

1.1 DESCRIPTION

A. The intent of this section is to provide a general outline of the work required under this contract and identify special project conditions and/or requirements. It is not intended to provide detailed specifications for materials, labor, and workmanship. These are covered in other sections of these specifications.

B. The Bessey Recreation Area (Bessey) has seen some recent improvements to the nursey portion of the site. However, the public facing day-use developed recreation site has not been so fortunate. This project covers irrigation system automation and improvements as well as addressing much needed deferred maintenance.

1.2 LOCATION

A. Bessey is located west of the town of Halsey, Nebraska

a. Address – 40637 River Loop, Halsey, Nebraska 69142

b. Bessey coordinates: 41° 54' 02.64"N, 100° 17' 54.43"W

1.3 SPECIFICATIONS

A. The specifications establish the construction procedures and materials to be employed throughout.

1.4 GENERAL SITE CONDITIONS AND WEATHER

A. The elevation of the site is approximately 2,720 feet above mean sea level. The site generally experiences moderate to high temperatures in the summer and cold, windy, and snowy conditions in the winter. The average annual temperatures range from 56 degrees F to 86 degrees F in summer and 7 to 34 degrees F in the winter. This area sees approximately

23.3 inches of rain per year, which is about 60% of the national average.

1.5 SITE ACCESS

A. Directions from North Platte, NE: Travel approximately 64.8 miles north on US-83. Turn east (right) onto NE-2 and travel east approximately 15.3 miles. Turn south (right) onto NE-86B and travel south approximately 0.2 miles. The Bessey Day-Use project site and Ranger Station facility will be on your east (left).

1.6 USE OF FACILITIES AND UTILITIES

A. Water should be available on-site.

B. There is cell phone coverage in this area.

BESSEY REC. SITE IRRIGATION IMPROVEMENTS 010150 – 2

C. Restrooms will be available for contractor use at the site during the project.

D. Electrical service is available at this site and can be utilized for the project.

1.7 STAGING AREA

A. An area at or near the project site will be made available for use as a staging area. Staging areas shall be approved by the Contracting Officer (CO) prior to use. Camping may be available on-site at the campground or location approved by CO. Security and clean-up of this area shall be the responsibility of the Contractor.

1.8 WORK RESTRICTIONS

A. Nonsmoking Buildings: Smoking is not permitted within the buildings or within 25 feet (8

m) of entrances.

1.9 SCHEDULE

A. Pre-work conference shall be conducted virtually with the Forest Service and the Prime.

B. The Contractor shall not work on weekends, federally recognized holidays, or holiday weekends.

C. See Section 13200 Construction Progress Documentation for “Project Schedule General Requirements.”

1.10 PROTECTION OF PUBLIC

A. Bessey will likely remain open during construction and every precaution shall be taken to protect the public.

B. Install and maintain suitable barriers to ensure the protection of the public, employees, and facilities.

1. Fence, barricade, or otherwise block off the immediate work area to prevent unauthorized entry to the work area.

2. Erect and maintain barricades and warning signs in accordance with ANSID6.1.

3. Material may be new or used but shall be suitable for intended purpose.

4. Fences and barriers shall be structurally adequate and neat in appearance.

1.11 CONTRACTOR’S RESPONSIBILITIES

A. Confine storage of materials to areas as approved by the CO.

B. Provide adequate signing and barricades and take necessary safety measures to protect the public during all construction operations. Minimize disturbance of all undisturbed areas.

C. The Contractor at the Contractor’s expense shall repair Existing Forest Service roads and parking areas disturbed by construction activities. Repair includes any work needed to

BESSEY REC. SITE IRRIGATION IMPROVEMENTS 010150 – 3

return the roads and parking areas to their existing condition before construction began and shall include replacing road aggregate if necessary.

D. All areas where the existing grass vegetation is removed or damaged, or destroyed due to construction activities, shall be decompacted, regraded, and revegetated. Contractor shall apply all provided seed in accordance with specifications. Seed shall be provided by the Forest Service.

E. The Contractor shall be responsible for all damage that results from the Contractor's action during completion of the project work. Any damage that occurs due to action of the Contractor shall be repaired at the Contractor's expense.

F. Protect trees, tree root zones, and vegetation within project area from damage unless otherwise directed by CO.

1.12 UTILITY LOCATIONS

A. There are a number of utilities known to exist at the project site, including but not limited to buried power lines, 6” water main pipes, irrigation pipes, sewer lines and manholes. The Contractor shall be responsible for hiring a locating service to locate all utilities. A copy of the utility locates map shall be provided to the Forest Service.

1.13 CONSTRUCTION WASTE DISPOSAL FACILITIES

A. Provide waste-collection containers in sizes adequate to handle waste from construction operations. Containerize and clearly label hazardous, dangerous, or unsanitary waste materials separately from other waste.

1.14 SITE CLEANUP AND DISPOSAL AREA

A. The Contractor shall cleanup construction debris at the completion of each day’s work.

Disposal of construction debris shall be at an established Sanitary Landfill, with all permits and related costs of disposal being the responsibility of the Contractor. The Contractor and the CO shall mutually agree to the frequency of disposal. The Contractor shall not use existing on-site trash receptacles for disposal or interim storage of construction debris.

Burning of construction debris shall not be allowed on lands administered by the Forest Service.

1.15 FIELD VERIFICATION

A. Verify in the field, all new and existing dimensions affecting the work of this contract before ordering products.

B. Contractor shall visit the project site and appraise themselves of conditions prior to submitting a bid package.

1.16 PERMITS

A. Obtain any applicable permits required by County, State, or Federal laws or regulations.

BESSEY REC. SITE IRRIGATION IMPROVEMENTS 010150 – 4

PART 2 – DEFINITION OF ITEMS AND PAYMENT

2.1 DESCRIPTION

A. This section explains what is and what is not included in each pay item; the limits or cut-off points where one item ends, and another begins; and basis of payment for work items listed in the Schedule of Items.

B. Payment: For each individual item listed here and in the Schedule of Items (SOI), payment shall be full compensation for all work related to the particular item in accordance with these specifications, and as shown on the drawings.

2.2 SCHEDULE OF ITEMS

A. Schedule of Items: The project SOI includes several sections to organize the work into Base Items and Optional Items.

1. Provide pricing for all items listed in the SOI.

2. Contract award will be made for all Base Items.

3. Optional Items may be awarded based on available project funding.

B. Determination of Quantities:

1. The contractor shall perform, or cause to be performed, all measurement of quantities of materials incorporated into the work processes that are to be measured under the provisions of the contract.

2. Quantity Measurements:

a. The Contractor shall make all measurements for computation of quantities for all work items except those specified for payment by Actual Quantity (AQ), Designed Quantity (DQ) or Lump Sum Quantity (LSQ).

b. The contractor shall compute the quantities for periodic progress payments;

the Contracting Officer shall compute the quantities for the final payment based on measurements taken by the Contractor.

c. All Contractor measurements are subject to verification.

d. The Contractor shall submit all field notes, calculation sheets, and other data used to determine quantities.

e. The Contractor shall certify in writing as to the accuracy of the measurements and computations submitted.

C. Units of Measurement:

1. Payment shall be by units defined and determined according to U.S. Standard measure and by the following:

a. Designed Quantities (DQ): Estimated quantities which are determined from contract design measurements and determinations.

b. Actual Quantities (AQ): Estimated quantities which are determined from actual measurements of completed work.

c. Linear Feet (LF): Linear feet measured horizontally.

d. Square Feet (SF): Square feet measured horizontally, in two different directions.

BESSEY REC. SITE IRRIGATION IMPROVEMENTS 010150 – 5

e. Lump Sum Quantities (LSQ): These quantities denote one complete unit of work as required by or described in the contract, including necessary materials, equipment, and labor to complete the job. They shall not be measured.

f. Each (EA): One complete unit, which may consist of one or more parts.

D. Base Items (BI):

1. Base Item No. 1 – Mobilization

a. This base item consists of all preparatory work and operations necessary for the movement of personnel, equipment, supplies, and incidentals to the project site, and for all other work and operations that must be performed or that cause costs to be incurred prior to beginning work on the various items on the project site. This base item applies to work included in the base items only.

b. This base item also consists of all survey work and construction staking necessary to adequately control the work and set horizontal and vertical alignments. Contractor shall establish control points and perform all surveying and staking necessary to locate the irrigation system as shown on the drawings and described in the specifications. The Contracting Officer shall approve all alignments and layouts before construction begins.

c. Payment shall be made at the contract lump-sum price.

2. Base Item No. 2 – Demolition, Clearing & Grubbing

a. This base bid item consists of all equipment, labor, and associated cost to remove and dispose of brush, weeds, vegetation, and debris within 3-feet of the proposed improvements where noted on the project drawings. Site work also includes associated minor earthwork or grading involved with clearing and grubbing activities. Work includes all associated removal, waste handling and hauling.

b. This base bid item also includes demolition of existing irrigation components, water well components, water supply piping and valves, concrete valve access box with metal doors, and concrete hardscape. Site work also includes associated minor earthwork or grading involved with demolition activities. Work includes all associated demolition, removal, waste handling and hauling.

c. Payment shall be made at the contract lump sum price (LSQ).

3. Base Item No. 3 – Well, Well Pump, Pressure Tank, and Controllers – Day-Use Site

a. This base item consists of all materials, personnel, equipment and supplies to replace the existing well pump, pitless adapter, all galvanized steel piping, install a new water pressure tank, install new pump controller with pressure switch, and install an irrigation clock with weather sensors for the day-use area as shown on the drawings and described in the specifications. Work includes all associated earthwork, trenching, backfill, plumbing, fittings, and all associated electric.

b. Payment shall be made at the contract lump sum price (LSQ).

BESSEY REC. SITE IRRIGATION IMPROVEMENTS 010150 – 6

4. Base Item No. 4 – Irrigation Mainline & Valves (Zones #1-9 & Cistern) – Day-Use Site

a. This base item consists of all materials, personnel, equipment, and supplies to install the 2” diameter irrigation mainline, 2” remote control valves, 2” manual ball valves for zones #1-9, and connection to the cistern piping, as shown on the drawings and as described in the specifications. Work includes all associated earthwork, excavation, trenching and backfill, plumbing, piping, fittings, wiring, and all associated electrical work.

5. Base Item No. 5 – Irrigation Lateral Lines (Zones #1-9) – Day-Use Site

a. This base item consists of all materials, personnel, equipment and supplies to install 2” diameter irrigation piping and insert fittings, sprinkler heads, sprinkler nozzles for zones #1-9 in the day-use area as shown on the drawings and described in the specifications. Work includes all associated earthwork, trenching with backfill, sleeving, pipe fittings, pipe laying, piping, sprinkler head and nozzle installation, pressure testing with adjustments, as shown on the drawings, and as described in the specifications.

b. Payment shall be made at the cost per linear foot of the designed quantities

(DQ).

E. Optional Bid Items (OBI):

1. Option Item No. 1 – Irrigation Mainline & Valves (Zones #10-11) – Day-Use Site

a. This option item consists of all materials, personnel, equipment, and supplies to install the 2” diameter irrigation mainline, and 2” remote control valves for zones #10 and #11 as shown on the drawings and as described in the specifications. Work includes all associated earthwork, excavation, trenching and backfill, plumbing, piping, fittings, wiring, and all associated electrical work.

2. Option Item No. 2 – Irrigation Lateral Lines (Zones #10-11) – Day-Use Site

a. This option item consists of all materials, personnel, equipment and supplies to install irrigation piping, sprinkler heads, sprinkler nozzles for zones #10 and #11 in the day-use area as shown on the drawings and described in the specifications. Work includes all associated earthwork, trenching with backfill, sleeving, pipe fittings, pipe laying, piping, sprinkler head and nozzle installation, pressure testing with adjustments as shown on the drawings, and as described in the specifications.

3. Option Item No. 3 – Irrigation Mainline & Valves (Zones #12-14) – Day-Use Site

BESSEY REC. SITE IRRIGATION IMPROVEMENTS 010150 – 7

a. This option item consists of all materials, personnel, equipment, and supplies to install the 2” diameter irrigation mainline, and 2” remote control valves for zones #12-14 as shown on the drawings and as described in the specifications.

Work includes all associated earthwork, excavation, trenching and backfill, plumbing, piping, fittings, wiring, and all associated electrical work.

4. Option Item No. 4 – Irrigation Lateral Lines (Zones #12-14) – Day-Use Site

a. This option item consists of all materials, personnel, equipment and supplies to install irrigation piping, sprinkler heads, sprinkler nozzles for zones #12-14 in the day-use area as shown on the drawings and described in the specifications. Work includes all associated earthwork, trenching with backfill, sleeving, pipe fittings, pipe laying, piping, sprinkler head and nozzle installation, pressure testing with adjustments as shown on the drawings, and as described in the specifications.

b. Payment shall be made at the cost per linear foot of the designed quantities

(DQ).

5. Option Item No. 5 – Well, Well Pump, Controllers, Pressure Tank, Mainline, Valves, and Enclosure - Group Site

a. This option item consists of all materials, personnel, equipment and supplies to replace the existing well pump, pitless adapter, all galvanized steel piping, install a new water pressure tank, install new pump controller with pressure switch, install an irrigation clock with weather sensors, 2” irrigation mainline, 2” remove control valves, and construct a storage shed for the group site as shown on the drawings and described in the specifications. Work includes all associated earthwork, trenching, backfill, plumbing, fittings, pressure testing, carpentry, and all associated electric.

b. Payment shall be made at the contract lump sum price (LSQ).

6. Option Item No. 6 – Irrigation Lateral Lines (Group Site)

a. This option item consists of all materials, personnel, equipment and supplies to install irrigation piping, sprinkler heads, sprinkler nozzles for the group site zones as shown on the drawings and described in the specifications. Work includes all associated earthwork, trenching with backfill, sleeving, pipe fittings, pipe laying, piping, sprinkler head and nozzle installation, pressure testing with adjustments as shown on the drawings, and as described in the specifications.

PART 3 – ACCIDENT PREVENTION

3.1 DESCRIPTION

A. This section consists of establishing an effective accident prevention plan and providing a safe environment for personnel and visitors.

BESSEY REC. SITE IRRIGATION IMPROVEMENTS 010150 – 8

3.2 SUBMITTALS

A. Traffic Plan: Before on-site work begins, submit a plan to handle vehicular and pedestrian traffic for each of the project sites. Submittal shall also include a schedule.

B. Accident Prevention and Safety Plan: Before on-site work begins, submit a company approved accident prevention plan. This plan will be posted in the contract file. Design the plan to address Federal, State, and Local Occupational Safety and Health requirements that apply to this project. No progress payments will be processed until the plan is received. As a minimum the plan shall include:

1. Name, position title and contact information of company executive responsible for approving the Accident Prevention Plan.

2. Name and contact information of supervisor responsible to carry out the plan.

3. Outline of each phase of the work, the hazards associated with each major phase, and the methods proposed to ensure property protection and safety of the public, government personnel, and the Contractor's employees. Identify the work included under each phase by reference to specification section or division numbers.

4. Contingency plans for emergency situations such as medical, fire, hazard material spills and other contract assessed hazard prevention and abatement requirement needs that apply to this project.

C. Certificates: Provide certificates from a mechanic that all mechanical equipment has been inspected and meets OSHA requirements.

D. Submit a copy of test reports, as required by OSHA, for personnel working with hazardous materials.

E. Submit a brief report of safety meetings and of inspections.

F. Upon request, submit proof of employees' qualifications to perform assigned duties in a safe manner.

3.3 QUALITY ASSURANCE

A. Clauses entitled "Accident Prevention" and "Permits and Responsibilities" of the General Provisions: In case of conflicts between Federal, state, and local safety and health requirements, the most stringent shall apply. Equipment or tools not meeting OSHA requirements will not be allowed on the project sites. Failure to comply with the requirements of this section and related sections may result in suspension of work.

B. Qualifications of Employees: Ensure employees are physically qualified to perform assigned duties in a safe manner.

3.4 ACCIDENT REPORTING

A. Reportable Accidents: A reportable accident is defined as death, occupational disease, traumatic injury to employees or the public, property damage by accident in excess of

BESSEY REC. SITE IRRIGATION IMPROVEMENTS 010150 – 9

$100, and fires. Within 7 calendar days of a reportable accident, fill out and forward to the CO a CA-1 form, which may be obtained from CO.

B. All Other Accidents: Report all other accidents to the CO as soon as possible and assist the CO and other officials as required in the investigation of the accident.

3.5 FIRST AID FACILITIES

A. Provide adequate facilities for the number of employees and the type of construction at the site.

3.6 PERSONNEL PROTECTIVE EQUIPMENT

A. Meet requirements of NIOSH and MSHA, where applicable, as well as ANSI.

B. Inspect personal protective equipment daily and maintain in a serviceable condition. Clean, sanitize, and repair, as appropriate, personal items before issuing them to another individual.

C. Inspect and maintain other protective equipment and devices before use and on a periodic basis to ensure safe operation.

3.7 EMERGENCY INSTRUCTIONS

A. Post telephone numbers and reporting instructions for ambulance, physician, hospital, fire department, and police in conspicuous locations at the work site.

3.8 SAFETY MEETINGS

A. As a minimum, conduct weekly 15-minute "toolbox" safety meetings. These meetings shall be conducted by a foreman and attended by all construction personnel at the worksite.

3.9 HARD HATS AND PROTECTIVE EQUIPMENT AREAS

A. The CO will designate a hard hat area. Post the hard hat area in a manner satisfactory to the CO.

B. It is the Contractor's responsibility to require, at all times, that all those working on or visiting the site to wear hard hats and other necessary personal protective equipment. As a minimum, provide two hard hats for use by visitors. Change liners or clean and disinfect before reissuing hats.

3.10 TRAINING

A. First Aid: Provide adequate training to ensure prompt and efficient first aid.

B. Hazardous Material: Train and instruct each employee exposed to hazardous material in safe and approved methods of handling and storage. Hazardous materials are defined as

BESSEY REC. SITE IRRIGATION IMPROVEMENTS 010150 – 10

explosive, flammable, poisonous, corrosive, oxidizing, irritating, or otherwise harmful substances that could cause death or injury.

PART 5 – EXECUTION REQUIREMENTS

5.1 DESCRIPTION

A. This section consists of general procedural requirements governing execution of the Work including, but not limited to, the following:

1. General installation of products.

2. Progress cleaning.

3. Protection of installed construction.

4. Correction of the Work.

5.2 PREPARATION

A. Field Measurements: Take field measurements as required to fit the Work properly.

B. Review of Contract Documents and Field Conditions: Immediately on discovery of the need for clarification of the Contract Documents, submit a request for information to CO.

Include a detailed description of problem encountered, together with recommendations for changing the Contract Documents.

5.3 INSTALLATION

A. General: Locate the Work and components of the Work accurately, in correct alignment and elevation, as indicated.

1. Make vertical work plumb and make horizontal work level.

B. Comply with manufacturer's written instructions and recommendations for installing products.

C. Hazardous Materials: Use products, cleaners, and installation materials that are not considered hazardous.

5.4 PROGRESS CLEANING

A. General: Clean Project site and work areas daily, including common areas. Dispose of materials lawfully.

1. Comply with requirements in NFPA 241 for removal of combustible waste materials and debris.

2. Do not hold materials more than 7 days during normal weather or 3 days if the temperature is expected to rise above 80 deg F (27 deg C).

3. Containerize hazardous and unsanitary waste materials separately from other waste.

Mark containers appropriately and dispose of legally, according to regulations.

BESSEY REC. SITE IRRIGATION IMPROVEMENTS 010150 – 11

B. Site: Maintain Project site free of waste materials and debris.

C. Work Areas: Clean areas where work is in progress to the level of cleanliness necessary for proper execution of the Work.

D. Waste Disposal: Burying or burning waste materials on-site will not be permitted. Washing waste materials down sewers or into waterways will not be permitted.

5.5 PROTECTION OF INSTALLED CONSTRUCTION

A. Provide final protection and maintain conditions that ensure installed Work is without damage or deterioration at time of Substantial Completion.

5.6 CORRECTION OF THE WORK

A. Repair or remove and replace defective construction. Restore damaged substrates and finishes.

1. Repairing includes replacing defective parts, refinishing damaged surfaces, touching up with matching materials, and properly adjusting operating equipment.

PART 6 – CLOSEOUT PROCEDURES

6.1 DESCRIPTION

A. This section consists of administrative and procedural requirements for contract closeout, including, but not limited to, the following:

1. Inspection procedures.

2. Project Record Documents.

3. Final cleaning.

6.2 SUBSTANTIAL COMPLETION

A. Definition of Substantial Completion: The Date certified by the Contracting Officer when construction is sufficiently complete, in accordance with the Contract Documents, so the Government can occupy or utilize the Work or designated portion thereof for the use for which it is intended, as expressed in the Contract Documents.

B. Preliminary Procedures: Before requesting inspection for determining date of Substantial Completion, complete the following. List items below that are incomplete in request.

1. Prepare a list of items to be completed and corrected (punch list), the value of items on the list, and reasons why the Work is not complete.

2. Advise Contracting Officer (CO) of pending insurance changeover requirements.

3. Submit specific warranties, workmanship bonds, final certifications, and similar documents.

BESSEY REC. SITE IRRIGATION IMPROVEMENTS 010150 – 12

4. Obtain and submit releases permitting Government unrestricted use of the Work and access to services and utilities. Include occupancy permits, operating certificates, and similar releases.

5. Prepare and submit Project Record Documents, operation and maintenance manuals, Final Completion construction photographs and photographic negatives, and similar final record information.

6. Deliver tools, spare parts, extra materials, and similar items to location designated by Government. Label with manufacturer's name and model number where applicable.

7. Complete startup testing of systems.

8. Submit changeover information related to Government occupancy, use, operation, and maintenance.

9. Complete final cleaning requirements, including touchup painting.

10. Touch up and otherwise repair and restore marred exposed finishes to eliminate visual defects.

C. Inspection: Submit a written request for inspection for Substantial Completion at least 24 hours before inspection is needed. On receipt of request, CO will either proceed with inspection or notify Contractor of unfulfilled requirements. CO will prepare the Certificate of Substantial Completion after inspection or will notify Contractor of items, either on Contractor's list or additional items identified by CO, that must be completed or corrected before certificate will be issued.

1. Reinspection: Request reinspection when the Work identified in previous inspections as incomplete is completed or corrected.

2. Results of completed inspection will form the basis of requirements for Final Completion.

6.3 FINAL COMPLETION

A. Preliminary Procedures: Before requesting final inspection for determining date of Final Completion, complete the following:

1. Submit certified copy of CO’s Substantial Completion inspection list of items to be completed or corrected (punch list), endorsed and dated by CO. The certified copy of the list shall state that each item has been completed or otherwise resolved for acceptance.

2. Submit evidence of final, continuing insurance coverage complying with insurance requirements.

3. Instruct Government personnel in operation, adjustment, and maintenance of products, equipment, and systems.

B. Inspection: Submit a written request for final inspection for acceptance at least 24 hours before inspection is needed. On receipt of request, CO will either proceed with inspection or notify Contractor of unfulfilled requirements. CO will prepare a final Certificate for Payment after inspection or will notify Contractor of construction that must be completed or corrected before certificate will be issued.

BESSEY REC. SITE IRRIGATION IMPROVEMENTS 010150 – 13

1. Reinspection: Request reinspection when the Work identified in previous inspections as incomplete is completed or corrected.

6.4 LIST OF INCOMPLETE ITEMS (PUNCH LIST)

A. Preparation: Submit one electronic copy of the list. Include name and identification of each space and area affected by construction operations for incomplete items and items needing correction including, if necessary, areas disturbed by Contractor that are outside the limits of construction.

6.5 PROJECT RECORD DOCUMENTS

A. General: Do not use Project Record Documents for construction purposes. Protect Project Record Documents from deterioration and loss. Provide access to Project Record Documents for CO's reference during normal working hours.

B. As-Built Drawings: Maintain and submit, upon contract completion, two physical sets and one electronic copy of As-Built Contract Drawings and Shop Drawings.

1. The contractor shall keep and maintain current red-lines on-site and shall be regularly monitored. Monthly progress payments shall be withheld if as-built drawings are not being maintained.

2. Electronic as-built drawings shall be in both PDF and AutoCAD 2018 DWG formats.

3. As-built drawings shall show the actual construction or installation where construction or installation varies from that shown originally. Require individual or entity who obtained the data, whether individual or entity is installer, subcontractor, or similar entity, to prepare the as-built drawings.

a. Give particular attention to information on concealed elements that cannot be readily identified and recorded later.

b. Record data as soon as possible after obtaining it. Record and check the as-builts before enclosing concealed installations.

4. Mark as-built sets to clearly distinguish between changes for different categories of the Work at the same location.

a. Note Construction Change Directive numbers, Change Order numbers, alternate numbers, and similar identification where applicable.

6.6 FINAL CLEANING

A. General: Provide final cleaning. Conduct cleaning and waste-removal operations to comply with local laws and ordinances and Federal and local environmental and antipollution regulations.

B. Cleaning Agents: Use cleaning materials and agents recommended by manufacturer or fabricator of the surface to be cleaned. Do not use cleaning agents that are potentially hazardous to health or property or that might damage finished surfaces.

C. Complete the following cleaning operations before requesting inspection for certification of Substantial Completion for entire Project or for a portion of Project:

BESSEY REC. SITE IRRIGATION IMPROVEMENTS 010150 – 14

1. Clean Project site, yard, and grounds, in areas disturbed by construction activities, including landscape development areas, of rubbish, waste material, litter, and other foreign substances.

2. Remove tools, construction equipment, machinery, and surplus material from Project site.

3. Touch up and otherwise repair and restore marred, exposed finishes and surfaces.

Replace finishes and surfaces that cannot be satisfactorily repaired or restored or that already show evidence of repair or restoration.

D. Comply with safety standards for cleaning. Do not burn waste materials. Do not bury debris or excess materials on Government property. Do not discharge volatile, harmful, or dangerous materials into drainage systems. Remove waste materials from Project site and dispose of lawfully.

END OF SECTION

BESSEY REC. SITE IRRIGATION IMPROVEMENTS 010200-1

NEBRASKA NATIONAL FOREST & GRASSLANDS CONTROL OF MATERIALS

SECTION 010200

CONTROL OF MATERIALS

PART 1 - GENERAL

1.01 HANDLING MATERIALS

A. All materials shall be transported and handled to preserve their quality and fitness for the work.

B. Aggregates shall be stockpiled, loaded, and transported in a manner that will preserve specified gradation and avoid contamination. Stockpiles of aggregate having different gradations shall not be intermingled.

C. Soils or soil amendments shall be stockpiled, loaded, and transported in a manner that will preserve the integrity and avoid contamination.

1.02 SAMPLING & TESTING

A. For contractor-furnished sources, the contractor shall submit test results and a Certificate of Compliance that states that the aggregate meets the contract requirements.

1.03 MATERIAL SOURCES

A. Designated Sources. Specific government designated sources are not available.

B. Contractor-Furnished Sources shall be non-Forest Service sources supplied from a commercial rock source.

C. Quality testing in conformance with applicable requirements and acceptable to the CO to establish the equivalency of the product shall be the responsibility of the contractor. Test results shall be furnished to the CO.

END OF SECTION 010200

BESSEY DAY-USE IRRIGATION IMPROVEMENTS 010250-1

NEBRASKA NATIONAL FOREST & GRASSLANDS MEASUREMENT & PAYMENT

SECTION 010250

MEASUREMENT & PAYMENT

PART 1 – GENERAL

1.01 MEASUREMENT & PAYMENT

A. Measurement and payment for contract work will be made only for and under those pay items included in the SCHEDULE OF ITEMS. All other work and materials will be considered as included in the payment for items shown.

1.02 DETERMINATION OF QUANTITIES

The following measurements and calculations are used to determine contract quantities.

A. For individual construction items, longitudinal and lateral measurements for area computations will be made horizontally or corrected to horizontal measurement unless otherwise specified. Measurements for seeding, mulching, geotextiles, netting, and erosion control blankets will be along slope lines.

B. The average end area method will be used to compute volumes of excavation or embankment. However, if in the judgment of the CO, the average end area method is impractical, measurement will be made by volume in hauling vehicles or by other three-dimensional methods.

C. Structures will be measured according to neat lines SHOWN ON THE

DRAWINGS or as altered by the CO in writing to fit field conditions.

D. For items that are measured by the linear foot, such as irrigation pipe, pipe culverts, fencing, guardrail, and underdrains, measurements will be made parallel to the base or foundation upon which the structures are placed. Pipe and pipe arch culverts shall be measured along center of invert and arches shall be measured at spring line.

E. For standard manufactured items identified by gauge, weight, section dimensions, and so forth, such identifications shall be considered the nominal weights or dimensions. Unless controlled by tolerances in cited specifications manufacturer's tolerances will be accepted.

1.03 UNITS OF MEASUREMENT

A. Payment will be by units defined and determined according to U.S. Standard measure and by the following:

a. Lump Sum. Do not measure directly. The bid amount is complete

BESSEY DAY-USE IRRIGATION IMPROVEMENTS 010250-2

NEBRASKA NATIONAL FOREST & GRASSLANDS MEASUREMENT & PAYMENT

payment for all work described in the contract and necessary to complete the work for that item.

b. Linear Feet (LF). One linear foot measured horizontally.

1.04 METHODS OF MEASUREMENT

A. One of the following methods of measurement for determining final payment is DESIGNATED on the SCHEDULE OF ITEMS for each pay item:

a. Designed Quantities (DQ). These quantities denote the final number or units to be paid for under the terms of the contract. They are based upon the original design data available prior to advertising the project. Original design data include the preliminary survey information, design assumptions, calculations, drawings, and the presentation in the contract. Changes in the number of units SHOWN in the SCHEDULE OF ITEMS may be authorized under any of the following conditions:

i. As a result of changes in the work authorized by the CO.

ii. As a result of the CO determining that errors exist in the original design that cause a pay item quantity to change by 15 percent or more.

iii. As a result of the contractor submitting to the CO a written request showing evidence of errors in the original design that cause a pay item quantity to change by 15 percent or more. The evidence must be verifiable and consist of calculations, drawings, or other data that show how the designed quantity is believed to be in error.

b. Actual Quantities (AQ). These quantities are determined from measurements of completed work. The contractor shall be responsible for measuring all "AQ" items.

c. Lump Sum Quantities (LSQ). These quantities denote one complete unit of work as required by or described in the contract, including necessary materials, equipment, and labor to complete the job. They will not be measured.

END OF SECTION 010250

BESSEY DAY-USE IRRIGATION IMPROVEMENTS 013200-1

NEBRASKA NATIONAL FOREST & GRASSLANDS PROGRESS DOCUMENTATION

SECTION 013200

CONSTRUCTION PROGRESS DOCUMENTATION

1.1 SUMMARY

A. This Section includes administrative and procedural requirements for documenting the progress of construction during performance of the Work, including the following:

1. Contractor's Construction Schedule.

2. Daily construction reports.

3. Field condition reports.

B. See Division 1 Section "Price and Payment Procedures" for submitting the Schedule of

Values.

1.2 SUBMITTALS

A. Contractor's Cost Loaded Construction Schedule: Submit one electronic copy of initial schedule.

1. Include type of schedule (Initial or Updated) and date on label.

B. Daily Construction Reports: Submit one electronic copy at weekly intervals.

C. Field Condition Reports: Submit one electronic copy at time of discovery of differing conditions.

1.3 COORDINATION

A. Coordinate preparation and processing of schedules and reports with performance of construction activities and with scheduling and reporting of separate contractors.

B. Coordinate Contractor's Cost Loaded Construction Schedule with the list of subcontracts, progress reports, payment requests, and other required schedules and reports.

1. Secure time commitments for performing critical elements of the Work from parties involved.

2. Coordinate each construction activity in the network with other activities and schedule them in proper sequence.

BESSEY DAY-USE IRRIGATION IMPROVEMENTS 013200-2

PART 2 – PRODUCTS (Not Used)

PART 3 - EXECUTION

3.1 REPORTS

A. Daily Construction Reports: Prepare a daily construction report recording the following information concerning events at Project site:

1. List of workers, including subcontractors, at Project site.

2. Summary of work completed.

3. Equipment at Project site.

4. Material deliveries.

5. High and low temperatures and general weather conditions.

6. Accidents.

7. Stoppages, delays, shortages, and losses.

8. Meter readings and similar recordings.

9. Orders and requests of authorities having jurisdiction.

10. Services connected and disconnected.

11. Equipment or system tests and startups.

B. Field Condition Reports: Immediately on discovery of a difference between field conditions and the Contract Documents, prepare and submit a detailed report. Submit with a request for interpretation. Include a detailed description of the differing conditions, together with recommendations for changing the Contract Documents.

3.2 PROJECT SCHEDULE GENERAL REQUIREMENTS

A. Prepare for approval a Project Schedule, as specified herein, pursuant to FAR Clause

52.236-15 Schedules for Construction Contracts. Show in the schedule the proposed sequence to perform the work and dates contemplated for starting and completing all schedule activities. The scheduling of the entire project is required. The scheduling of construction is the responsibility of the Contractor. Contractor management personnel must actively participate in its development. Subcontractors and suppliers working on the project must also contribute to developing and maintaining an accurate Project Schedule. Provide a schedule that is a forward planning as well as a project monitoring tool. Use the Critical Path Method (CPM) of network calculation to generate all Project Schedules. Prepare each Project Schedule using the Precedence Diagram Method (PDM).

B. Gantt-Chart Schedule: Submit a comprehensive, fully developed, horizontal Gantt-chart-type, Contractor's Construction Schedule within 60 days of date established for the Notice of Award.

3.3 BASIS FOR PAYMENT AND COST LOADING SCHEDULE

A. The schedule is the basis for determining contract earnings during each update period

BESSEY DAY-USE IRRIGATION IMPROVEMENTS 013200-3

and therefore the amount of each progress payment. The aggregate value of all activities coded to a contract CLIN or Bid Schedule Item must equal the value of the CLIN or Bid Schedule Item.

B. Activity cost loading must be reasonable and without front-end loading. Provide additional documentation to demonstrate reasonableness if requested by the Contracting Officer.

C. Failure to meet the requirements of this specification may result in the disapproval of the preliminary, initial, or periodic schedule updates and subsequent rejection of payment requests until compliance is met. In the event that the Contracting Officer directs schedule revisions and those revisions have not been included in subsequent Project Schedule revisions or updates, the Contracting Officer may withhold 10 percent of pay request amount from each payment period until such revisions to the project schedule have been made.

3.4 PROJECT SCHEDULE DETAILED REQUIREMENTS

A. Develop the Project Schedule to the appropriate level of detail to address major milestones and to allow for satisfactory project planning and execution. Failure to develop the Project Schedule to an appropriate level of detail will result in its disapproval. The Contracting Officer will consider, but is not limited to, the following characteristics and requirements to determine appropriate level of detail:

1. Reasonable activity durations are those that allow the progress of ongoing activities to be accurately determined between update periods. Less than 2 percent of all non- procurement activities may have Original Durations (OD) greater than 20 workdays or 30 calendar days.

2. Include activities associated with the critical submittals and their approvals, procurement, fabrication, and delivery of long lead materials, equipment, fabricated assemblies, and supplies. Long lead procurement activities are those with an anticipated procurement sequence of over 90 calendar days.

B. Contract Milestones and Constraints: Milestone activities are to be used for significant project events including, but not limited to, project phasing, project start and end activities, or interim completion dates. The use of artificial float constraints such as "zero free float" or "zero total float" are prohibited. Mandatory constraints that ignore or effect network logic are prohibited. No constrained dates are allowed in the schedule other than those specified herein. Submit additional constraints to the Contracting Officer for approval on a case-by-case basis.

1. The first activity in the project schedule must be a start milestone titled "NTP

Acknowledged," which must have a "Start On" constraint date equal to the date that the NTP is acknowledged.

2. The last activity in the schedule must be a finish milestone titled "End Project."

BESSEY DAY-USE IRRIGATION IMPROVEMENTS 013200-4

Constrain the project schedule to the Contract Completion Date in such a way that if the schedule calculates an early finish, then the float calculation for "End Project" milestone reflects positive float on the longest path. If the project schedule calculates a late finish, then the "End Project" milestone float calculation reflects negative float on the longest path.

3. The Government is under no obligation to accelerate Government activities to support a Contractor's early completion.

4. Constrain contractually specified interim completion dates to show negative float when the calculated late finish date of the last activity in that phase is later than the specified interim completion date.

5. If the contract specifies phasing with separately defined performance periods, identify a Phase Code to allow filtering and organizing the schedule accordingly.

a. Use a start milestone as the first activity for a project phase. Call the start milestone "Start Phase X" where "X" refers to the phase of work.

b. Use a finish milestone as the last activity for a project phase. Call the finish milestone "End Phase X" where "X" refers to the phase of work.

3.5 SCHEDULE UPDATES

A. Contractor's Construction Schedule Updating: At monthly intervals, update schedule to reflect actual construction progress and activities. Issue schedule one week before each regularly scheduled progress meeting.

1. Revise schedule immediately after each meeting or other activity where revisions have been recognized or made. Issue updated schedule concurrently with the report of each such meeting.

2. Include a report with updated schedule that indicates every change, including, but not limited to, changes in logic, durations, actual starts and finishes, and activity durations.

3. As the Work progresses, indicate Actual Completion percentage for each activity.

4. Schedule updates and agreement to schedule item percentages complete will precede applications for partial payment.

B. Distribution: Distribute copies of approved schedule to Contracting Officer, separate contractors, testing and inspecting agencies, and other parties identified by Contractor with a need-to-know schedule responsibility.

1. Post copies in Project meeting rooms and temporary field offices.

BESSEY DAY-USE IRRIGATION IMPROVEMENTS 013200-5

2. When revisions are made, distribute updated schedules to the same parties and post in the same locations. Delete parties from distribution when they have completed their assigned portion of the Work and are no longer involved in performance of construction activities.

END OF SECTION 013200

BESSEY DAY-USE IRRIGATION IMPROVEMENTS 013223 - 1

NEBRASKA NATIONAL FOREST & GRASSLANDS CONST. SURVEYING & STAKING

SECTION 013223

CONSTRUCTION SURVEYING AND STAKING

PART 1 – GENERAL

1.1 SUMMARY OF WORK

A. This work shall consist of the construction staking of the project by the methods specified herein, or another acceptable coordinate geometry method. The items to be surveyed and staked include trails and pathways, drainage features, culverts, dumpster pad and enclosures, irrigation, underground utilities, and other related site work shown on the drawings, from coordinates and control points shown on the drawings. The work includes furnishing all labor, equipment, instruments, stakes, materials, transportation, and other incidentals necessary to complete the construction staking in accordance with these specifications and acceptable engineering practices. The work shall also include setting grade-finishing stakes and/or red and blue tops for surfacing and concrete forming.

B. Construction staking shall be accomplished under the direction of a Colorado Registered Professional Engineer or Land Surveyor. The Professional Engineer or Land Surveyor will be closely associated and familiar with the construction staking; periodic visits to the project site are required.

C. Measurement shall be lump sum for surveying and staking the project through all phases of construction.

PART 2 – PRODUCTS

2.1 STAKES

A. Identification stakes and hubs shall be of sufficient length and width (nominal size of 1”x2”x18”) to provide and solid set in the ground and to provide space for marking above ground when applicable. Other dimensions and materials may be used, such as steel reinforcing bars, wire flagging and markers, and metal pins, if approved in writing by the Contracting Officer (CO). The top 2 inches of all slope, guard, reference, clearing, and structure stakes shall be painted or marked with plastic flagging. Colors used on stakes or for flagging shall be as follows:

1. Miscellaneous Items - Blue/White Striped

2. Roadway/Parking Lot Centerline - Red

3. Roadway Centerline Reference Points - Red and White

4. Temporary Benchmarks - Yellow

5. Slope Stakes - Orange

6. Drainage Structures - Blue

7. Slope Stakes Reference Points - Orange and White

8. Drainage Structures Reference Points - Blue and White

BESSEY DAY-USE IRRIGATION IMPROVEMENTS 013223 - 2

9. Cross-Section Alignment - Orange wire flag

10. Clearing Limits - Yellow

11. Archaeological Sites - Pink/Black Striped Flagging

B. And others as agreed to by the Contracting Officer.

2.2 SURVEY NOTE PAPER AND BOOKS

A. Paper for survey notes shall be moisture-resistant paper.