Attachment 1. Schedule of Items.pdf

PDF 83 KB Posted

Attached to
Irrigation Improvement Project
Solicitation number
12441926Q0032
Issued by

About this file

This is a Schedule of Items (SOI) for an irrigation improvements project at Bessey Recreation Site, Nebraska National Forest & National Grasslands.

The project comprises five base items and six optional items. Base items include mobilization and site preparation (demolition, clearing, and grubbing) as lump sum quantities; installation of a well, tank, pump, and controllers for the day-use area as a lump sum; mainline and valves for zones #1-9 and cistern as a lump sum; and irrigation lateral lines for zones #1-9 measured in linear feet at a quantity of 8,600. Optional items include mainline and valves for zones #10-11 and #12-14 (lump sums); irrigation lateral lines for zones #10-11 (1,690 linear feet) and #12-14 (3,200 linear feet); and well, tank, pump, controllers, mainline, valves, and enclosure for a group site (lump sum) with associated irrigation lateral lines (1,190 linear feet). The SOI provides a framework for pricing with columns designated for unit prices and totals, with separate subtotals for base items, optional items, and a combined total. No pricing information, response dates, award dates, or other procurement terms are specified in this document.

View the file

Other files

File Type Posted
Questions_Answers.pdf PDF
Attahment 4. Wage Determinations.pdf PDF
Attachment 2. Specifications.pdf PDF
Attachment 3. Drawing and Diagrams.pdf PDF
12441926Q0032.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PROJECT NAME PROJECT TITLE DATE

Base Items

Description Method of Measure

Unit Quantity Unit Price TOTAL

1 Mobilization L.S.Q. Lump Sum 1

2 Demolition, Clearing & Grubbing L.S.Q. Lump Sum 1

Well, Tank, Pump & Controllers - Day-Use Area

L.S.Q. Lump Sum 1

4 Mainline & Valves (Zones #1-9 & Cistern) L.S.Q. Lump Sum 1

5 Irrigation Lateral Lines (Zones #1-9) D.Q. Linear Foot 8,600

Optional

Items

1 Mainline & Valves (Zones #10-11) L.S.Q. Lump Sum 1

2 Irrigation Lateral Lines (Zones #10-11) D.Q. Linear Foot 1690

3 Mainline & Valves (Zones #12-14) L.S.Q. Lump Sum 1

4 Irrigation Lateral Lines (Zones #12-14) D.Q. Linear Foot 3200

Well, Tank, Pump, Controllers, Mainline, Valves & Enclosure (Group Site)

L.S.Q. Lump Sum 1

6 Irrigation Lateral Lines (Group Site) D.Q. Linear Foot 1190

Description Method of Measure

Unit Quantity Unit Price

SCHEDULE OF ITEMS

Bessey Recreation Site IRRIGATION IMPROVEMENTS

Nebraska National Forest & National Grasslands

TOTAL BASE PLUS OPTIONAL

ITEMS

TOTAL BASE ITEMS

TOTAL

TOTAL OPTIONAL ITEMS

SCHEDULE OF ITEMS (SOI)

SOI

File details come from the government source that posted it. Updated .