This document contains an attachment schedule for a construction contract solicitation. The solicitation is for the GAOA Sierra Vista Scenic Byway, Sky Ranch Road 2 project located on the Sierra National Forest. The schedule lists estimated quantities and unit prices for various construction items including mobilization, testing, base rock placement and compaction, asphalt paving, chip sealing, crack sealing, pavement markings, traffic control, and drainage work totaling between $1,000,000 and $5,000,000. The opportunity is a total small business set aside issued by the Forest Service. Offerors must submit all proposals and any requests for information by April 14, 2023. A pre-proposal conference will also be held.

View the file

Other files

Show all 16

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PART I—THE SCHEDULE

SECTION B-- SCHEDULE OF ITEMS

B.1 SCHEDULE OF ITEMS

Item
Construction Items
Qty
UOI
Unit Price
Total Price
151
Mobilization
1
LS
154
Contractor Testing
1
LS
301
Import and place Caltrans 3/4" class 2 base rock, compaction method D.

(2" layer MP 6.72 - 7.46)

1455
Cubic

Yard

403
3/4" Hot Mix Asphalt. Caltrants Type A,

Grading: PG 64-16. (MP 6.72-7.46)

1795
Ton
406
Fog Seal (MP 5.69 - 6.72)
1.03
Mile
407
Double course chip seal, type 2C

(MP 0-5.69)

5.69
Mile
414
Asphalt pavement crack sealing and filling

(MP 0-5.69)

5.69
Mile
416(b)
Road Mix Surfacing Laid, type SC-250

Road Oil (MP 7.46 -9.98)

2.52
Mile
634
Permanent Pavement Markings, double

yellow centerline type B. (Mile post 0- 7.46)

7.46
Mile
635
Temporary traffic control
1
LS
814
Pothole repairs
230
Ton
834
Drainage structures maintenance
9.98
Mile
842
Cutting roadway vegetation (0-5.69)
5.69
Mile
TOTAL:
___________

B.2 SCHEDULE NOTES

* QUANITIES ARE ESTIMATED, CONTRACTOR SHALL FIELD VERIFY TO SATISFY ALL REQUIREMENTS OF THE DRAWINGS, STATEMENT OF WORK, AND SPECIFICATIONS.

NOTE: Payment for bond premiums in accordance with Clause 52.232-5, Payments under Fixed-Price Construction Contracts, shall not be in addition to the contract price.

Company Name:
POC & Title:
Email:
Phone Number:
Unique Entity Identifier (UEI) Number:
Tax ID:

Solicitation No: 127EAW23R0011 Project Name: GAOA Sierra Vista Scenic Byway, Sky Ranch Road