This document outlines the scope of work for a renovation project at Building 1579 to accommodate relocation of a Criminal Investigation Division field office. Key aspects of the project include interior renovations such as partition reconfigurations, finish replacements, and building system modifications to meet new program needs. The east side of the building will be mostly demolished and reframed to create interview, administrative, and waiting spaces per requirements. Mechanical, electrical, and architectural drawings as well as project specifications are provided. Renovation work will be performed according to applicable building codes and standards. Materials will be new unless explicitly stated otherwise. The scope of work details requirements by division including wood and plastic components, finishes, specialties, plumbing, HVAC, electrical, fire suppression, and more.
View the file
Other files
Show all 15
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PROJECT SCOPE
11/09/2020
Project Title: Renovate B1579, CID
Project Number: FTW430
Brief Description of the Project:
The FTW430 renovation of B1579 includes approximately 10,000sf to accommodate the CID field office program to be relocated from B1051. The project involves interior renovations including reconfiguration of some partitions, replacement of some finishes and replacement or reconfiguration of building systems to meet new program requirements. The east of B1579 is be mostly demolished on the interior and reframed to create interview, administrative, and waiting spaces that meet CID requirements for size, adjacency, sound rating, and ballistics ratings. The remainder of the interiors are to be altered only as necessary to meet program needs for evidence handling and offices. The project also includes addition of fencing around a portion of the existing gravel parking area on the north side of the building to create a secure parking area for agents personal and work vehicles. The project has been broken out for architectural, electrical and mechanical.
Construction Schedule:
• Start date: NTP concurrent with award
Potential Long Lead Items:
• Doors and Hardware
• Ballistic Wall Fabric
Project Plans:
• Architectural Drawings
• Electrical Drawings
Project Specifications/Standards:
• Reference Drawings for Particular Code Analysis / Information
• 2018 International Building Code
• UFC 1-200-01
• NFPA 72
• NFPA 101
• Installation of all materials per manufacturer’s specifications.
Division 1- General Requirements:
The Contractor shall maintain a clean construction site daily and professionally clean at the conclusion of construction activities. The Contractor will secure materials using interior space made available in the building or exterior areas, for temporary material laydown. Provide a site plan of the temporary laydown yard, construction, and occupant traffic, as a pre-construction submittal. The contractor is only permitted to park in locations made available by DPW.
1.1- Properly remove all construction debris generated by this project.
1.2- Maintain a laydown yard to store and protect materials. Provide a site-layout concept sketch, with proposal.
1.3- Protect the building components from damage and return the project site to initial existing conditions documented during the preconstruction survey.
1.4- All materials, which replace existing, shall be new unless the project scope explicitly references “remove and reinstall”.
1.5- The locations for any containers for storage or collection of refuse, materials, both new and waste, and equipment associated with the project shall be submitted to the
Government prior to issuance of task order.
Division 2- Existing Conditions:
The existing occupancy and use of the facility requires the contractor to perform the project IAW with the provided drawings, building codes, and scope of work.
Division 6- Wood, Plastics, and composites:
Location of walls requiring demolition and new construction can be found on AD-101 and A101
Sound detaining is required in all interview room walls to include the polygraph room 112 & meeting room 128.
Division 9- Finishes:
Replace 2’x4’ acoustical ceiling with new 2’x4’ x ¾” mineral fiber acoustical ceiling tile and new 2’ x 4’, 15/16” T bar ceiling suspension system.
Provide luxury plank vinyl (LVT), Mannington Amtico or equal, in all rooms, offices, and common areas. A subtle transition will occur at every door opening where color types change.
Standard Styles / Patterns and colors will be provided for determinations.
All interior walls will be painted with 1 coat primer and 2 coats latex paint. Paint color will be determined from a selection of standard colors.
Division 10- Specialties:
Waiting room 116 will receive a level 3 anti-ballistic fabric under a 5/8” GWB located on two walls as annotated on drawing A-402.
Toilet Rooms 102 and 104:
Provide one Enmotion 59466 or approved equivalent surface mount automatic paper towel dispenser.
Provide one Bobrick B-2111 or approved equivalent soap dispenser.
Provide one Bobrick B-2888 or approved equivalent two-roll surface mounted toilet tissue dispenser.
Provide one Bobrick B-270 or approved equivalent surface mount sanitary napkin disposer in women’s latrine only.
Provide one Bobrick B-58616 or approved equivalent two wall grab bars in each ADA accessible toilet with one Bobrick B-6806x12 or approved equivalent grab bar. Install per ANSI 117.1
Provide one Bobrick B-166 24” x 36” or approved equivalent mirror over each lavatory sink.
Provide one Bobrick B-298 x 24 or approved equivalent stainless steel shelf under each mirror.
Division 11- Equipment:
Equipment unless called out will be the responsibility of the government.
Division 12- Furnishings:
Furnishings unless called out will be the responsibility of the government.
Division 21- Fire Suppression:
Verify all areas have required coverage and modify according to the attached Fire Protection Plans.
Doyon Utility will replace an existing 3” wet riser with a new 6” wet riser, prior to project start date. The contractor will be required to size and make all required modification to connect the new riser to the existing system.
Division 22- Plumbing:
All plumbing to be accomplished can be located and will be performed as annotated, on drawing M-102.
Remove and replace existing toilets in room 102 and 104.
Remove and replace existing lavatories, faucets, and vanities in toilet rooms 102 and 104.
Division 23- HVAC
All HVAC shall be performed according to the provided mechanical plans M-101 and M701-M- 703.
Division 26- Electrical:
See attached electrical Scope of Work.