This contract surveillance plan outlines quality assurance methods for a cost-plus-fixed-fee contract to provide technical, engineering products, hardware, and services in support of air traffic control and landing systems for the Department of the Navy Naval Air Systems Command. The contractor will perform tasks such as technical support, systems testing and evaluation, equipment installation, maintenance and repair, engineering support, and inspection system planning in accordance with statements of work under individual task orders. The government will conduct quarterly and annual performance evaluations focusing on quality, schedule, cost control, business relations, management, and utilization of small businesses. Metrics and acceptance criteria are defined for contractor deliverables required by contract data requirements lists.

View the file

Other files

Show all 20

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Source Selection Information 1 UNCLASSIFIED//FOR OFFICIAL USE ONLY See FAR 2.101 and 3.104

Contract Surveillance Plan for Air Traffic Control & Landing Systems Division

Area Control Systems Hardware Support Services

1. Purpose

This Contract Surveillance Plan (CSP) document is a Government developed and applied document used to ensure systematic Quality Assurance (QA) methods are used in the administration and surveillance of tasking under the Contract. The intent is to ensure the Contractor performs In Accordance With (IAW) the Statement of Work (SOW), and the Government receives the quality of services called for in each Task Order (TO) SOW.

This Contract will provide technical, engineering products, hardware, and services in support of the Fleet Area Control and Surveillance Facility (FACSFAC) Air Control Tracking System (FACTS), which is comprised of the AN/FYK-39 and OJ-753; the FACSFAC Navy Scheduling System (NAVSKED) AN/FYK-37; Integrated Range Status System (IRSS); Air Traffic Navigation, Integration, and Coordination System (ATNAVICS) AN/TPN-31; Tactical Aircraft Control and Navigation System (TACAN) AN/TRN-47(V); Automatic Carrier Landing Systems (ACLS);

Precision Global Positioning System (GPS) systems; and similar ATC Systems. Area Control Systems (ACS) services shall also encompass systems and displays, such as the Standard Terminal Automation Replacement System (STARS), the Air Defense System Integrator (ADSI), the Air 02 Digital Audio Data Recorder (DADR) System, the Non-Organic Radar Access (NORA) System, the Control and Reporting Center Simulation Package (CSP), and other similar systems.

This Contract will have Cost-Plus-Fixed-Fee (CPFF) term Contract Line Item Numbers (CLINs) for labor and corresponding cost reimbursable CLINs for Other Direct Costs (ODCs). The Contract will have a five-year ordering period. A properly executed CSP will assist the Government in achieving the objectives of this procurement.

2. Authority

Authority for issuance of this CSP is provided under Contract Section E – Inspection and Acceptance, which provides for inspections and acceptance of the services, products, and documentation called for in the Contract executed by the Contracting Officer (KO) or a duly authorized representative.

3. Scope

To fully understand the roles and responsibilities of the parties, it is important to first define the distinction in terminology between Quality Control Plan (QCP) and the CSP. The Contractor, and not the Government, is responsible for the QCP, which defines the management and quality control actions necessary to meet the quality standards set forth in the Contract and all resultant orders.

Source Selection Information 2 UNCLASSIFIED//FOR OFFICIAL USE ONLY

The CSP provides Government surveillance oversight of the Contractor’s efforts to assure they are timely, effective, and delivering the results specified in the Contract and each TO.

4. Government Resources

The following definitions for Government resources are applicable to this plan:

KO: A person duly appointed with the authority to enter into a contract (Procuring Contracting Officer (PCO)), or a person with the authority to administer contracts (Administrative Contracting Officer (ACO)) and make related determinations and findings on behalf of the Government. The PCO for this Contract is Jennifer Lundburg. The ACO will be designated in the resulting Contract. KOs are designated via a written warrant that sets forth limitations of authority.

Contracting Officer’s Representative (COR): An individual appointed in writing by the PCO to act as their authorized representative to assist in administering the Contract. The COR will be appointed in the resulting Contract. The limitations of authority are contained in the letter of appointment.

Alternate Contracting Officer’s Representative (ACOR): An individual appointed in writing by the PCO to act as their authorized representative, in the absence of the COR, to assist in administering the Contract. The ACOR will be appointed in the resulting Contract. The limitations of authority are contained in a written letter of appointment.

Technical Point of Contact (TPOC): The COR designates individual TPOCs to assist in administering of specific efforts under the Contract.

5. Responsibilities

The following Government resources will have responsibility for the implementation of this

CSP:

KO: The KO (PCO or ACO) ensures performance of all necessary actions for effective contracting, ensures compliance with the terms of the Contract, and safeguards the interests of the United States in the contractual relationship. The KO that assures the Contractor receives impartial, fair, and equitable treatment under the Contract. The KO is ultimately responsible for the final determination of the adequacy of the Contractor’s performance.

COR: The COR is responsible for technical administration of the Contract and assures proper Government surveillance of the Contractor’s performance. The COR is not empowered to make any contractual commitments or to authorize any changes on the Government’s behalf. Any changes that the Contractor deems may affect the Contract price, terms, or conditions shall be referred to the KO for action.

ACOR: The ACOR assists the COR for technical administration of the Contract and assures proper Government surveillance of the Contractor’s performance. The ACOR is not empowered

Source Selection Information 3 UNCLASSIFIED//FOR OFFICIAL USE ONLY to make any contractual commitments or to authorize any changes on the Government’s behalf.

Any changes that the Contractor deems may affect the Contract price, terms, or conditions shall be referred to the KO for action.

TPOC: The TPOC is responsible for assisting in administering specific efforts under the Contract. A TPOC cannot, in any manner, alter the scope of the Contract, make commitments or authorize any changes on the Government’s behalf.

6. Methods of QA Surveillance

a. Contractor Performance Assessment Reporting System (CPARS): The marketplace for this type of effort is very competitive. As such, the successful Offeror has a vested interest in the Government generated CPARS under this Contract. Additionally, an evaluation using the CPARS format will be performed at the end of each ordering year. This evaluation will be one

(1) determinant in the award of future contracts or TOs. The Government will address the quality of product or service, schedule, cost control, business relations, management, utilization of Small Business (SB), and other important areas for this procurement. Some of the monitoring methods to be used will be Government observation, review of reports, customer feedback and review of Contract Data Requirements Lists (CDRLs). As this information may affect future source selections throughout the Department of Defense (DoD), as well as the continuation of this tasking, the annual Government assessment will be used appropriately as an additional performance oversight and communication tool within the policies of this CSP.

b. CSP: This document will be used by the COR, ACOR, and TPOCs in the technical administration of this Contract. In addition to the below instructions, the form to be used for documentation of QA surveillance is the Surveillance Activity Checklist (SAC).

7. Surveillance

Enclosure (2) sets forth the performance standards, incentives, and surveillance methods for the Contractor, the COR/ACOR, and TPOCs while Enclosures (1) and (3) provide the checklist and means for the COR to document the results of the surveillance and will be provided to the KO.

8. Documentation

In addition to providing reports to the KO, the COR will maintain a complete QA file. The file will contain copies of all reports, evaluations, recommendations, and any actions related to the Government’s performance of the QA function, including the originals of the QA Checklists. All such records will be maintained for the life of the Contract. The COR shall forward these records to the KO at termination or completion of the Contract.

9. Enclosures

Enclosure (1): Surveillance Activity Checklist (SAC) Enclosure (2): Quarterly Evaluation by CDRL Enclosure (3): Annual Surveillance Summary

Enclosure (1)

Source Selection Information 4 UNCLASSIFIED//FOR OFFICIAL USE ONLY See FAR 2.101 and 3.104

ENCLOSURE (1): SURVEILLANCE ACTIVITY CHECKLIST (SAC)

Quarterly Surveillance:

The COR will perform a quarterly assessment of quality, schedule, cost control, business relations, management, utilization of SB, and other areas as applicable utilizing the CPARS evaluation rating definitions listed in Enclosure (3).

QUARTERLY EVALUATION BY SOW PARAGRAPH

Description Surveillance

Method/Measure Dates

Quality Assessment

Schedule Assessment

Cost Control Assessment

Business Relations

Assessment

Management Assessment

Utilization of SB

Assessment

Other Areas

Assessment Provide technical support IAW SOW Para. 3.3.1

100% Inspection by COR/ACOR and/or TPOCs

Provide systems test and evaluation support IAW SOW Para. 3.3.2

100% Inspection by

Provide ACS systems installation support IAW SOW Para. 3.3.3

100% Inspection by

Provide test bed equipment and software maintenance support IAW SOW Para. 3.3.4

100% Inspection by

Provide acquisition and procurement support IAW SOW Para. 3.3.5

100% Inspection by

Enclosure (1)

Source Selection Information 5 UNCLASSIFIED//FOR OFFICIAL USE ONLY See FAR 2.101 and 3.104

Provide repair efforts support IAW SOW Para.

3.3.6

100% Inspection by

Provide general and maintenance engineering support services IAW SOW Para. 3.3.7

100% Inspection by

Provide inspection system plan support IAW SOW Para.

3.3.8

100% Inspection by

Enclosure (2)

Source Selection Information 6 UNCLASSIFIED//FOR OFFICIAL USE ONLY

ENCLOSURE (2): QUARTERLY EVALUATION BY CDRL

Description Surveillance Method/Measure Dates Due

Dates Completed

No.

Submittals

No. of Req’d

Rework

Percentage On Time

Comments

Technical Report – Study/Services (FACSFAC Repair Facility Return Item Form (RIF)) CDRL A001

100% Inspection by COR/ACOR and/or TPOCs.

Certification/Data Report (Beyond Economical Repair (BER) Report) CDRL A002

Test Plans/Test Procedures (Test and Quality Control Procedures) CDRL A003

Inventory/Utilization Data Report (Inventory List Report) CDRL A004

Scientific and Technical Reports (Recommendations Report) CDRL A005

Trip/Travel Report CDRL A006

Technical Report – Study/Services (Fleet Metrics Forms) CDRL A007

Engineering Drawings CDRL A008

Test Procedure CDRL A009

Site Preparation Requirements and Installation Plan (Production Program Plan)

CDRL A010

Technical Report – Study/Services (Production Acceptance Test (PAT) Results)

CDRL A011

Technical Report – Study/Services (Maintenance Action Form Status Report)

CDRL A012

Enclosure (2)

Source Selection Information 7 UNCLASSIFIED//FOR OFFICIAL USE ONLY See FAR 2.101 and 3.104

Description Surveillance Method/Measure Dates Due

Dates Completed

No.

Submittals

No. of Req’d

Rework

Percentage On Time

Comments

Contracting Officer’s Management Report (Segregation of Costs and Invoice Requirements Reporting (TDLs)) CDRL A013

Government Furnished Equipment Detail Transaction Status Data (Government Owned Material Status Report) CDRL A014

Operations Security (OPSEC) Plan CDRL A015

Phase-Out Transition Plan CDRL A016

Government Property (GP) Inventory Report (Contractor Acquired Property (CAP))

CDRL A017

Metric Summary:

Current Period

Cumulative

Total Number of Deliverables Submitted:

Total Number of Deliverables Submitted Late:

Total Number of Deliverables Requiring Revision:

Percentage of Deliverables Submitted Late:

Percentage of Deliverables Requiring Revision:

Enclosure (3)

Source Selection Information 8 UNCLASSIFIED//FOR OFFICIAL USE ONLY

ENCLOSURE (3): ANNUAL SURVEILLANCE SUMMARY

The COR will perform an assessment of overall contract performance utilizing the CPARS evaluation rating definitions listed in Enclosure (3). This assessment will be completed annually covering the previous twelve (12) months.

Description Surveillance Method/Measure Date Planned Date Completed Summary Rating/Results Quality of Product or Service Review of Quarterly Ratings Schedule Review of Quarterly Ratings Cost Control Review of Quarterly Ratings Business Relations Review of Quarterly Ratings Management Review of Quarterly Ratings Utilization of SB Review of Quarterly Ratings Other Areas Review of Quarterly Ratings

Annual Surveillance Completed By: _______________________

Date Completed: ________________

All SOW and CDRL tasks, including sub-tasks, will be assessed focusing on the following.

Quality of product or service: Assess the Contractor’s effort to transform operational needs and requirements into an integrated solution. Areas of focus may include the planning and management of program tasks, the quality of support provided throughout all phases of contract execution, the integration of program management specialties, management of interfaces and the management of a totally integrated effort of all program management concerns to meet cost, performance and schedule objectives. Assess how successfully the Contractor meets program quality.

Schedule: Assess the Contractor’s adherence to the required delivery schedule by assessing the Contractor’s efforts during the assessment period that contribute to or effect the schedule variance. Also address significance of scheduled events (i.e., design reviews), discuss causes, and assess the effectiveness of Contractor corrective actions.

Source Selection Information 9 UNCLASSIFIED//FOR OFFICIAL USE ONLY

Cost control: Assess the Contractor’s effectiveness in forecasting, managing and controlling contract cost. Is the Contractor experiencing cost growth or under-run? If so, discuss the causes and Contractor proposed solutions for the cost overruns. For contracts where task or contract sizing is based upon Contractor provided person hour estimates, the relationship of these estimates to ultimate cost should be assessed. In addition, the extent to which the Contractor demonstrates a sense of cost responsibility, through the efficient use of resources in each work effort should be assessed.

Business relations: Assess the timeliness, completeness, and quality of problem identification, corrective action plans, proposal submittals, the Contractor’s reasonable and cooperative behavior, effective business relations, and customer satisfaction.

Management: Assess the Contractor’s success with timely award and management of subcontracts, including whether the Contractor met small/small disadvantage and women-owned business participation goals. Discuss the extent to which the Contractor discharges its responsibility for integration and coordination of all activity needed to execute the Contract; identifies and applies resources required to meet schedule requirements; assigns responsibility for tasks/actions required by contract; communicates appropriate information to affected program elements in a timely manner. Assess the Contractor’s risk mitigation plans.

Utilization of SB: The Request for Proposal (RFP) and FAR Subpart 19.7 and 15 U.S.C. 637 contains statutory requirements for complying with the SB Subcontracting Program. Assess whether the Contractor provided maximum practicable opportunity for SB (including Alaska Native Corporations (ANCs) and Indian Tribes) (including Small Disadvantaged Businesses (which also includes ANCs and Indian Tribes), Women Owned SBs (WOSBs), HUBZone, Veteran Owned SBs (VOSBs), Service Disabled Veteran Owned SB (SDVOSB), and ANCs and Indian Tribes that are not Small Disadvantaged Businesses (SDBs) or SBs to participate in contract performance consistent with efficient performance of the Contract. Evaluation will focus on the metrics of actual SB utilization as compared to the Contract required targets and the Contractor’s submitted SB plan.

Other areas: Assess additional evaluation areas unique to the Contract or that cannot be captured elsewhere.

The evaluation ratings are as follows:

Exceptional Performance: Performance meets contractual requirements and exceeds many to the Government’s benefit. The contractual performance of the element or sub-element being evaluated was accomplished with few minor problems for which corrective actions taken by the contractor were highly effective.

Source Selection Information 10 UNCLASSIFIED//FOR OFFICIAL USE ONLY

Very Good Performance: Performance meets contractual requirements and exceeds some to the Government’s benefit. The contractual performance of the element or sub-element being evaluated was accomplished with some minor problems for which corrective actions taken by the contractor were effective.

Satisfactory Performance: Performance meets contractual requirements. The contractual performance of the element or sub-element contains some minor problems for which corrective actions taken by the contractor appear or were satisfactory.

Marginal Performance: Performance does not meet some contractual requirements. The contractual performance of the element or sub-element being evaluated reflects a serious problem for which the contractor has not yet identified corrective actions. The contractor’s proposed actions appear only marginally effective or were not fully implemented.

Unsatisfactory Performance: Performance does not meet most contractual requirements and recovery is not likely in a timely manner. The contractual performance of the element or sub-element contains a serious problem(s) for which the contractor’s corrective actions appear or were ineffective.

File details come from the government source that posted it. Updated .