Attachment 2 - CMRAwningCostBreakdown.pdf
PDF 149 KB Posted
- Attached to
- Guatemala - CMR - Back Patio Awning Construction
- Solicitation number
- 19GT5025Q0013
About this file
The document is a detailed Cost Breakdown for a Construction Management Request (CMR) Awning project for the U.S. Embassy in Guatemala. The breakdown provides a comprehensive itemized list of construction activities across multiple specification divisions, including health and safety requirements, structural concrete, storm drainage, unit paving, structural metal framing, electrical work, skylight installation, roofing, and specialized glass work. Key quantities include 19 construction personnel requiring safety equipment, 25.32 MT2 of base concrete demolition, 114.05 MT2 of structural steel framing, electrical installations (21 ML of feeders, 14 LED strip lights, 2 wall lamps, 4 flood lights), and specialized elements like a US Flag stained glass fabrication (7.84 MT2) and PMMA resin waterproof roofing (114.06 MT2). The document meticulously breaks down the project into specific tasks, quantities, and units of measure, providing a granular view of the construction scope for the embassy's back patio awning project.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Vendor_WORK LINES_Awning.xlsx | XLSX spreadsheet | |
| Vendor Name_QUANTITY SHEET_Awning.xlsx | XLSX spreadsheet | |
| QA 19GT5025Q0013 Wtih Responses.pdf | ||
| Attachment 3 - Drawings.zip | ZIP file | |
| Attachment 1 - Specifications.pdf | ||
| 19GT5025Q0013 CMR BackPatioAwningConstruction.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
No. DESCRIPTION QUANTITY UNIT OF MEASURE
00 73 19 HEALTH AND SAFETY REQUIREMENTS
1 Construction Personnel SAFETY EQUIPMENT 19.00 PEOPLE
2 Base Concrete Demolition FOOTINGS, TIE BEAMS AND INSTALLATIONS 25.32 MT2
3 Debris EXTRACTION 3.80 MT3
03 31 00 STRUCTURAL CONCRETE & PAVER BASE
4 Excavation FOOTINGS, TIE BEAMS AND INSTALLATIONS 19.24 MT3
5 Structural Concrete FOOTINGS 3.70 MT3
6 Structural Concrete TIE BEAMS 4.23 MT3
7 Structural Concrete PEDESTALS 1.20 MT3
8 Concrete Tests 1.00 GLOBAL
9 Soil BACKFILL 15.32 MT3
10 Waste Soil EXTRACTION 5.00 MT3
03 31 00 FACILITY STORM DRAINAGE
11 3 in. Drain Pipe INSTALLATION 6.00 ML
12 4 in. Drain Pipe INSTALLATION 25.41 ML
13 6 in. Drain Pipe INSTALLATION 14.83 ML
14 18 in x 18 in Concrete Drainage Box INSTALLATION 2.00 UNITS
32 14 00 UNIT PAVING
15 Well Head Base CONSTRUCTION 1.00 UNIT
16 Exterior Paver ANTIGUA Series 20 x 20 INSTALLATION 25.32 MT2
05 12 00 STRUCTURAL METAL FRAMING
17 Structural Steel Framing INSTALLATION 114.05 MT2
18 Visual, Magnetic and Ultrasonic Test by Certified ATF 1.00 GLOBAL
19 Structural Steel PAINTING 1123.00 MT2
03 50 00 CAST DECKS AND UNDERLAYMENT
20 LOSACERO Metal Deck INSTALLATION 114.05 MT2
21 Reinforced Concrete Slab POURING 10.00 MT3
22 Concrete Tests 1.00 GLOBAL
23 Construction Joint INSTALLATION 15.35 ML
09 29 13 ELECTRICAL
24 Electrical Feeders INSTALLATION 21.00 ML
25 Led Strips Lights INSTALLATION 14.00 STRIPS
26 Wall Lamps INSTALLATION 2.00 LAMPS
27 Flood Lights INSTALLATION 4.00 LAMPS
28 Exterior Outlets INSTALLATION 7.00 OUTLETS
29 Pumps Outlets INSTALLATION 2.00 OUTLETS
08 63 00 PYRAMIDAL STAINLESS STEEL-FRAMED SKYLIGHT
30 Skylight FABRICATION & INSTALLATION 10.24 MT2
31 Durock Backing Board INSTALLATION 54.17 MT2
09 29 82 DENSGLASS BOARD WATERPROOF CEILING
32 Densglass Ceiling INSTALLATION 123.65 MT2
33 Wall & Ceiling PAINTING 373.42 MT2
34 Debris EXTRACTION 1.00 GLOBAL
12 17 16 STAINED GLASS
35 US Flag Stained Glass FABRICATION & INSTALLATION 7.84 MT2
07 54 30 PMMA RESIN WATERPROOF ROOFING
36 Exterior Slab PMMA Resin WATERPROOFING 114.06 MT2
37 Facility Fall Protection 1.00 GLOBAL
CMR- AWNING COST BREAKDOWN
FACILITLY MANAGEMENT
File details come from the government source that posted it. Updated .