Attachment 2 - CMRAwningCostBreakdown.pdf

PDF 149 KB Posted

Attached to
Guatemala - CMR - Back Patio Awning Construction
Solicitation number
19GT5025Q0013
Issued by

About this file

The document is a detailed Cost Breakdown for a Construction Management Request (CMR) Awning project for the U.S. Embassy in Guatemala. The breakdown provides a comprehensive itemized list of construction activities across multiple specification divisions, including health and safety requirements, structural concrete, storm drainage, unit paving, structural metal framing, electrical work, skylight installation, roofing, and specialized glass work. Key quantities include 19 construction personnel requiring safety equipment, 25.32 MT2 of base concrete demolition, 114.05 MT2 of structural steel framing, electrical installations (21 ML of feeders, 14 LED strip lights, 2 wall lamps, 4 flood lights), and specialized elements like a US Flag stained glass fabrication (7.84 MT2) and PMMA resin waterproof roofing (114.06 MT2). The document meticulously breaks down the project into specific tasks, quantities, and units of measure, providing a granular view of the construction scope for the embassy's back patio awning project.

View the file

Other files

File Type Posted
Vendor_WORK LINES_Awning.xlsx XLSX spreadsheet
Vendor Name_QUANTITY SHEET_Awning.xlsx XLSX spreadsheet
QA 19GT5025Q0013 Wtih Responses.pdf PDF
Attachment 3 - Drawings.zip ZIP file
Attachment 1 - Specifications.pdf PDF
19GT5025Q0013 CMR BackPatioAwningConstruction.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

No. DESCRIPTION QUANTITY UNIT OF MEASURE

00 73 19 HEALTH AND SAFETY REQUIREMENTS

1 Construction Personnel SAFETY EQUIPMENT 19.00 PEOPLE

2 Base Concrete Demolition FOOTINGS, TIE BEAMS AND INSTALLATIONS 25.32 MT2

3 Debris EXTRACTION 3.80 MT3

03 31 00 STRUCTURAL CONCRETE & PAVER BASE

4 Excavation FOOTINGS, TIE BEAMS AND INSTALLATIONS 19.24 MT3

5 Structural Concrete FOOTINGS 3.70 MT3

6 Structural Concrete TIE BEAMS 4.23 MT3

7 Structural Concrete PEDESTALS 1.20 MT3

8 Concrete Tests 1.00 GLOBAL

9 Soil BACKFILL 15.32 MT3

10 Waste Soil EXTRACTION 5.00 MT3

03 31 00 FACILITY STORM DRAINAGE

11 3 in. Drain Pipe INSTALLATION 6.00 ML

12 4 in. Drain Pipe INSTALLATION 25.41 ML

13 6 in. Drain Pipe INSTALLATION 14.83 ML

14 18 in x 18 in Concrete Drainage Box INSTALLATION 2.00 UNITS

32 14 00 UNIT PAVING

15 Well Head Base CONSTRUCTION 1.00 UNIT

16 Exterior Paver ANTIGUA Series 20 x 20 INSTALLATION 25.32 MT2

05 12 00 STRUCTURAL METAL FRAMING

17 Structural Steel Framing INSTALLATION 114.05 MT2

18 Visual, Magnetic and Ultrasonic Test by Certified ATF 1.00 GLOBAL

19 Structural Steel PAINTING 1123.00 MT2

03 50 00 CAST DECKS AND UNDERLAYMENT

20 LOSACERO Metal Deck INSTALLATION 114.05 MT2

21 Reinforced Concrete Slab POURING 10.00 MT3

22 Concrete Tests 1.00 GLOBAL

23 Construction Joint INSTALLATION 15.35 ML

09 29 13 ELECTRICAL

24 Electrical Feeders INSTALLATION 21.00 ML

25 Led Strips Lights INSTALLATION 14.00 STRIPS

26 Wall Lamps INSTALLATION 2.00 LAMPS

27 Flood Lights INSTALLATION 4.00 LAMPS

28 Exterior Outlets INSTALLATION 7.00 OUTLETS

29 Pumps Outlets INSTALLATION 2.00 OUTLETS

08 63 00 PYRAMIDAL STAINLESS STEEL-FRAMED SKYLIGHT

30 Skylight FABRICATION & INSTALLATION 10.24 MT2

31 Durock Backing Board INSTALLATION 54.17 MT2

09 29 82 DENSGLASS BOARD WATERPROOF CEILING

32 Densglass Ceiling INSTALLATION 123.65 MT2

33 Wall & Ceiling PAINTING 373.42 MT2

34 Debris EXTRACTION 1.00 GLOBAL

12 17 16 STAINED GLASS

35 US Flag Stained Glass FABRICATION & INSTALLATION 7.84 MT2

07 54 30 PMMA RESIN WATERPROOF ROOFING

36 Exterior Slab PMMA Resin WATERPROOFING 114.06 MT2

37 Facility Fall Protection 1.00 GLOBAL

CMR- AWNING COST BREAKDOWN