Vendor_WORK LINES_Awning.xlsx

XLSX spreadsheet 22 KB Posted

Attached to
Guatemala - CMR - Back Patio Awning Construction
Solicitation number
19GT5025Q0013
Issued by

About this file

The document is a detailed work breakdown structure (WBS) for a construction project at the Chief of Mission Residence (CMR) in Guatemala, specifically for a back patio awning construction. The work lines spreadsheet comprehensively itemizes 37 distinct construction activities, including safety equipment provision, concrete work (demolition, excavation, pouring), pipe and drainage installations, structural steel framing, electrical work, and architectural finishing tasks. Key construction components include installing drain pipes (3, 4, and 6-inch sizes), structural steel framing, metal deck installation, electrical feeders, lighting (LED strips, wall lamps, flood lights), skylights, and specialized elements like a US flag stained glass feature.

The project's scope encompasses multiple technical domains such as structural work, electrical installations, waterproofing, and finishing, with precise measurements in cubic meters (MT3) and square meters (MT2). Total project elements include concrete testing, backfill, waste soil extraction, exterior paving, painting, fall protection, and specialized installations. The work is associated with US Embassy Guatemala City's Solicitation Number 19GT5025Q0013, indicating this is a formal government contract opportunity for constructing a back patio awning at the Chief of Mission Residence, with contact details provided for Architect Mario Ovalle, who appears to be involved in the project planning and execution.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

WORK LINES

DIVISIONES
ARQ. MARIO OVALLE
27 AVENIDA 21-10 ZONA 16
Cel. Mario Ovalle: 5206-7902
email:mariovalleaguilera@gmail.com
CMR AWNING WORK LINES
ORIGINAL PROJECT
No.DESCRIPTIONQUANTITYUNIT OF MEASURE
1Construction Personnel SAFETY EQUIPMENT19.00PEOPLE
2Base Concrete Demolition FOOTINGS, TIE BEAMS AND INSTALLATIONS25.32MT2
3Debris EXTRACTION3.80MT3
4Excavation FOOTINGS, TIE BEAMS AND INSTALLATIONS19.24MT3
5Structural Concrete FOOTINGS3.70MT3
6Structural Concrete TIE BEAMS4.23MT3
7Structural Concrete PEDESTALS1.20MT3
8Concrete Tests1.00GLOBAL
9Soil BACKFILL15.32MT3
10Waste Soil EXTRACTION5.00MT3
113 in. Drain Pipe INSTALLATION6.00ML
124 in. Drain Pipe INSTALLATION25.41ML
136 in. Drain Pipe INSTALLATION14.83ML
1418 in x 18 in Concrete Drainage Box INSTALLATION2.00UNITS
15Well Head Base CONSTRUCTION1.00UNIT
16Exterior Paver ANTIGUA Series 20 x 20 INSTALLATION25.32MT2
17Structural Steel Framing INSTALLATION114.05MT2
18Visual, Magnetic and Ultrasonic Test by Certified ATF1.00GLOBAL
19Structural Steel PAINTING1123.00MT2
20LOSACERO Metal Deck INSTALLATION114.05MT2
21Reinforced Concrete Slab POURING10.00MT3
22Concrete Tests1.00GLOBAL
23Construction Joint INSTALLATION15.35ML
24Electrical Feeders INSTALLATION21.00ML
25Led Strips Lights INSTALLATION14.00STRIPS
26Wall Lamps INSTALLATION2.00LAMPS
27Flood Lights INSTALLATION4.00LAMPS
28Exterior Outlets INSTALLATION7.00OUTLETS
29Pumps Outlets INSTALLATION2.00OUTLETS
30Skylight FABRICATION & INSTALLATION10.24MT2
31Durock Backing Board INSTALLATION54.17MT2
32Densglass Ceiling INSTALLATION123.65MT2
33Wall & Ceiling PAINTING373.42MT2
34Debris EXTRACTION1.00GLOBAL
35US Flag Stained Glass FABRICATION & INSTALLATION7.84MT2
36Exterior Slab PMMA Resin WATERPROOFING114.06MT2
37Facility Fall Protection1.00GLOBAL