Attachment_2_CLIN_Schedule_N3319126R0033.xlsx
XLSX spreadsheet 43 KB Posted
- Solicitation number
- N3319126R0033
About this file
This is a CLIN (Contract Line Item Number) schedule pricing template for solicitation N3319126R0033, a multiple-year services contract with the Department of the Navy Naval Facilities Engineering Command (NAVFAC). The contract supports Resident Officer in Charge of Construction (ROICC) offices across the NAVFAC EURAFCENT area of responsibility, providing construction management, quality assurance, and administrative services at multiple locations including ROICC Naples/Italy (NI), Sigonella, Rota, Souda Bay, and additional locations in Poland and Romania that appear in the option periods.
The contract structure includes a base period running from September 19, 2026 through September 18, 2027, followed by four one-year option periods and a six-month extension option, extending the potential contract through March 17, 2032. The base period requires 17 personnel positions including four Construction Managers, eleven Engineering Technicians, and administrative, planning, and architectural staff at various locations. Other Costs (ODC) in the base period include $20,000 in travel funding distributed across the locations. Option periods (Years 2-5) expand staffing significantly, adding positions in Poland and Romania while increasing travel budgets to $85,000-$100,000 annually. All labor CLIN unit prices are listed as "$-0" indicating that offerors must provide pricing. This solicitation is restricted to SEAPORT MAC holders only. The contract is structured as a time-and-materials procurement with all personnel billed on a 12-month basis (6-month for the extension) with specified geographic duty locations.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Solicitation_Amendment_N3319126R00330002_SF_30.pdf | ||
| Solicitation Amendment N3319126R00330001 SF 30.pdf | ||
| Attachment_1_Pre_Proposal_Inquiry_Form.xlsx | XLSX spreadsheet | |
| Solicitation - N3319126R0033.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Cover Sheet
INSERT COMPANY NAME AND UEI
TOTAL PROPOSED PRICE (Includes All Option Periods) $ - 0
Base
| Attachment 2 | |||||||
| CLIN Schedule | |||||||
| Solicitation: N33191-26-R-0033 | |||||||
| BASE PERIOD | |||||||
| CLIN | Description | Quantity | Unit of Issue | Unit Price | Annual Cost | PoP Start | PoP End |
| 5000 | Construction Manager - ROICC NI (1) | 12 | Month | $ - 0 | 9/19/26 | 9/18/27 |
5000 Construction Manager - Sigonella (1) 12 Month $ - 0 9/19/26 9/18/27
5000 Construction Manager - Rota (1) 12 Month $ - 0 9/19/26 9/18/27
5000 Construction Manager - Souda Bay (1) 12 Month $ - 0 9/19/26 9/18/27
5000 Engineering Technician - ROICC NI (1) 12 Month $ - 0 9/19/26 9/18/27
5000 Engineering Technician - ROICC NI (1) 12 Month $ - 0 9/19/26 9/18/27
5000 Engineering Technician - Sigonella (1) 12 Month $ - 0 9/19/26 9/18/27
5000 Engineering Technician - Sigonella (1) 12 Month $ - 0 9/19/26 9/18/27
5000 Engineering Technician - Rota (1) 12 Month $ - 0 9/19/26 9/18/27
5000 Engineering Technician - Rota (1) 12 Month $ - 0 9/19/26 9/18/27
5000 Engineering Technician - Souda Bay (1) 12 Month $ - 0 9/19/26 9/18/27
5000 Administrative Rota (1) 12 Month $ - 0 9/19/26 9/18/27
5000 Administrative Sigonella (1) 12 Month $ - 0 9/19/26 9/18/27
5000 Administrative Souda Bay (1) 12 Month $ - 0 9/19/26 9/18/27
5000 Administrative Naples FEC (1) 12 Month $ - 0 9/19/26 9/18/27
5000 Planner Naples FEC (1) 12 Month $ - 0 9/19/26 9/18/27
| 5000 | Architect - Naples FEC (1) | 12 | Month | $ - 0 | 9/19/26 | 9/18/27 | |
| TOTAL | $ - 0 | ||||||
| ODC CLINS (FOR GOVERNMENT USE ONLY) | |||||||
| CLIN | Description | Quantity | Unit of Issue | Unit Price | Annual Cost | PoP Start | PoP End |
| 7000 | ODC TRAVEL - ROICC NI | 1 | EA | $5,000.00 | $ 5,000.00 | 9/19/26 | 9/18/27 |
| 7000 | ODC TRAVEL - Sigonella | 1 | EA | $5,000.00 | $ 5,000.00 | 9/19/26 | 9/18/27 |
| 7000 | ODC TRAVEL - Naples FEC Planner | 1 | EA | $5,000.00 | $ 5,000.00 | 9/19/26 | 9/18/27 |
| 7000 | ODC TRAVEL - Naples FEC Architect | 1 | EA | $5,000.00 | $ 5,000.00 | 9/19/26 | 9/18/27 |
Opt 1
| Attachment 2 | |||||||
| CLIN Schedule | |||||||
| Solicitation: N33191-26-R-0033 | |||||||
| Option 1 | |||||||
| CLIN | Description | Quantity | Unit of Issue | Unit Price | Annual Cost | PoP Start | PoP End |
5100 Engineering Technician - ROICC NI (1) 12 Month $ - 0 9/19/27 9/18/28
5100 Engineering Technician - ROICC NI (1) 12 Month $ - 0 9/19/27 9/18/28
5100 Engineering Technician - Sigonella (1) 12 Month $ - 0 9/19/27 9/18/28
5100 Engineering Technician - Sigonella (1) 12 Month $ - 0 9/19/27 9/18/28
5100 Administrative Rota (1) 12 Month $ - 0 9/19/27 9/18/28
5100 Planner Naples FEC (1) 12 Month $ - 0 9/19/27 9/18/28
5100 Architect - Naples FEC (1) 12 Month $ - 0 9/19/27 9/18/28
5100 Construction Manager - ROICC NI (1) 12 Month $ - 0 9/19/27 9/18/28
5100 Construction Manager - ROICC NI (1) 12 Month $ - 0 9/19/27 9/18/28
5100 Engineering Technician - ROICC NI (1) 12 Month $ - 0 9/19/27 9/18/28
5100 Engineering Technician - ROICC NI (1) 12 Month $ - 0 9/19/27 9/18/28
5100 Administrative - ROICC NI (1) 12 Month $ - 0 9/19/27 9/18/28
5100 Construction Manager - Sigonella (1) 12 Month $ - 0 9/19/27 9/18/28
5100 Construction Manager - Sigonella (1) 12 Month $ - 0 9/19/27 9/18/28
5100 Engineering Technician - Sigonella (1) 12 Month $ - 0 9/19/27 9/18/28
5100 Engineering Technician - Sigonella (1) 12 Month $ - 0 9/19/27 9/18/28
5100 Administrative - Sigonella (1) 12 Month $ - 0 9/19/27 9/18/28
5100 Construction Manager - Rota (1) 12 Month $ - 0 9/19/27 9/18/28
5100 Construction Manager - Rota (1) 12 Month $ - 0 9/19/27 9/18/28
5100 Engineering Technician - Rota (1) 12 Month $ - 0 9/19/27 9/18/28
5100 Engineering Technician - Rota (1) 12 Month $ - 0 9/19/27 9/18/28
5100 Engineering Technician - Rota (1) 12 Month $ - 0 9/19/27 9/18/28
5100 Engineering Technician - Rota (1) 12 Month $ - 0 9/19/27 9/18/28
5100 Construction Manager - Naples (1) 12 Month $ - 0 9/19/27 9/18/28
5100 Engineering Technician - Naples (1) 12 Month $ - 0 9/19/27 9/18/28
5100 Engineering Technician - Naples (1) 12 Month $ - 0 9/19/27 9/18/28
5100 Administrative - Naples (1) 12 Month $ - 0 9/19/27 9/18/28
5100 Construction Manager - Souda Bay (1) 12 Month $ - 0 9/19/27 9/18/28
5100 Engineering Technician - Souda Bay (1) 12 Month $ - 0 9/19/27 9/18/28
5100 Engineering Technician - Souda Bay (1) 12 Month $ - 0 9/19/27 9/18/28
5100 Administrative - Souda Bay (1) 12 Month $ - 0 9/19/27 9/18/28
5100 Construction Manager - Poland (1) 12 Month $ - 0 9/19/27 9/18/28
5100 Engineering Technician - Poland (1) 12 Month $ - 0 9/19/27 9/18/28
5100 Construction Manager - Romania (1) 12 Month $ - 0 9/19/27 9/18/28
5100 Engineering Technician - Romania (1) 12 Month $ - 0 9/19/27 9/18/28
5100 Administrative - Naples FEC (1) 12 Month $ - 0 9/19/27 9/18/28
| 5100 | Administrative - Naples FEC (1) | 12 | Month | $ - 0 | 9/19/27 | 9/18/28 | |
| TOTAL | $ - 0 | ||||||
| ODC CLINS (FOR GOVERNMENT USE ONLY) | |||||||
| CLIN | Description | Quantity | Unit of Issue | Unit Price | Annual Cost | PoP Start | PoP End |
| 7100 | ODC TRAVEL - ROICC NI | 1 | EA | $10,000.00 | $ 10,000.00 | 9/19/27 | 9/18/28 |
| 7100 | ODC TRAVEL - Sigonella | 1 | EA | $10,000.00 | $ 10,000.00 | 9/19/27 | 9/18/28 |
| 7100 | ODC TRAVEL - Rota | 1 | EA | $20,000.00 | $ 20,000.00 | 9/19/27 | 9/18/28 |
| 7100 | ODC TRAVEL - Naples | 1 | EA | $5,000.00 | $ 5,000.00 | 9/19/27 | 9/18/28 |
| 7100 | ODC TRAVEL - Souda Bay | 1 | EA | $5,000.00 | $ 5,000.00 | 9/19/27 | 9/18/28 |
| 7100 | ODC TRAVEL - Poland | 1 | EA | $5,000.00 | $ 5,000.00 | 9/19/27 | 9/18/28 |
| 7100 | ODC TRAVEL - Romania | 1 | EA | $5,000.00 | $ 5,000.00 | 9/19/27 | 9/18/28 |
| 7100 | ODC TRAVEL - Naples FEC Planner | 1 | EA | $5,000.00 | $ 5,000.00 | 9/19/27 | 9/18/28 |
| 7100 | ODC TRAVEL - Naples FEC Architect | 1 | EA | $5,000.00 | $ 5,000.00 | 9/19/27 | 9/18/28 |
| 7100 | ODC TRAVEL - Naples FEC Admin | 1 | EA | $10,000.00 | $ 10,000.00 | 9/19/27 | 9/18/28 |
Opt 2
| Attachment 2 | |||||||
| CLIN Schedule | |||||||
| Solicitation: N33191-26-R-0033 | |||||||
| Option 2 | |||||||
| CLIN | Description | Quantity | Unit of Issue | Unit Price | Annual Cost | PoP Start | PoP End |
5200 Engineering Technician - ROICC NI (1) 12 Month $ - 0 9/19/28 9/18/29
5200 Engineering Technician - ROICC NI (1) 12 Month $ - 0 9/19/28 9/18/29
5200 Engineering Technician - Sigonella (1) 12 Month $ - 0 9/19/28 9/18/29
5200 Engineering Technician - Sigonella (1) 12 Month $ - 0 9/19/28 9/18/29
5200 Administrative Rota (1) 12 Month $ - 0 9/19/28 9/18/29
5200 Planner Naples FEC (1) 12 Month $ - 0 9/19/28 9/18/29
5200 Architect - Naples FEC (1) 12 Month $ - 0 9/19/28 9/18/29
5200 Construction Manager - ROICC NI (1) 12 Month $ - 0 9/19/28 9/18/29
5200 Construction Manager - ROICC NI (1) 12 Month $ - 0 9/19/28 9/18/29
5200 Engineering Technician - ROICC NI (1) 12 Month $ - 0 9/19/28 9/18/29
5200 Engineering Technician - ROICC NI (1) 12 Month $ - 0 9/19/28 9/18/29
5200 Administrative - ROICC NI (1) 12 Month $ - 0 9/19/28 9/18/29
5200 Construction Manager - Sigonella (1) 12 Month $ - 0 9/19/28 9/18/29
5200 Construction Manager - Sigonella (1) 12 Month $ - 0 9/19/28 9/18/29
5200 Engineering Technician - Sigonella (1) 12 Month $ - 0 9/19/28 9/18/29
5200 Engineering Technician - Sigonella (1) 12 Month $ - 0 9/19/28 9/18/29
5200 Administrative - Sigonella (1) 12 Month $ - 0 9/19/28 9/18/29
5200 Construction Manager - Rota (1) 12 Month $ - 0 9/19/28 9/18/29
5200 Construction Manager - Rota (1) 12 Month $ - 0 9/19/28 9/18/29
5200 Engineering Technician - Rota (1) 12 Month $ - 0 9/19/28 9/18/29
5200 Engineering Technician - Rota (1) 12 Month $ - 0 9/19/28 9/18/29
5200 Engineering Technician - Rota (1) 12 Month $ - 0 9/19/28 9/18/29
5200 Engineering Technician - Rota (1) 12 Month $ - 0 9/19/28 9/18/29
5200 Construction Manager - Naples (1) 12 Month $ - 0 9/19/28 9/18/29
5200 Engineering Technician - Naples (1) 12 Month $ - 0 9/19/28 9/18/29
5200 Engineering Technician - Naples (1) 12 Month $ - 0 9/19/28 9/18/29
5200 Administrative - Naples (1) 12 Month $ - 0 9/19/28 9/18/29
5200 Construction Manager - Souda Bay (1) 12 Month $ - 0 9/19/28 9/18/29
5200 Engineering Technician - Souda Bay (1) 12 Month $ - 0 9/19/28 9/18/29
5200 Engineering Technician - Souda Bay (1) 12 Month $ - 0 9/19/28 9/18/29
5200 Administrative - Souda Bay (1) 12 Month $ - 0 9/19/28 9/18/29
5200 Construction Manager - Poland (1) 12 Month $ - 0 9/19/28 9/18/29
5200 Engineering Technician - Poland (1) 12 Month $ - 0 9/19/28 9/18/29
5200 Construction Manager - Romania (1) 12 Month $ - 0 9/19/28 9/18/29
5200 Engineering Technician - Romania (1) 12 Month $ - 0 9/19/28 9/18/29
5200 Administrative - Naples FEC (1) 12 Month $ - 0 9/19/28 9/18/29
| 5200 | Administrative - Naples FEC (1) | 12 | Month | $ - 0 | 9/19/28 | 9/18/29 | |
| TOTAL | $ - 0 | ||||||
| ODC CLINS (FOR GOVERNMENT USE ONLY) | |||||||
| CLIN | Description | Quantity | Unit of Issue | Unit Price | Annual Cost | PoP Start | PoP End |
| 7200 | ODC TRAVEL - ROICC NI | 1 | EA | $10,000.00 | $ 10,000.00 | 9/19/28 | 9/18/29 |
| 7200 | ODC TRAVEL - Sigonella | 1 | EA | $10,000.00 | $ 10,000.00 | 9/19/28 | 9/18/29 |
| 7200 | ODC TRAVEL - Rota | 1 | EA | $20,000.00 | $ 20,000.00 | 9/19/28 | 9/18/29 |
| 7200 | ODC TRAVEL - Naples | 1 | EA | $5,000.00 | $ 5,000.00 | 9/19/28 | 9/18/29 |
| 7200 | ODC TRAVEL - Souda Bay | 1 | EA | $5,000.00 | $ 5,000.00 | 9/19/28 | 9/18/29 |
| 7200 | ODC TRAVEL - Poland | 1 | EA | $5,000.00 | $ 5,000.00 | 9/19/28 | 9/18/29 |
| 7200 | ODC TRAVEL - Romania | 1 | EA | $5,000.00 | $ 5,000.00 | 9/19/28 | 9/18/29 |
| 7200 | ODC TRAVEL - Naples FEC Planner | 1 | EA | $5,000.00 | $ 5,000.00 | 9/19/28 | 9/18/29 |
| 7200 | ODC TRAVEL - Naples FEC Architect | 1 | EA | $5,000.00 | $ 5,000.00 | 9/19/28 | 9/18/29 |
| 7200 | ODC TRAVEL - Naples FEC Admin | 1 | EA | $10,000.00 | $ 10,000.00 | 9/19/28 | 9/18/29 |
Opt 3
| Attachment 2 | |||||||
| CLIN Schedule | |||||||
| Solicitation: N33191-26-R-0033 | |||||||
| Option 3 | |||||||
| CLIN | Description | Quantity | Unit of Issue | Unit Price | Annual Cost | PoP Start | PoP End |
5300 Engineering Technician - ROICC NI (1) 12 Month $ - 0 9/19/29 9/18/30
5300 Engineering Technician - ROICC NI (1) 12 Month $ - 0 9/19/29 9/18/30
5300 Engineering Technician - Sigonella (1) 12 Month $ - 0 9/19/29 9/18/30
5300 Engineering Technician - Sigonella (1) 12 Month $ - 0 9/19/29 9/18/30
5300 Administrative Rota (1) 12 Month $ - 0 9/19/29 9/18/30
5300 Planner Naples FEC (1) 12 Month $ - 0 9/19/29 9/18/30
5300 Architect - Naples FEC (1) 12 Month $ - 0 9/19/29 9/18/30
5300 Construction Manager - ROICC NI (1) 12 Month $ - 0 9/19/29 9/18/30
5300 Construction Manager - ROICC NI (1) 12 Month $ - 0 9/19/29 9/18/30
5300 Engineering Technician - ROICC NI (1) 12 Month $ - 0 9/19/29 9/18/30
5300 Engineering Technician - ROICC NI (1) 12 Month $ - 0 9/19/29 9/18/30
5300 Administrative - ROICC NI (1) 12 Month $ - 0 9/19/29 9/18/30
5300 Construction Manager - Sigonella (1) 12 Month $ - 0 9/19/29 9/18/30
5300 Construction Manager - Sigonella (1) 12 Month $ - 0 9/19/29 9/18/30
5300 Engineering Technician - Sigonella (1) 12 Month $ - 0 9/19/29 9/18/30
5300 Engineering Technician - Sigonella (1) 12 Month $ - 0 9/19/29 9/18/30
5300 Administrative - Sigonella (1) 12 Month $ - 0 9/19/29 9/18/30
5300 Construction Manager - Rota (1) 12 Month $ - 0 9/19/29 9/18/30
5300 Construction Manager - Rota (1) 12 Month $ - 0 9/19/29 9/18/30
5300 Engineering Technician - Rota (1) 12 Month $ - 0 9/19/29 9/18/30
5300 Engineering Technician - Rota (1) 12 Month $ - 0 9/19/29 9/18/30
5300 Engineering Technician - Rota (1) 12 Month $ - 0 9/19/29 9/18/30
5300 Engineering Technician - Rota (1) 12 Month $ - 0 9/19/29 9/18/30
5300 Construction Manager - Naples (1) 12 Month $ - 0 9/19/29 9/18/30
5300 Engineering Technician - Naples (1) 12 Month $ - 0 9/19/29 9/18/30
5300 Engineering Technician - Naples (1) 12 Month $ - 0 9/19/29 9/18/30
5300 Administrative - Naples (1) 12 Month $ - 0 9/19/29 9/18/30
5300 Construction Manager - Souda Bay (1) 12 Month $ - 0 9/19/29 9/18/30
5300 Engineering Technician - Souda Bay (1) 12 Month $ - 0 9/19/29 9/18/30
5300 Engineering Technician - Souda Bay (1) 12 Month $ - 0 9/19/29 9/18/30
5300 Administrative - Souda Bay (1) 12 Month $ - 0 9/19/29 9/18/30
5300 Construction Manager - Poland (1) 12 Month $ - 0 9/19/29 9/18/30
5300 Engineering Technician - Poland (1) 12 Month $ - 0 9/19/29 9/18/30
5300 Construction Manager - Romania (1) 12 Month $ - 0 9/19/29 9/18/30
5300 Engineering Technician - Romania (1) 12 Month $ - 0 9/19/29 9/18/30
5300 Administrative - Naples FEC (1) 12 Month $ - 0 9/19/29 9/18/30
| 5300 | Administrative - Naples FEC (1) | 12 | Month | 9/19/29 | 9/18/30 | ||
| TOTAL | $ - 0 | ||||||
| ODC CLINS (FOR GOVERNMENT USE ONLY) | |||||||
| CLIN | Description | Quantity | Unit of Issue | Unit Price | Annual Cost | PoP Start | PoP End |
| 7300 | ODC TRAVEL - ROICC NI | 1 | EA | $10,000.00 | $ 10,000.00 | 9/19/29 | 9/18/30 |
| 7300 | ODC TRAVEL - Sigonella | 1 | EA | $10,000.00 | $ 10,000.00 | 9/19/29 | 9/18/30 |
| 7300 | ODC TRAVEL - Rota | 1 | EA | $20,000.00 | $ 20,000.00 | 9/19/29 | 9/18/30 |
| 7300 | ODC TRAVEL - Naples | 1 | EA | $5,000.00 | $ 5,000.00 | 9/19/29 | 9/18/30 |
| 7300 | ODC TRAVEL - Souda Bay | 1 | EA | $5,000.00 | $ 5,000.00 | 9/19/29 | 9/18/30 |
| 7300 | ODC TRAVEL - Poland | 1 | EA | $5,000.00 | $ 5,000.00 | 9/19/29 | 9/18/30 |
| 7300 | ODC TRAVEL - Romania | 1 | EA | $5,000.00 | $ 5,000.00 | 9/19/29 | 9/18/30 |
| 7300 | ODC TRAVEL - Naples FEC Planner | 1 | EA | $5,000.00 | $ 5,000.00 | 9/19/29 | 9/18/30 |
| 7300 | ODC TRAVEL - Naples FEC Architect | 1 | EA | $5,000.00 | $ 5,000.00 | 9/19/29 | 9/18/30 |
| 7300 | ODC TRAVEL - Naples FEC Admin | 1 | EA | $10,000.00 | $ 10,000.00 | 9/19/29 | 9/18/30 |
Opt 4
| Attachment 2 | |||||||
| CLIN Schedule | |||||||
| Solicitation: N33191-26-R-0033 | |||||||
| Option 4 | |||||||
| CLIN | Description | Quantity | Unit of Issue | Unit Price | Annual Cost | PoP Start | PoP End |
5400 Engineering Technician - ROICC NI (1) 12 Month $ - 0 9/19/30 9/18/31
5400 Engineering Technician - ROICC NI (1) 12 Month $ - 0 9/19/30 9/18/31
5400 Engineering Technician - Sigonella (1) 12 Month $ - 0 9/19/30 9/18/31
5400 Engineering Technician - Sigonella (1) 12 Month $ - 0 9/19/30 9/18/31
5400 Administrative Rota (1) 12 Month $ - 0 9/19/30 9/18/31
5400 Planner Naples FEC (1) 12 Month $ - 0 9/19/30 9/18/31
5400 Architect - Naples FEC (1) 12 Month $ - 0 9/19/30 9/18/31
5400 Construction Manager - ROICC NI (1) 12 Month $ - 0 9/19/30 9/18/31
5400 Construction Manager - ROICC NI (1) 12 Month $ - 0 9/19/30 9/18/31
5400 Engineering Technician - ROICC NI (1) 12 Month $ - 0 9/19/30 9/18/31
5400 Engineering Technician - ROICC NI (1) 12 Month $ - 0 9/19/30 9/18/31
5400 Administrative - ROICC NI (1) 12 Month $ - 0 9/19/30 9/18/31
5400 Construction Manager - Sigonella (1) 12 Month $ - 0 9/19/30 9/18/31
5400 Construction Manager - Sigonella (1) 12 Month $ - 0 9/19/30 9/18/31
5400 Engineering Technician - Sigonella (1) 12 Month $ - 0 9/19/30 9/18/31
5400 Engineering Technician - Sigonella (1) 12 Month $ - 0 9/19/30 9/18/31
5400 Administrative - Sigonella (1) 12 Month $ - 0 9/19/30 9/18/31
5400 Construction Manager - Rota (1) 12 Month $ - 0 9/19/30 9/18/31
5400 Construction Manager - Rota (1) 12 Month $ - 0 9/19/30 9/18/31
5400 Engineering Technician - Rota (1) 12 Month $ - 0 9/19/30 9/18/31
5400 Engineering Technician - Rota (1) 12 Month $ - 0 9/19/30 9/18/31
5400 Engineering Technician - Rota (1) 12 Month $ - 0 9/19/30 9/18/31
5400 Engineering Technician - Rota (1) 12 Month $ - 0 9/19/30 9/18/31
5400 Construction Manager - Naples (1) 12 Month $ - 0 9/19/30 9/18/31
5400 Engineering Technician - Naples (1) 12 Month $ - 0 9/19/30 9/18/31
5400 Engineering Technician - Naples (1) 12 Month $ - 0 9/19/30 9/18/31
5400 Administrative - Naples (1) 12 Month $ - 0 9/19/30 9/18/31
5400 Construction Manager - Souda Bay (1) 12 Month $ - 0 9/19/30 9/18/31
5400 Engineering Technician - Souda Bay (1) 12 Month $ - 0 9/19/30 9/18/31
5400 Engineering Technician - Souda Bay (1) 12 Month $ - 0 9/19/30 9/18/31
5400 Administrative - Souda Bay (1) 12 Month $ - 0 9/19/30 9/18/31
5400 Construction Manager - Poland (1) 12 Month $ - 0 9/19/30 9/18/31
5400 Engineering Technician - Poland (1) 12 Month $ - 0 9/19/30 9/18/31
5400 Construction Manager - Romania (1) 12 Month $ - 0 9/19/30 9/18/31
5400 Engineering Technician - Romania (1) 12 Month $ - 0 9/19/30 9/18/31
5400 Administrative - Naples FEC (1) 12 Month $ - 0 9/19/30 9/18/31
| 5400 | Administrative - Naples FEC (1) | 12 | Month | $ - 0 | 9/19/30 | 9/18/31 | |
| TOTAL | $ - 0 | ||||||
| ODC CLINS (FOR GOVERNMENT USE ONLY) | |||||||
| CLIN | Description | Quantity | Unit of Issue | Unit Price | Annual Cost | PoP Start | PoP End |
| 7400 | ODC TRAVEL - ROICC NI | 1 | EA | $10,000.00 | $ 10,000.00 | 9/19/30 | 9/18/31 |
| 7400 | ODC TRAVEL - Sigonella | 1 | EA | $10,000.00 | $ 10,000.00 | 9/19/30 | 9/18/31 |
| 7400 | ODC TRAVEL - Rota | 1 | EA | $20,000.00 | $ 20,000.00 | 9/19/30 | 9/18/31 |
| 7400 | ODC TRAVEL - Naples | 1 | EA | $5,000.00 | $ 5,000.00 | 9/19/30 | 9/18/31 |
| 7400 | ODC TRAVEL - Souda Bay | 1 | EA | $5,000.00 | $ 5,000.00 | 9/19/30 | 9/18/31 |
| 7400 | ODC TRAVEL - Poland | 1 | EA | $5,000.00 | $ 5,000.00 | 9/19/30 | 9/18/31 |
| 7400 | ODC TRAVEL - Romania | 1 | EA | $5,000.00 | $ 5,000.00 | 9/19/30 | 9/18/31 |
| 7400 | ODC TRAVEL - Naples FEC Planner | 1 | EA | $5,000.00 | $ 5,000.00 | 9/19/30 | 9/18/31 |
| 7400 | ODC TRAVEL - Naples FEC Architect | 1 | EA | $5,000.00 | $ 5,000.00 | 9/19/30 | 9/18/31 |
| 7400 | ODC TRAVEL - Naples FEC Admin | 1 | EA | $10,000.00 | $ 10,000.00 | 9/19/30 | 9/18/31 |
6 Mo Ext
| Attachment 2 | |||||||
| CLIN Schedule | |||||||
| Solicitation: N33191-26-R-0033 | |||||||
| 52.217-8 6-Month Extension | |||||||
| CLIN | Description | Quantity | Unit of Issue | Unit Price | Annual Cost | PoP Start | PoP End |
5500 Engineering Technician - ROICC NI (1) 6 Month $ - 0 9/19/31 3/17/32
5500 Engineering Technician - ROICC NI (1) 6 Month $ - 0 9/19/31 3/17/32
5500 Engineering Technician - Sigonella (1) 6 Month $ - 0 9/19/31 3/17/32
5500 Engineering Technician - Sigonella (1) 6 Month $ - 0 9/19/31 3/17/32
5500 Administrative Rota (1) 6 Month $ - 0 9/19/31 3/17/32
5500 Planner Naples FEC (1) 6 Month $ - 0 9/19/31 3/17/32
5500 Architect - Naples FEC (1) 6 Month $ - 0 9/19/31 3/17/32
5500 Construction Manager - ROICC NI (1) 6 Month $ - 0 9/19/31 3/17/32
5500 Construction Manager - ROICC NI (1) 6 Month $ - 0 9/19/31 3/17/32
5500 Engineering Technician - ROICC NI (1) 6 Month $ - 0 9/19/31 3/17/32
5500 Engineering Technician - ROICC NI (1) 6 Month $ - 0 9/19/31 3/17/32
5500 Administrative - ROICC NI (1) 6 Month $ - 0 9/19/31 3/17/32
5500 Construction Manager - Sigonella (1) 6 Month $ - 0 9/19/31 3/17/32
5500 Construction Manager - Sigonella (1) 6 Month $ - 0 9/19/31 3/17/32
5500 Engineering Technician - Sigonella (1) 6 Month $ - 0 9/19/31 3/17/32
5500 Engineering Technician - Sigonella (1) 6 Month $ - 0 9/19/31 3/17/32
5500 Administrative - Sigonella (1) 6 Month $ - 0 9/19/31 3/17/32
5500 Construction Manager - Rota (1) 6 Month $ - 0 9/19/31 3/17/32
5500 Construction Manager - Rota (1) 6 Month $ - 0 9/19/31 3/17/32
5500 Engineering Technician - Rota (1) 6 Month $ - 0 9/19/31 3/17/32
5500 Engineering Technician - Rota (1) 6 Month $ - 0 9/19/31 3/17/32
5500 Engineering Technician - Rota (1) 6 Month $ - 0 9/19/31 3/17/32
5500 Engineering Technician - Rota (1) 6 Month $ - 0 9/19/31 3/17/32
5500 Construction Manager - Naples (1) 6 Month $ - 0 9/19/31 3/17/32
5500 Engineering Technician - Naples (1) 6 Month $ - 0 9/19/31 3/17/32
5500 Engineering Technician - Naples (1) 6 Month $ - 0 9/19/31 3/17/32
5500 Administrative - Naples (1) 6 Month $ - 0 9/19/31 3/17/32
5500 Construction Manager - Souda Bay (1) 6 Month $ - 0 9/19/31 3/17/32
5500 Engineering Technician - Souda Bay (1) 6 Month $ - 0 9/19/31 3/17/32
5500 Engineering Technician - Souda Bay (1) 6 Month $ - 0 9/19/31 3/17/32
5500 Administrative - Souda Bay (1) 6 Month $ - 0 9/19/31 3/17/32
5500 Construction Manager - Poland (1) 6 Month $ - 0 9/19/31 3/17/32
5500 Engineering Technician - Poland (1) 6 Month $ - 0 9/19/31 3/17/32
5500 Construction Manager - Romania (1) 6 Month $ - 0 9/19/31 3/17/32
5500 Engineering Technician - Romania (1) 6 Month $ - 0 9/19/31 3/17/32
5500 Administrative - Naples FEC (1) 6 Month $ - 0 9/19/31 3/17/32
| 5500 | Administrative - Naples FEC (1) | 6 | Month | $ - 0 | 9/19/31 | 3/17/32 | |
| TOTAL | $ - 0 | ||||||
| ODC CLINS (FOR GOVERNMENT USE ONLY) | |||||||
| CLIN | Description | Quantity | Unit of Issue | Unit Price | Annual Cost | PoP Start | PoP End |
| 7500 | ODC TRAVEL - ROICC NI | 1 | EA | $10,000.00 | $ 10,000.00 | 9/19/31 | 3/17/32 |
| 7500 | ODC TRAVEL - Sigonella | 1 | EA | $10,000.00 | $ 10,000.00 | 9/19/31 | 3/17/32 |
| 7500 | ODC TRAVEL - Rota | 1 | EA | $20,000.00 | $ 20,000.00 | 9/19/31 | 3/17/32 |
| 7500 | ODC TRAVEL - Naples | 1 | EA | $5,000.00 | $ 5,000.00 | 9/19/31 | 3/17/32 |
| 7500 | ODC TRAVEL - Souda Bay | 1 | EA | $5,000.00 | $ 5,000.00 | 9/19/31 | 3/17/32 |
| 7500 | ODC TRAVEL - Poland | 1 | EA | $5,000.00 | $ 5,000.00 | 9/19/31 | 3/17/32 |
| 7500 | ODC TRAVEL - Romania | 1 | EA | $5,000.00 | $ 5,000.00 | 9/19/31 | 3/17/32 |
| 7500 | ODC TRAVEL - Naples FEC Planner | 1 | EA | $5,000.00 | $ 5,000.00 | 9/19/31 | 3/17/32 |
| 7500 | ODC TRAVEL - Naples FEC Architect | 1 | EA | $5,000.00 | $ 5,000.00 | 9/19/31 | 3/17/32 |
| 7500 | ODC TRAVEL - Naples FEC Admin | 1 | EA | $10,000.00 | $ 10,000.00 | 9/19/31 | 3/17/32 |
File details come from the government source that posted it. Updated .