Attachment 2 - Bill of Quantities - 191T7024Q0029.pdf

PDF 160 KB Posted

Attached to
MSB Vatican floor, Rome, Italy
Solicitation number
191T7024Q0029
Issued by

About this file

This document is an Attachment 2 - Bill of Quantities for a federal contract opportunity with Solicitation Number 191T7024Q0029 to install a new wooden floor and replace baseboards in the Mel Sembler Building on the U.S. Embassy compound in Rome, Italy.

The Bill of Quantities lists the required line items and quantities, including removal of existing baseboards, loading and transport of debris, preparation of the work site, supply and installation of a new 180 sq. m. three-layer American walnut wood floor, and installation of new teak veneered baseboards. Lump sum pricing is required for each line item. Additional requirements include submission of a safety plan and professional deep cleaning of the site. The total estimated cost for the project is EUR 1,000.00.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

No. DESCRIPTION UNIT COST

TOTAL COST

REMOVALS AND DEMOLITIONS

1 Removal of existing baseboard (approx. 100 lm) lump sum 1

Loading and transport to authorized landfills and / or plants including loading, round trip and unloading including landfill charges at authorized facilities lump sum 1

Preparation of the work site, movement of existing furniture, store it and reinstall it at the end of the work lump sum 1

CIVIL WORKS

Supply and install new wooden floor (approx. 180 sqm) of three-layer American walnut:

first layer in 3.5mm solid walnut, the second layer is in fir wood. The third layer is in rotary-cut veneer. Four-sided beveling. Brushed, UV matte oil varnished. Tongue/groove on all four sides. Commercial first grade(classic). Installation of floating parquet with D3 vinyl glue between the tongues. Where the new floor result too hight, will be Contractor’s responsibility to mill it. All samples shall be submitted to Embassy C.O.R.

lump sum 1

Supply and install teak veneered baseboards, installed with sealing (approx. 100 lm). All samples shall be submitted to Embassy C.O.R. All samples shall be submitted to Embassy

C.O.R.

lump sum 1

Safety and Cleaning

7 Submit a Safety Plan for the entire project to the approval of the Embassy superintendent lump sum 1

8 Professional deep cleaning of the site lump sum 1

Total

MSB MEZZANINE HOLY SEE OFFICES FLOOR REPLACEMENT

€ 1,000.00

File details come from the government source that posted it. Updated .