This document is a technical specification for a federal contract opportunity to install a new wooden floor and replace baseboards in the Mel Sembler Building on the U.S. Embassy compound in Rome, Italy.
The key details are:
- The scope of work is to remove existing carpet tiles, install approximately 180 sq. m of new three-layer American walnut wood flooring, and replace approximately 120 linear meters of teak veneer baseboards.
- The contractor must submit a preliminary safety plan with the offer and a detailed operational safety plan at least 15 days before starting work.
- All materials and samples must be approved by the Contracting Officer's Representative (COR) prior to installation.
- The contract performance period is 15 calendar days from the Notice to Proceed.
- There is a 4% allowance for government-retained materials.
- The contractor must provide a maintenance plan for the new equipment at the end of the project.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
- 1 -
United States Embassy to the
Holy See
Rome, Italy
MEL SEMBLER BUILDING OFFICE FLOOR RENOVATION
Facility Management
03/18/2024
- 2 -
TABLE OF CONTENTS
1 FOREWORDS
2 GENERAL
2.1 DEFINITIONS
2.2 SAFETY STANDARS
2.3 DESCRIPTION OF WORK
2.4 LIMITATIONS
2.5 MATERIAL EQUIVALENTS
2.6 TENDER DOCUMENTS
2.7 SMOKING POLICY
3 SOLICITATION CHARACTERISTICS
3.1 IMPLEMENTATION PHASE
3.2 SUBMITTALS DESCRIPTION (SD)
3.3 CONCLUSION PHASE
3.4 PERFORMANCE TIME AND PENALTIES FOR DELAYS
3.5 WORK PROGRESS
3.6 PARKING
4 SPECIFICATIONS
4.1 WOODEN FLOOR / PARQUET
4.1.1 REFERENCES
4.1.2 PRODUCTS
4.1.3 EXECUTION
4.2 PAINTS AND COATINGS
4.2.1 REFERENCES
4.2.2 PRODUCTS
4.2.3 EXECUTION
4.3 MAINTENANCE PLAN
5 MATERIAL SHEETS
- 3 -
- 4 -
1 FOREWORDS
United States Embassy to the Holy See in Rome, needs to award a contract for replace carpet tiles with new wooden floor inside sensitive offices on the mezzanine floor of the Mel Sembler
Building in Via Sallustiana, 49.
2 GENERAL
The area interested by the work is on the mezzanine floor of Mel Sembler building in Rome, located in Via Sallustiana, 49.
• The scope of work is to install new wooden floor in three sensitive offices.
• Install new baseboard all around the rooms interested by the project.
• Touch-ups areas damaged during the work are in the scope.
• Will be Contractor’s responsibility to take care of the height below the existing doors to allow the correct opening after wooden floor installation.
• The Contractor shall supply all the material and equipment, skilled and unskilled labor, technical supervision, as well as logistic and administrative support. The Contractor shall also supply all accessory services such as: transportation, leasing, equipment and tools, disposal of debris, cleaning the work area and anything else necessary to complete the project in compliance with the present specifications.
• The Contractor shall provide a Safety Plan designated for this project.
• Maximum attention is required for the safety of personnel at work on the site. The workers shall operate in compliance with standard codes. Since the work site consists of crucial technical installations, temporary safety protection measures towards third parties and workers shall be installed with care and attention, especially for the hours when work site is closed.
• The Contractor will be responsible for submitting, for approval by the COR, samples of materials and supplies to be used.
• Will be Contractor's responsibility to verify all the quantities and dimensions.
- 5 -
2.1 DEFINITIONS
A glossary of terms and relative equivalents used in the drawing up of the tender documents are indicated hereunder:
Client, Administration, Project Supervisor, COR, CO: all these denominations identify the technical administrative staff, predisposed to handle the contract on behalf of the Embassy of the United States of America.
Contracting Company, Contractor: all these denominations identify the subject that undertakes to carry out the work described in the contract.
Contract, Purchase Order (P.O.), Work Order: these terms identify the contract document with which the project is awarded. The Client at his indisputable judgement shall make the formal selection of the different types of documents.
For safety plan purposes, the figures of the Embassy that are key elements in the definition of roles and responsibility in the safety plan are:
"RUP Responsabile Unico del Procedimento" The Contracting Officer Representative of Tri-
Missions Rome, whose name appears in the contract or Purchase Order.
"Committente" The Senior Facility Manager of Tri-Missions Rome, whose name shall be communicated after the award.
"Responsabile del Servizio Prevenzione E Protezione - RSPP" and "Responsabile Dei Lavori"
The POSHO (Post Safety and Health Officer) of the Tri-Mission Rome, whose name shall be communicated after award. The POSHO shall perform his/her duties also using an A/POSHO part of his/her staff.
"Direttore dei Lavori" The COR nominated by the Contracting Officer after award.
- 6 -
2.2 SAFETY STANDARS
The contractor must fulfill all the safety legal requirements according to the D.Lgs. 81/2008
Testo Unico sulla Salute e Sicurezza nei Luoghi di Lavoro. The objective is to avoid or in any case to reduce to the minimum the workers’ exposure to risks associated with work activities.
Therefore the contractor is expected to deliver the Risk Assessment Document (Documento
Valutazione Rischi, DVR) or the Operational Safety Plan (Piano Operativo di Sicurezza, POS) when required, to provide trainings to the laborers, to supply individual and collective protective equipment and to comply with all the other requirements disciplined by the D.Lgs.
81/08.
In the solicitation process set up by the Contracting Officer (RUP), to verify the professional technical suitability, the Embassy asks the offerors a statement on the average annual workforce and on collective bargaining agreement (Contratto di lavoro) applied to employees, the details of the workers' complaints made to INPS, INAIL and Casse Edili.
In the case of private works, no permission from construction and the amount of the work less than € 100,000, the verification of the suitability of the company is simplified and is considered satisfied through the presentation by the company of the certificate of registration in the Chamber of Commerce, Industry e Handicraft and the Single Document of
Regularity Contribution (DURC), accompanied by self-certification in order to meet the other requirements set out in Annex XVII of the Local Consolidated Law on Finance.
The contractor shall submit with the offer a preliminary safety plan that must take into account all kind of work to be performed within the project being solicited.
The plan must be detailed sufficiently to let the team evaluating the offers that the contractor had understood correctly the nature of the work and its own typical risks, and therefore, had evaluated the relevant costs in their proposal.
The Preliminary Safety Plan must contain:
- For each sequence of work a brief description of the related risks.
- For each sequence of work brief description of the practices, the measures, the individual and collective protection devices that will be adopted by the company in order to respond, minimizing the highlighted risks.
- For each sequence of work a cost-analysis of the selected measures.
The estimate must be congruous, analytical for single items, per unit or per measure.
After the tender closure, the company entitled to the work must submit a detailed
- 7 -
Operational Safety Plan (Piano Operativo di Sicurezza) at least 15 days before starting the operations.
The safety plan submitted must clearly identify the professional figures as follows:
"DIRETTORE TECNICO DI CANTIERE" The construction site technical director is the person who manages for the contractor the construction site. This role can be played by both an employee of the company and by an external professional, with a specific and formal assignment. The figure of the technical director of the construction site must not be confused with that of the construction manager, who is instead appointed by the client and checks that the works are carried out in accordance with the provisions of project and related specifications.
"PREPOSTO" an individual who is identified for the functions he/she performs and is therefore comparable to what with other terms is indicated as site manager, workshop manager, department head, office manager, etc. He/she must also be trained to be able to perform the functions attributed to him, as indicated in art. 19 letter g) of paragraph 1 and according to the objectives set by art. 37 of D.Lgs. 81/08. The PREPOSTO, insures continuously and effectively that the workers:
1) follow the safety regulations imparted and outlined in the safety plan.
2) use the required personal protective equipment (PPE).
3) promptly report to the employer or manager any deficiencies in the procedures, tools, personal protective equipment, and persistent protocols disregards.
2.3 DESCRIPTION OF WORK
The aim of the work is to install new wooden floor (approx. 180 sqm), after removing carpet tiles floor, and replace baseboard (approx. 120 lm).
Removal of existing carpet floor tiles throughout entire rooms, below the faincoils included.
Loading and transport to authorized landfills and / or plants including loading, round trip and unloading including landfill charges at authorized facilities
Due to sensitive area, any existing furniture can be taken outside the offices, then the work will be scheduled by phases, to allow the movement of furniture from one room to another within the classified area.
Moving furniture inside all rooms, and subsequently relocation after works is part of the scope.
All material shall be scanned in a specific day, scheduled with C.O.R.
- 8 -
Electrical devices are strictly prohibited, and the works will be supervised by an Escort.
Due to critical underneath floor, the space below the doors is very thin. All measurement shall take by Contractor and will be his responsibility.
Remove current baseboard along all permiter of the rooms.
After surface preparation, spread the glue on the surface of the screed, distributing the glue evenly without creating air bubbles between the screed and the wooden floor. Dose the optimal amount of glue recommended for gluing of pre-finished wooden floor.
Supply and install new wooden floor (approx. 180 sqm) of three-layer American walnut: first layer in 3.5mm solid walnut, the second layer is in fir wood. The third layer is in rotary-cut veneer. Four-sided beveling. Brushed, UV matte oil varnished. Tongue/groove on all four sides. Commercial first grade(classic). Installation of floating parquet with D3 vinyl glue between the tongues. Where the new floor result too hight, will be Contractor’s responsibility to mill it. All samples shall be submitted to Embassy C.O.R.
Supply and install new teak veneered baseboards, installed with sealing (approx. 120 lm). All samples shall be submitted to Embassy C.O.R.
Anything damaged is Contractor’s responsibility.
Thresholds to connect the different quotes between the rooms are included.
A location to store the furnitures will be identified.
All parts fix in the rooms shall be covered and doors shall be isolated to avoid damage and dust, fan coils included.
All the switches present along the baseboard way, shall cut in place. Likewise, the pieces below the windows and the faincoils.
At the end of floor and baseboard installation, the Contractor shall provide to touch-ups all parts who seems damaged during the works.
All the material should be of primary brands and sample should be submitted to the C.O.R.
for approval. All sample should be submitted within 15 days from the notice to proceed.
All the debris from the work shall be loaded and disposed outside the building on the very same day, and only a small internal area will be set up to deposit the material to be installed
(previously scanned).
- 9 -
All the material shall to submitted to Embassy Superintendent (C.O.R.) for approval.
The supply of the materials, as listed in the bill of quantities, shall be fully charged to the
Contractor.
A percentage of 4% of all materials of the project is included in this solicitation and shall remain with the Embassy to allow the future installation.
The Contractor shall provide professional cleaning of the premises at final completion of the work.
2.4 LIMITATIONS
The accomplishment of the project shall be circumscribed to the specific requests described in the Tender Documents.
2.5 MATERIAL EQUIVALENTS
The contractor shall verify and ensure that all the materials supplied are new and without defects and that their use and/or installation is carried out using the best techniques and fully respecting the instructions supplied by the manufacturers.
Special parts shall be manufactured solely by workshops that are highly qualified in that specific sector.
The makes indicated in this SOW (Scope of Work) are intended as a point of reference and therefore, the words or approved equivalent are implicit.
Therefore, the makes and products listed are to be deemed equivalent to each other.
Different selections implemented by the Contractor shall be approved in advance by the COR, after submission of samples and technical cards.
Special products must be processed only to workshops highly qualified in the field of specific realization.
Refer to datasheets attached to this document.
WOODEN FLOOR
Three-layer American walnut wooden floor. First layer in 3.5mm solid walnut. The second layer is in fir wood. The third layer is in rotary-cut veneer. Four-sided beveling. Brushed, UV matte oil varnished. Tongue/groove on all four sides. Commercial first grade(classic).
- 10 -
BASEBOARD
Teak veneered baseboards with sealing
VINIL GLUE
D3 Vinil Glue: Water-resistant glue, resistant to strong humidity and brief exposure to running water. (classification D3)
2.6 TENDER DOCUMENTS
The following documents shall form an integral part of the contract:
➢ The present Special Tender Document
➢ General Conditions in use by the Client
➢ Drawings
➢ Bill of quantities
2.7 SMOKING POLICY
U.S. Tri-Mission Rome Employee Smoking Policy
Tri-Mission services are performed by direct-hire LES. and Embassy contractors.
This smoking policy has been established for the following reasons:
To protect individuals from second-hand smoking
To avoid setting off alarms and smoke detectors
To maintain a clean workplace
To avoid fires from discarded cigarettes
Any LES or Embassy Contractor working in/on a Government Owned residential compound/property or in a owned or leased residence will follow the rules listed below:
No smoking is allowed on the compound or inside any government-owned residence outside of the dedicated areas.
- 11 -
No smoking is allowed inside a government owned or leased residence.
No smoking is allowed on terraces, in common areas, or parking lots.
No smoking is allowed in any enclosed spaces.
Smoking is allowed outside the gates of a compound or in dedicated areas only. Any person found to be in violation of the above rules will be escorted off the property immediately, reported to the Facility Manager and or GSO, and face immediate disciplinary action.
For questions, concerns, or reporting of a violation please call Facility Management or GSO at
X2132 or RomeFacilMaint-DL@state.gov.
- 12 -
3 SOLICITATION CHARACTERISTICS
3.1 IMPLEMENTATION PHASE
The implementation phase starts with the Notice to proceed (NTP).
No work shall be performed before the submission of the shop drawings and relevant approval.
No materials shall be installed prior the relevant submission and approval.
Normal working hours are from 08:30 up to 17:30 during weekdays. Any work to be carried out after normal working hours or during the week-end shall be agreed upon in advance with the COR in order to obtain all the necessary authorizations and approvals.
Due to sensitive offices, it would be possible to perform the works during weekend and/or after working hours.
Demolitions, perforations and other high noise operations shall be carried out no earlier than
09.30. The quiet rule shall apply even during the time 12.30 to 15.30, during work days.
The work-site shall be kept as clean as possible.
Areas for storing material shall be agreed upon, together with the COR, based on logistical-operative criteria.
Any temporary interruptions of utilities shall be scheduled at least 5 days in advance and shall be subject to approval from the COR.
Tests on the correct operation of the systems and consignment of parts of completed work shall be carried out in the presence of the person designated by the contractor and someone authorized by the Embassy. The contractor shall be responsible for drawing up the necessary delivery reports for the work and systems carried out and shall be subject to verification and acceptance by the COR.
3.2 SUBMITTALS DESCRIPTION (SD)
Submittal requirements are specified in the technical sections. Examples and descriptions of submittals identified by the Submittal Description (SD) numbers and titles follow:
• SD-01 Preconstruction Submittals
Preconstruction Submittals include schedules and a tabular list of locations, features, and other pertinent information regarding products, materials, equipment, or components to be used in the work.
• SD-02 Shop Drawings
Drawings, diagrams, and schedules specifically prepared to illustrate some portions of the work are requested by the cor. Diagrams and instructions from a manufacturer or fabricator
- 13 -for use in producing the product and as aids to the Contractor for integrating the product or system into the project.
Drawings prepared by or for the Contractor to show how multiple systems and interdisciplinary work will be coordinated.
• SD-03 Product Data
Catalog cuts, illustrations, schedules, diagrams, performance charts, instructions and brochures illustrating size, physical appearance and other characteristics of materials, systems or equipment for some portion of the work.
Samples of warranty language when the contract requires extended product warranties.
• SD-04 Samples
Fabricated or unfabricated physical examples of materials, equipment or workmanship that illustrate functional and aesthetic characteristics of a material or product and establish standards by which the work can be judged. Requested by the the COR.
Color samples from the manufacturer's standard line (or custom color samples if specified) to be used in selecting or approving colors for the project.
Field samples and mock-ups constructed on the project site establish standards ensuring work can be judged. Includes assemblies or portions of assemblies that are to be incorporated into the project and those that will be removed at conclusion of the work.
• SD-05 Design Data
Design calculations, mix designs, analyses or other data pertaining to a part of work.
• SD-06 Certificates
Statements printed on the manufacturer's letterhead and signed by responsible officials of manufacturer of product, system or material attesting that the product, system, or material meets specification requirements. Must be dated after award of project contract and clearly name the project.
Document required of Contractor, or of a manufacturer, supplier, installer, or Subcontractor through Contractor. The document purpose is to further promote the orderly progression of a portion of the work by documenting procedures, acceptability of methods, or personnel qualifications.
Confined space entry permits
- 14 -
Text of posted operating instructions
Material Testing
• SD-07 Manufacturer's Instructions
Preprinted material describing installation of a product, system, or material, including special notices and (SDS) concerning impedances, hazards, and safety precautions.
• SD-08 Operation and Maintenance Data
Data provided by the manufacturer, or the system provider, including manufacturer's help and product line documentation, necessary to maintain and install equipment, for operating and maintenance use by facility personnel.
Data required by operating and maintenance personnel for the safe and efficient operation, maintenance, and repair of the item.
Data incorporated in an operations and maintenance manual or control system.
• SD-09 Closeout Submittals
Documentation to record compliance with technical or administrative requirements or to establish an administrative mechanism.
Submittals required for Guiding Principal Validation (GPV) or Third-Party Certification
Special requirements necessary to properly close out a construction contract. For example, Record Drawings and as-built drawings. Also, submittal requirements necessary to properly close out a major phase of construction on a multi-phase contract.
Approving Authority
Office or designated person authorized to approve the submittal.
3.3 CONCLUSION PHASE
At the completion of the works, a final inspection inspection will be conducted by the representatives of the Contracting Company and the C.O.R. to verify the correctness of execution, the compliance with the requirements of the technical specifications and the full functionality of the works contracted and carried out, in their entirety.
- 15 -
Upon completion of the work and acceptance of by the C.O.R. of what has been achieved, the
Contracting Company must deliver the following documentation to the Customer's Technical
Office:
- Detailed as-built drawings of the works, both at an architectural/structural and various systems.
- Technical data sheets of the most significant materials used for the realization, with the list of the contact details of the sales warehouses of local suppliers.
- Certifications of conformity and testing of materials subject to certification carried out by the manufacturing companies and the guarantee of their correct installation on site by the Contracting Company for what may be pertinent to the realizations and for what is provided by the legal requirements.
3.4 PERFORMANCE TIME AND PENALTIES FOR DELAYS
The contract performance time and the methods with which these times will be calculated are fully described in the solicitation package and here listed for convenience.
The Registry of Submission, at the following of this document, shall, (but shall not be limited to), indicate the kind of material samples and the number of them for selection and approval by the COR.
Period of time the complete execution of the project, from mobilization to final cleaning:
15 calendar days
Penalties for delays in completing the project are those described in the tender documents.
3.5 WORK PROGRESS
The Administration reserves in any case the right to order the execution of a specific work within a predetermined period or to order the execution of the works in the way it deems most convenient, especially in relation to the needs dependent on the execution of works and the delivery of supplies excluded from the contract, without the Contractor being able to refuse or make it the subject of a request for special compensation.
The Contractor will submit to the management of the works for approval, before the start of the works, the detailed operational program of the works and the related amounts to which it will comply in the execution of the works, in harmony with the program referred to in Law
10-12-1981, n. 741 in the cases contemplated.
- 16 -
3.6 PARKING
No parking is allowed inside the site. The Contractor's vehicles shall be allowed to enter only for loading and unloading materials.
Loading and unloading operations shall be carried out using only one vehicle at a time.
Consequently, during the accomplishment of the project the Contractor shall ensure that its vehicles are parked at its own expense outside the Government property.
- 17 -
4 SPECIFICATIONS
4.1 WOODEN FLOOR / PARQUET
4.1.1 REFERENCES
The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.
EUROPEAN STANDARDS – EUROPEAN COMMITTEE FOR STANDARDIZATION AND NATIONAL
LAWS
• UNI 11265:2015 Wood and/or wood based floorings and claddings - Installation -
Tasks, responsibilities and contractual indications
• UNI 11368:2021 Wood flooring and parquet - Installation - Criteria and methods of assessment of layed flooring, after installation and at the time of the flooring delivery
• UNI 11864:2022 Building adhesives - Adhesives for bonding parquet to subfloor -
Silylated adhesives, thermal stability test - Test method and requirements
• EN 14342:2013 Wood flooring and parquet - Characteristics, evaluation of conformity and marking
• EN 13488:2002 Wood flooring - Mosaic parquet elements
• EN 14354:2017 Wood-based panels - Wood veneer floor coverings
• EN 14762:2006 Wood flooring - Sampling procedures for evaluation of conformity
• EN 1533:2010 Wood flooring - Determination of bending strength under static load -
Test methods
• EN 13489:2017 Wood-flooring and parquet - Multi-layer parquet elements
• EN 13756:2018 Wood flooring and parquet - Terminology
• EN ISO 17178:2020 Adhesives - Adhesives for bonding parquet to subfloor - Test methods and minimum requirements (ISO 17178:2013)
• ISO 17178:2013 Adhesives - Adhesives for bonding parquet to subfloor - Test methods and minimum requirements
- 18 -
• CEN/TS 15717:2008 Parquet flooring - General guideline for installation
• EC 1 ; 2-2018 UNI EN 13756:2018 Wood flooring and parquet – Terminology
• UNI EN 17456:2021 Wood flooring and parquet - Determination of top layer delamination of multilayer elements - Test method
• UNI EN 350:2016 Durability of wood and wood-based products - Testing and classification of the durability to biological agents of wood and wood-based materials
• UNI EN 975-2:2005 Sawn timber - Appearance grading of hardwoods - Part 2: Poplars
• UNI EN 16929:2019 Test methods - Timber floors - Determination of vibration properties
• UNI EN 17668:2023 Adhesives for floor coverings - Preparation of adhesive application
- Test methods for the determination of corresponding humidity of mineral substrates
• UNI EN 17618:2022 Adhesives - Wood-to-wood adhesive bonds for non-structural applications - Determination of shear strength by compressive loading
• UNI EN ISO 17178:2020 Adhesives - Adhesives for bonding parquet to subfloor - Test methods and minimum requirements
• ISO 3398:1977 Broadleaved wood raw parquet blocks - Classification of oak parquet blocks
• ISO 3399:1976 Broadleaved wood raw parquet blocks - Classification of beech parquet blocks
• ISO 5323:2019 Wood flooring and parquet – Vocabulary
4.1.1.1 Submittal
The following designation are for Contractor Quality Control Approval Submit the following in accordance with referred section
SD-03 Product Data
Illustrations
Instructions and brochures
- 19 -
Illustrating size, SD-04 Samples
Fabricated or unfabricated physical examples of materials.
Wooden floor sample
Equipment or workmanship
Color and shape samples from the manufacturer's standard line to be used in selecting or approving colors for the project.
SD-06 Certificates
Applicator qualification for wooden floor
Fireproof and soundproofing adhesive
Material Testing
SD-07 Manufacturer's Instructions
Application Instructions
Mixing Manufacturer's Safety
Data Sheets
SD-08 Operation and Maintenance Data
Manufacturer's help
Product line documentation
Maintain and install equipment
SD-09 Closeout Submittals
Warranty
- 20 -
4.1.2 PRODUCTS
Include data for material descriptions, recommendations for product shelf life, and precautions for flammability and toxicity.
4.1.2.1 Certificates
Remove products from the work site which do not conform, and replace with new products that conform to the referenced specification. Test replacement products that failed initial testing at no cost to the Government.
Regulatory Requirements In addition to requirements specified elsewhere for environmental protection, provide coating materials that conform to the restrictions of the local Air Pollution
Control District and regional jurisdiction. Notify Contracting Officer of any paint specified herein which fails to conform.
4.1.2.2 Safety and Health
Apply sticky materials using safety methods and equipment in accordance with the applicable
State, regional and local laws and regulations.
Toxic Materials: to protect personnel from overexposure to toxic materials, conform to the most stringent guidance of: The applicable manufacturer's Safety Data Sheets (SDS) or local regulation.
Follow the general prevention measures against the individual risks identified above.
All workers must be adequately informed and trained on the correct methods of carrying out the activities and using the equipment (Art. 71 comma 7 lettera a) del D.lgs. n.81/08 as modified by D.lgs n.106/09).
Periodically check the efficiency of the tools and equipment used (Art 71 del D.lgs. n.81/08 as modified by D.lgs n.106/09).
Make sure of the toxicity of the materials and products used and follow the instructions given in the respective safety data sheets of the products used.
Be aware of the characteristics of the substances used (e.g. flammability, incompatibility), specifically the concentrations, methods of use and contact times (Art 227, comma 1 del D.lgs.
n.81/08 as modified by D.lgs n.106/09).
The substances used must not be accumulated in the workplace in quantities exceeding that strictly necessary for processing.
- 21 -
Ensure air exchange in the workplace (Allegato IV del D.lgs. n.81/08 as modified by D.lgs n.106/09).
Comply with the necessary measures so that the workplace and the position of the workers during the use of the equipment present safety requirements and respond to the principles of ergonomics (Art. 71 comma 6 del D.lgs. n.81/08 as modified by D.lgs n.106/09).
Do not assume awkward positions for long periods, but if necessary, interrupt work often in order to relax the muscles.
Provide employees with the necessary information for the correct handling of heavy or bulky loads (Art. 168 del D.lgs. n.81/08 as modified by D.lgs n.106/09).
Comply with the instructions received for an exact and correct position to assume when handling loads (Art. 168 del D.lgs. n.81/08 as modified by D.lgs n.106/09).
Before moving the elements by hand, evaluate their weight and size and identify the most suitable way to grasp them, get up and move them without straining your back (Art. 168 del
D.lgs. n.81/08 come modificato dal D.lgs n.106/09).
For heavy or bulky loads, the mass must be moved with the intervention of several people in order to distribute and reduce the effort (Art. 168 del D.lgs. n.81/08 as modified by D.lgs n.106/09).
Always use the Personal Protective Equipment provided and Verify the continuous use of PPE by all operating personnel (Art. 75-78 del D.lgs. n.81/08 as modified by D.lgs n.106/09).
4.1.2.3 Adhesives and Sealants
Provide products certified to meet indoor air quality requirements by EN UNI standards above mentioned. Provide certification or validation by other third-party program that products meet the requirements of this Section. Provide current product certification documentation from certification body. When product does not have certification, provide validation that product meets the indoor air quality product requirements cited herein.
4.1.2.4 Schedules for Finishes
Submit manufacturer's samples of wooden floor. Cross references and certification as indicated.
4.1.2.5 Materials
Submit product data sheets for specified coatings and solvents. Submit Manufacturer's
- 22 -
Instructions on Mixing: Detailed mixing instructions, minimum and maximum application temperature and humidity, and curing and drying times between coats.
4.1.3 EXECUTION
4.1.3.1 Protection of areas ad spaces not subject to the work
Prior to surface preparation and wooden floor applications, remove, mask, or otherwise protect, machined surfaces, radiator covers, plates, lighting fixtures, public and private property, and other such items not to be coated that are in contact with surfaces to be coated.
4.1.3.2 Wooden Floor Application
Different type of wooden floor application:
• Nailed: for this technique, the oldest and most expensive, it is necessary to use staves at least 1.8 cm thick and a layer of wood to be able to fix the nails.
• Glued: installation carried out with special glues applied to the pre-existing floor, an intermediate layer is not necessary. This technique is the ideal one for laying solid wood parquet.
• Floating: Ideal for prefinished parquet, laying floating or "floating" parquet does not use nails, glues or other supports. It consists in placing the parquet on the base by hooking the slats thanks to T&G decking joints. To guarantee soundproofing, protection from humidity and thermal insulation, insulating material or soundproofing adhesive is placed between the wooden slats and the old floor. Being an interlocking installation, the advice is to opt for large and therefore heavier lists, so as to minimize movement.
If the underlying floor is valuable, the best option for laying is the floating one:
a layer of functional insulating fabric is laid to make the planks adhere to the laying surface, thus avoiding the formation of voids which can damage the parquet and amplify noise from trampling.
To lay the parquet on an existing floor, the initial height will rise by 1-1.5 cm, so it is essential that the professional check the level of the fixtures during the inspection.
- 23 -
Prepare and clean the substrate, checking its flatness, compactness and absence of humidity. In the presence of defects, smooth or use a self-leveling product.
Smooth the substrate with a pumice stone to favor the adherence of the glue.
In the case of walls that are not perpendicular to each other, square the room, tracing perpendicular lines, to refer to when laying the first row of strips.
Apply the leveler with suitable materials, starting from the point furthest from the door, pouring gradually and insisting a little on the marked and grouted areas. Wait about 3 days before laying the parquet.
Spread the glue evenly with a notched trowel, without excesses that could create imperfections as creating air bubbles between the screed and the wooden floor. Dose the optimal amount of glue for good bonding and use single-component adhesive with a silanic termination that reduce noise, recommended for gluing of pre-finished wooden floor onto marble, grit, ceramic or marble-chip floor tiles and with acoustic insulation.
Proceed with the application of the wooden floor, and baseboard if required by the contract, agreed with the C.O.R. Lay the strips and with a rubber mallet and spirit level, make sure that the strips adhere to the substrate, are perfectly aligned and do not present flatness problems.
Space the slats 1 cm from the walls to compensate for the expansion of the wood as a result of temperature changes.
Glue the skirting board on the walls.
4.1.3.3 Finished Surfaces
Provide finished surfaces free from runs, drops, ridges, waves, laps, works marks, and variations in colors. Apply special water-based or synthetic resin varnish to the parquet, creating a film that tends to uniform the surface of the wood, making it particularly bright and resistant to abrasion and absorption.
- 24 -
4.2 PAINTS AND COATINGS
4.2.1 REFERENCES
The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.
European Standards – European Committee for Standardization:
UNI 8758:1985 Building. Varnish systems, paint systems, glaze and stain systems and mixed. Criteria for technical information.
UNI EN 998-1:2016 Specification for mortar for masonry - Part 1: Rendering and plastering mortar
EN 1015-19:1998 Methods of test for mortar for masonry - Part 19: Determination of water vapour permeability of hardened rendering and plastering mortars
UNI EN 1062-1:2004 Paints and varnishes - Coating materials and coating systems for exterior masonry and concrete - Part 1: Classification
UNI EN 13300:2022 Paints and varnishes - Paints and varnishes for interior walls and ceilings – Classification
UNI EN 13914-2:2016 Design, preparation and application of external rendering and internal plastering - Part 2: Internal plastering
UNI EN 12206-1:2021 Paints and varnishes - Coating of aluminium and aluminium alloys for architectural purposes – All parts.
UNI EN 21512:1994 Paints and varnishes - Sampling of products in liquid or paste form
(ISO 1512:1991)
UNI EN ISO 2884-1:2006 Paints and varnishes - Determination of viscosity using rotary viscometers - Part 1: Cone-and-plate viscometer operated at a high rate of shear (ISO
2884-1:1999)
UNI EN ISO 3248:2016 Paints and varnishes - Determination of the effect of heat (ISO
3248:2016)
UNI EN ISO 4618:2023 Paints and varnishes - Vocabulary (ISO 4618:2023)
UNI EN ISO 4619:2018 Driers for paints and varnishes (ISO 4619:2018)
- 25 -
UNI EN ISO 7142:2023 Binders for paints and varnishes - Epoxy resins - General methods of test (ISO 7142:2023)
UNI EN ISO 7784-1:2006 Paints and varnishes - Determination of resistance to abrasion
- Part 1: Rotating abrasive-paper-covered wheel method (ISO 7784-1:1997)
UNI EN ISO 8130-14:2019 Coating powders - Part 14: Vocabulary (ISO 8130-14:2019)
UNI EN ISO 9117-2:2010 Paints and varnishes - Drying tests - Part 2: Pressure test for stackability (ISO 9117-2:2010)
UNI EN 1062-6:2002 Paints and varnishes - Coating materials and coating systems for exterior masonry and concrete – All Parts
UNI EN 1062-3:2008 Paints and varnishes - Coating materials and coating systems for exterior masonry and concrete – All parts.
UNI EN 10792 Paints and varnishes - Wall paints for interiors, white or light coloured -
Determination of dirt pick-up
UNI EN 10795 Paints and varnishes - Emulsion paints for interiors - Important characteristics for comparative or no- comparative tests
UNI 11271:2008 Paints and varnishes - Hiding power assessment of emulsion paints white or light colured
UNI EN ISO 12944-1-7:2018 Paints and varnishes - Corrosion protection of steel structures by protective paint systems
UNI EN ISO 1514:2016 Paints and varnishes - Standard panels for testing (ISO 1514:2016)
ISO 4618:2023 Paints and varnishes – Vocabulary
ISO 4618:2006 Paints and varnishes - Terms and definitions
ISO 4619:2018 Driers for paints and varnishes
ISO 4623-1:2018 Paints and varnishes - Determination of resistance to filiform corrosion
- Part 1: Steel substrates
ISO 7142:2023 Binders for paints and varnishes - Epoxy resins - General methods of test
ISO 1514:2016 Paints and varnishes - Standard panels for testing http://store.uni.com/catalogo/uni-11271-2008
- 26 -
ISO 16053:2022 Paints and varnishes - Coating materials and coating systems for exterior wood - Natural weathering test
ISO 16862:2003 Paints and varnishes - Evaluation of sag resistance
UNI 10560:1996 Paints and varnishes. Emulsion paints for interior masonry. Wet scrub resistance. Brush method.
MIT (Ministry of Infrastructure and Transport) Law
DM 14/01/2008 – Technical Standards for construction.
EUROPEAN COUNCIL DIRECTIVE:
89/106/ CE construction Products Directive (CE Marking)
4.2.1.1 Submittals
The following designation are for Contractor Quality Control approval
Submit the following in accordance with SUBMITTAL PROCEDURES:
SD-Product Data
Coating
Sealant
SD-Samples
Color
Textured Wall
Coating System
Sample Textured Wall Coating System Mock-Up;
SD-Certificates
Applicator's Qualifications
Qualification Testing laboratory for coatings
Indoor Air Quality for Paints and Primers
- 27 -
SD-Manufacturer's Instructions
Application Instructions Mixing
Manufacturer's Safety Data Sheets
SD-Operation and Maintenance Data
Coatings
4.2.1.2 Certificates
Indoor Air Quality
Submit required indoor air quality certifications in one submittal package.
Paints and Coatings
Provide paint and coating products certified by third-party programs. Provide current product certification documentation from certification body.
4.2.1.3 Applicator’s qualifications
Contractor Qualification
Submit the name, address, telephone number, FAX number, and e-mail address of the contractor that will be performing all surface preparation and coating application.
Submit evidence that key personnel have successfully performed surface preparation and application of coatings on a minimum of three similar projects within the past three years.
4.2.1.4 Field Samples and Tests
The C.O.R. may choose up to two coatings that have been delivered to the site to be tested at no cost to the Government.
Remove products from the job site which do not conform and replace with new products that conform to the referenced specification.
Test replacement products that failed initial testing at no cost to the Government.
- 28 -
4.2.1.5 Sampling Procedure
The C.O.R. will select paint at random from the products that have been delivered to the job site for sample testing. The Contractor will provide one liter samples of the selected paint materials. Take samples in the presence of the C.O.R., and label, and identify each sample.
4.2.1.6 Testing Procedure
Provide Qualification Testing for specified products above to the appropriate product specification, using third-party laboratory approved by the C.O.R. Include the backup data and summary of the test results within the qualification testing lab report. Provide a summary listing of all the reference specification requirements and the result of each test. Clearly indicate in the summary whether the tested paint meets each test requirement.
Submit name, address, telephone number, FAX number, and e-mail address of the independent third-party laboratory selected to perform testing of coating samples for compliance with specification requirements. Submit documentation that laboratory is regularly engaged in testing of paint samples for conformance with specifications, and that employees performing testing are qualified.
4.2.1.7 Regulatory Requirements
In addition to requirements specified elsewhere for environmental protection, provide coating materials that conform to the restrictions of the local Air Pollution Control District and regional jurisdiction. Notify C.O.R. of any paint specified herein which fails to conform.
Lead Content
Do not use coatings having a lead content over 0.06 percent by weight of nonvolatile content.
Chromate Content
Do not use coatings containing zinc-chromate or strontium-chromate.
Asbestos Content
Provide asbestos-free materials.
Mercury Content
Provide materials free of mercury or mercury compounds.
Silica
- 29 -
Provide abrasive blast media containing no free crystalline silica.
Human Carcinogens
Provide materials that do not contain WHO-IARC (International Agency for Research on
Cancer) confirmed human carcinogens (1) or suspected human carcinogens (2).
4.2.1.8 Packaging, labeling and storage
Provide paints in sealed containers that legibly show the contract specification number, designation name, formula or specification number, batch number, color, quantity, date of manufacture, manufacturer's formulation number, manufacturer's directions including any warnings and special precautions, and name and address of manufacturer.
Furnish pigmented paints in containers not larger than 20 liters.
Store paints and thinners in accordance with the manufacturer's written directions, and as a minimum, stored off the ground, under cover, with sufficient ventilation to prevent the buildup of flammable vapors, and at temperatures between 4 to 35 degrees C.
Do not store paint, polyurethane, varnish, or wood stain products in occupied spaces.
4.2.1.9 Safety and Health
Apply coating materials using safety methods and equipment in accordance with the applicable State, regional and local laws and regulations.
Toxic Materials
To protect personnel from overexposure to toxic materials, conform to the most stringent guidance of:
The applicable manufacturer's Safety Data Sheets (SDS) or local regulation.
WHO-IARC threshold limit values
Submit manufacturer's Safety Data Sheets for coatings, solvents, and other potentially hazardous materials.
Apply sticky materials using safety methods and equipment in accordance with the applicable
State, regional and local laws and regulations.
Toxic Materials to protect personnel from overexposure to toxic materials, conform to the most stringent guidance of: The applicable manufacturer's Safety Data Sheets (SDS) or local
- 30 -regulation.
Follow the general prevention measures against the individual risks identified above.
All workers must be adequately informed and trained on the correct methods of carrying out the activities and using the equipment (Art. 71 comma 7 lettera a) del D.lgs. n.81/08 as modified by D.lgs n.106/09).
Periodically check the efficiency of the tools and equipment used (Art 71 del D.lgs. n.81/08 as modified by D.lgs n.106/09).
Make sure of the toxicity of the materials and products used and follow the instructions given in the respective safety data sheets of the products used.
Be aware of the characteristics of the substances used (e.g. flammability, incompatibility), specifically the concentrations, methods of use and contact times (Art 227, comma 1 del D.lgs.
n.81/08 as modified by D.lgs n.106/09).
The substances used must not be accumulated in the workplace in quantities exceeding that strictly necessary for processing.
Ensure air exchange in the workplace (Allegato IV del D.lgs. n.81/08 as modified by D.lgs n.106/09).
Comply with the necessary measures so that the workplace and the position of the workers during the use of the equipment present safety requirements and respond to the principles of ergonomics (Art. 71 comma 6 del D.lgs. n.81/08 as modified by D.lgs n.106/09).
Do not assume awkward positions for long periods, but if necessary, interrupt work often in order to relax the muscles.
Provide employees with the necessary information for the correct handling of heavy or bulky loads (Art. 168 del D.lgs. n.81/08 as modified by D.lgs n.106/09).
Comply with the instructions received for an exact and correct position to assume when handling loads (Art. 168 del D.lgs. n.81/08 as modigied by D.lgs n.106/09).
Before moving the elements by hand, evaluate their weight and size and identify the most suitable way to grasp them, get up and move them without straining your back (Art. 168 del
D.lgs. n.81/08 come modificato dal D.lgs n.106/09).
For heavy or bulky loads, the mass must be moved with the intervention of several people in order to distribute and reduce the effort (Art. 168 del D.lgs. n.81/08 as modified by D.lgs
- 31 -n.106/09).
Always use the Personal Protective Equipment provided and Verify the continuous use of PPE by all operating personnel (Art. 75-78 del D.lgs. n.81/08 as modified by D.lgs n.106/09).
4.2.1.10 Environmental conditions
Comply, at minimum, with manufacturer recommendations for space ventilation during and after installation.
Coatings
Do not apply coating when air or substrate conditions are below 10 degrees C or over 35 degrees C, unless specifically pre-approved by the Contracting Officer and the product manufacturer.
Do not, under any circumstances, violate the manufacturer's application recommendations.
Post-Application
Vacate space for as long as possible after application. Wait a minimum of 48 hours before occupying freshly painted rooms. Maintain one of the following ventilation conditions during the curing period, or for 72 hours after application:
Supply 100 percent outside air 24 hours a day.
Supply airflow at a rate of 6 air changes per hour, when outside temperatures are between 13 degrees C and 29 degrees C and humidity is between 30 percent and 60 percent.
Supply airflow at a rate of 1.5 air changes per hour, when outside air conditions are not within the range stipulated above.
4.2.1.11 Color selection
Color Coding For Shore-To-Ship Utility Connections:
Paint hose connection fittings and shut-off valves the designated color.
In addition to color coding provide 50 mm high stenciled letters using black stencil paint, clearly designating service for each connection.
Provide colors of finish coats as indicated or specified.
- 32 -
Allow C.O.R. to select colors not indicated or specified. Manufacturers' names and color identification are used for the purpose of color identification only. Named products are acceptable for use only if they conform to specified requirements.
Products of other manufacturers are acceptable if the colors approximate colors indicated, and the product conforms to specified requirements.
Tint each coat progressively darker to enable confirmation of the number of coats.
Provide color, texture, and pattern of wall coating systems as indicated in the Detail Drawing and in accordance with C.O.R.
Submit manufacturer's samples of paint colors.
Cross reference color samples to color scheme as indicated.
Submit color stencil codes.
4.2.1.12 Location and surface type to be painted
Painting Included
Where a space or surface is indicated to be painted, include the following unless indicated otherwise:
Surfaces behind portable objects and surface mounted articles readily detachable by removal of fasteners, such as screws and bolts.
New factory finished surfaces that require identification or color coding and factory finished surfaces that are damaged during performance of the work.
Existing coated surfaces that are damaged during performance of the work.
Exterior Painting
Includes new surfaces, existing coated surfaces, and existing uncoated surfaces, of the buildings and appurtenances. Also included are existing coated surfaces made bare by cleaning operations.
Interior Painting
Includes new surfaces, existing coated surfaces, and existing uncoated surfaces, of the buildings and appurtenances as indicated and existing coated surfaces made bare by cleaning
- 33 -operations. Where a space or surface is indicated to be painted, include the following items, unless indicated otherwise:
Exposed columns, girders, beams, joists, and metal deck; and
Other contiguous surfaces.
4.2.1.13 Mechanical and Electrical Painting
Includes field coating of interior and exterior new surfaces.
Where a space or surface is indicated to be painted, include the following items unless indicated otherwise.
Exposed piping, conduit, and ductwork;
Supports, hangers, air grilles, and registers;
Miscellaneous metalwork and insulation coverings.
4.2.1.14 Definitions and Abbreviation
Qualification Testing
Qualification testing is the performance of all test requirements listed in the product specification.
Coating
A film or thin layer applied to a base material called a substrate. A coating may be a metal, alloy, paint, or solid/liquid suspensions on various substrates (such as metals, plastics, wood, paper, leather, cloth). They may be applied by electrolysis, vapor deposition, vacuum, or mechanical means such as brushing, spraying, calendaring, and roller coating. A coating may be applied for aesthetic or protective purposes or both.
The term "coating" as used herein includes emulsions, enamels, stains, varnishes, sealers, epoxies, and other coatings, whether used as primer, intermediate, or finish coat. The terms paint and coating are used interchangeably.
4.2.2 PRODUCTS
Include data for material descriptions, recommendations for product shelf life, and precautions for flammability and…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .