attachment_2_bid_129_25.pdf
PDF 290 KB Posted
- Attached to
- Stainless Steel Slide Gate
- Solicitation number
- Bid 129-25
- Issued by
- Cheshire County, Warner CDP, New Hampshire
About this file
The image is a technical drawing or engineering blueprint for the Pine River Pond Dam located in Wakefield, NH. The document appears to be a set of gate details and elevation plans, showing multiple views and sections of dam gates, including "Gate Fully Closed" and "Gate in Various Slide Mode" configurations. The drawings include detailed measurements, annotations, and structural representations of the dam's gate system, with a north arrow indicating orientation and a seal/logo from what seems to be a municipal or engineering organization.
The blueprint provides comprehensive technical specifications for the dam's gate infrastructure, including precise dimensional drawings that show different operational states of the gates. The document includes multiple section views and elevation perspectives, suggesting a detailed engineering design intended for construction or renovation purposes. Specific technical details are annotated throughout the drawing, including measurements, material specifications, and structural components related to the dam's gate mechanism.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| bid_129_25_award.pdf | ||
| attachment-1-bid-129-25.docx | DOCX document | |
| bid-129-25.pdf | ||
| attachment-2-bid-129-25.pdf | ||
| bid-129-25-award.pdf | ||
| attachment_1_bid_129_25.docx | DOCX document | |
| bid_129_25.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .