Attachment 2 - AFRL Rome Equipment List.xlsx
XLSX spreadsheet 13 KB Posted
- Attached to
- Vehicle Barrier Maintenance - AFRL Rome
- Solicitation number
- FA875125Q0064
About this file
This file is an Excel-based Equipment List for Vehicle Barrier and Support Equipment Maintenance and Repair Services for the Air Force Research Laboratory (AFRL) at multiple locations in New York. The list details five vehicle barrier systems across four AFRL sites (Rome, Stockbridge, Newport Irish Hill, and Newport Tanner Hill), including specific equipment models and years of installation. The barriers include two wedge systems, two drop arm systems, and one sliding gate, with various supporting technologies such as traffic signals, warning systems, and vehicle detection systems.
The related federal contract opportunity (Solicitation FA875125Q0064) is a small business set-aside procurement for maintenance of these vehicle barrier systems, with a performance period from July 16, 2025, to January 15, 2031. The contract includes a base year and four option years, covering maintenance services for all personnel, labor, equipment, tools, and periodic inspections. Quotes are due by 3:00 PM Eastern Standard Time on July 21, 2025, and must be submitted to specified Air Force contacts. The solicitation emphasizes evaluation based on total price and past performance, with the government intending to award the contract without discussions.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Attachment 7 - SF1449.pdf | ||
| QA - Vehicle Barrier Maintenance - AFRL Rome.docx | DOCX document | |
| Attachment 3- Pricing Schedule Rev1_21July2025.xlsx | XLSX spreadsheet | |
| Attachment 1- Vehicle Barrier Maint PWS - Rev1_21July2025.docx | DOCX document | |
| QA - Vehicle Barrier Maintenance - AFRL Rome.docx | DOCX document | |
| QA - Vehicle Barrier Maintenance - AFRL Rome.docx | DOCX document | |
| Attachment 3- Pricing Schedule.xlsx | XLSX spreadsheet | |
| Attachment 6- Wage Determination.pdf | ||
| Attachment 4 - Equipment Information and Drawings.pdf | ||
| Attachment 5- Offeror Representations and Certifications.docx | DOCX document | |
| Attachment 1- Vehicle Barrier Maint PWS - 18 June 25.docx | DOCX document |
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1 Vehicle Barrier/ Support Equipment Maintenance and Repair Services Equipment List
Project Title: AFRL Rome/Stockbridge/Newport Irish Hill/ Newport Tanner Hill - Vehicle Barrier/ Support Equipment Maintenance and Repair Services Equipment List
| Location: | Air Force Research Lab, Rome, NY 13440 | (qty 2) Drop Arms & (qty 2) Wedges |
| Stockbridge Test Annex, 5251 Burleson Road Oneida NY 13421 | (qty 1) Sliding Gate | |
| Newport Irish Hill Annex, 391 Lindsay Road, Poland NY 13431 | (qty 2) Drop Arms | |
| Newport Tanner Hill Annex, 208 Tower Road, Newport, NY 13416 | (qty 1) Drop Arm |
| Barrier/Equipment Information: | ||||||||||||||||||||||||||||
| Schematic Required | ||||||||||||||||||||||||||||
| Gate Name | Active Vehicle Barrier/Support Equipment | Main Control Panel | Slave (secondary) Control Panels | Stand-alone EFO Panel/Button | Lanes In | Lanes Out | AVB Traffic Controls System | Warning Systems | Vehicle Detection System @ AVB | Wrong Way Detection | Over speed destection | Overspeed Detection | Wrong way detection | Condition/Comments | ||||||||||||||
| Type | Power | Model # | Year | Pit Heater | Qty | Type | Model # | Year | Type | Model # | Year | Qty | Type | Model # | Year | Qty | Qty | Qty | Type | Type | Y/N | Type | Y/N | Type | Y/N | Type | ||
| Main Gate | Wedge | Electro-Mechanical | Gilbralter G-2000 | 2022 | Y | 2 | S&B | Gilbralter | 2022 | S&B | Gilbralter | 2022 | 2 | S&B | Gilbralter | 2022 | 3 | 1 | 1 | Pole mounted traffic signals on each approach to barriers. | Wig wag lights and annunciator | Y | Induction Loop | N/A | N/A | All equipment is operational. | ||
| Main Gate | Drop Arm | Electric | DoorKing 1601 | 2022 | N | 2 | S&B | N/A | N/A | N/A | N/A | N/A | N/A | N/A | N/A | N/A | N/A | N/A | N/A | N/A | N/A | N/A | N/A | N/A | N/A | N/A | N/A | Operational |
| Stockbridge Main Gate | Sliding Gate | Electrical | Tymetal TCG-4 | 2018 | N | 1 | S&B | N/A | N/A | N/A | N/A | N/A | N/A | N/A | N/A | N/A | N/A | N/A | N/A | N/A | N/A | N/A | N/A | N/A | N/A | N/A | N/A | Operational |
| Newport Irish Hill Main Gate | Drop Arm | Electric | B&B 773E | 2020 | N | 2 | S&B | N/A | N/A | N/A | N/A | N/A | N/A | N/A | N/A | N/A | N/A | N/A | N/A | N/A | N/A | N/A | N/A | N/A | N/A | N/A | N/A | Operational |
| Newport Tanner Hill Main Gate | Drop Arm | Electric | B&B 773E | 2020 | N | 1 | S&B | N/A | N/A | N/A | N/A | N/A | N/A | N/A | N/A | N/A | N/A | N/A | N/A | N/A | N/A | N/A | N/A | N/A | N/A | N/A | N/A | Operational |
| *The DoorKing 1601 Drop Arm is not considered a vehicle barrier per PWS Section 1.2 because it is a light duty drop arm and not a crash rated system; however, this is a piece of support equipment which will require the Contractor's attention. Therefore, the total number of vehicle barriers for the Task Order is five (5). | ||||||||||||||||||||||||||||
| HYDR | Hydraulic | |||||||||||||||||||||||||||
| ELEC | Electric | |||||||||||||||||||||||||||
| S&B | Switch and button human machine interface | |||||||||||||||||||||||||||
| TS | Touch screen human interface | |||||||||||||||||||||||||||
| PLC | Programmable Logic Control |
File details come from the government source that posted it. Updated .