Attachment_2_-_ADMIN_REQUIREMENTS3.docx

DOCX document 42 KB Posted

Attached to
ENGINE HOSES & NOZZLES (DGS/OTA)
Solicitation number
0000032076
Issued by
Sacramento County, California

About this file

This document outlines the administrative requirements for the ENGINE HOSES & NOZZLES BU 3540 0000032076 4210-0200511 contract opportunity issued by the California Department of Forestry and Fire (CAL FIRE). The administrative requirements include submitting complete descriptive literature with the bid, delivery within 120 calendar days after the Purchase Order date, inspection and acceptance procedures, warranty terms, and provisions for unanticipated tasks. The contract opportunity requires the successful bidder to deliver equipment that complies with the listed specifications, and CAL FIRE reserves the right to reject non-compliant equipment. The contract also allows for up to 20% of the total contract/purchase order value to be added for state-required options/upgrades, unanticipated tasks, and unforeseen components or labor.

The document also includes the contract opportunity details, which indicate that the UTVs will be used by staff at Nimbus Fish Hatchery for daily use in fish husbandry activities, hatchery operations, and maintenance. The contract is for the state of California.

View the file

Other files

File Type Posted
APP_Cover_Page_-_Copy.doc DOC document
Attachment_1_-_Specifications_Hoses_.pdf PDF
Attachment_4_-_NARRATIVE_RESPONSE.docx DOCX document
ENGINE_HOSES_AND_NOZZLE.docx DOCX document
Questions_and_Answers_Matrix_.pdf PDF
Attachment_5_-_WORK_AUTHORIZATION.docx DOCX document
ADD_ENGINE_HOSES_AND_NOZZLE.pdf PDF
Attachment_3_-_COST_WORKSHEET2.xlsx XLSX spreadsheet
4210-0200511-1_R1.pdf PDF
Postconsumer-Content_Certification_Form.pdf PDF
STD_204_-_Payee_Data_Record.pdf PDF
GenAI_Reporting_and_Factsheet.pdf PDF
Bidder_Declaration.pdf PDF
DARFUR.pdf PDF
RFQ-R2-0625-01.pdf PDF
Show all 15

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ENGINE HOSES & NOZZLES

BU 3540 0000032076

4210-0200511 - AR

Attachment 2 Administrative Requirements

SCOPE

The administrative requirements described herein shall make up part of the minimum requirements for the attached Invitation for Bid package and outline the acceptance process after a PO has been issued. In addition to meeting all technical requirements as outlined in the specification, Bidders shall also meet any administrative requirements listed herein.

Each bid package shall constitute a single bid that meets the specifications. A single bid package with multiple bids that were not requested shall have all bids in the bid package voided.

DESCRIPTIVE LITERATURE

Bidder shall submit complete descriptive literature with the bid and are to note their brand name and catalog or model number. Descriptive literature shall be annotated to specify the applicable page, brand, model, and item(s).

FAILURE TO SUBMIT DESCRIPTIVE LITERATURE BY THE BIDDER, MAY BE CONSIDERED NON-RESPONSIVE AND NOT ACCEPTED.

DELIVERY

Inspection, delivery, and final acceptance of each unit on the PO shall be within 120 calendar days after Purchase Order date. Each accessory shall be delivered ready to operate.

Delivery timelines can be changed if both, the state, and the contractor agree. Approval for extensions will be done using a Work Authorization Form (Attachment 5). The Contractor will submit a Work Authorization Form to California Department of Forestry and Fire (CAL FIRE) for approval and after (CAL FIRE‘S) approval, can proceed with the approved changes. The approved Work Authorization Form will thereby be incorporated to the contract. A Purchase Order Change or amendment will not be required.

Delivery shall be made to the below delivery address during normal business hours Monday through Friday from 8:00 a.m. to 12:00 p.m. or 1:00 p.m. to 4:00 p.m. except State Holidays.

Deliveries are to be made to the below destination:

RRU Service Center 210 W. San Jacinto Perris, CA 92570

Delivery Contact Person: Keith Miller or Donovan Ozenne Phone Number: Keith-(951) 355-3698 or Donovan (951) 840-6967

Contractor shall contact the delivery contact person at least two (2) weeks prior to delivery to make delivery arrangements.

Acceptance of equipment upon delivery does not exempt manufacturer from liability for any major defects or inherently problematic design.

INSPECTION AND ACCEPTANCE

Inspection will be done at the time of delivery at the final destination by CAL FIRE inspector(s). Completion of inspection or acceptance by the State inspector shall in no way release the dealer from satisfying the requirements of the contract, specifications, and warranty. The dealer shall correct deviations from the specified requirements that are detected by the owning agency in an expeditious manner at no expense to the owning agency.

Any unsatisfactory materials or evidence of faulty workmanship shall be removed and replaced or corrected by and at the expense of the manufacturer. Failure to find faulty materials or workmanship at inspection times does not release the manufacturer of responsibility for said faulty materials or workmanship.

REJECTION

As previously mentioned, the awarded bidder shall deliver equipment that is in compliance to the listed specifications of the bid package. Material deviations not previously discussed and agreed to, from the listed specifications of the bid package, may result in rejection of the equipment by CAL FIRE.

CAL FIRE reserves right to reject equipment that is non-compliant with specifications of the bid package.

Rejection of the equipment may result in contract termination at no cost to the state, including manufacturing costs and shipping/delivery costs.

CAL FIRE will provide written notice to the supplier that equipment has been rejected by CAL FIRE due to non-compliance of the equipment to listed specifications of the bid package.

Final acceptance of the equipment and final payment by the State does not release supplier from specifications, requirements, and warranty under contract. Supplier is liable for equipment’s compliance to specifications and warranty, including after final payment is made.

WARRANTY

Copies of the manufacturer's warranties (including purchased equipment) shall be provided at the time of delivery.

Equipment, electronics, and miscellaneous shall include manufacturers standard warranties. The manufacturer or their authorized dealer shall respond to warranty requests within one (1) business day of report of a failure from CAL FIRE and shall dispatch a factory representative to address any workmanship-related issues.

Manufacturer must have a Warranty Service provider. Contractor shall bear all material, labor and transportation costs for repair or defects as well as failures occurring within the warranty period.

Warranty shall include all mechanical and electrical parts and labor for machine equipment.

Warranty shall not include items depreciated through standard wear. Costs of mechanic and electrical parts and labor shall be included at no cost to the State.

All products offered must conform to the warranty language identified in the General Provisions, 19. Warranty.

UNANTICIPATED TASKS

For the purpose of this procurement, the State shall allow an amount equal to 20% of the total contract/purchase order (PO), to be added to the contract / purchase order to allow for State required options/upgrades (components, equipment, licenses, parts, etc. that provide additional functionality to the specification or scope of work), unanticipated tasks (well documented and unanticipated price increase of goods/services, freight/shipping/delivery or additional work that must be performed which was wholly unanticipated and is not specified in the specification, but which in the opinion of both parties is necessary), and unforeseen components or labor, etc. necessary to complete the requirements as indicated within the agreement. This is the maximum amount that will be available for State required and approved options/upgrades, components, additional work, etc. after Purchase Order award.

All Unanticipated Tasks must be defined and authorized by a Work Authorization Form (Attachment 5). The Contractor will submit a Work Order Authorization Form to the (CAL FIRE) and after (CAL FIRE‘s) approval, can proceed with the approved changes, and will be paid from this reserved allowance.

Each Work Authorization Form shall consist of a detailed statement of the work to be performed, an estimated time schedule for the performance of the work, and the Contractor’s itemized and total one-time and on-going costs, or cost reductions, of the Work Authorization. Prior to commencing work, the Work Authorization Form must be signed by the Contractor’s designated representative and by the (CAL FIRE‘s) or designated representative. The approved Work Authorization will thereby be included in the contract. A Purchase Order Change or Amendment will not be needed.

The contractor is not entitled to any portion of the additional 20% unless the extra components, labor, tasks, etc. are documented and approved by the (CAL FIRE). A Purchase Order Change or Amendment will not be needed.

Bidder Certification:

Please certify that you have received all four (4) pages of this document and that you have reviewed and agree to the requirements, terms, and conditions within by signing below and returning all pages with bid submission.

Printed Name

Signature

Date image1.png

File details come from the government source that posted it. Updated .