Attachment 2 - Addendum to 52.212-2 Evaluation .pdf

PDF 132 KB Posted

Attached to
Washer and Dryer Lease and Maintenance Federal contract opportunity
Solicitation number
FA303025Q0021
Issued by
Department of the Air Force Air Education and Training Command

About this file

This document is an Addendum to 52.212-2 Evaluation Criteria for a Lowest Price Technically Acceptable (LPTA) procurement process. The solicitation is for washer and dryer lease and maintenance services at Goodfellow Air Force Base, with a period of performance from July 1, 2025, to June 30, 2030. The procurement is a 100% small business set-aside, with award to be made to the lowest-priced, technically acceptable offeror.

The evaluation will focus on two primary factors: Price and Technical Capability. For pricing, the government will conduct price reasonableness and realism analyses using comparative methods like government estimates and commercial price lists. Technical evaluation requires a Capability Statement addressing preventative maintenance, equipment quality standards, phase-in/out procedures, record-keeping, and past performance with washer and dryer leasing. Quotes will be rated as either technically acceptable or unacceptable, with price being the more important factor in the selection process.

View the file

Other files for this federal contract opportunity

Other files attached to Washer and Dryer Lease and Maintenance, newest first.
File Type Posted
Solicitation Amendment FA303025Q00210001 SF 30.pdf PDF
Solicitation Amendment - FA303025Q00210001.pdf PDF
Questions and Answers.pdf PDF
Solicitation - FA303025Q0021.pdf PDF
Attachment 3 - Service Contract Act WD 2015-5251.pdf PDF
Attachment 4 - (CUI) BAL Template .docx DOCX document
Attachment 1 - Performance Work Statement (PWS) .pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Addendum to 52.212-2 Evaluation-Commercial Products and Commercial Services

Evaluation Criteria

The Government will utilize lowest price technically acceptable (LPTA) procedures. The Government will award a contract resulting from this solicitation to the responsible offeror conforming to the solicitation that will be most advantageous to the Government, price and other factors considered. The price is more important than technical. The Government will first establish a competitive range based on price and then evaluate the lowest offer within that range for technical acceptability. If the lowest offer is not technically acceptable, the Government will proceed to evaluate the next lowest offer, and so on, until a technically acceptable offer is identified.

The following three factors shall be used to evaluate offerors:

Factor 1: Price

An offeror’s Total Evaluated Price (TEP) will be determined by multiplying the quantities identified by the proposed unit price for each Contract Line Item Number (CLIN) to confirm the extended amount for each. The Government will first conduct a review of the overall quoted pricing and place the offerors in order from lowest to highest based on price. The government will conduct both price reasonableness and price realism to establish a competitive range. Generally, adequate price competition will satisfy the criteria of price reasonableness;

other methods include, but are not limited to, historical prices paid and comparison to the Independent Government Cost Estimate. In addition, the Government will conduct a price realism analysis to ensure that the proposed price is realistic for the work to be performed, reflects a clear understanding of the requirements, and is consistent with the offeror's technical proposal.

This analysis will include one of the following:

• Comparative Analysis: Comparing proposed prices with the Government estimate, historical prices, or prices submitted by other offerors.

• Commercial Price Lists or Industry Catalogs: Using commercial price lists or industry catalogs to verify that proposed prices are in line with industry standards for similar goods or services.

Factor 2: Technical

Technical proposals shall include the Offeror’s Capability Statement. Each quote will receive an acceptable or unacceptable rating indicating whether the quote is technically acceptable.

Technical Acceptable / Unacceptable Ratings Acceptable Quote clearly meets the minimum requirements of the solicitation.

Unacceptable Quote does not clearly meet the minimum requirements of the solicitation.

At a minimum, the quote must include a Capability Statement that states:

• Contractor understands and is capable of providing preventative maintenance and repair service requests IAW PWS Para 1.6.2

• Contractor understands Equipment Quality standards as outlined in PWS Para 1.5

• Contractor understands and is capable of the “Phase-in and Phase-Out” method IAW PWS Para 1.2

• Contractor understands and is capable of maintaining records of inspections, key control logs, maintenance, repairs, and inventory of units.

• Contractor’s past performance demonstrating familiarity with leasing and maintenance of washers and dryers.

(End of Addendum)

File details come from the government source that posted it. Updated .