Attachment 1(a) - ZLC NEMC HVAC and Electrical Upgrades - Drawings.pdf

PDF 8 MB Posted

Attached to
Amendment 0003 - NAS Enterprise Management Center (NEMC) HVAC & Electrical Upgrades at the Salt Lake City Air Route Traffic Control Center (ARTCC) - Salt Lake City, UT
Solicitation number
697DCK-23-R-00120
Issued by

About this file

This document package includes drawings and specifications for an upcoming Federal Aviation Administration project for HVAC and electrical upgrades at the NAS Enterprise Management Center located at the Salt Lake City Air Route Traffic Control Center in Salt Lake City, Utah. The project magnitude is estimated between $250,000 and $500,000. A pre-bid site visit is scheduled for February 22, 2023 and requests for information or clarification are due by March 1, 2023. Offers must be submitted by March 8, 2023 and shall be emailed with total file size less than 10MB due to FAA email restrictions. The package outlines the scope of work including mechanical, electrical and control system replacements and upgrades.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

For the best experience, open this PDF portfolio in

Acrobat X or Adobe Reader X, or later.

Get Adobe Reader Now!

http://www.adobe.com/go/reader

2022-11-22T14:17:00-0800

DONALD E SCHMEICHEL

2022-11-29T07:25:13-0800

CALLEN R COLLINS

2022-11-22T14:17:50-0800

DONALD E SCHMEICHEL

2022-11-29T07:22:58-0800

CALLEN R COLLINS

2022-11-22T14:19:25-0800

DONALD E SCHMEICHEL

2022-11-29T07:38:31-0800

CALLEN R COLLINS

2022-11-22T14:20:06-0800

DONALD E SCHMEICHEL

2022-11-29T07:52:32-0800

CALLEN R COLLINS

2022-11-22T14:21:02-0800

DONALD E SCHMEICHEL

2022-11-29T07:51:16-0800

CALLEN R COLLINS

2022-11-22T14:21:46-0800

DONALD E SCHMEICHEL

2022-11-29T07:49:49-0800

CALLEN R COLLINS

2022-11-22T14:23:17-0800

DONALD E SCHMEICHEL

2022-11-29T07:48:31-0800

CALLEN R COLLINS

2022-11-22T14:23:59-0800

DONALD E SCHMEICHEL

2022-11-29T07:47:00-0800

CALLEN R COLLINS

2022-11-22T14:24:55-0800

DONALD E SCHMEICHEL

2022-11-29T07:45:43-0800

CALLEN R COLLINS

DRAWING NUMBER DESCRIPTION

SLC‐22004645‐G001 COVER SHEET, VICINITY MAP AND DRAWING INDEX

SLC‐22004645‐G002 ELECTRICAL AND MECHANICAL LEGEND

SLC‐22004645‐G003 GUIDE PLANS ‐ FIRST AND SECOND FLOORS

SLC‐22004645‐A102 FIRST FLOOR EQUIPMENT ROOM PLAN ‐ DEMOLITION

SLC‐22004645‐A202 FIRST FLOOR EQUIPMENT ROOM PLAN

SLC‐22004645‐A501 WALL DETAILS

SLC‐22004645‐M102 FIRST FLOOR EQUIPMENT ROOM MECHANICAL PLAN ‐ DEMOLITION

SLC‐22004645‐M111 SECOND FLOOR MECHANICAL ROOM PLAN ‐ DEMOLITION

SLC‐22004645‐M112 SECOND FLOOR EQUIPMENT ROOM MECHANICAL PLAN ‐ DEMOLITION

SLC‐22004645‐M202 FIRST FLOOR EQUIPMENT ROOM MECHANICAL PLAN

SLC‐22004645‐M212 SECOND FLOOR EQUIPMENT ROOM MECHANICAL PLAN

SLC‐22004645‐M501 MECHANICAL EQUIPMENT DETAILS

SLC‐22004645‐M601 MECHANICAL SCHEDULES

SLC‐22004645‐E102 FIRST FLOOR EQUIPMENT ROOM POWER DEMOLITION PLAN

SLC‐22004645‐E112 SECOND FLOOR EQUIPMENT ROOM POWER DEMOLITION PLAN

SLC‐22004645‐E201 FIRST FLOOR MECHANICAL AND TELCO ROOM POWER PLAN

SLC‐22004645‐E202 FIRST FLOOR EQUIPMENT ROOM POWER PLAN

SLC‐22004645‐E211 SECOND FLOOR MECHANICAL AND TELCO ROOM POWER PLAN

SLC‐22004645‐E212 SECOND FLOOR EQUIPMENT ROOM POWER PLAN

SLC‐22004645‐E501 KIRK KEY PANEL AND CONDUIT DETAILS

SLC‐22004645‐E502 ELECTRICAL DETAILS

SLC‐22004645‐E701 ELECTRICAL ONE‐LINE DIAGRAMS ‐ CRITICAL POWER

SLC‐22004645‐E702 ELECTRICAL ONE‐LINE DIAGRAMS ‐ CRITICAL POWER BRANCH CIRCUITS

SLC‐22004645‐E801 CRITICAL PANEL SCHEDULES NC‐225‐A & NC‐225‐B

SLC‐22004645‐E802 CRITICAL PANEL SCHEDULES NC‐113‐A & NC‐113‐B

SLC‐22004645‐E803 CRITICAL PANEL SCHEDULES NC‐113‐F & NC‐113‐F

SLC‐22004645‐E804 BUILDING SERVICE PANEL SCHEDULES NB‐120‐A, NB‐225‐A & NE‐225‐A

SLC‐22004645‐Z102 FIRST FLOOR EQUIPMENT ROOM TEMPORARY COOLING PLAN

SLC‐22004645‐Z112 SECOND FLOOR EQUIPMENT ROOM TEMPORARY COOLING PLAN

DRAWING INDEX

2022-11-22T14:26:13-0800

DONALD E SCHMEICHEL

2022-11-29T07:44:21-0800

CALLEN R COLLINS

2022-11-22T14:26:56-0800

DONALD E SCHMEICHEL

2022-11-29T07:43:09-0800

CALLEN R COLLINS

2022-11-22T14:28:48-0800

DONALD E SCHMEICHEL

2022-11-29T07:41:43-0800

CALLEN R COLLINS

2022-11-22T14:29:57-0800

DONALD E SCHMEICHEL

2022-11-29T10:12:28-0800

CALLEN R COLLINS

2022-11-22T14:30:45-0800

DONALD E SCHMEICHEL

2022-11-29T10:05:27-0800

CALLEN R COLLINS

2022-11-22T14:32:59-0800

DONALD E SCHMEICHEL

2022-11-29T10:10:54-0800

CALLEN R COLLINS

2022-11-22T14:33:41-0800

DONALD E SCHMEICHEL

2022-11-29T10:06:36-0800

CALLEN R COLLINS

2022-11-22T14:34:21-0800

DONALD E SCHMEICHEL

2022-11-29T10:08:05-0800

CALLEN R COLLINS

2022-11-22T14:35:18-0800

DONALD E SCHMEICHEL

2022-11-29T10:09:32-0800

CALLEN R COLLINS

HP VOLTS PH HZ # FANS TOTAL

(MBH)

SENS.

(MBH) EDB ( ̊F) EWB ( ̊F) LDB ( ̊F) LWB ( ̊F) GPM ENT ( ̊F) LWT ( ̊F) TOTAL (MBH) GPM PRESSURE

DROP PSI TEMP DROP KW LBS/HR MFGR. MODEL/ SERIES

N-CRAC-1 113 113 17,200 0.30 DIRECT - 4.1 460 3 60 3 341 322 72 60 73 45 55 190 19.5 19.5 20F 6.8 20 13.00 5 STULZ CCD-1800-CWE

N-CRAC-2 113 113 17,200 0.30 DIRECT - 4.1 460 3 60 3 341 322 72 60 73 45 55 190 19.5 19.5 20F 6.8 20 13.00 5 STULZ CCD-1800-CWE

N-CRAC-5 224 224 17,200 0.30 DIRECT - 4.1 460 3 60 3 341 322 72 60 73 45 55 190 19.5 19.5 20F 6.8 20 13.00 5 STULZ CCD-1800-CWE

N-CRAC-6 224 224 17,200 0.30 DIRECT - 4.1 460 3 60 3 341 322 72 60 73 45 55 190 19.5 19.5 20F 6.8 20 13.00 5 STULZ CCD-1800-CWE

AIR HANDLING UNIT SCHEDULE

UNIT NO. CAPACITY WATER REMARKS

SUPPLY FAN DATA

AIR

COOLING COIL DATA KNOWN ACCEPTIBLE

SOURCESLOCATION AREA

SERVICED ESP (IN

W.G.) DRIVE

HUMIDIFICATION

RPM

SUPPLY

AIR

(CFM)

NOTE:

1. PROVIDE DOWN DISCHARGE UNITS WITH SEISMICALLY CERTIFIED FLOOR STANDS, FACTORY INSTALLED DISCONNECT SWITCH, CONDENSATE PUMP, SMOKE DETECTOR, CANISTER TYPE HUMIDIFIER, AND FACTORY NETWORK CONTROLLER.

2. UNITS SHALL UTILIZE FAN SETTINGS TO OBTAIN REQUIRED CFM AIR PROPERTIES AND TUNED GPM TO OBTAIN REQUIRED COOLING CAPACITY.

3. UNITS SHALL UTILIZE ONBOARD LEAK DETECTION AND ALARM TO BAS.

SUPPLY FAN(S) MOTOR DATA

NOTE 1, 2

FILTER SCHEDULE

MERV

EFF SIZEQTY

HEATING COIL DATA

23x32x4 (5)

CAPACITY

2022-11-22T14:35:53-0800

DONALD E SCHMEICHEL

2022-11-29T13:51:05-0800

CALLEN R COLLINS

2022-11-22T14:37:02-0800

DONALD E SCHMEICHEL

2022-11-29T13:46:03-0800

CALLEN R COLLINS

2022-11-22T14:32:13-0800

DONALD E SCHMEICHEL

2022-11-29T13:50:32-0800

CALLEN R COLLINS

2022-11-22T14:07:26-0800

DONALD E SCHMEICHEL

2022-11-29T07:20:08-0800

CALLEN R COLLINS

2022-11-22T14:09:40-0800

DONALD E SCHMEICHEL

2022-11-29T07:37:16-0800

CALLEN R COLLINS

2022-11-22T14:10:30-0800

DONALD E SCHMEICHEL

2022-11-29T07:35:59-0800

CALLEN R COLLINS

2022-11-22T14:11:47-0800

DONALD E SCHMEICHEL

2022-11-29T07:31:06-0800

CALLEN R COLLINS

2022-11-22T14:12:54-0800

DONALD E SCHMEICHEL

2022-11-29T07:32:14-0800

CALLEN R COLLINS

2022-11-22T14:14:33-0800

DONALD E SCHMEICHEL

2022-11-29T07:34:22-0800

CALLEN R COLLINS

2022-11-22T14:15:31-0800

DONALD E SCHMEICHEL

2022-11-29T07:28:22-0800

CALLEN R COLLINS

2022-11-22T14:16:18-0800

DONALD E SCHMEICHEL

2022-11-29T07:26:41-0800

CALLEN R COLLINS

File details come from the government source that posted it. Updated .