These are technical engineering drawings for an Air Handling Unit (AHU) Replacement project at the Federal Aviation Administration's Air Route Traffic Control Center (ARTCC) located in Auburn, Washington. The comprehensive set of drawings includes multiple detailed plans and schedules, specifically covering HVAC, electrical, and demolition aspects of the project. Key technical documents include:

Drawings cover multiple building levels (basement, first floor, second floor, third floor, and penthouse), with detailed plans for HVAC floor layouts, power plans, demolition sequences, mechanical and electrical schedules, and one-line electrical diagrams. The project involves replacing existing air handling units, associated electrical infrastructure, and mechanical systems. Technical details include air handler unit specifications for different floors (AHU-601 through AHU-604), VAV terminal box schedules, motor control center elevations, and electrical panel configurations. The drawings are prepared by Austin R. Brown for the Department of Transportation's Federal Aviation Administration, with engineering services conducted for the Western Service Area.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

H

G

F

E

AIR

D

C

B

A

7 6 5 4

ROUTE TRAFFIC CONTROL CENTER

AUBURN, WA

OPERATION SUPPORT WING

AHU REPLACEMENT

DRAWING INDEX

DRAWING NUMBER DESCRIPTION

ZSE-1403142-GOOl COVER SHEET, DRAWING INDEX AND VICINITY MAP

ZSE-1403142-GOOZ LEGENDS AND SYMBOLS

ZSE-1403142-G003 ABBREVIATIONS

ZSE-140314Z-G004 CONSTRUCTION STAGING PLAN

ZSE-1403142-GOOS CONSTRUCTION SEQUENCE FOR PHASED WORK

ZSE-1403142-MlOl BASEMENT HVAC FLOOR PLAN - DEMOLITION

ZSE-1403142-M102 PENTHOUSE HVAC FLOOR PLAN - DEMOLITION

ZSE-1403142-M201 BASEMENT HVAC FLOOR PLAN

ZSE-1403142-M202 PENTHOUSE HVAC FLOOR PLAN

ZSE-1403142-M301 HVAC SECTIONS

ZSE-1403142-MSOl HVAC DETAILS

ZSE-1403142-M601 MECHANICAL SCHEDULES

ZSE-1403142-M?Ol HVAC AIR FLOW DIAGRAM FIRST AND SECOND FLOORS

ZSE-1403142-M702 HVAC AIR FLOW DIAGRAM BASEMENT AND THIRD FLOORS

ZSE-1403142-ElOl BASEMENT POWER PLAN - DEMOLITION

ZSE-1403142-El02 PENTHOUSE POWER PLAN - DEMOLITION

ZSE-1403142-E201 BASEMENT POWER PLAN

ZSE-1403142-E202 PENTHOUSE POWER PLAN

ZSE-1403142-ESOl MCC ELEVATIONS

ZSE-1403142-E601 PANEL AND ELECTRICAL SCHEDULES

ZSE-1403142-E?Ol ONE LINE DIAGRAM - DEMOLITION

ZSE-1403142-E?ll ONE LINE DIAGRAM - NEW CONSTRUCTION

6 5

LOCATION MAP

AIR ROUTE TRAFFIC

CONTROL CENTER

3101 AUBURN WAYS

AUBURN, WA 98092

AUBURN

GENERAL

DEPOT

H

G

F

E

(ARTCC)

D

C

1--R-,v-+--,-e-

�-��-,-0 -+ -------0-,s-

C

-RIP

T

_IO

-N -------+-

J C

-N --1

.,,.R,""o�-��-,-t--

PV

D is

DEPARTMENT OF TRANSPORTATION g

FEDERAL AVIATION ADMINISTRATION �8

ATO � TECHNICAL OPERATIONS WESTERN SERVICE AREA 8

SEATTLE

ARTCC

OPERATIONS SUPPORT WING AHU REPLACEMENT

COVER SHEET,

DRAWING INDEX AND VICINITY MAP

SEATTLE CENTER

REVIEWED BY

SUBMITTED BY

AUSTIN R

DRAWN ENGINEERING SERVICES DRAWING NO

CHECKED

ENROUTEIFSS

2 1

WA

1403142

DRAWING PRODUCED ON WSA MICROSTATION SYSTEM

8 I 7 I 6 I 5 • 4 I 3 I 2 I 1

H H

AIR HANDLING UNIT SCHEDULE

SUPPLY FAN COOLING COIL HEATING COIL RETURN FAN FILTERS

SYMBOL LOCATION AREA MIN

-- SERVED COOLING CAPACITY AIR FACE FACE QA NUMBER

TOTAL MOTOR DATA EAT LAT WATER FINS CAP EAT EXT SP MOTOR DATA PD IN WG

CFM RPM SP MBH PD GPM AREA VEL ROWS PER GPM CFM IN WG

CFM AND HOUSING MERV REMARKS MBH °F DB ROWS TYPE INWG IN WG SOFT FPM FOOT HP VOLl PH HZ SIZE INIT FINAL HP VOLT PH Hz °F DB °F WB °F DB °F WB SENSIBLE TOTAL ENT ° LVG °F PDFT

AHU-601 PENTHOUSE 1 ST FLOOR 10340 1850 4,1 15 460 3 60 76.6 62.2 52.6 52.1 272.3 296.8 0.46 59.2 45 55 2.6 24.1 429 6 109 - - - - 9260 2.0 7.5 460 3 60 1080 NOTE1 CARTR 8 & 15 0.61 0.73 NOTE 2, 3, AHU-602 PENTHOUSE 2 ND FLOOR 10450 1839 4.0 15 460 3 60 76.6 62.2 52.6 52.1 275.2 300.0 0.47 59.8 45 55 2.6 24.1 434 6 110 - - - - 9450 2.0 7.5 460 3 60 1000 NOTE1 CARTR 8 & 15 0.61 0.73 NOTE2, 3.

AHU-603 PENTHOUSE 3 RD FLOOR 10690 1862 4.0 15 460 3 60 76,6 62.2 52.7 52.2 280.3 304.7 0.48 60.7 45 55 2.7 24.1 444 6 109 - - - - 9690 2.0 7.5 460 3 60 1000 NOTE1 CARTR 8& 15 0.62 0.74 NOTE2, 3.

G AHU-604 BASEMENT BASEMENT 5940 1800 4.4 7.5 460 3 60 76.2 62.7 51.4 51.3 161.8 192.8 0.56 38.4 45 55 5,1 13.1 453 6 114 - - - - 5040 - - 460 3 60 1000 NOTE4 PLEAT 8& 15 0.63 0.75 NOTE 2, 5. G

AHU-605 PENTHOUSE PENTHOUSE 790 1080 0.05 0.2 115 1 60 80.0 67.0 - - 13.1 16.1 - 3.3 45 55 3.8 2.1 - 2 12/IN 48.1 3.2 70 2 - - - - - - - 1 9X42 THROW - - - NOTE 6, GENERAL NOTES:

1. FOR DRAWING INDEX SEE DRAWING G001, FOR GENERAL SYMBOLS AND LEGEND SEE DRAWING G002. FOR MECHANICAL AND PLUMBING LEGEND

SEE DRAWING G002. ABBREVIATIONS SEE DRAWING G003.

2. ALL NOTED DUCT DIMENSIONS ARE CLEAR INSIDE DIMENSIONS AFTER LININGS, IF ANY, HAVE BEEN INSTALLED.

3. THE CONTRACTOR AND/OR HIS AGENTS SHALL NOT INSTALL NOR UTILIZE ANY FINISHES,MATERIALS,EQUIPMENT, OR TOOLS THAT CONTAIN ASBESTOS F AS DESCRIBED IN THE CURRENT RULES AND REGULATIONS ESTABLISHED AND ENFORCED BY OSHA AND/OR EPA. F

4. CONTRACTOR SHALL FURNISH AND INSTALL ALL INTERMEDIATE BEAM SUPPORTS AND MISCELLANEOUS ANGLES IN AREAS WHERE STRUCTURAL BEAMS ARE NOT SPACED ADEQUATELY TO PROVIDE THE NECESSARY SUPPORT AND/OR ANCHORING POINTS.

5. LOCATIONS, SIZES, CLEARANCES AND CONFIGURATIONS OF EQUIPMENT SHOWN ARE BASED ON SPECIFIED MANUFACTURER'S AND MODEL NUMBERS.

VERIFY AND COORDINATE LOCATION, SIZE, CLEARANCE AND CONFIGURATION OF ALL SUCH WORK AND PROVIDE ALL NECESSARY MOUNTING

-- TEMPLATES AND BOLT PATTERNS FOR ANCHORING EQUIPMENT. SUBSTITUTION OF EQUIPMENT SPECIFIED, WITH OTHER MANUFACTURER'S -- EQUIPMENT WILL REQUIRE THE CONTRACTOR'S PRIOR VERIFICATION OF CONFORMANCE TO REQUIREMENTS OF PERFORMANCE, SIZE, CLEARANCES, LOCATION AND CONFIGURATIONS COMPARED TO THE SPACE ALLOCATED TO HOUSE THE SPECIFIC EQUIPMENT. CONTRACTOR SHALL RESUBMIT THE

PROPOSED EQUIPMENT TO THE COR FOR APPROVAL.

6. ELEVATIONS INDICATED ON THE DRAWINGS ARE APPROXIMATE FOR COORDINATION PURPOSES. ELEVATIONS CAN BE ALTERED TO FIT FIELD

CONDITIONS OR TO FACILITATE INSTALLATION OF WORK.

E 7. CONTRACTOR SHALL PROVIDE FIRE RATED SEALANTS AT ALL PIPE PENETRATIONS THRU FIRE RATED ASSEMBLIES. RATING OF SEALANT SHALL BE E

EQUAL TO OR EXCEED RATING OF FIRE RATED ASSEMBLY.

8, ALL THERMOSTATS, MANUAL CONTROL SWITCHES, ETC SHALL BE MOUNTED 5'-0" ABOVE FINISH FLOOR UNLESS OTHERWISE NOTED.

9. FOR EXACT LOCATIONS OF LOUVERS OR ROOF OPENINGS, SEE MECHANICAL FLOOR PLANS.

FOR INFORMATION USE ONLY 10. ALL LINE VOLTAGE (120V OR HIGHER) THERMOSTATS, DAMPERS, AND ACTUATORS SHALL BE PROVIDED AND INSTALLED IN ACCORDANCE WITH THE

---------------------------- SPECIFICATIONS (TBD) AND DRAWINGS AND WIRED IN ACCORDANCE WITH THE ELECTRICAL SPECIFICATIONS (TBO) AND DRAWINGS.

I l

11. FOR SUPPLIMENTAL CONTROL DRAWINGS AND SEQUENCE OF OPERATIONS FROM SCHNEIDER ELECTRIC PLEASE SEE DRAWINGS 326-001, 326-002, 326-003, 3267-001, 327-003, 327-004, 327-005, AND 327-006.

I I

12. INSTALLATION SHALL PROVIDE FOR READY ACCESS TO ALL DAMPERS, COILS AND OTHER AIR CONTROL DEVICES. DAMPER ACCESS DOORS SHALL

VAV TERMINAL BOX SCHEDULE

BE LOCATED TO PROVIDE EASY AND DIRECT ACCESS TO DAMPERS.

D I I 13. ALL AIR FLOWS INDICATED ARE IN ACTUAL CFM. D

I DISCHARGE

I 14. CONTRACTOR SHALL BE RESPONSIBLE FOR ALL CONSEQUENCES AND/OR APPURTENANCE AS A RESULT OF SUBSTITUTION SUCH AS EQUIPMENT, NECK CFM REHEAT COIL

I

SYMBOL SIZE MIN-MAX

OPNG SIZE REMARKS

I

MATERIAL, ETC.

W X H ROW MBTU/H GPM PIPE

SIZE (INCH)

I VAV-1 5 175-350 BX 8,7 1 6,0 J J I

I

VAV-2 6 300 - 600 8 X 7.5 1 8,3 1 J

I

VAV-3 8 525 - 1050 11 X 10 1 16.6 2

I VAV-4 10 750 - 1500 12 X 12.5 1 22.6 3 f I

I

VAV-5 12 1000 - 2000 17 X 15 1 35.8 4 1

I VAV-6 14 1400 - 2800 18 X 17.5 1 44.7 5 1

C I I

C

I

NOTES: 1) BASIS OF DESIGN IS JC1 VG7000 VALVE WITH JCI VA-7152 ACTUATOR.

I

APPROVED

JCN

REDLINE z

REV DATE DESCRIPTION DATE APVO 0

DEPARTMENT OF TRANSPORTATION

B FEDERAL AVIATION ADMINISTRATION �B

z

ATO - TECHNICAL OPERATIONS WESTERN SERVICE AREA

ARTCC

OPERATIONS SUPPORT WING AHU REPLACEMENT

MECHANICAL SCHEDULES -- --

SEATTLE SEATTLE CENTER WA

REVIEWED BY

SUBMITTED BY APPROVED BY Digitally signed by Olgltally s1gned by AUSTIN R BROWN

::i AUSTIN R BROWN g������=J.1�.���r!��C=US d f{ � CALLEN R COLLINS

{ � 0818:2024.10.2812;27;16-06'00' Date: 2024.10.29 A PROJECT ENGINEER MGR: ENGINEERING - SB�lnl:i8 -07'00' A•

DESIGNED AB I

ISSUED BY DATE 10/17/2024 IJCN 1403142 ;

DRAWN JA I ENGINEERING SERVICES DRAWING NO REV

CHECKED

I

ENROUTE/FSS ZSE-1403142-M601

� �a

8 I 7 I 6 I 5 + 4 I 3 I 2 I ORA WING PRODUCED ONWSA MICROSTATION SYSTEM

H

G

F

E

D

C

B

A

8 7

I 18 2A 28 2C 2D 2E 2F 3A

L w

U)

SHEET NOTES:

u.

'I' ::::, u.

a:: � 0 'I' ::::, :c u.

s 'I' :c u.

a::

N

'I' ::::, u.

II) "'

'I' :c

LL

a:: "'

'I' ::::, /0,, INSTALL AIR HANDLER MOUNTED VFD WITH INTEGRAL DISCONNECTING

":/ MEANS. VFD IS PROVIDED WITH NEW AIR HANDLER UNIT.

A PROVIDE AND INSTALL WALL MOUNTED VFD WITH INTEGRAL

"/ DISCONNECTING MEANS.

A PROVIDE AND INSTALL NEW CONDUCTORS FROM AIR HANDLER UNIT TO

';;:/ OSW MCC. REUSE EXISTING CONDUIT.

0 PROVIDE AND INSTALL NEW CIRCUIT BREAKER INSIDE MCC BUCKET.

8 7

:f w

T ) MCP

1 3 1 gj (0

Li.

w

3C T

MCC-C (GENERAL ELECTRIC)

I

5 480Y/277V, 30, 3W, 1000A i

30,000 AMP ATC

400AF

400AT

1A

400AF

400AT

I

I

3D I 3E 480Y/277V, 30, 3W, 600A

T - T

3F 3G 4A 4B 4C 4D

) MCP

1 3

) 100AF ) MCP

30AT

T) 100AF T) MCP r) MCP T )225AF T) 100AF T

100AT

3 30 225AT

I

100AT

:f w

30A

J;

30A r 100A 3P

1 11 � �

30A

� w w a::

8:

U)

480-480Y/277V

!:, \.A..\..A.J ISOLATION

T XFMR"TA" >r

I -f 150 KVA

) 225AF

w-, w a::

8:

U) w

U)

ELECTRICAL ONE LINE DIAGRAM - NEW CONSTRUCTION

NO SCALE

6 5

4 3

OSW MOTOR CONTROL CENTER

4E 4F 4G 4H 4J 5A 5B I - T T

7.5 w

U) w

U) w

U) w

U) w

U) w

U)

4 3

H

G

F

E

D

C

1- R_EV.J__,e..:;b:.:;;�r:...._

...J.. ______ o_es_ c._,e_r,_o" ______ .,L__J_cN_J__·���::.:��:....E___1'_'P-1VD is t

DEPARTMENT OF TRANSPORTATION

FEDERAL AVIATION ADMINISTRATION

�B

ATO - TECHNICAL OPERATIONS

z

WESTERN SERVICE AREA 8

AUBURN

ARTCC

OPERATIONS SUPPORT WING AHU REPLACEMENT

ONE LINE DIAGRAM - NEW CONSTRUCTION

ESSENTIAL BUS

SEATTLE CENTER

REVIEWED BY

SUBMITTED BY

1-

--fcc

DRA

W N=---

JA

-'---l l ENGINEERING SERVICES

CHECKED

I

ENROUTE/FSS

DRAWING NO

ZSE-1403142-E711

WA

REV

DRAWING PRODUCED ON WSA MICROSTATION SYSTEM

File details come from the government source that posted it. Updated .