This document contains a price breakdown template for a federal contract opportunity to refurbish and upgrade elevators in two buildings at a Veterans Affairs medical center campus in Spokane, Washington. The template includes line items for construction divisions covering general requirements through various mechanical, electrical, and communications systems. Pricing is fixed for unpriced line items and rates are requested for period of performance, mobilization and demobilization, insurance and bonds, taxes, O&M manuals, overhead, subcontract markups, and profit. The related federal contract opportunity is a pre-solicitation for the project under Solicitation Number 36C26024R0009 to be awarded by the Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 20.

View the file

Other files

Show all 19

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Instructions

PRICE SCHEDULE BREAKDOWN INSTRUCTIONS
INSTRUCTIONS
1Awardee is Responsible for determining accuracy of formulas to calcualte SubTotals and Contract Totals as well as accurately transposing totals to the Price Summary
2The term “Division” used with each line item in the Price Schedule refers to the general construction industry term and association with the Construction Specification Institute or common CSI specification breakdown of work actions. These Divisions roughly match those presented to the Contractors when they review the contract document specification binders for this project as created by the architect of record.
3The contract line item price breakdown is for information purposes only and does not constitute separate billable deliverables.
4Field office overhead and general conditions are considered to represent the same category of costs and the terms are used interchangeably. As such, this category of costs will be applied only once to the contract and to any changes, if applicable.
5All pricing is fixed price.

Proposal Price Schedule

PRICE SCHEDULE BREAKDOWN
RFQ-36C26023Q0778

Project Number / Title: 668-18-109 / Refurbish and Upgrade Elevators in Bldg 1 & 27 Project Location: Spokane VAMC Campus

CLIN 0001CLIN 0002
RatesItemItem
PricePrice
Division Item 1 General RequirementsN/A$0.00$0.00
Division Item 2 Existing ConditionsN/A$0.00$0.00
Division Item 3 ConcreteN/A$0.00$0.00
Division Item 4 MasonryN/A$0.00$0.00
Division Item 5 MetalsN/A$0.00$0.00
Division Item 6 Woods, Plastic and CompositesN/A$0.00$0.00
Division Item 7 Thermal and Moisture ProtectionN/A$0.00$0.00
Division Item 8 OpeningsN/A$0.00$0.00
Division Item 9 FinishesN/A$0.00$0.00
Division Item 10 SpecialtiesN/A$0.00$0.00
Division Item 11 EquipmentN/A$0.00$0.00
Division Item 12 FurnishingsN/A$0.00$0.00
Division Item 13 Special ConstructionN/A$0.00$0.00
Division Item 14 Conveying EquipmentN/A$0.00$0.00
Division Item 21 Fire SuppressionN/A$0.00$0.00
Division Item 22 PlumbingN/A$0.00$0.00
Division Item 23 Heating, Ventilating and A/CN/A$0.00$0.00
Division Item 25 Integrated AutomationN/A$0.00$0.00
Division Item 26 ElectricalN/A$0.00$0.00
Division Item 27 CommunicationsN/A$0.00$0.00
Division Item 28 Electronic Safety and SecurityN/A$0.00$0.00
Division Item 31 EarthworkN/A$0.00$0.00
Division Item 32 Exterior ImprovementsN/A$0.00$0.00
Division Item 33 UtilitiesN/A$0.00$0.00
Divisoin Item 34 TransportaionN/A$0.00$0.00
Division Item 35 Waterway and Marine ConstructionN/A$0.00$0.00
Division Item 40 Process IntegrationN/A$0.00$0.00
Division Item 41 Material Process and Handling EquipmentN/A$0.00$0.00
Division Item 42 Process Heating, Cooling, and Drying EquipmentN/A$0.00$0.00
Division Item 43 Process Gas and Liquid Handling, Purification and Storage EquipmentN/A$0.00$0.00
Division Item 44 Pollution and Waste Control EquipmentN/A$0.00$0.00
Division Item 45 Industry Specific Manufacturing EquipmentN/A$0.00$0.00
Division Item 46 Water and Wastewater EquipmentN/A$0.00$0.00
Division Item 48 Electrical Power GenerationN/A$0.00$0.00
SubTotals$0.00$0.00

Period of Performance (FAR 52.211-10) ________ days ________ days

Mobilization / DemobilizationN/A$0.00$0.00
Insurance / BondsN/A$0.00$0.00
Taxes / Other Fees (provide itemized list)N/A$0.00$0.00
O&M Manuals and Red Line DrawingsN/A$0.00$0.00
OverheadRate _______%N/AN/A
Overhead (daily rate)Per Day $0.00N/AN/A
SubContract Mark-UpRate _______%N/AN/A
ProfitRate _______%N/AN/A
SubTotals$0.00$0.00

Other Items not Requested Above (provide itemized list) $0.00 $0.00

CONTRACT TOTALS $0.00 $0.00