Attachment 14 - Specialized Experience Form (3 pages).pdf

PDF 126 KB Posted

Attached to
Y1DA--Replace Elevator Systems (DB)
Solicitation number
36C24823R0060
Issued by

About this file

This document contains a specialized experience form and information on a federal contract opportunity for elevator replacement services. The specialized experience form requests information on three past projects including contractor details, contract numbers, work performed as prime or subcontractor, percentage of work performed, government customers and points of contact, project descriptions and responsibilities, performance periods, completion dates, budgets, issues encountered and resolutions. The federal contract opportunity is a solicitation to provide design and build services to upgrade four elevators, shafts and components at the Malcolm Randall Veterans Affairs Medical Center. Services include evaluating existing conditions and components and replacing the complete elevator systems. The solicitation number, opportunity type, agency and description of requirements are provided.

View the file

Other files

File Type Posted
Attachment 10 - Letter of Commitment Key Subcontractors (1 page).pdf PDF
Attachment 13 - Key Personnel Resume Form (1 page).pdf PDF
Attachment 15 - Subcontractor Past Performance Consent Form (1 page).pdf PDF
Attachment 04 - Specifications VA 01 42 19 _ Reference Standards (9 pages).doc DOC document
Attachment 17 - Wage Determination Davis Bacon Act FL20210194 (6 pages).pdf PDF
Attachment 09 - Safety or Environmental Violations and Experience Modification Rate EMR Form (1 page).pdf PDF
S02 - 36C24823R0060 (Replace Elevator Systems).pdf PDF
Attachment 12 - Letter of Commitment for Design Firm Teaming Arrangement (1 page).pdf PDF
Attachment 11 - Letter of Commitment for Key Personnel (1 page).pdf PDF
Attachment 01 - VHA Supplemental Contract Requirements for Combatting COVID-19 (2 pages).docx DOCX document
Attachment 02 - VA 01 33 23 Shop Drawings Product Data and Samples (3 pages).pdf PDF
Attachment 03 - Specifications VA 01 00 00 General Requirements (26 pages).doc DOC document
Attachment 05 - Specifications VA 01 32 16 16 - Network Analysis Schedules 573-20-109 (23 pages).doc DOC document
Attachment 06 - Specifications VA 14 21 10 - Modernization of Traction Elevators (41 pages).docx DOCX document
Attachment 07 - Specifications VA 14 24 10 - Modernization of Hydraulic Elevators (41 pages).docx DOCX document
Attachment 08 - Itemized Cost Breakdown (1 page).xlsx XLSX spreadsheet
Attachment 16 - Past Performance Questionnaire (4 pages).pdf PDF
Show all 17

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SPECIALIZED EXPERIENCE FORM

SPECIALIZED EXPERIENCE INFORMATION SHEET

PROJECT NO. [ ] Page 1 Must have a total of THREE (3) projects, more than 3 will not be evaluated; less than 3 may result in a lower rating.

a. Contractor Information of awarded contract (Firm Name, Address, DUNS Number and Cage Code, Phone number, POC Name, POC email, Company email)

b. Contract and/or Task Order Number and Award Date (mm/dd/yyyy)

c. Project Title/Name and Location

d. Work Performed as: Prime Contractor, Subcontractor, Joint Venture, Other (explain)

e. Percent (%) of project work performed by your company

f. if you work as subcontractor, who was the prime?

(Firm Name, Address, DUNS Number and Cage Code, Phone number, POC Name, POC email, Company email)

g. Government Agency/Company which awarded contract to offeror, and Contact Information, such Contracting Officer/Procurement Official/Point of Contract (Name, Title, Email, Phone Number).

EXPERIENCE INFORMATION SHEET

PROJECT NO. [ ] Page 2

h. Description of project’s scope of work and the offeror’s specific roles and responsibilities in the project:

Describe work performed in sufficient detail to permit evaluation of project relevancy to this procurement. Detail how work performed is relevant to the effort required by the solicitation? Use continuation sheet for additional information, if necessary

EXPERIENCE INFORMATION SHEET

PROJECT NO. [ ] Page 3

i. Describe any difficulties and/or obstacles encountered during performance; steps taken toward resolution

j. Describe unforeseen conditions and how each were resolved

k. Performance Period, including contract start date (mm/dd/yyyy), and original completion date, if not completed, projected date (mm/dd/yyyy) contract start date:

original completion date, if not completed, projected completion date (mm/dd/yyyy)

l. Actual Completion Date (mm/dd/yyyy), and if not completed, why?

Actual Completion Date:

If not completed, Why?

m. Project is 50% or more complete? YES [ ] No [ ]. If “No” explain percentage of completion, if not 50% completed for any reason, rating may be lower.

n. The Offerors shall indicate if any of the contracts listed were terminated and the type and reasons for the termination.

o. Original Contract Price (Award Amount), Final Contract Price (to include all modifications, if applicable), Explain Differences.

Original Contract Price: Final Contract Price:

Explain Differences:

File details come from the government source that posted it. Updated .