Attachment 08 - Itemized Cost Breakdown (1 page).xlsx

XLSX spreadsheet 23 KB Posted

Attached to
Y1DA--Replace Elevator Systems (DB)
Solicitation number
36C24823R0060
Issued by

About this file

This document contains an itemized cost breakdown template and information about a federal contract opportunity for elevator replacement services. The template provides a breakdown of estimated labor, material, and total costs by construction division. It includes fields for overhead percentage, profit percentage, and bond percentage to calculate total base offer cost. The related federal contract opportunity is a solicitation from the Department of Veterans Affairs to provide design and construction services to upgrade four elevator systems at the Malcolm Randall Veterans Affairs Medical Center. The project scope involves evaluating existing elevators, shafts, components, and integrated systems and providing replacement services. No response or award dates are included.

View the file

Other files

File Type Posted
Attachment 10 - Letter of Commitment Key Subcontractors (1 page).pdf PDF
Attachment 13 - Key Personnel Resume Form (1 page).pdf PDF
Attachment 15 - Subcontractor Past Performance Consent Form (1 page).pdf PDF
Attachment 04 - Specifications VA 01 42 19 _ Reference Standards (9 pages).doc DOC document
Attachment 17 - Wage Determination Davis Bacon Act FL20210194 (6 pages).pdf PDF
Attachment 09 - Safety or Environmental Violations and Experience Modification Rate EMR Form (1 page).pdf PDF
S02 - 36C24823R0060 (Replace Elevator Systems).pdf PDF
Attachment 12 - Letter of Commitment for Design Firm Teaming Arrangement (1 page).pdf PDF
Attachment 11 - Letter of Commitment for Key Personnel (1 page).pdf PDF
Attachment 01 - VHA Supplemental Contract Requirements for Combatting COVID-19 (2 pages).docx DOCX document
Attachment 02 - VA 01 33 23 Shop Drawings Product Data and Samples (3 pages).pdf PDF
Attachment 03 - Specifications VA 01 00 00 General Requirements (26 pages).doc DOC document
Attachment 05 - Specifications VA 01 32 16 16 - Network Analysis Schedules 573-20-109 (23 pages).doc DOC document
Attachment 06 - Specifications VA 14 21 10 - Modernization of Traction Elevators (41 pages).docx DOCX document
Attachment 07 - Specifications VA 14 24 10 - Modernization of Hydraulic Elevators (41 pages).docx DOCX document
Attachment 14 - Specialized Experience Form (3 pages).pdf PDF
Attachment 16 - Past Performance Questionnaire (4 pages).pdf PDF
Show all 17

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Base Offer

Base Offer Cost Breakdown

Project Number:

Edward L Roy: VA assigned project #

Date:
Project Title

Edward L Roy: VA assigned Project Title

Project Location
Offeror Name
Offeror Street
Offeror CityStateZip

Item Description Labor Cost Edward L Roy: Enter all Labor Costs by Division

Material Cost
Edward L Roy: Enter all Material Costs by DivisionTotal Cost

Edward L Roy: This Column is the sum of the Division's Labor and Material Costs

Division 1General Requirements$ - 0$ - 0$ - 0
Division 2Existing Conditions- 0- 0- 0
Division 3Concrete- 0- 0- 0
Division 4Masonry- 0- 0- 0
Division 5Metals- 0- 0- 0
Division 6Wood and Plastic- 0- 0- 0
Division 7Thermal & Moisture Protect- 0- 0- 0
Division 8Doors and Windows- 0- 0- 0
Division 9Finishes- 0- 0- 0
Division 10Specialties- 0- 0- 0
Division 11Equipment- 0- 0- 0
Division 12Furnishings- 0- 0- 0
Division 13Special Construction- 0- 0- 0
Division 14Conveying Equipment- 0- 0- 0
Division 21Fire Suppression- 0- 0- 0
Division 22Plumbing- 0- 0- 0
Division 23HVAC- 0- 0- 0
Division 26Electrical- 0- 0- 0
Division 27Communications- 0- 0- 0
Division 28Electronic Safety & Security- 0- 0- 0
Division 31Earthwork- 0- 0- 0
Division 32Exterior Improvements- 0- 0- 0
Division 33Utilities- 0- 0- 0
Division 34Transportation Subtotal- 0- 0- 0
Division Subtotals :$ - 0$ - 0$ - 0

Overhead % 0.00% Edward L Roy: Enter Overhead % here. This % will be multiplied by the Division Total Cost Subtotal (cell F36).

Edward L Roy: Date Offer Prepared/Submitted

- 0
Profit %0.00%
Edward L Roy: Enter Profit % here.This % will be multiplied by the sum of the Division Total Cost subtotal (cell F36) plus the calculated Overhead (cell F38).- 0
Bond %0.00%

Edward L Roy: Enter Bond % here. This % will be multiplied by the sum of the Division Total Cost Subtotal (cell F36), the amount of calculated Overhead (cell F38) and the amount of calculated Profit (cell F39).

Edward L Roy: Enter all Labor Costs by Division

- 0
Overhead/Profit Subtotals :$ - 0

Edward L Roy: Sum of Overhead, Profit and Bond %.

Edward L Roy: Enter all Material Costs by Division Edward L Roy: This Column is the sum of the Division's Labor and Material Costs Total Base Offer Cost $ - 0 $ - 0 $ - 0

File details come from the government source that posted it. Updated .