This document contains a letter of commitment from a prime contractor to a subcontractor for a Department of Veterans Affairs design-build contract opportunity to replace elevator systems. The prime contractor commits to using the named subcontractor to perform elevator-related services, including evaluating existing elevators, shafts, carriages, and other components. The letter specifies that the prime contractor may receive credit for the subcontractor's experience and past performance as it relates to the committed services. Written approval from the contracting officer would be required to substitute another firm for the subcontractor.

View the file

Other files

File Type Posted
Attachment 13 - Key Personnel Resume Form (1 page).pdf PDF
Attachment 15 - Subcontractor Past Performance Consent Form (1 page).pdf PDF
S02 - 36C24823R0060 (Replace Elevator Systems).pdf PDF
Attachment 12 - Letter of Commitment for Design Firm Teaming Arrangement (1 page).pdf PDF
Attachment 11 - Letter of Commitment for Key Personnel (1 page).pdf PDF
Attachment 01 - VHA Supplemental Contract Requirements for Combatting COVID-19 (2 pages).docx DOCX document
Attachment 02 - VA 01 33 23 Shop Drawings Product Data and Samples (3 pages).pdf PDF
Attachment 03 - Specifications VA 01 00 00 General Requirements (26 pages).doc DOC document
Attachment 05 - Specifications VA 01 32 16 16 - Network Analysis Schedules 573-20-109 (23 pages).doc DOC document
Attachment 06 - Specifications VA 14 21 10 - Modernization of Traction Elevators (41 pages).docx DOCX document
Attachment 07 - Specifications VA 14 24 10 - Modernization of Hydraulic Elevators (41 pages).docx DOCX document
Attachment 08 - Itemized Cost Breakdown (1 page).xlsx XLSX spreadsheet
Attachment 14 - Specialized Experience Form (3 pages).pdf PDF
Attachment 16 - Past Performance Questionnaire (4 pages).pdf PDF
Attachment 04 - Specifications VA 01 42 19 _ Reference Standards (9 pages).doc DOC document
Attachment 17 - Wage Determination Davis Bacon Act FL20210194 (6 pages).pdf PDF
Attachment 09 - Safety or Environmental Violations and Experience Modification Rate EMR Form (1 page).pdf PDF
Show all 17

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Attachment Letter of Commitment Key Subcontractors (Sample)

(PRIME CONTRACTOR LETTERHEAD)

Insert Date (MM/DD/YYYY)

Department of Veterans Affairs Network Contracting Office 8 8875 Hidden River Parkway Tampa, FL 3367

Attn.: Contracting Officer

Subject: Letter of Commitment for Solicitation No. ____________________________________ Project Tile: _________________________________________________________________________.

In the event that Prime Contractor X is awarded a contract under the subject solicitation, Prime Contractor X commits to using Subcontractor Y as a subcontractor for the services described in this Letter of Commitment and Subcontractor Y agrees to perform as a subcontractor to Prime Contractor X for those services.

Prime Contractor X will perform as the prime contractor while Subcontractor Y will perform the following services as a subcontractor under the resultant contract:

(Describe the work to be performed by the subcontractor, i.e. electrical, mechanical, civil, etc.)

Prime Contractor X may be credited with the experience, expertise and/or past performance of Subcontractor Y as they relate to the services described in this Letter of Commitment.

In the event that Prime Contractor X is awarded the resultant contract, another firm cannot be substituted for Subcontractor Y without prior written approval of the contracting officer. Approval or disapproval of a substitute subcontractor is a matter within the sole discretion of the Contracting Officer, considering such factors as whether the contracting officer considers the proposed substitute to be equally qualified and the substitution to be in the best interests of project execution.

In approving a substitution, the contracting officer may impose such conditions on the substitution as the contracting officer deems appropriate in the exercise of his/her sole discretion.

In the event Prime Contractor X is not awarded a contract under the subject solicitation, this Letter of Commitment is null and void.

Name Name Prime Contractor Name Subcontractor Name Title Title