This is a Hazardous Waste Management Plan (HWMP) Installation Supplement for Royal Air Force (RAF) Lakenheath and RAF Feltwell, updated as of February 25, 2025. The document establishes procedures for managing hazardous waste (HW) at these two U.S. Air Force installations in the United Kingdom to comply with Final Governing Standards for the United Kingdom (FGS-UK), Department of Defense regulations, and Air Force instructions.
The plan designates 48 Civil Engineering Squadron Installation Management Environmental (48 CES/CEIE) at DSN 226-3990 as the Office of Primary Responsibility for HW management, with Rebecca Webb serving as HW Program Manager and Keith Barrett as Alternate. The installation operates one central Hazardous Waste Storage Area (HWSA) located at Building 1218, RAF Lakenheath, with no time limits during accumulation at Hazardous Waste Accumulation Points (HWAPs) and a 90-day storage limit at the HWSA. The plan covers waste identification, characterization, container management, labeling, transportation, inspection, and disposal procedures. All HW disposal is conducted through Defense Logistics Agency Disposition Services (DLA-DS), the approved disposal contractor. Training requirements mandate that HW Program Managers complete AFIT 521 Hazardous Waste Management with annual refresher training, HWAP monitors and shop personnel complete annual RAF Lakenheath Hazardous Waste Monitor Training, and HWSA personnel complete annual training plus Dangerous Goods Certifier training. The document includes detailed appendices covering waste analysis procedures, emergency contacts, HWSA closure plans, a facility listing of 46 active HWAPs across various maintenance and support shops, and sample inspection checklists and forms for implementation.
View the file
Other files
Show all 21
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Department of the Air Force
Overseas Hazardous Waste Management Plan
Lakenheath_HWMP
Installation Supplement
About This Plan
Document Control
HWMP Approval (Signature Page)
1 Overview and Scope
2 Installation Profile
3 Environmental Management System
4 Roles and Responsibilities
5 Training
6 Recordkeeping and Reporting
7 Procedures
7.1 Waste Inventory
7.2 Waste Identification
7.3 Container Management
7.4 Labeling and Marking
7.5 Hazardous Waste Management
7.6 Transportation
7.7 Turn In/Disposal
7.8 Inspection
7.9 Waste Minimization
7.10 Preparedness and Prevention
7.11 Waste Specific Procedures
8 References
9 Acronyms
10 Definitions
11 Installation-Specific Content
Appendix A Waste Analysis Plan
Appendix A.1 Background
Appendix A.2 Detailed Definition of Hazardous Waste
Appendix A.3 Waste Sampling Procedures
Appendix A.4 Sample Documentation
Appendix A.5 Waste Characterization
Appendix A.6 Hazardous Waste Profile Sheet
Appendix A.7 Analysis Frequency
Appendix B Information and Emergency Contacts
Appendix C RAF Lakenheath HWSA Closure Plan
Appendix D RAF Lakenheath and RAF Feltwell HWAP Facility Listing
Appendix E Sample Forms and Templates
Appendix E.1 HWAP Inspection Sheet 2024
Appendix E.2 HWSA Weekly Inspection Checklist
Appendix E.3 Hazardous waste stream Review Request
Appendix E.4 Sample Chain of Custody
ABOUT THIS PLAN
This installation-specific Environmental Management Plan (EMP) uses the U.S. Air Force’s (AF) standardized Hazardous Waste Management Plan (HWMP) template for overseas installations. This plan is not an inventory of all hazardous waste (HW) requirements and practices. External resources, including Air Force Instructions (AFIs); Air Force Manuals (AFMANs); AF Playbooks; Final Governing Standards (FGS); and permit requirements, are referenced.
Each section of this plan begins with standard language that addresses AF and Department of Defense (DoD) policy and federal requirements. The standard language is restricted from editing to ensure consistent application across the AF enterprise. Standard language is maintained by the Air Force Civil Engineer Center (AFCEC) designated Subject Matter Expert (SME) for this plan.
Immediately following the standard text are installation-specific sections that address country, local, and installation-specific requirements and processes. Installation sections are maintained and updated by the installation HW Program Manager and/or the AFCEC Branch and/or Air Force Installations and Mission Support Center (AFIMSC) Detachment appointed to support this installation.
This document is optimized to be accessed and viewed electronically on the installation and AF eDASH website, the primary communication tool for AF EMPs.
DOCUMENT CONTROL
Standardized HWMP Template
In accordance with (IAW) the AFCEC Environmental (CZ) Business Rule (BR) 08, EMP Review, Update, and Maintenance, the standard content in this HWMP template is reviewed periodically, updated as appropriate, and approved by the HW and Environmental Overseas SME.
This version of the template is current as of 10/02/2024 and supersedes the 2021 version.
NOTE: Installations are not required to update their HWMPs every time this template is updated. When it is time for installations to update their HWMPs, installations should adopt the most recent version of this template available.
Installation HWMP
The initial HWMP must be approved and signed by the Installation Commander (at the time of publication) as the legal HW Generator for this installation. The approval can be via signature or as documented in appropriate Environment, Safety, and Occupational Health Council (ESOHC) minutes (AFMAN 32-7002, 3.2.2.). NOTE: This is not a Wing Contingency Plan and is not governed by installation or Wing plans or readiness format or coordination requirements of DAFI 10-401, Operations Planning and Execution. It is governed by AFMAN 32-7002, Environmental Compliance and Pollution Prevention, Section 5.2. Hazardous Waste Management Plan (HWMP). Because this is not a contingency plan, coordination should be with Environmental Management System Cross Functional Team (EMS CFT) and applicable units with roles and responsibilities in the HWMP. The plan does not require a new signature after each change in wing command.
Record of Updates – The HWMP is updated as changes to waste generation and management practices occur, including those driven by changes in applicable regulations and approved by the installation HW Program Manager as the plan Office of Primary Responsibility (OPR). Formatting and administrative changes such as the incorporation of updated regulatory language, or other minor updates are documented below.
Record of Annual Review – IAW AFMAN 32-7002, this plan is reviewed annually by the EMS CFT. Formatting and administrative changes should be noted in the previous paragraph for record of updates as approved by the EMS CFT Chair and do not require Installation Commander or Environmental, Safety, and Occupational Health Council (ESOHC) approval. Substantive revisions require coordination and approval by the Installation Commander as determined by the EMS CFT Chair and/or IAW host installation procedures. Substantive changes include manpower or resource requirements changes that impact installation hazardous waste generating organizations.
Installation Supplement
Record of Updates
Change No. Nature of Change Date of Change Approved By:
1 Administrative changes to personnel, new HWAP.
3 march 2021 R Webb
2 Administrative changes to personnel, new HWAP
4 March 2022 R Webb
3 Administrative changes to new HWAP Titles Removed closed shops 28 February 2023 R Webb 4 Administrative changes to new HWAP Titles Removed closed shops 3 March 2024 R Webb 5 Administrative changes and chapter changes from UK FGS 25 February 2025 R Webb
Record of EMS CFT Annual Review
Review Date Review Participants Notes/Remarks Result in Plan Update?
(Yes or No)
04/12/2021 ECFT Col Phillips Approved Yes 05/24/2022 ECFT Approved Yes
04/03/2023 Signed 04/27/23 ECFT Col Webb Approved Yes 22nd April 2024 ECFT Approved Yes 1st April 2025 ECFT Lt Col Schneider Approved Yes
HWMP APPROVAL (SIGNATURE PAGE)
Annual Review of HWMP will be Briefed at the next ECFT April 2025
[SIGNATURE]
1 OVERVIEW AND SCOPE
This HWMP contains procedures for management of HW to implement the FGS requirements, or if no FGS exists, the Overseas Environmental Baseline Guidance Document (OEBGD). AFMAN 32-7002 acts as a main driver for the HWMP. Also the HWMP addresses special requirements of DoDI 4715.05, Environmental Compliance at Installations Outside the United States, for the disposal of HW in host-countries. The HW Playbook serves as supplemental guidance to this plan.
Installation Supplement
Purpose
This plan serves as primary guidance for managing HW activities at Royal Air Force (RAF) Lakenheath and RAF Feltwell. It provides a management overview and specific requirements for the successful execution of the HW program. If there is a conflict between this plan and regulatory guidance, the regulatory requirements will take precedence. This plan is intended to assist operators, technicians and managers in meeting 48 FW HW program requirements. The cooperative efforts of many organizations and individuals are required for effective implementation of the 48 FW HW program.
Overview
This HWMP establishes the overall strategy, delineates responsibilities, and sets forth specific objectives for effective management of HW at RAF Lakenheath and RAF Feltwell. Effective HW management requires active, continuing participation at all levels of management. This plan supports AF directives and is intended to ensure compliance with the applicable Final Governing Standards for the United Kingdom (FGS-UK), DoD, and AF requirements.
Environmental Office, 48 Civil Engineer Squadron (CES)/CEIE, Annual Review Procedures
The installation environmental office, 48 CES/CEIE, annually conducts an internal review of the HWMP. The following sections and tables must be reviewed, usually prior to the annual review by the EMS CFT, to ensure accuracy and consistency.
Section 2 – Installation Profile Section 4 – General Roles and Responsibilities Section 8 – References Appendix D – RAF Lakenheath and RAF Feltwell HWAP Facility Listing
Guidance
AFMAN Waste Management provides AF HW management guidance, which requires each installation to develop a plan outlining an overall program strategy. This plan satisfies those requirements.
Hazardous Communication (HAZCOM). This plan does not discuss requirements for the hazardous communication program.
LAKI 90-802, Workplace Hazard Communication Program, defines the requirements for the HAZCOM program.
Hazardous Materials (HAZMAT) Management. HAZMAT requirements are covered in AFMAN 32-7002, HAZMAT Management is not covered in this plan.
Hazardous Materials Spill Prevention and Response Plan. This HWMP does not describe the actions and reporting requirements for spills or releases of HAZMAT. That information is found in the 48 FW Hazardous Materials Spill Prevention and Response Plan.
Legal Considerations
The objectives, policies and procedures included within this plan are in effect when approved by the 48 FW ESOHC chairperson, responsible for implementing AF environmental policy at RAF Lakenheath and RAF Feltwell. This plan may direct management requirements that are more stringent than regulations. If a conflict arises between this plan and regulatory requirements, such as the FGS-UK, regulatory requirements take precedence.
Final Governing Standards. The FGS-UK, provides specific standards for environmental protection at DoD installations in the United Kingdom (UK). The standard’s requirements are included in the Overseas Environmental Baseline Guidance Document (OEBGD), DoD Instruction (DODI) 4715.5, Management of Environmental Compliance at Overseas Installations and Executive Order (EO) 12088, Federal Compliance with Pollution Control Standards.
The FGS-UK C16.5.3.1 requires that a waste analysis plan (WAP) is developed to determine how and when wastes are analyzed.
This requirement is satisfied in Appendix A of this plan.
2 INSTALLATION PROFILE
Installation Profile
Scope of Plan This plan is designed to define processes related to the HW management program at RAF Lakenheath and RAF Feltwell.
OPR
(Civil Engineer or designated office that has overall responsibility for implementing the HW management program and is the lead organization for monitoring compliance with regulations.)
48 CES/CEIE at DSN 226-3990 has overall responsibility for implementing the HW management program and is the lead organization for monitoring compliance with regulations
HW Program Manager Rebecca Webb: rebecca.webb.2.gb@us.af.mil
DSN: 314-226-3989
Alternate HW Program Manager Keith Barrett: keith.barrett.2.gb@us.af.mil
DSN: 314-226-5590
Emergency contacts Fire Department - 911 Emergency Medical Care – 911 Refer to Appendix B for additional contacts
Waste registration numbers RAF Lakenheath - Feltwell DLA-DS. DLA-DS is the code used for all UK installations as there is no EPA Registration Number for overseas installations
FGS (or OEBGD) regulatory references FGS-UK, Chapter 16 Approved HW disposal contractors Defense Logistics Agency Disposition Services (DLA-DS) HW storage areas Building 1218, RAF Lakenheath HW accumulation time limits No time limits during accumulation at HWAP; 90 days at HWSA HW generator reporting frequency Not Applicable
3 ENVIRONMENTAL MANAGEMENT SYSTEM
The DAF environmental program adheres to the Environmental Management System (EMS) framework and its "Plan, Do, Check, Act" cycle for ensuring mission success. Executive Order (EO) 14057, Catalyzing Clean Energy Industries and Jobs Through Federal Sustainability; DoDI 4715.17, Environmental Management Systems; DAFI 32-7001, Environmental Management; and International Organization for Standardization (ISO) 14001 standard, Environmental Management Systems - Requirements with guidance for use, provide guidance on how environmental programs should be established, implemented, and maintained to operate under the EMS framework.
The HW management program employs EMS-based processes to achieve compliance with all legal obligations and current policy drivers, effectively manage associated risks, and instill a culture of continuous improvement. The HWMP serves as an administrative operational control that defines compliance-related activities and processes.
4 ROLES AND RESPONSIBILITIES
The major roles/organizations involved in supporting the HW program include:
Wing/Installation Commander
ESOHC
EMS CFT
HW Program Manager/Alternate Shop/HW Generator Personnel Hazardous Waste Accumulation Point (HWAP) and Hazardous Waste Storage Area (HWSA) Supervisors/Managers Unit Commanders Unit Environmental Coordinators (UECs), see AFI 32-7001 for role description Contracting Officer Defense Logistics Agency Disposition Services (DLA-DS) Tenant Organizations
AFCEC
AFIMSC Detachment mailto:rebecca.webb.2.gb@us.af.mil
Detailed information about typical responsibilities for these and other roles is available in AFMAN 32-7002, applicable installation supplements, and the HW Playbook. Additional HW management-related roles and responsibilities are described throughout this plan and in referenced documents.
Installation Supplement
Specific responsibilities for organizations and personnel tasked with HW program management and implementation are described in the following paragraphs.
Installation Commander – 48 FW/CC
Be responsible for compliance with the FGS-UK and regulations applicable to HW.
Sign, or delegate in writing, the authority to sign HW consignment notes. Signature delegation shall remain with active duty and AF civilian employees only.
Ensure that HAZMAT is made available for reuse to the maximum extent possible before disposal.
Signs HW permit applications or other regulatory binding agreements as required.
Environmental, Safety and Occupational Health Council (ESOHC)
Chaired by 48 MSG/DC.
Direct matters involving HW management.
Review HW management procedures as needed and resolve any conflicts or areas of noncompliance.
Reviews and approves HWMP when substantive changes are proposed.
Environmental Management System Cross Functional Team (EMS CFT)
Reviews HWMP, at least annually, with administrative changes annotated in the plan by the 48 CES/CEIE HW Program Manager, without need for ESOHC approval.
Documents EMS CFT annual review in HWMP Record of Annual Review.
Civil Engineer Squadron – 48 CES/CC
Assign, equip and train sufficient personnel to support the implementation of this plan by the OPR, 48 CES/CEIE.
Ensure contractors working on behalf of RAF Lakenheath and RAF Feltwell Civil Engineer (CE) projects comply with all necessary requirements for the collection and disposal of HW.
Installation Management Flight, Environmental Management Element – 48 CES/CEIE
Establish local procedures, prepare and maintain management plans and provide technical expertise with regard to waste management requirements and preparation of a Hazardous Waste Profile Sheet (HWPS) for transport and disposal of HW.
Review HWPS using information provided by the waste generator, Safety Data Sheet (SDS) and analytical results, if applicable.
Maintain a copy of each HWPS IAW retention times prescribed by the Air Force Records Disposition Schedule.
Develop and submit five-year budget requests for facilities, personnel, training, and other waste management needs.
Oversee proper programming and record keeping procedures.
Prepare, review and update the WAP IAW Appendix A.
Provide sampling and analysis of HW as necessary for proper characterization, management and disposal.
Complete HW reporting requirements as necessary, including submittals for data calls.
Coordinates and supervises the HW training for all RAF Lakenheath and RAF Feltwell personnel IAW Section 5.0.
Provide technical assistance for generators for MICT Stage 1 SAC assessments as needed.
Manage the HWSA.
Prepare waste shipping documents in coordination with DLA-DS.
Participate in approval of HWAP and HWSA locations.
Liaises with AFIMSC DET 4/CEIE for requests of waste management services (WMS) through DLA-DS.
Monitors DLA-DS contractor performance and reports discrepancies/concerns to contracting officer representative (COR) and
AFIMSC DET 4/CEIE.
Performs CE annual oversight inspections of HWAPs and HWSA IAW Section 7.8.
Provides technical expertise to generating activities regarding waste management.
Ensures funding requirements are properly identified and reported to AFIMSC DET 4/CEIE.
Maintains HWSA records IAW Section 6.0.
Re-validates HWAP waste streams annually by evaluating the shops’ HWPS.
Fire Protection Flight – 48 CES/CEF
Provide guidance, technical expertise and assistance to implement this plan.
Participate in approval of HWAP and HWSA locations.
Installation Dangerous Goods Advisor – 48 MSG/IDGA
Provide advice for the safe transport of HW from or within RAF Lakenheath and RAF Feltwell.
Coordinate Dangerous Goods Certifier training for those 48 CES/CEIE personnel designated to sign HW consignment notes.
Advise the generator on completion of the proper shipping information, containers and transportation requirements in the
HWPS.
Contracting Squadron – 48 CONS
Provide contracting support and expertise for all contracts that either generate or require the disposal and movement of waste.
Provide timely and effective contracting support to 48 CES/CEIE to accomplish HW management, as appropriate, including using applicable provisions of the Federal Acquisition Regulation (FAR) and environmental policies and procedures.
Bioenvironmental Engineering (BE) Flight – 48 AMDS/SGPB
Advise the generator on completion of the health portions of the HWPS, on request.
As requested, participate in approval of HWAP and HWSA locations.
Provide environmental and occupational health consultation services IAW AFI 48-145, Occupational and Environmental Health Program.
Safety – 48 FW/SE
Review the HWSA and HWAPs for safety issues while performing facility safety inspections.
Ensure plans and procedures comply with applicable safety requirements.
As requested, participate in approval of HWAP and HWSA locations.
Judge Advocate – 48 FW/JA
Identify applicable HW management laws, regulations, EOs and policies for the ESOHC.
Provide advice to ensure compliance and provide legal support at hearings.
Plans and Programs – 48 FW/XP
Consult with tenant unit and 48 CES/CEIE to determine tenant unit HW support requirements during development of Support Agreements (SA).
Define requirements and responsibilities in SA.
Work-Area Supervisors of HW Generating Activities
Manage HW and HWAP IAW the FGS-UK and this plan in coordination with 48 CES/CEIE.
Ensure a primary and alternate HWAP monitor is assigned by the shop supervisor. Appointments must be documented electronically by e-mail to the 48 CES/CEIE HW Program Manager.
Complete HW management training, both initial and annual refresher IAW Section 5.0.
Ensure all personnel that are assigned duties involving actual or potential exposure to HW are trained IAW Section 5.0.
Coordinate with 48 CES/CEIE to characterize (i.e. to determine whether or not they are hazardous) all wastes and prepare
HWPS.
Ensure that all new and existing waste streams and/or process changes have been coordinated with 48 CES/CEIE, 48 CES/CEF, 48 FW/SE and 48 AMDS/SGPB.
Notify HWSA personnel when HW containers are full to schedule pickup.
Ensure requirements for proper HW management, such as labeling and disposal, are implemented Maintain documentation and recordkeeping IAW this HWMP.
Notify 48 CES/CEIE of unknown wastes.
Ensure shops have an adequate supply of materials and equipment to accommodate routine collection of HW and any potential emergency situations (i.e. spill kits).
Prepare and update a Site Specific Spill Plan and ensure all personnel are trained on spill prevention and response procedures.
Support and implement HW minimization or pollution prevention initiatives directed by the 48 FW ESOHC.
Minimize HW generation to the maximum extent possible by following the HAZMAT management procedures of AFMAN 32- 7002.
Hazardous Waste Accumulation Point (HWAP) Monitors and Alternates
The HWAP Monitors and Alternates are appointed by their supervisor. The supervisor will email the 48 CES/CEIE HW Program Manager to update the training/appointment tracker. All generators of HW must be capable of recognizing, tracking and maintaining all documentation necessary for proper HW management. The HWAP Monitors and Alternates main duties include:
Manage HWAPs IAW HWMP and all applicable policies, regulations, and laws.
Successfully complete annual RAF Lakenheath Hazardous Waste Monitor Training supplied by 48 CES/CEIE HW Program Managers prior to working unsupervised with HW IAW Section 5.0.
Conduct HW Awareness Training to individuals that handle or have the potential to be exposed to HW IAW Section 5.0.
Coordinate with 48 CES/CEIE HW Program Manager, 48 CES/CEF, and 48 FW/SE on initial location or relocation of HWAPs IAW Section 7.5.
Ensure proper HW procedures are followed IAW Section 7.0.
Conduct weekly inspections of their HWAPs IAW Section 7.8.
Notify 48 CES/CEIE HW Program Manager when a change in type or quantity of HW generated will occur to ensure contract requirements for disposal can be processed in a timely manner.
Unit Environmental Coordinator (UEC)
Complete HW management training as required by 48 CES/CEIE.
Assist HW monitors, supervisors, and unit staff with staying in compliance with this plan.
Tenant Organizations
Comply with all requirements of the FGS-UK and this HWMP, unless exempted by DoD/AF Instructions.
HW support for tenant organizations will be defined in the tenant organization Support Agreements.
Defense Logistics Agency Disposition Services (DLA-DS)
Provide HW disposal contracting and oversight services. Provides copies of HW manifests and delivery orders (including modifications) to 48 CES/CEIE HW Program Manager.
Verifies accuracy of HW weights prior to acceptance and completion of disposal actions.
Reviews and verifies HWPS and manifests prior to acceptance and completion of disposal actions.
Coordinates HW removal between contractor and 48 CES/CEIE HW Program Manager.
Defence Infrastructure Organization (DIO) (formerly Defence Estates)
Defence Infrastructure Organization consigns and tracks wastes generated through their contracts on behalf of the U.S. Visiting Forces.
Defence Infrastructure Organization assigns their own consignment note code numbers for shipments and tracks those shipments on a separate database from the 48 FW HW shipments.
Defence Infrastructure Organization retains copies of the consignment notes for three (3) years, per UK requirements.
Each year, DIO renews the site HW registration for RAF Lakenheath and RAF Feltwell by 14 July and provides this number to 48
CES/CEIE.
5 TRAINING
5.1. Hazardous waste awareness training is provided to satisfy AFMAN 32-7002 and country-specific FGS requirements and needs. All training requirements and sources are provided in the Environmental Training Matrix on eDASH. Specific local training procedures are provided in section 5.5.
5.2. Hazardous waste training is provided only by qualified authorized personnel. Training records are maintained IAW the Recordkeeping and Reporting section of this plan.
5.3. Hazardous waste program managers and alternates appointed in writing by the Wing Commander to sign manifests, require specific training to include HW Management Compliance Training and Department of Transportation training to sign HW manifests.
Installation HW Program Managers should complete the Air Force Institute of Technology in-residence course (or equivalent) AFIT 521, Hazardous Waste Management. After initial course completion, refresher training is required annually for RCRA. See training matrix for more information.
5.4. Function-Specific Training (Local In-House/On-Line Training Sources): (Group A) Organizational (non-central) Hazardous Waste Storage Area Managers, HW Accumulation Point Managers, and their immediate supervisor; and (Group B) all shop personnel, and their immediate supervisors, who generate HW.
5.5 Each installation should make a determination of the applicable host-nation transportation regulations to determine the degree of training required for those preparing hazardous materials, consisting of hazardous waste on a manifest for ground transportation on public roads. Installations will enter procedures below regarding site-specific training requirements below based upon FGS and Host Nation (HN) regulations, consistent with the eDASH training matrix.
Installation Supplement
Installation Hazardous Waste Program Manager Training
The 48 CES/CEIE HW Program Manager will complete the following training:
New HW Program Managers will complete initial HW training by completing the Air Force Institute of Technology (AFIT) Hazardous Waste Management Course WENV 521.
Annual refresher training requirements can be satisfied by conducting the RAF Lakenheath Hazardous Waste Monitor Training or attending USAFE HW refresher training events hosted by AFIMSC Det 4/CEIE.
European Agreement Concerning the International Carriage of Dangerous Goods by Road (ADR) Certifier training in order to certify HW shipments leaving the installation (initial with annual refresher).
Hazardous Waste Accumulation Point (HWAP) Monitors and Shop Personnel Training
In accordance with FGS-UK C16.2, personnel and their supervisors assigned to duties involving actual or potential exposure to HW must successfully complete an appropriate training program prior to assuming those duties. These tasks include generation, movement, handling or characterization.
Hazardous Waste Accumulation Point Monitors (primary and alternates) and shop supervisors must complete the RAF Lakenheath Hazardous Waste Monitor Training. This training is administered in person or slides sent by the 48 CES/CEIE HW Program Manager.
Shop-level worker training is developed by the HWAP Monitors and supervisors for their particular shop. A training template is provided by 48 CES/CEIE outlining the required information and is available on the 48 CES/CEIE eDASH SharePoint website.
This document should be kept electronically and updated for correctness on a yearly basis or if a new waste stream is introduced into the shop. As long as the template is followed, 48 CES/CEIE does not need to approve the training slides. Any deviation from the template requires approval.
In accordance with FGS-UK C16.2.1, refresher training is accomplished annually for Shop Level Workers and HWAP Monitors.
After the HWAP Monitor delivers the training, a record of all shop personnel trained will be kept. A training record template is available on the 48 CES/CEIE eDASH SharePoint page. Shops will send the tracker to the 48 CES/CEIE HW Program Manager on the first week of July each year, where it will be kept for three years.
Only the 48 CES/CEIE HW Program Manager can approve alternative training to satisfy FGS-UK requirements.
Training records must be maintained for as long as personnel are present at the site and at least three (3) years after termination of HW duties at the site.
Hazardous Waste Storage Area (HWSA) Personnel Training
Individuals’ assigned duties at the HWSA will complete the following training:
RAF Lakenheath Hazardous Waste Monitor Training (annually) Dangerous Goods Certifier Training (initial with annual refresher)
Shipment Personnel Training
Individuals who sign consignment notes on behalf of 48 FW should be ADR certified and designated by the Wing Commander.
6 RECORDKEEPING AND REPORTING
Recordkeeping
The installation complies with the following HW recordkeeping requirements, as applicable, based on generator status. Records may be kept in either paper or electronic form. While the OEBGD has a baseline requirement of 3 years, each installation must be familiar with unique FGS requirements and include appropriate details in their installation supplement section.
Reporting
The HW Program Manager, and other designated personnel, generate needed reports from the Enterprise Environmental, Safety, and Occupational Health - Management Information System (EESOH-MIS).
Enforcement actions, spills, and inspections are reported via the Enforcement Actions, Spills, and Inspections Environmental Reporting (EASIER) database.
Installation Supplement
Summary of HW Recordkeeping Requirements
Record Retention Time* Citation HW determination documentation 3 years from the closure of the HWSA and
HWAP
FGS/OEBGD
HW manifest (turn-in document) 3 years FGS/OEBGD HWSA (inspection, container and/or inventory records, etc. EESOH-MIS)
Until closure of installation FGS/OEBGD
Employee HW training records 3 years from date of termination of duties FGS/OEBGD
* The AF, through the Air Force Records Information Management System (AFRIMS), requires that HW-related reports, documents, studies, HW manifests, and disposal records (including contracts) are destroyed 50 years from the date of the record. Note that the records required by law, external regulation, or OEBDG/FGS should be readily available on-site. Records required by AF Record Retention requirements can be archived.
Hazardous Waste Accumulation Point (HWAP) Recordkeeping Requirements
Hazardous Waste Accumulation Points are required to maintain the following records, either hard copy or electronic.
Site-Specific Spill Plan. Each HWAP must have a site specific spill plan that addresses spill procedures at that location and is formatted IAW 48 CES/CEIE requirements. The 48 CES/CEIE Spill Manager will review the plan for completeness. The plan must contain an accurate site map that includes at a minimum the locations of HWAP and HAZMAT storage lockers, drain locations, spill kits, fire extinguishers, eyewash stations and Personal Protective Equipment (PPE).
Spill Reporting Procedure. Refer to 48 FW 32-4013, Section 4.2.8. Spill Cleanup, Storage, and Disposal, Section 4.2.9. Post Spill Incident Response, and 4.3. Industrial Discharge (Slug) Response Procedures located on eDASH at the following link:
https://usaf.dps.mil/teams/10626/Lakenheath/WPP/ProgramPage/Hazardous+Waste.aspx
Hazardous Waste Storage Area (HWSA) Documentation Requirements
Hazardous Waste Storage Area Log. Recordkeeping of all HW containers picked up, transported to the HWSA, and shipped offsite for disposal is maintained in EESOH-MIS and available at any time by using the system’s reporting features. This information will be maintained until closure of the installation.
A written log (electronic) will be maintained to record all HW handled and should consist of the following:
Name/address of generator;
Description and hazard class of the HW;
Number and types of containers;
Quantity of HW;
Date stored;
Storage location;
Disposition data to include: dates received, sealed, transported, and transporter used;
The HW Log will be available to emergency personnel in the event of a fire or spill.
Log will be maintained until closure or transfer of the installation.
Weekly Inspections. The HWSA must be inspected at least every seven days to include containers and equipment on site – see Appendix E – Sample Forms and Templates. Inspection logs are maintained by 48 CES/CEIE on site, and maintained for three
(3) years.
Hazardous Waste Storage Area Contingency Plan. The contingency plan details emergency procedures and maintained by 48 CES/CEIE on site.
Hazardous Waste Storage Area Closure Plan. A closure plan will be maintained for the HWSA by 48 CES/CEIE. It is located at Appendix C.
Hazardous Waste Tracking System (electronic)
EESOH-MIS is the standardized Air Force HW tracking & reporting system. EESOH-MIS functions will be maintained to provide for:
Real time tracking of every container issued by the HWSA
Site lists, waste stream lists, and waste codes HW and waste oil processed through the HWSA, by organization, quantity, and type
48 CES/CEIE will maintain program plans, documents, and templates referenced in this section on the RAF Lakenheath environmental eDASH website at the link below:
https://usaf.dps.mil/teams/10626/Lakenheath/WPP/ProgramPage/Hazardous+Waste.aspx
Training Documentation
Proper documentation is essential to an effective training program. Section 5.0 Training defines training requirements for the HW program. Training records must be kept to provide evidence that the training was successfully completed; these records must be available for internal, as well as external, inspections. Training records for HWAP Monitors and shop personnel and training records for HWSA personnel are kept at the 48 CES/CEIE office. Additionally, the 48 CES/CEIE HW Program Manager maintains a spreadsheet tracking the appointment of HWAP Monitors and their most recent training completion dates. Training records for the 48 CES/CEIE HW Program Manager must be kept in the 48 CES/CEIE Environmental Office files. Training records must be kept for current employees as long as they work at the installation and for an additional three (3) years after the date they leave the base (or stop working at a position related to HW management).
Reporting
Spill Reporting
48 FW procedures, as outlined in the Spill Prevention and Response Plan, require responsible organizations to report releases of any amount of HW releases to the 48 CES/CEIE Environmental Office at 226-3990 and to the Fire Department.
7 PROCEDURES
This section contains procedures for managing HW from identification, accumulation, offsite transportation and disposal. The HW Program Manager ensures that appropriate procedures are properly communicated and followed by all necessary personnel.
7.1 Waste Inventory
A current waste inventory can be generated within EESOH-MIS using the Ad-Hoc Reporting Tool or by completing the following steps:
Log into EESOH-MIS, select the “Reporting” option, and select “Hazardous Waste” to generate the Waste Site Waste Stream Summary Report.
Installation Supplement
The HWSA Manager or 48 CES/CEIE HW Program Manager should be contacted in the event that a current waste inventory for RAF Lakenheath or RAF Feltwell is needed and they will then generate a current report from EESOH-MIS using the steps outlined above.
Hazardous Waste (HW) Stream
A HW stream is defined as HW that has the same properties that allow it to be shipped off-base under the same information. Each waste stream is assigned a HWPS number.
Hazardous Waste Accumulation Point Monitors or shop supervisors must immediately contact the 48 CES/CEIE HW Program Manager when potentially generating a new waste stream. See Appendix E – Sample Forms and Templates for the Hazardous Waste Stream Review Request form.
7.2 Waste Identification
The HW Program Manager determines the nature of waste based on a detailed qualitative analysis of the regulated waste generating process, associated Safety Data Sheet (SDS) information, and coordination with generating activity personnel involved in the use of hazardous materials. If uncertainties about a waste stream exist, the HW Program Manager pursues waste stream sampling and analysis IAW the Waste Analysis Plan (WAP) found in Appendix A.
The WAP details the wastes that have been evaluated and analyzed, a description of the testing and analytical methods used, the HW sampling methods used, the location of samples taken for analysis and frequency, sample documentation, sample quality assurance and quality control procedures, and sample request procedures.
Generator knowledge and the results of the WAP are used to minimize waste re-characterizations to those instances where a process change has occurred or the waste stream is highly variable.
Installation Supplement
Refer to the WAP found in Appendix A for RAF Lakenheath-specific waste identification procedures.
7.3 Container Management
Container management procedures are as follows:
Containers storing HW must be in good condition and meet transportation and other applicable requirements. “Good condition” means there should be no severe rusting, no sharp-edged creases or dents, no bulging heads, and no severe structural defects.
Ensure that the waste material will not react with the container itself.
Use plastic or plastic-lined steel drums to safely store corrosive wastes.
Segregate and store incompatible wastes separately.
Immediately transfer the contents of a leaking container to another container or over pack into a salvage drum.
Containers with free liquid or drum contents on top must be cleaned or over packed in the case of a leak.
Containers must remain closed at all times except when adding or removing waste.
Adequate headspace must be maintained at all times when filling a container to account for content expansion. The required headspace is unique to each waste stream and expected storage conditions. For liquids and volatile chemicals, a general rule is to not fill to more than 85% of container capacity to allow for temperature changes, and that equates to approximately four inches of headspace in a typical 55-gallon drum. The ultimate requirement is performance based, such that drums do not bulge or leak. A good inspection process will enable any recommendations for specific waste streams as appropriate.
Containers holding HW must not be opened, handled, or stored in a manner which may rupture the container or cause it to leak.
Containers of flammable liquids must be grounded when transferring flammable liquids from one container to the other.
HWAPs and HWSAs with containers must have a secondary containment system that meets the following requirements
1. Must be sufficiently impervious to contain leaks, spills, and accumulated precipitation until the collected material is detected and removed;
2. The secondary containment system must have sufficient capacity to contain 10 percent of the volume of stored containers or the volume of the largest container, whichever is greater.
Installation Supplement
Hazardous Waste Accumulation Point Monitors may obtain the appropriate, empty containers from the HWSA. It is the ultimate responsibility of the HWAP and HWSA Managers to ensure the HW containers are managed according to the requirements described in Section 7.3, Container Management.
The following precautions should be taken at HWAPs and the HWSA to prevent container ruptures and leaks:
Containers must not be overfilled. A minimum 6-inch gap will be maintained to allow for expansion and for drum movement.
Closed head containers must be filled using a funnel.
Drums must not be stacked more than two high. Drums containing flammable liquids must not be stacked.
Containers should be stored in an area, which is away from or protected from damage due to the movement of vehicles such as trucks, forklifts, etc.
Drums and other containers must be handled and transported with equipment designed for the task. Drum grappler attachments may be purchased for tow motors to securely grab and move containers. Secure containers to pallets before moving pallets. Use drum carts designed for the types of containers used by your organization to reduce the likelihood of dropping a container during handling. Never balance drums on the forks of a forklift or tow motor.
Containers must remain closed at all times, except when waste is added or removed. Closed means that for open-top drums, the lid is securely closed using the clip or nut and bolt on the drum ring. For closed-top drums, the bung cap is in place and tightened. For drums accumulating liquids that are filled through a funnel, the funnel must be closed unless adding fluids.
Fuel/oil soaked Rags must be wrung out and bagged before placing in drum.
Lithium/Lithium Ion batteries must be taped up at the terminal.
Secondary Containment
Container storage areas must have a secondary containment system meeting the following requirements:
If HW liquids are accumulated, they must be kept on secondary containment spill pallets both indoors and outdoors.
Containment must be monitored for spills and the spillage removed when it is identified.
Containment must be adequately sized to hold 25% of the volume of stored containers or 110% of the volume of the largest container, whichever is greater.
Separate containment is required for incompatible hazards.
Hazardous Waste Storage Area (HWSA)
Container Management
Adequate aisle space must be maintained to allow free movement of personnel, firefighting equipment and spill prevention materials.
Containers cannot block entry or exit points.
Containers must be segregated by appropriate hazards.
Storage bays must be appropriately marked with the HW in storage.
7.4 Labeling and Marking
Containers used for the accumulation and transportation of HW must be properly identified with a HW marker and an appropriate hazard class label (e.g., flammable, corrosive, etc.) at all times from the start of accumulation to ultimate disposal IAW applicable laws and regulations. The HW marker for transportation will include a description of the contents of the container in the form of a Proper Shipping Name (PSN) as established in the waste characterization process and used on the waste manifest which accompanies the container to the ultimate disposal site (either paper or approved electronic form).
When transporting HW via commercial transportation on public roads and highways, HW generators will prepare off-installation HW shipments in compliance with DoD Component Policies. Requirements may include placarding, marking, containerization, and labeling. HW designated for international transport will be prepared in accordance with the documents listed above and applicable international regulations.
EESOH-MIS, HW Module has a version of the HW label that can be customized (i.e., HN language) and utilized.
Installation Supplement
Hazardous Waste Accumulation Points (HWAPs)
Labels
Every active HW container at an HWAP must have a correct and complete HW label.
Labels are generated and provided by the HWSA and are delivered with containers to the HWAPs.
The HWAPs are responsible for maintaining the label on each container.
The HWAPs must contact 48 CES/CEIE immediately if a container is missing the required label.
Labels must be securely adhered to the container and placed so that they are clearly visible at all times upon approach to the HWAP and to anyone placing waste in the container.
Labeling information must remain legible at all times.
Placards
Placards or hazard diamonds are required for items that have a PSN and are regulated for transport on the roadways.
The HWSA will provide the HWAPs with the appropriate hazard diamond sticker for each container.
The HWAPs are responsible for maintaining the hazard diamond sticker on each container.
The HWAPs must contact 48 CES/CEIE immediately if a container is missing the required hazard diamond.
The hazard diamond should be placed near the HW label on the container and should be visible upon approach to the HWAP.
7.5 Hazardous Waste Management
An HWAP may be used to accumulate no more than 208 liters (55 gallons) of HW, or 1 liter (1 quart) of acute HW, from each waste stream. When these limits have been reached, the generator will make arrangements within five working days to move the HW to an HWSA or ship it off-site for treatment or disposal.
Hazardous waste should be stored IAW OEBGD or FGS requirements (i.e. not stored longer than 90 days, 180 days, one year) in an
HWSA.
Wastes intended to be recycled or used for energy recovery (e.g., used oil or antifreeze) are exempt from the 208-liter (55-gallons)/1-liter (1-quart) volume accumulation limits, but must be transported off-site to a final destination facility within one year.
Installation Supplement
Hazardous Waste Accumulation Point Operating Procedures
The HWAP Monitor and Alternate assume overall responsibility for management of the HWAP. Details on the overall management of the HWAP are outlined in Section 4.0, Roles and Responsibilities of the HWAP Manager and Alternate.
The previously discussed waste identification (Section 7.2), container management and containment requirements (Section 7.3) and labeling and marking (Section 7.4) also apply to HWAP operations. Furthermore, there are additional record keeping and reporting requirements (Section 6.0) relevant to HWAP operations also previously discussed. Other specific requirements for HWAPs are listed below:
The HWAP must be at or near the point of generation.
The HWAP must be under the control of the unit managing it. Authorized site security measures include constant monitoring, a locked storage unit, or locked containers.
The HWAP must be designed and operated to provide appropriate segregation for different waste streams, including those that are chemically incompatible.
Each HWAP is required to have a portable fire extinguisher and an emergency eyewash station, PPE, and a spill kit with adequate materials for the type of HW stored. The spill kit must contain an adequate amount of appropriate spill materials for items accumulated on site or any potential spill from facility operations. For example, if corrosive liquid is accumulated on site, spill absorbents made for corrosives must be present. The purchase of spill kits and materials is the responsibility of the user.
Signage for the HWAP must be visible from 25 ft. Information on the sign must be kept updated. The HWAP sign should include the HWAP assigned number, the HWAP shop’s phone number, and the emergency phone number.
The HWAP Monitor submits requests to the HWSA Manager via telephone at DSN 226-5352 to pick up full containers and should expect containers to be collected within five working days. The HWSA Manager will replace the full containers with empty containers that are labeled to accept the same waste as the full container.
Establishment of HWAPs
Any organization on base that determines its activities will generate HW must contact 48 CES/CEIE to establish an HWAP in advance of waste generation.
The operator must contact 48 CES/CEIE and 48 CES/CEF to allow these offices an opportunity to inspect the proposed HWAP location. 48 AMDS/SGPB and 48 FW/SEG will be notified of new or changed HWAP locations.
HWAP monitors or supervisors must notify the offices listed above if moving an accumulation point or a waste stream.
Each waste-generating functional area shall appoint a primary and alternate site manager for each HWAP and/or accumulation site.
All HW must be within the control of a responsible, trained party. The waste must be placed into the appropriate HWAP container in a timely manner, but no later than the end of the shift.
Hazardous Waste Storage Area Operating Procedures
The only HWSA for RAF Lakenheath and RAF Feltwell is located at Building 1218, RAF Lakenheath. The previously discussed waste identification (Section 7.2), container management requirements (Section 7.3) and labeling and marking (Section 7.4) all apply to HWSA operations as well as record keeping requirements (Section 6.0). There are other more rigorous requirements for HWSAs as listed below:
Communications. An internal communications or alarm system capable of providing immediate emergency instructions (voice or signal) to HWSA personnel must be available. The HWSA is currently equipped with a fire alarm system and a telephone.
Emergency Equipment. Portable fire extinguishers, fire control equipment appropriate to the material in storage, spill control equipment and decontamination equipment must be available on site.
Water Supply. Water with adequate volume and pressure must be available on site.
Eyewash and Shower. Eyewash and shower facilities must be on site.
Personnel Protective Equipment. An adequate amount of PPE of the appropriate size and type must be readily available.
Security. The facility entrance gate at the HWSA is kept locked when personnel are not present. The HWSA consists of lockable units. Any unit storing HW must be locked when not in use.
Signage. “Danger Unauthorized Personnel Keep Out” signs must be posted at each entrance to the HWSA and visible from at least 25 feet.
"No Smoking" signs must be conspicuously placed wherever there is a hazard from ignitable or reactive waste.
If there is only one person on duty at the HWSA premises, that person must have immediate access to a device, such as a telephone (immediately available at the scene of operation) or a hand held two way radio, capable of summoning external emergency assistance.
Hazardous Waste Storage Area Closure Plan
A closure plan has been developed for the RAF Lakenheath HWSA (Appendix C). The closure plan will be implemented in the future if a decision is ever made to close the HWSA at Building 1218.
7.6 Transportation
The HW Program Manager has overall responsibility for the transportation of HW from an HWAP to a HWSA, and from an HWSA to the disposal facility. The HW Program Manager ensures:
All transportation over HN public roads is conducted IAW applicable HN or international transportation regulations.
Containers are approved.
Transporters have the appropriate training.
Uniform HW Manifests are prepared for offsite transportation, and signed by a duly authorized signatory.
All necessary documentation has been completed and records are maintained IAW all applicable requirements and the AF Records Disposition Schedule.
Installation Supplement
Hazardous Waste (HW) Transport from RAF Feltwell to RAF Lakenheath HWSA
Hazardous wastes should never be transported from RAF Feltwell to RAF Lakenheath. Generation of HW at RAF Feltwell should be coordinated with 48 CES/CEIE to establish an HWAP and ensure proper storage. 48 CES/CEIE will coordinate pickups and shipments of HW from RAF Feltwell with DLA-DS and an authorized HW transporter.
7.7 Turn In/Disposal
The turn in procedures contained in DoDM 4160.21, Volumes 1 - 4. DLA Disposition Services must be followed. In the event an alternate disposal agent is needed, a waiver will be obtained with proper justification and approval.
Containers are inspected prior to turn-in to ensure that container management procedures have been followed and that containers are properly labeled and in good condition. If the container is not in good condition, contents must be transferred to a container that is in good condition.
In addition to the FGS or…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .