This is a Price Schedule Breakdown template for a fixed-price construction project at the Anchorage VA Medical Center in Anchorage, Alaska. The document serves as an instruction guide and pricing framework for Request for Proposal No. 36C26026R0061, Project 463-21-101 (Repair Building 100 Moisture Barrier Project), submitted by the Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 20.

The template outlines a Construction Specification Institute (CSI) division-based breakdown structure for contractors to populate with pricing information across multiple categories, including General Requirements (Division 1), Existing Conditions (Division 2), Woods/Plastics/Composites (Division 6), Thermal and Moisture Protection (Division 7), Openings (Division 8), Finishes (Division 9), and HVAC (Division 23). Additional pricing line items include Mobilization/Demobilization, Insurance/Bonds, Taxes/Other Fees, Operations & Maintenance Manuals and Red Line Drawings, and fields for Overhead Rate (percentage and daily rate), Subcontract Mark-Up Rate, and Profit Rate. The instructions specify that all pricing is fixed price, field office overhead and general conditions are applied only once to the contract and any changes, and that the contract line item price breakdown is for information purposes only and does not constitute separate billable deliverables. All cells currently display $0.00, indicating this is a blank template awaiting contractor pricing input.

View the file

Other files

Show all 14

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Instructions

PRICE SCHEDULE BREAKDOWN INSTRUCTIONS
INSTRUCTIONS
1Awardee is Responsible for determining accuracy of formulas to calcualte SubTotals and Contract Totals as well as accurately transposing totals to the Price Summary
2The term “Division” used with each line item in the Price Schedule refers to the general construction industry term and association with the Construction Specification Institute or common CSI specification breakdown of work actions. These Divisions roughly match those presented to the Contractors when they review the contract document specification binders for this project as created by the architect of record.
3The contract line item price breakdown is for information purposes only and does not constitute separate billable deliverables.
4Field office overhead and general conditions are considered to represent the same category of costs and the terms are used interchangeably. As such, this category of costs will be applied only once to the contract and to any changes, if applicable.
5All pricing is fixed price.

Price Schedule 463-21-101

PRICE SCHEDULE BREAKDOWN
Request For Proposal No.: 36C26026R0061

Project Number / Title: Construction Project 463-21-101 Bldg 100 Repair Envelope Moisture Barrier Project Location: Anchorage VA Medical Center, Anchorage, AK

RatesBase Item
Price
Division 1 General RequirementsN/A$0.00
Division 2 Existing ConditionsN/A$0.00
Division 6 Woods, Plastic and CompositesN/A$0.00
Division 7 Thermal and Moisture ProtectionN/A$0.00
Division 8 OpeningsN/A$0.00
Division 9 FinishesN/A$0.00
Division 23 HVAC

Subtotals N/A $0.00

Period of Performance (FAR 52.211-10) ________ days

Mobilization / DemobilizationN/A$0.00
Insurance / BondsN/A$0.00
Taxes / Other Fees (provide itemized list)N/A$0.00
O&M Manuals and Red Line DrawingsN/A$0.00
OverheadRate _______%N/A
Overhead (daily rate)Per Day $0.00N/A
Subcontract Mark-UpRate _______%N/A
ProfitRate _______%N/A
Subtotals$0.00

Other Items not Requested Above (provide itemized list) $0.00

CONTRACT TOTALS $0.00