This is Amendment 001 to a Request for Proposals (RFP) for Project 463-21-101, Repair Building 100 Envelope Moisture Barrier at Anchorage VA Medical Center. The amendment, issued by NCO 20 Network Contracting Office on June 23, 2026, extends the proposal due date to June 30, 2026, at 11:00 AM AKDT. Key modifications include: removal of Attachment 9 (Limitation on Subcontracting requirement); elimination of commissioning requirements with instructions to ignore Section 01 91 00 General Commissioning Requirements and Section 23 08 00 Commissioning of HVAC System; clarification that bid guarantee shall be 20 percent of the bid price or $2,000,000, whichever is less; and attachment of questions and answers addressing contractor inquiries regarding commissioning scope, bid due dates, personnel qualifications, equipment responsibility, antenna operations, roof protection, and subcontracting set-asides.

The Questions and Answers section clarifies that commissioning will not be required for this project, reaffirms minimum qualification requirements for project managers and QCQ system managers cannot be substituted with additional experience, confirms the contractor is responsible for moving interfering equipment or materials, requires contractor notification to VA before work near antennas, specifies standard roof protection practices apply, and corrects the bid guarantee provision. All terms and conditions of the original RFP remain in effect except as modified by this amendment.

View the file

Other files

Show all 14

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

5. PROJECT NUMBER (if applicable)

CODE 7. ADMINISTERED BY

2. AMENDMENT/MODIFICATION NUMBER

CODE

6. ISSUED BY

8. NAME AND ADDRESS OF CONTRACTOR

4. REQUISITION/PURCHASE REQ. NUMBER 3. EFFECTIVE DATE

9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED

PAGE OF PAGES

10A. MODIFICATION OF CONTRACT/ORDER NUMBER

10B. DATED

BPA NO. 1. CONTRACT ID CODE

FACILITY CODE CODE

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

E. IMPORTANT:

is extended,

(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.

12. ACCOUNTING AND APPROPRIATION DATA

(REV. 11/2016)

is required to sign this document and return ___________ copies to the issuing office. is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.

15C. DATE SIGNED

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER

Contractor

16C. DATE SIGNED

14. DESCRIPTION OF AMENDMENT/MODIFICATION

16B. UNITED STATES OF AMERICA

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER 16A. NAME AND TITLE OF CONTRACTING OFFICER

15B. CONTRACTOR/OFFEROR

STANDARD FORM 30 PREVIOUS EDITION NOT USABLE

Prescribed by GSA - FAR (48 CFR) 53.243

(Type or print) (Type or print)

(Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

(Number, street, county, State and ZIP Code)

(If other than Item 6)

(Specify type of modification and authority)

(such as changes in paying office, appropriation date, etc.)

(If required)

(SEE ITEM 11)

(SEE ITEM 13)

(X)

CHECK

ONE

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

(Signature of person authorized to sign) (Signature of Contracting Officer)

1 3

0001 06-23-2026

463-21-101

36C260

NCO 20 Network Contracting Office

ATTN: V4CONT

1601 E. Fourth Plain Blvd Bldg.17, Suite B428 Vancouver WA 98661

NCO 20 Network Contracting Office

ATTN: V4CONT

1601 E. Fourth Plain Blvd Bldg.17, Suite B428 Vancouver WA 98661

To all Offerors/Bidders

36C26026R0061

05-28-2026

X

X X

** HOUR & DATE for Receipt of Offers is EXTENDED to: 06-30-2026 11:00 AM

The effective date of this Amendment 001 is 6/23/26

The purpose of this amendment is to:

a) Attach the questions and answers received.

b) Correct RFP by removing requirement to complete Attachment 9-Limitation on Subcontracting.

c) Correct Specification - Commissioning will not be required. References to 01 91 00 General Commissioning Requirements and 23 08 00 Commissioning of HVAC System shall be ignored.

d) Correct FAR Provision 52.228-1 Bid Guarantee (c) Bid guarantee shall be 20% of the bid price or $2,000,000.00 whichever is less.

e) Proposal due date is changed to 6/30/26 at 11:00AM AKDT.

CONTINUATION PAGE

QUESTIONS AND ANSWERS

PROJECT 463-21-101 Repair Bld 100 Envelope Moisture Barrier Solicitation Number: 36C26026R0061

Anchorage VA Medical Center

6/23/26

Below are questions that were submitted by potential Contractors for the above referenced project along with the Government’s answers to the Questions/Request for Information.

Contractor Questions Government Response

1. On the specifications for the project, Section 23 08 00 Commissioning of HVAC Systems.

That section references Section 01 91 00

GENERAL COMMISSIONING

REQUIRMENTS. However, there is no Section 01 91 00 included in the documents.

Will a Section 01 91 00 be issued?

Will building envelope commissioning be required as well?

Commissioning will not be required. References to 01 91 00 General Commissioning Requirements and 23 08 00 Commissioning of HVAC System shall be ignored.

2. The SF1442 lists the bid due date as 06-29- 2026 by 9 AM. However, the General Submission Requirements list the due date as 06-29-2026 by 9 PM (AKDT). Please advise.

The bid due date is 6/30/26 at 11:00 AM AKDT.

The General Submission Requirements have been corrected.

3. The minimum qualification requirements for the project manager state that they must have a BS degree in construction management in addition to the five (5) years of experience. Can additional years of experience be counted in lieu of the degree?

No. The minimum qualifications requirement stands as is.

4. The minimum qualification requirements for the QCQ system manager state that in addition to the five (5) years of construction experience, that they must have a bachelor's degree in engineering, industrial engineering or a related discipline and be a certified quality manager. Can additional years of experience and an International Code Council (ICC) Commercial Building Inspection certification be counted in lieu of the education requirement?

No. The minimum qualifications requirement stands as is.

Page | 3

5. Who is responsible for moving the antennas and or tie downs during construction.

The contractor awarded this project will be responsible for moving any equipment or materials that interfere with construction.

6. Will the Antennas remain in use during construction. Not knowing their frequencies is there a radiation hazard from prolonged exposure?

Contractor to notify VA when work will be in process near the antennas so that they can be taken out of operation.

7. Attachment 9 – Limitation on Subcontracting notes SDVOSB. Shouldn’t it be HUBZone?

Attachment 9 has been removed from this solicitation because it does not apply.

8. Is there a requirement to protect the roof? It is standard practice to protect the rubber membrane roof.

9. Section 2.4 FAR 52.228-1(c) Bid Guarantee provision is not filled in. What is the bid guarantee requirement?

2.4 52.228-1(c) BID GUARANTEE (SEP 1996)

(c) The amount of the bid guarantee shall be 20 percent of the bid price or $2,000,000, whichever is less.