Sheet1
| BCTE CLIN-Crosswalk | |||||
| CLIN | Description | Type | IDIQ PWS/Paragraph | TO 0001 PWS/Paragraph | Explanation |
| BASE | |||||
| 0001 | Program Management | FFP | 1.6, 5.1, 5.1.1, 5.1.2, 5.1.3, 5.1.4, 5.1.5, 5.1.6, 5.1.7, 5.1.7.1, 5.1.8, | All of 8 | Labor only. The Contractor shall provide the overall management and administrative effort necessary to ensure the requirements of this contract are accomplished. |
| 0002 | Help Desk Support (includes: RWIS Help Desk, IA Support, and Video Telecon Help Desk Support) | FFP | 5.3, 5.4 | 12 | Labor associated with Helpdesk support per the PWS and requirements to provide the activities necessary to ensure that Systems Engineering and sustainment principles, processes and practices are applied throughout its lifecycle. The Help Desk support shall be available Monday-Friday during your organization’s normal business hours. The objective is for users to have the ability to submit request for support twenty-four (24) hours per day via email, website or voicemail and receive a callback the next business day. The RWIS ELA shall include unlimited licenses and support for the BCTE program. The current MTC RWIS system is the Advanced Simulations Technologies, Inc. (ASTi) Voisus radio wire integration system. |
Travel is on Travel CLIN.
| 0003 | BCTC-ES Site Surveys | FFP | 4.11.4, 4.11.2, 4.11.3, 4.11.6, 4.10.2, 4.11.6, 4.12, 4.4.3, 4.6, 4.13, 5.2.5.6, 5.2.8, 5.2.9,5.2.10,5.2.11,5.2.12,5.2.13,5.2.14 | All of 9.1 | Labor Only associated with technology refresh for sites per the PWS and requirements. The Contractor shall collect detailed information about the facility to ensure the COTS products and FFE can be properly operated, maintained, and oriented within the available space. |
| 0004 | CBCSE Site Surveys | FFP | 4.11.4, 4.11.2, 4.11.3, 4.11.6, 4.10.2, 4.11.6, 4.12, 4.4.3, 4.6, 4.13, 5.2.5.6, 5.2.8, 5.2.9,5.2.10,5.2.11,5.2.12,5.2.13,5.2.15 | All of 9.2 | Labor Only associated with technology refresh for sites per the PWS and requirements. The Contractor shall collect detailed information about the facility to ensure the COTS products and FFE can be properly operated, maintained, and oriented within the available space. |
| 0005 | BCTC-ES Installation Services, Labor | CPFF | 4.1.1, 4.1.11, 4.2.3, 4.2.4, 4.2.5.2, 4.4.1, 4.4.3, 4.5, 4.8, 4.13, 5.2.5.6, 5.2.8, 5.2.9,5.2.10,5.2.11,5.2.12,5.2.13,5.2.14, 5.2.6.1-5.2.7 | 11, 12, 13, 14, 15, 16, 17, 18, 19, 20, 21, 22 | Labor, Travel, Material and ODCs associated with hardware, FFE and software licensces activities per the PWS and requirements. The integration of mature technological solutions to increase readiness, reduce life cycle costs, and reduce the logistics footprint. |
| 0006 | CBCSE Installation Services, Labor | CPFF | 4.1.1, 4.1.11, 4.2.3, 4.2.4, 4.2.5.2, 4.4.1, 4.4.3, 4.5, 4.8, 4.13, 5.2.5.6, 5.2.8, 5.2.9,5.2.10,5.2.11,5.2.12,5.2.13,5.2.14, 5.2.6.1-5.2.8 | 11, 12, 13, 14, 15, 16, 17, 18, 19, 20, 21, 22 | Labor, Travel, Material and ODCs associated with hardware, FFE and software licensces activities per the PWS and requirements. The integration of mature technological solutions to increase readiness, reduce life cycle costs, and reduce the logistics footprint. |
| 0007 | ESS Support | FFP | 5.6, 5.6.1, 5.6.2, 5.6.3, 5.6.4, 5.7, 5.7.1, 5.7.2, 5.8, 5.9, 5.9.1, 5.10, 5.10.1, 5.10.2, 5.10.3, 5.10.4, 5.10.4.1, 5.10.4.2, 5.10.4.3, 5.10.4.4, 5.10.5, 5.10.6, 5.10.7, 5.10.8, 5.10.9, 5.10.10, 5.10.11, 5.10.12, 5.10.13, 5.10.14, 5.10.15 | 23 | Maintenance & Service (M&S) of all integrated NIPR Electronic Security Systems (ESS), and the supporting communications and power equipment. The current ESS consists of an IDS, Access Control System (ACS) and Closed-Circuit Televisions (CCTV) systems. This task order applies only to the ACS and the CCTV systems at each MTC in NIPR locations. |
| 0008 | BCTC-ES Materials, Equipment, and ODCs | CPFF | 1.6.14, 5.2.5 | 9.1 | Material associated with LVC-IA Concurrency, PDSS, and tech refresh per the PWS and requirements. Labor, Travel, Material and ODCs associated with Technology Insertion activities per the PWSand requirements. The integration of mature technological solutions (e.g. cloud capability) to increase readiness, reduce life cycle costs, and reduce the logistics footprint. |
| 0009 | CBCSE Materials, Equipment, and ODCs | CPFF | 1.6.14, 5.2.5 | 9.2 | Material associated with LVC-IA Concurrency, PDSS, and tech refresh per the PWS and requirements. Labor, Travel, Material and ODCs associated with Technology Insertion activities per the PWSand requirements. The integration of mature technological solutions (e.g. cloud capability) to increase readiness, reduce life cycle costs, and reduce the logistics footprint. |
| 0010 | BCTC-ES Software Licenses | Cost | 4.1.5.3, 4.1.11, 4.5, 4.7, 4.7.5, 4.7.7.1, 4.7.7.4, 4.7.7.5., 4.13 | 11, 18, 26.3 | Material associated with spares per the PWS and requirements. Labor and ODCs associated with spares would fall under PDSS. |
| 0011 | CBCSE Software Licenses | Cost | 4.1.5.3, 4.1.11, 4.5, 4.7, 4.7.5, 4.7.7.1, 4.7.7.4, 4.7.7.5., 4.13 | 11, 18 | Material associated with spares per the PWS and requirements. Labor and ODCs associated with spares would fall under PDSS. |
| 0012 | BCTC-ES Travel | Cost | 1.6.13, 4.10.4 | 5, 9.1 | The Contractor shall be required to travel to both CONUS and OCONUS MTC locations identified in PWS Addendum 1, BCTE Fielding Locations and PEO STRI during the performance of this contract to attend meetings, for site surveys, for installation services and on-site training services. Contractor shall be authorized travel expenses IAW the Joint Travel Regulation (JTR) and the limitation of funds specified in this contract. |
| 0013 | CBCSE Travel | Cost | 1.6.13, 4.10.4 | 5, 9.2 | The Contractor shall be required to travel to both CONUS and OCONUS MTC locations identified in PWS Addendum 1, BCTE Fielding Locations and PEO STRI during the performance of this contract to attend meetings, for site surveys, for installation services and on-site training services. Contractor shall be authorized travel expenses IAW the Joint Travel Regulation (JTR) and the limitation of funds specified in this contract. |
| 0014 | CMRA | NSP | 5.1.3 | NA | Not Seperately Priced (NSP) |
| 0015 | CDRLs | NSP | 5.1.1, 5.1.2, 5.1.7.1, 5.2.1, 5.2.5.1, 5.2.5.3, 5.2.5.6, 5.2.6.1, 5.2.7.1, 5.2.8, 5.2.9 | 26.1 | The following list represents deliverables that the Contractor shall provide per the instructions specified in DD Form 1423 |
| 0016 | Customer Support | FFP | 5.5 | 21 | Customer Support Mission Requirements represent tasks to support or customers through the life of the contract based on mission requirements and available funding. |
| 0017 | Phase In | FFP | 1.6.17.1 | 6 | Transition to full development and support capability. (1) Non-recurring labor and travel unique to Transition Phase-In, including hiring and training of personnel to staff facility (contractor); and (2) Non-recurring labor for set-up of computing equipment, network infrastructure, and associated ODC required to transition to contractor's facility. 60 day transition period. |
| CLIN | PWS/Paragraph | ||||
| 1st OPTION | |||||
| 1001 | Program Management | FFP | 1.6, 5.1, 5.1.1, 5.1.2, 5.1.3, 5.1.4, 5.1.5, 5.1.6, 5.1.7, 5.1.7.1, 5.1.8, | TBD | Labor only. The Contractor shall provide the overall management and administrative effort necessary to ensure the requirements of this contract are accomplished. |
| 1002 | Help Desk Support (includes: RWIS Help Desk, IA Support, and Video Telecon Help Desk Support) | FFP | 5.3, 5.4 | TBD | Labor associated with Helpdesk support per the PWS and requirements to provide the activities necessary to ensure that Systems Engineering and sustainment principles, processes and practices are applied throughout its lifecycle. The Help Desk support shall be available Monday-Friday during your organization’s normal business hours. The objective is for users to have the ability to submit request for support twenty-four (24) hours per day via email, website or voicemail and receive a callback the next business day. The RWIS ELA shall include unlimited licenses and support for the BCTE program. The current MTC RWIS system is the Advanced Simulations Technologies, Inc. (ASTi) Voisus radio wire integration system. |
Travel is on Travel CLIN.
| 1003 | BCTC-ES Site Surveys | FFP | 4.11.4, 4.11.2, 4.11.3, 4.11.6, 4.10.2, 4.11.6, 4.12, 4.4.3, 4.6, 4.13, 5.2.5.6, 5.2.8, 5.2.9,5.2.10,5.2.11,5.2.12,5.2.13,5.2.14 | TBD | Labor Only associated with technology refresh for sites per the PWS and requirements. The Contractor shall collect detailed information about the facility to ensure the COTS products and FFE can be properly operated, maintained, and oriented within the available space. |
| 1004 | CBCSE Site Surveys | FFP | 4.11.4, 4.11.2, 4.11.3, 4.11.6, 4.10.2, 4.11.6, 4.12, 4.4.3, 4.6, 4.13, 5.2.5.6, 5.2.8, 5.2.9,5.2.10,5.2.11,5.2.12,5.2.13,5.2.15 | TBD | Labor Only associated with technology refresh for sites per the PWS and requirements. The Contractor shall collect detailed information about the facility to ensure the COTS products and FFE can be properly operated, maintained, and oriented within the available space. |
| 1005 | BCTC-ES Installation Services, Labor | CPFF | 4.1.1, 4.1.11, 4.2.3, 4.2.4, 4.2.5.2, 4.4.1, 4.4.3, 4.5, 4.8, 4.13, 5.2.5.6, 5.2.8, 5.2.9,5.2.10,5.2.11,5.2.12,5.2.13,5.2.14, 5.2.6.1-5.2.7 | TBD | Labor, Travel, Material and ODCs associated with hardware, FFE and software licensces activities per the PWS and requirements. The integration of mature technological solutions to increase readiness, reduce life cycle costs, and reduce the logistics footprint. |
| 1006 | CBCSE Installation Services, Labor | CPFF | 4.1.1, 4.1.11, 4.2.3, 4.2.4, 4.2.5.2, 4.4.1, 4.4.3, 4.5, 4.8, 4.13, 5.2.5.6, 5.2.8, 5.2.9,5.2.10,5.2.11,5.2.12,5.2.13,5.2.14, 5.2.6.1-5.2.8 | TBD | Labor, Travel, Material and ODCs associated with hardware, FFE and software licensces activities per the PWS and requirements. The integration of mature technological solutions to increase readiness, reduce life cycle costs, and reduce the logistics footprint. |
| 1007 | ESS Support | FFP | 5.6, 5.6.1, 5.6.2, 5.6.3, 5.6.4, 5.7, 5.7.1, 5.7.2, 5.8, 5.9, 5.9.1, 5.10, 5.10.1, 5.10.2, 5.10.3, 5.10.4, 5.10.4.1, 5.10.4.2, 5.10.4.3, 5.10.4.4, 5.10.5, 5.10.6, 5.10.7, 5.10.8, 5.10.9, 5.10.10, 5.10.11, 5.10.12, 5.10.13, 5.10.14, 5.10.15 | TBD | Maintenance & Service (M&S) of all integrated NIPR Electronic Security Systems (ESS), and the supporting communications and power equipment. The current ESS consists of an IDS, Access Control System (ACS) and Closed-Circuit Televisions (CCTV) systems. This task order applies only to the ACS and the CCTV systems at each MTC in NIPR locations. |
| 1008 | BCTC-ES Materials, Equipment, and ODCs | CPFF | 1.6.145.2.5 | TBD | Material associated with LVC-IA Concurrency, PDSS, and tech refresh per the PWS and requirements. Labor, Travel, Material and ODCs associated with Technology Insertion activities per the PWSand requirements. The integration of mature technological solutions (e.g. cloud capability) to increase readiness, reduce life cycle costs, and reduce the logistics footprint. |
| 1009 | CBCSE Materials, Equipment, and ODCs | CPFF | 1.6.145.2.5 | TBD | Material associated with LVC-IA Concurrency, PDSS, and tech refresh per the PWS and requirements. Labor, Travel, Material and ODCs associated with Technology Insertion activities per the PWSand requirements. The integration of mature technological solutions (e.g. cloud capability) to increase readiness, reduce life cycle costs, and reduce the logistics footprint. |
| 1010 | BCTC-ES Software Licenses | Cost | 4.1.5.3, 4.1.11, 4.5, 4.7, 4.7.5, 4.7.7.1, 4.7.7.4, 4.7.7.5., 4.13 | TBD | Material associated with spares per the PWS and requirements. Labor and ODCs associated with spares would fall under PDSS. |
| 1011 | CBCSE Software Licenses | Cost | 4.1.5.3, 4.1.11, 4.5, 4.7, 4.7.5, 4.7.7.1, 4.7.7.4, 4.7.7.5., 4.13 | TBD | Material associated with spares per the PWS and requirements. Labor and ODCs associated with spares would fall under PDSS. |
| 1012 | BCTC-ES Travel | Cost | 1.6.13, 4.10.4 | TBD | The Contractor shall be required to travel to both CONUS and OCONUS MTC locations identified in PWS Addendum 1, BCTE Fielding Locations and PEO STRI during the performance of this contract to attend meetings, for site surveys, for installation services and on-site training services. Contractor shall be authorized travel expenses IAW the Joint Travel Regulation (JTR) and the limitation of funds specified in this contract. |
| 1013 | CBCSE Travel | Cost | 1.6.13, 4.10.4 | TBD | The Contractor shall be required to travel to both CONUS and OCONUS MTC locations identified in PWS Addendum 1, BCTE Fielding Locations and PEO STRI during the performance of this contract to attend meetings, for site surveys, for installation services and on-site training services. Contractor shall be authorized travel expenses IAW the Joint Travel Regulation (JTR) and the limitation of funds specified in this contract. |
| 1014 | CMRA | NSP | 5.1.3 | TBD | Not Seperately Priced (NSP) |
| 1015 | CDRLs | NSP | 5.1.1, 5.1.2, 5.1.7.1, 5.2.1, 5.2.5.1, 5.2.5.3, 5.2.5.6, 5.2.6.1, 5.2.7.1, 5.2.8, 5.2.9, | TBD | The following list represents deliverables that the Contractor shall provide per the instructions specified in DD Form 1423 |
| 1016 | Customer Support | FFP | 5.5 | TBD | Customer Support Mission Requirements represent tasks to support or customers through the life of the contract based on mission requirements and available funding. |
| CLIN | PWS/Paragraph | ||||
| 2nd OPTION | |||||
| 2001 | Program Management | FFP | 1.6, 5.1, 5.1.1, 5.1.2, 5.1.3, 5.1.4, 5.1.5, 5.1.6, 5.1.7, 5.1.7.1, 5.1.8, | TBD | Labor only. The Contractor shall provide the overall management and administrative effort necessary to ensure the requirements of this contract are accomplished. |
| 2002 | Help Desk Support (includes: RWIS Help Desk, IA Support, and Video Telecon Help Desk Support) | FFP | 5.3, 5.4 | TBD | Labor associated with Helpdesk support per the PWS and requirements to provide the activities necessary to ensure that Systems Engineering and sustainment principles, processes and practices are applied throughout its lifecycle. The Help Desk support shall be available Monday-Friday during your organization’s normal business hours. The objective is for users to have the ability to submit request for support twenty-four (24) hours per day via email, website or voicemail and receive a callback the next business day. The RWIS ELA shall include unlimited licenses and support for the BCTE program. The current MTC RWIS system is the Advanced Simulations Technologies, Inc. (ASTi) Voisus radio wire integration system. |
Travel is on Travel CLIN.
| 2003 | BCTC-ES Site Surveys | FFP | 4.11.4, 4.11.2, 4.11.3, 4.11.6, 4.10.2, 4.11.6, 4.12, 4.4.3, 4.6, 4.13, 5.2.5.6, 5.2.8, 5.2.9,5.2.10,5.2.11,5.2.12,5.2.13,5.2.14 | TBD | Labor Only associated with technology refresh for sites per the PWS and requirements. The Contractor shall collect detailed information about the facility to ensure the COTS products and FFE can be properly operated, maintained, and oriented within the available space. |
| 2004 | CBCSE Site Surveys | FFP | 4.11.4, 4.11.2, 4.11.3, 4.11.6, 4.10.2, 4.11.6, 4.12, 4.4.3, 4.6, 4.13, 5.2.5.6, 5.2.8, 5.2.9,5.2.10,5.2.11,5.2.12,5.2.13,5.2.15 | TBD | Labor Only associated with technology refresh for sites per the PWS and requirements. The Contractor shall collect detailed information about the facility to ensure the COTS products and FFE can be properly operated, maintained, and oriented within the available space. |
| 2005 | BCTC-ES Installation Services, Labor | CPFF | 4.1.1, 4.1.11, 4.2.3, 4.2.4, 4.2.5.2, 4.4.1, 4.4.3, 4.5, 4.8, 4.13, 5.2.5.6, 5.2.8, 5.2.9,5.2.10,5.2.11,5.2.12,5.2.13,5.2.14, 5.2.6.1-5.2.7 | TBD | Labor, Travel, Material and ODCs associated with hardware, FFE and software licensces activities per the PWS and requirements. The integration of mature technological solutions to increase readiness, reduce life cycle costs, and reduce the logistics footprint. |
| 2006 | CBCSE Installation Services, Labor | CPFF | 4.1.1, 4.1.11, 4.2.3, 4.2.4, 4.2.5.2, 4.4.1, 4.4.3, 4.5, 4.8, 4.13, 5.2.5.6, 5.2.8, 5.2.9,5.2.10,5.2.11,5.2.12,5.2.13,5.2.14, 5.2.6.1-5.2.8 | TBD | Labor, Travel, Material and ODCs associated with hardware, FFE and software licensces activities per the PWS and requirements. The integration of mature technological solutions to increase readiness, reduce life cycle costs, and reduce the logistics footprint. |
| 2007 | ESS Support | FFP | 5.6, 5.6.1, 5.6.2, 5.6.3, 5.6.4, 5.7, 5.7.1, 5.7.2, 5.8, 5.9, 5.9.1, 5.10, 5.10.1, 5.10.2, 5.10.3, 5.10.4, 5.10.4.1, 5.10.4.2, 5.10.4.3, 5.10.4.4, 5.10.5, 5.10.6, 5.10.7, 5.10.8, 5.10.9, 5.10.10, 5.10.11, 5.10.12, 5.10.13, 5.10.14, 5.10.15 | TBD | Maintenance & Service (M&S) of all integrated NIPR Electronic Security Systems (ESS), and the supporting communications and power equipment. The current ESS consists of an IDS, Access Control System (ACS) and Closed-Circuit Televisions (CCTV) systems. This task order applies only to the ACS and the CCTV systems at each MTC in NIPR locations. |
| 2008 | BCTC-ES Materials, Equipment, and ODCs | CPFF | 1.6.145.2.5 | TBD | Material associated with LVC-IA Concurrency, PDSS, and tech refresh per the PWS and requirements. Labor, Travel, Material and ODCs associated with Technology Insertion activities per the PWSand requirements. The integration of mature technological solutions (e.g. cloud capability) to increase readiness, reduce life cycle costs, and reduce the logistics footprint. |
| 2009 | CBCSE Materials, Equipment, and ODCs | CPFF | 1.6.145.2.5 | TBD | Material associated with LVC-IA Concurrency, PDSS, and tech refresh per the PWS and requirements. Labor, Travel, Material and ODCs associated with Technology Insertion activities per the PWSand requirements. The integration of mature technological solutions (e.g. cloud capability) to increase readiness, reduce life cycle costs, and reduce the logistics footprint. |
| 2010 | BCTC-ES Software Licenses | Cost | 4.1.5.3, 4.1.11, 4.5, 4.7, 4.7.5, 4.7.7.1, 4.7.7.4, 4.7.7.5., 4.13 | TBD | Material associated with spares per the PWS and requirements. Labor and ODCs associated with spares would fall under PDSS. |
| 2011 | CBCSE Software Licenses | Cost | 4.1.5.3, 4.1.11, 4.5, 4.7, 4.7.5, 4.7.7.1, 4.7.7.4, 4.7.7.5., 4.13 | TBD | Material associated with spares per the PWS and requirements. Labor and ODCs associated with spares would fall under PDSS. |
| 2012 | BCTC-ES Travel | Cost | 1.6.13, 4.10.4 | TBD | The Contractor shall be required to travel to both CONUS and OCONUS MTC locations identified in PWS Addendum 1, BCTE Fielding Locations and PEO STRI during the performance of this contract to attend meetings, for site surveys, for installation services and on-site training services. Contractor shall be authorized travel expenses IAW the Joint Travel Regulation (JTR) and the limitation of funds specified in this contract. |
| 2013 | CBCSE Travel | Cost | 1.6.13, 4.10.4 | TBD | The Contractor shall be required to travel to both CONUS and OCONUS MTC locations identified in PWS Addendum 1, BCTE Fielding Locations and PEO STRI during the performance of this contract to attend meetings, for site surveys, for installation services and on-site training services. Contractor shall be authorized travel expenses IAW the Joint Travel Regulation (JTR) and the limitation of funds specified in this contract. |
| 2014 | CMRA | NSP | 5.1.3 | TBD | Not Seperately Priced (NSP) |
| 2015 | CDRLs | NSP | 5.1.1, 5.1.2, 5.1.7.1, 5.2.1, 5.2.5.1, 5.2.5.3, 5.2.5.6, 5.2.6.1, 5.2.7.1, 5.2.8, 5.2.9, | TBD | The following list represents deliverables that the Contractor shall provide per the instructions specified in DD Form 1423 |
| 2016 | Customer Support | FFP | 5.5 | TBD | Customer Support Mission Requirements represent tasks to support or customers through the life of the contract based on mission requirements and available funding. |
| 2013 | Phase Out | FFP | 1.6.17.2 | TBD | Transition to full development and support capability. (1) Non-recurring labor and travel unique to Transition Phase-In, including hiring and training of personnel to staff the LVC-IA Development facility (JDIF) and the PDSS facility (contractor); and (2) Non-recurring labor for set-up of computing equipment, network infrastructure, GFP, software and associated ODC required to transition to contractor's PDSS facility. 60 day transition period. |