Attachment 12 - MAHG211009 - Specifications - Appendix H.pdf
PDF 897 KB Posted
- Solicitation number
- MAHG211009
About this file
This document is a solicitation for a federal contract to replace air handling units (AHUs) and variable air volume (VAV) boxes in the dormitories at Keesler Air Force Base. The project has an estimated value between $5,000,000 and $10,000,000 and is set aside for HUBZone small businesses. The solicitation includes detailed technical specifications for the mechanical systems work, including testing, adjusting and balancing, instrumentation and controls, and thermal insulation. A site visit is scheduled for August 1, 2024. Proposals must be submitted in response to the requirements outlined in Sections L and M of the solicitation. The contract will be awarded by the Department of the Air Force Air Education and Training Command.
View the file
Other files
Show all 18
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
MAHG211009 REPLACE AHUS AND VAVS in NPS DORMS PH1
SPECIFCATION INDEX
SECTION DESCRIPTION PAGES
23 03 00.00 20 BASIC MECHANICAL MATERIALS AND METHODS 5
23 05 93 TESTING ADJUSTING AND BALANCING 7
23 07 00 THERMAL INSULATION FOR MECHANICAL SYSTEMS 23
23 09 00 INSTRUMENTATION AND CONTROLS FOR HVAC 33
23 09 13 INSTRUMENTION AND CONTROL DEVICES AND
23 09 23.02
CONTROL DEVICES FOR HVAC
BACNET DIGITAL CONTROL FOR HVAC AND
OTHER BLDG CONTROLS 14
23 30 00 AIR DISTRIBUTION 24
23 31 13.00 40 METAL DUCTS 16
Attachment 12
FA301024R0008
MAHG211009 REPLACE AHU'S AND VAV'S IN NPS DOORMS PH1 CONNERSWINTERS
Section 23 03 00.00 20 Page 1
PART 1 GENERAL
1.1 REFERENCES
SECTION 23 03 00.00 20
BASIC MECHANICAL MATERIALS AND METHODS
08/10, CHG 3: 08/18
The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.
ASTM INTERNATIONAL (ASTM)
ASTM B117 (2019) Standard Practice for Operating Salt
Spray (Fog) Apparatus
INSTITUTE OF ELECTRICAL AND ELECTRONICS ENGINEERS (IEEE)
IEEE C2 (2017; Errata 1-2 2017; INT 1 2017) National
Electrical Safety Code
NATIONAL ELECTRICAL MANUFACTURERS ASSOCIATION (NEMA)
NEMA MG 1 (2018) Motors and Generators
NEMA MG 11 (1977; R 2012) Energy Management Guide for
Selection and Use of Single Phase Motors
NATIONAL FIRE PROTECTION ASSOCIATION (NFPA)
NFPA 70 (2020; ERTA 20-1 2020; ERTA 20-2 2020; TIA
20-1; TIA 20-2; TIA 20-3; TIA 20-4) National
Electrical Code
1.2 RELATED REQUIREMENTS
This section applies to all sections of Divisions: 23, HEATING, VENTILATING, AND AIR CONDITIONING of this project specification, unless specified otherwise in the individual section.
1.3 QUALITY ASSURANCE
1.3.1 Material and Equipment Qualifications
Provide materials and equipment that are standard products of manufacturers regularly engaged in the manufacture of such products, which are of a similar material, design and workmanship. Standard products must have been in satisfactory commercial or industrial use for 2 years prior to bid opening. The 2-year use must include applications of equipment and materials under similar circumstances and of similar size. The product must have been for sale on the commercial market through advertisements, manufacturers' catalogs, or brochures during the 2 year period.
Section 23 03 00.00 20 Page 2
1.3.2 Alternative Qualifications
Products having less than a two-year field service record will be acceptable if a certified record of satisfactory field operation for not less than 6000 hours, exclusive of the manufacturer's factory or laboratory tests, can be shown.
1.3.3 Service Support
The equipment items must be supported by service organizations. Submit a certified list of qualified permanent service organizations for support of the equipment which includes their addresses and qualifications. These service organizations must be reasonably convenient to the equipment installation and able to render satisfactory service to the equipment on a regular and emergency basis during the warranty period of the contract.
1.3.4 Manufacturer's Nameplate
For each item of equipment, provide a nameplate bearing the manufacturer's name, address, model number, and serial number securely affixed in a conspicuous place; the nameplate of the distributing agent will not be acceptable.
1.3.5 Modification of References
In each of the publications referred to herein, consider the advisory provisions to be mandatory, as though the word, "must" had been substituted for "should" wherever it appears. Interpret references in these publications to the "authority having jurisdiction", or words of similar meaning, to mean the Contracting Officer.
1.3.5.1 Definitions
For the International Code Council (ICC) Codes referenced in the contract documents, advisory provisions must be considered mandatory, the word
"should" is interpreted as "must." Reference to the "code official" must be interpreted to mean the "Contracting Officer." For Navy owned property, references to the "owner" must be interpreted to mean the "Contracting
Officer." For leased facilities, references to the "owner" must be interpreted to mean the "lessor." References to the "permit holder" must be interpreted to mean the "Contractor."
1.3.5.2 Administrative Interpretations
For ICC Codes referenced in the contract documents, the provisions of
Chapter 1, "Administrator," do not apply. These administrative requirements are covered by the applicable Federal Acquisition Regulations (FAR) included in this contract and by the authority granted to the Officer in Charge of
Construction to administer the construction of this project. References in the ICC Codes to sections of Chapter 1, must be applied appropriately by the
Contracting Officer as authorized by his administrative cognizance and the
FAR.
1.4 DELIVERY, STORAGE, AND HANDLING
Handle, store, and protect equipment and materials to prevent damage before and during installation in accordance with the manufacturer's
Section 23 03 00.00 20 Page 3 recommendations, and as approved by the Contracting Officer. Replace damaged or defective items.
1.5 ELECTRICAL INSTALLATION REQUIREMENTS
Electrical installations must conform to IEEE C2, NFPA 70, and requirements specified herein.
1.5.1 New Work
Provide electrical components of mechanical equipment, such as motors, motor starters (except starters/controllers which are indicated as part of a motor control center)], control or push-button stations, float or pressure switches, solenoid valves, integral disconnects, and other devices functioning to control mechanical equipment, as well as control wiring and conduit for circuits rated 100 volts or less, to conform with the requirements of the section covering the mechanical equipment. Extended voltage range motors are not to be permitted. The interconnecting power wiring and conduit, control wiring rated 120 volts (nominal) and conduit, and the electrical power circuits must be provided under Division 26, except internal wiring for components of package equipment must be provided as an integral part of the equipment. When motors and equipment furnished are larger than sizes indicated, provide any required changes to the electrical service as may be necessary and related work as a part of the work for the section specifying that motor or equipment1.5.2 High Efficiency Motors
1.5.2.1 High Efficiency Single-Phase Motors
Unless otherwise specified, single-phase fractional-horsepower alternating-current motors must be high efficiency types corresponding to the applications listed in NEMA MG 11.
1.5.2.2 High Efficiency Polyphase Motors
Unless otherwise specified, polyphase motors must be selected based on high efficiency characteristics relative to the applications as listed in NEMA MG
10. Additionally, polyphase squirrel-cage medium induction motors with continuous ratings must meet or exceed energy efficient ratings in accordance with Table 12-6C of NEMA MG 1.
1.5.3 Three-Phase Motor Protection
Provide controllers for motors rated one 1 horsepower and larger with electronic phase-voltage monitors designed to protect motors from phase-loss, undervoltage, and overvoltage. Provide protection for motors from immediate restart by a time adjustable restart relay.
]1.6 INSTRUCTION TO GOVERNMENT PERSONNEL
When specified in other sections, furnish the services of competent instructors to give full instruction to the designated Government personnel in the adjustment, operation, and maintenance, including pertinent safety requirements, of the specified equipment or system. Instructors must be thoroughly familiar with all parts of the installation and must be trained in operating theory as well as practical operation and maintenance work.
Section 23 03 00.00 20 Page 4
Instruction must be given during the first regular work week after the equipment or system has been accepted and turned over to the Government for regular operation. The number of man-days (8 hours per day) of instruction furnished must be as specified in the individual section. When more than 4 man-days of instruction are specified, use approximately half of the time for classroom instruction. Use other time for instruction with the equipment or system.
When significant changes or modifications in the equipment or system are made under the terms of the contract, provide additional instruction to acquaint the operating personnel with the changes or modifications.
1.7 ACCESSIBILITY
Install all work so that parts requiring periodic inspection, operation, maintenance, and repair are readily accessible. Install concealed valves, expansion joints, controls, dampers, and equipment requiring access, in locations freely accessible through access doors.
PART 2 PRODUCTS
Not Used
PART 3 EXECUTION
3.1 PAINTING OF NEW EQUIPMENT
New equipment painting must be factory applied or shop applied, and must be as specified herein, and provided under each individual section.
3.1.1 Factory Painting Systems
Manufacturer's standard factory painting systems may be provided subject to certification that the factory painting system applied will withstand 125 hours in a salt-spray fog test, except that equipment located outdoors must withstand 500 hours in a salt-spray fog test. Salt-spray fog test must be in accordance with ASTM B117, and for that test the acceptance criteria must be as follows: immediately after completion of the test, the paint must show no signs of blistering, wrinkling, or cracking, and no loss of adhesion; and the specimen must show no signs of rust creepage beyond 0.125 inch on either side of the scratch mark.
The film thickness of the factory painting system applied on the equipment must not be less than the film thickness used on the test specimen. If manufacturer's standard factory painting system is being proposed for use on surfaces subject to temperatures above 120 degrees F, the factory painting system must be designed for the temperature service.
3.1.2 Shop Painting Systems for Metal Surfaces
Clean, pretreat, prime and paint metal surfaces; except aluminum surfaces need not be painted. Apply coatings to clean dry surfaces. Clean the surfaces to remove dust, dirt, rust, oil and grease by wire brushing and solvent degreasing prior to application of paint, except metal surfaces subject to temperatures in excess of 120 degrees F must be cleaned to bare metal.
Section 23 03 00.00 20 Page 5
Where more than one coat of paint is specified, apply the second coat after the preceding coat is thoroughly dry. Lightly sand damaged painting and retouch before applying the succeeding coat. Color of finish coat must be aluminum or light gray.
a. Temperatures Less Than 120 Degrees F: Immediately after cleaning, the metal surfaces subject to temperatures less than 120 degrees F must receive one coat of pretreatment primer applied to a minimum dry film thickness of 0.3 mil, one coat of primer applied to a minimum dry film thickness of 1 mil; and two coats of enamel applied to a minimum dry film thickness of 1 mil per coat.
b. Temperatures Between 120 and 400 Degrees F: Metal surfaces subject to temperatures between 120 and 400 degrees F must receive two coats of
400 degrees F heat-resisting enamel applied to a total minimum thickness of 2 mils.
-- End of Section --
Section 23 05 93 Page 1
SECTION 23 05 93
TESTING, ADJUSTING, AND BALANCING FOR HVAC
11/15
The publications listed below form a part of this specification to the
ASSOCIATED AIR BALANCE COUNCIL (AABC)
AABC MN-1 (2002; 6th ed) National Standards for Total
System Balance
AABC MN-4 (1996) Test and Balance Procedures
NATIONAL ENVIRONMENTAL BALANCING BUREAU (NEBB)
NEBB PROCEDURAL STANDARDS (2015) Procedural Standards for TAB (Testing, Adjusting and Balancing) Environmental
Systems
SHEET METAL AND AIR CONDITIONING CONTRACTORS' NATIONAL ASSOCIATION
(SMACNA)
SMACNA 1780 (2002) HVAC Systems - Testing, Adjusting and
Balancing, 3rd Edition
1.2 DEFINITIONS
a. AABC: Associated Air Balance Council
b. COTR: Contracting Officer's Technical Representativee. HVAC: Heating, ventilating, and air conditioning; or heating, ventilating, and cooling
f. NEBB: National Environmental Balancing Bureau
g. Out-of-tolerance data: Pertains only to field acceptance testing of
TAB report. When applied to TAB work this phase means "a measurement taken during TAB field acceptance testing which does not fall within the range of plus 5 to minus 5 percent of the original measurement reported on the TAB Report for a specific parameter."i. Season of maximum cooling load: The time of year when the outdoor temperature at the project site remains within plus or minus 5 degrees Fahrenheit of the project site's summer outdoor design temperature, throughout the period of TAB data recording.l. TAB: Testing, adjusting, and balancing (of HVAC systems)
m. TAB’d: HVAC Testing/Adjusting/Balancing procedures performed
n. TAB Agency: TAB Firm
r. TABB: Testing Adjusting and Balancing Bureau
Section 23 05 93 Page 2
1.2.1 Similar Terms
In some instances, terminology differs between the Contract and the TAB
Standard primarily because the intent of this Section is to use the industry standards specified, along with additional requirements listed herein to produce optimal results.
The following table of similar terms is provided for clarification only.
Contract requirements take precedent over the corresponding AABC, NEBB, or
TABB requirements where differences exist.
SIMILAR TERMS
Contract Term AABC Term NEBB Term TABB Term
TAB Standard National Standards for Testing and
Balancing Heating, Ventilating, and
Air Conditioning
Systems
Procedural
Standards for
Testing, Adjusting and Balancing of
Environmental
Systems
International
Standards for
Environmental
Systems Balance
TAB Specialist TAB Engineer TAB Supervisor TAB Supervisor
Systems Readiness
Check
Construction Phase
Inspection
Field Readiness
Check & Preliminary
Field Procedures
Field Readiness
Check & Prelim.
Field Procedures
1.3 WORK DESCRIPTION
The work includes testing, adjusting, and balancing (TAB) of newand existing heating, ventilating, and cooling (HVAC) air distribution systems including equipment and performance data, ducts, and piping which are located within, on, under, between, and adjacent to buildings.
Perform TAB in accordance with the requirements of the TAB procedural standard recommended by the TAB trade association that approved the TAB
Firm's qualifications. Comply with requirements of AABC MN-1, NEBB
PROCEDURAL STANDARDS, or SMACNA 1780 (TABB) as supplemented and modified by this specification section. All recommendations and suggested practices contained in the TAB procedural standards are considered mandatory.
Conduct TAB of the indicated existing systems and equipment and submit the specified DALT and TAB reports for approval. Conduct TAB work in accordance with the requirements of this section.
1.3.1 Air Distribution Systems
Test, adjust, and balance systems (TAB) in compliance with this section.
Obtain Contracting Officer's written approval before applying insulation to
Section 23 05 93 Page 3 exterior of air distribution systems as specified under Section 23 07 00
THERMAL INSULATION FOR MECHANICAL SYSTEMS.
1.3.2 Water Distribution Systems
TAB systems in compliance with this section. Obtain Contracting Officer's written approval before applying insulation to water distribution systems as specified under Section 23 07 00 THERMAL INSULATION FOR MECHANICAL SYSTEMS.
At Contractor's option and with Contracting Officer's written approval, the piping systems may be insulated before systems are TAB'd.
Terminate piping insulation immediately adjacent to each flow control valve, automatic control valve, or device. Seal the ends of pipe insulation and the space between ends of pipe insulation and piping, with waterproof vapor barrier coating.
After completion of work under this section, insulate the flow control valves and devices as specified under Section 23 07 00 THERMAL INSULATION
FOR MECHANICAL SYSTEMS.
1.3.3 TAB SCHEMATIC DRAWINGS
Show the following information on TAB Schematic Drawings:
1. A unique number or mark for each piece of equipment or terminal.
2. Air quantities at air terminals.
3. Air quantities and temperatures in air handling unit schedules.
4. Water quantities and temperatures in thermal energy transfer equipment schedules.
5. Water quantities and heads in pump schedules.
6. Water flow measurement fittings and balancing fittings.
Submit three copies of the TAB Schematic Drawings and Report Forms to the
Contracting Officer, no later than 21 days prior to the start of TAB field measurements.
1.4 SUBMITTALS
Government approval is required for submittals with a "G" designation;
submittals not having a "G" designation are for Contractor Quality Control approval. Submit the following in accordance with Section 01 33 00 SUBMITTAL
PROCEDURES:
SD-01 Preconstruction Submittals
Records of Existing Conditions; G
SD-02 Shop Drawings
TAB Schematic Drawings and Report Forms; G
SD-03 Product Data
Section 23 05 93 Page 4
Equipment and Performance Data; G
TAB Related HVAC Submittals; G
A list of the TAB Related HVAC Submittals, no later than 7 days after the approval of the TAB team engineer [and assistant].
SD-06 Test Reports
SD-07 Certificates
Independent TAB Agency and Personnel Qualifications; G
TAB Pre-Field Engineering Report; G
1.5 QUALITY ASSURANCE
1.5.1 Independent TAB Agency and Personnel Qualifications
To secure approval for the proposed agency, submit information certifying that the TAB agency is a first-tier subcontractor who is not affiliated with any other company participating in work on this contract, including design, furnishing equipment, or construction. Further, submit the following, for the agency, to Contracting Officer for approval:
a. Independent AABC or NEBB or TABB TAB agency:
TAB agency: AABC registration number and expiration date of current certification; or NEBB certification number and expiration date of current certification; or TABB certification number and expiration date of current certification.
TAB team supervisor: Name and copy of AABC or NEBB or TABB TAB supervisor certificate and expiration date of current certification.
TAB team field leader: Name and documented evidence that the team field leader has satisfactorily performed full-time supervision of
TAB work in the field for not less than 3 years immediately preceding this contract's bid opening date.
TAB team field technicians: Names and documented evidence that each field technician has satisfactorily assisted a TAB team field leader in performance of TAB work in the field for not less than one year immediately preceding this contract's bid opening date.
Current certificates: Registrations and certifications are current, and valid for the duration of this contract. Renew
Certifications which expire prior to completion of the TAB work, in a timely manner so that there is no lapse in registration or certification. TAB agency or TAB team personnel without a current registration or current certification are not to perform TAB work on this contract.
Section 23 05 93 Page 5
b. TAB Team Members: TAB team approved to accomplish work on this contract are full-time employees of the TAB agency. No other personnel is allowed to do TAB work on this contract.
c. Replacement of TAB team members: Replacement of members may occur if each new member complies with the applicable personnel qualifications and each is approved by the Contracting Officer.
PART 2 PRODUCTS NOT USED PART 3 EXECUTION
3.1 TAB PROCEDURES3.1.1 TAB Air Distribution Systems
3.1.1.1 Units with Coils
Report heating and cooling performance capacity tests for hot water, chilled water, DX and steam coils for the purpose of verifying that the coils meet the indicated design capacity. Submit the following data and calculations with the coil test reports:
a. For air handlers with capacities greater than 7.5 tons (90,000 Btu) cooling, such as factory manufactured units, central built-up units and rooftop units, conduct capacity tests in accordance with AABC MN-4, procedure 3.5, "Coil Capacity Testing."
Do not determine entering and leaving wet and dry bulb temperatures by single point measurement, but by the average of multiple readings in compliance with paragraph 3.5-5, "Procedures", (in subparagraph d.) of
AABC MN-4, Procedure 3.5, "Coil Capacity Testing."
Submit part-load coil performance data from the coil manufacturer converting test conditions to design conditions; use the data for the purpose of verifying that the coils meet the indicated design capacity in compliance with AABC MN-4, Procedure 3.5, "Coil Capacity Testing," paragraph 3.5.7, "Actual Capacity Vs. Design Capacity" (in subparagraph c.).
b. For units with capacities of 7.5 tons (90,000 Btu) or less, such as fan coil units, duct mounted reheat coils associated with VAV terminal units, and unitary units, such as through-the-wall heat pumps:
Determine the apparent coil capacity by calculations using single point measurement of entering and leaving wet and dry bulb temperatures;
submit the calculations with the coil reports.
3.1.1.2 Air Handling Units
Air handling unit systems including fans (air handling unit fans, exhaust fans and winter ventilation fans), coils, ducts, plenums, mixing boxes, terminal units, variable air volume boxes, and air distribution devices for supply air, return air, outside air, mixed air relief air, and makeup air.
3.1.1.3 Makeup Air Units
Makeup air unit systems including fans, coils, ducts, plenums, and louvers for supply air, outside air, and mixed air.
3.1.2 TAB Water Distribution Systems
Section 23 05 93 Page 6
3.1.2.1 Chilled Water
Chilled water systems including coils, system balance valves and flow measuring devices.3.1.3 TAB Work on Performance Tests
3.1.3.1 Performance Tests
3.1.3.2 Ambient Temperatures
On each tab report form used for recording data, record the outdoor and indoor ambient dry bulb temperature range and the outdoor and indoor ambient wet bulb temperature range within which the report form's data was recorded.
Record these temperatures at beginning and at the end of data taking.
3.1.4 Workmanship
Conduct TAB work on the HVAC systems until measured flow rates are within plus or minus 5 percent of the design flow rates as specified or indicated on the contract documents. This TAB work includes adjustment of balancing valves, balancing dampers, and sheaves. Further, this TAB work includes changing out fan sheaves and pump impellers if required to obtain air and water flow rates specified or indicated. If, with these adjustments and equipment changes, the specified or indicated design flow rates cannot be attained, contact the Contracting Officer for direction.
3.1.5 Deficiencies
Strive to meet the intent of this section to maximize the performance of the equipment as designed and installed. However, if deficiencies in equipment design or installation prevent TAB work from being accomplished within the range of design values specified in the paragraph WORKMANSHIP, provide written notice as soon as possible to the Contractor and the Contracting
Officer describing the deficiency and recommended correction.
Responsibility for correction of installation deficiencies is the
Contractor's. If a deficiency is in equipment design, call the TAB team supervisor for technical assistance. Responsibility for reporting design deficiencies to Contractor is the TAB team supervisor's.
3.1.6 TAB Reports
3.1.7 Quality Assurance - COTR TAB Field Acceptance Testing
3.1.7.1 TAB Field Acceptance Testing
During the field acceptance testing, verify, in the presence of the COTR, random selections of data (water, air quantities, air motion,) recorded in the TAB Report. Points and areas for field acceptance testing are to be selected by the COTR. Measurement and test procedures are the same as approved for TAB work for the TAB Report.
Field acceptance testing includes verification of TAB Report data recorded for the following equipment groups:
Group 1: All air handling units (central stations).
Group 2: 25 percent of the VAV terminal boxes
Section 23 05 93 Page 7
Further, if any data on the TAB Report for Groups 2 through 5 is found not to fall within the range of plus 5 to minus 5 percent of the TAB Report data, additional group data verification is required in the presence of the
COTR. Verify TAB Report data for one additional piece of equipment in that group. Continue this additional group data verification until out-of-tolerance data ceases to be found.
3.1.7.2 Additional COTR TAB Field Acceptance Testing
If any of the acceptance testing measurements for a given equipment group is found not to fall within the range of plus 5 to minus 5 percent of the TAB
Report data, terminate data verification for all affected data for that group. The affected data for the given group will be disapproved. Make the necessary corrections and prepare a revised TAB Report. Reschedule acceptance testing of the revised report data with the COTR.
3.1.7.3 Prerequisite for Approval
Compliance with the field acceptance testing requirements of this section is a prerequisite for the final Contracting Officer approval of the TAB Report submitted.
3.2 MARKING OF SETTINGS
Upon the final TAB work approval, permanently mark the settings of HVAC adjustment devices including valves, gauges, splitters, and dampers so that adjustment can be restored if disturbed at any time. Provide permanent markings clearly indicating the settings on the adjustment devices which result in the data reported on the submitted TAB report.
3.3 MARKING OF TEST PORTS
The TAB team is to permanently and legibly mark and identify the location points of the duct test ports. If the ducts have exterior insulation, make these markings on the exterior side of the duct insulation. Show the location of test ports on the as-built mechanical drawings with dimensions given where the test port is covered by exterior insulation.
MAHG211009 REPLACE AHU'S AND VAV'S IN NPS DOORMS PH1
CONNERSWINTERS
Section 23 07 00 Page 1
SECTION 23 07 00
THERMAL INSULATION FOR MECHANICAL SYSTEMS
02/13, CHG 7: 05/20
The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only. At the discretion of the Government, the manufacturer of any material supplied will be required to furnish test reports pertaining to any of the tests necessary to assure compliance with the standard or standards referenced in this specification.
AMERICAN SOCIETY OF HEATING, REFRIGERATING AND AIR-CONDITIONING
ENGINEERS (ASHRAE)
ASHRAE 90.1 - SI (2013) Energy Standard for Buildings except
Low-Rise Residential Buildings
ASHRAE 90.2 (2020) Energy-Efficient Design of Low-Rise
Residential Buildings
ASTM INTERNATIONAL (ASTM)
ASTM A167 (2011) Standard Specification for Stainless and Heat-Resisting Chromium-Nickel Steel
Plate, Sheet, and Strip
ASTM A580/A580M (2018) Standard Specification for Stainless
Steel Wire
ASTM B209 (2014) Standard Specification for Aluminum and Aluminum-Alloy Sheet and Plate
ASTM C195 (2007; R 2013) Standard Specification for
Mineral Fiber Thermal Insulating Cement
ASTM C450 (2008) Standard Practice for Fabrication of
Thermal Insulating Fitting Covers for NPS
Piping, and Vessel Lagging
ASTM C534/C534M (2020a) Standard Specification for Preformed
Flexible Elastomeric Cellular Thermal
Insulation in Sheet and Tubular Form
ASTM C547 (2019) Standard Specification for Mineral
Fiber Pipe Insulation
ASTM C552 (2021a) Standard Specification for Cellular
Glass Thermal Insulation
Section 23 07 00 Page 2
ASTM C647 (2008; R 2013) Properties and Tests of
Mastics and Coating Finishes for Thermal
Insulation
ASTM C755 (2019b) Standard Practice for Selection of
Water Vapor Retarders for Thermal Insulation
ASTM C795 (2008; R 2018) Standard Specification for
Thermal Insulation for Use in Contact with
Austenitic Stainless Steel
ASTM C916 (2020) Standard Specification for Adhesives for Duct Thermal Insulation
ASTM C920 (2018) Standard Specification for Elastomeric
Joint Sealants
ASTM C921 (2010; R 2015) Standard Practice for
Determining the Properties of Jacketing
Materials for Thermal Insulation
ASTM C1136 (2021) Standard Specification for Flexible, Low Permeance Vapor Retarders for Thermal
Insulation
ASTM C1710 (2011) Standard Guide for Installation of
Flexible Closed Cell Preformed Insulation in
Tube and Sheet Form
ASTM D882 (2012) Tensile Properties of Thin Plastic
Sheeting
ASTM D2863 (2019) Standard Test Method for Measuring the
Minimum Oxygen Concentration to Support
Candle-Like Combustion of Plastics (Oxygen
Index)
ASTM D5590 (2000; R 2010; E 2012) Standard Test Method for Determining the Resistance of Paint Films and Related Coatings to Fungal Defacement by
Accelerated Four-Week Agar Plate Assay
ASTM E84 (2020) Standard Test Method for Surface
Burning Characteristics of Building Materials
ASTM E96/E96M (2016) Standard Test Methods for Water Vapor
Transmission of Materials
ASTM E2231 (2019) Standard Practice for Specimen
Preparation and Mounting of Pipe and Duct
Insulation Materials to Assess Surface
Burning Characteristics
CALIFORNIA DEPARTMENT OF PUBLIC HEALTH (CDPH)
CDPH SECTION 01350 (2010; Version 1.1) Standard Method for the
Testing and Evaluation of Volatile Organic
Section 23 07 00 Page 3
FM GLOBAL (FM)
Chemical Emissions from Indoor Sources using
Environmental Chambers
FM APP GUIDE (updated on-line) Approval Guide http://www.approvalguide.com/
GREEN SEAL (GS)
GS-36 (2013) Adhesives for Commercial Use
INTERNATIONAL ORGANIZATION FOR STANDARDIZATION (ISO)
ISO 2758 (2014) Paper - Determination of Bursting
Strength
MANUFACTURERS STANDARDIZATION SOCIETY OF THE VALVE AND FITTINGS
INDUSTRY (MSS)
MSS SP-58 (2018) Pipe Hangers and Supports - Materials, Design and Manufacture, Selection, Application, and Installation
MIDWEST INSULATION CONTRACTORS ASSOCIATION (MICA)
MICA Insulation Stds (8th Ed) National Commercial & Industrial
Insulation Standards
NATIONAL FIRE PROTECTION ASSOCIATION (NFPA)
NFPA 90A (2021) Standard for the Installation of Air
Conditioning and Ventilating Systems
NFPA 90B (2021) Standard for the Installation of Warm
Air Heating and Air Conditioning Systems
SCIENTIFIC CERTIFICATION SYSTEMS (SCS)
SCS SCS Global Services (SCS) Indoor Advantage
SOUTH COAST AIR QUALITY MANAGEMENT DISTRICT (SCAQMD)
SCAQMD Rule 1168 (2017) Adhesive and Sealant Applications
TECHNICAL ASSOCIATION OF THE PULP AND PAPER INDUSTRY (TAPPI)
TAPPI T403 OM (2015) Bursting Strength of Paper
U.S. DEPARTMENT OF DEFENSE (DOD)
MIL-A-3316 (1987; Rev C; Am 2 1990) Adhesives, Fire-
Resistant, Thermal Insulation
MIL-A-24179 (1969; Rev A; Am 2 1980; Notice 1 1987;
Notice 2 2020) Adhesive, Flexible
Unicellular-Plastic Thermal Insulation http://www.approvalguide.com/
Section 23 07 00 Page 4
MIL-PRF-19565 (1988; Rev C) Coating Compounds, Thermal
Insulation, Fire- and Water-Resistant, Vapor-
Barrier
UNDERWRITERS LABORATORIES (UL)
UL 94 (2013; Reprint May 2021) UL Standard for
Safety Tests for Flammability of Plastic
Materials for Parts in Devices and Appliances
UL 723 (2018) UL Standard for Safety Test for
Surface Burning Characteristics of Building
Materials
UL 2818 (2013) GREENGUARD Certification Program For
Chemical Emissions For Building Materials, Finishes And Furnishings
1.2 SYSTEM DESCRIPTION
1.2.1 General
Provide field-applied insulation and accessories on mechanical systems as specified herein; factory-applied insulation is specified under the piping, duct or equipment to be insulated. Field applied insulation materials required for use on Government-furnished items as listed in the SPECIAL
CONTRACT REQUIREMENTS shall be furnished and installed by the Contractor.
1.3 SUBMITTALS
Government approval is required for submittals with a "G" or "S" classification. Submittals not having a "G" or "S" classification are for
Contractor Quality Control approval and for information only. When used, a code following the "G" classification identifies the office that will review the submittal for the Government. Submit the following in accordance with
Section 01 33 00 SUBMITTAL PROCEDURES:
Submit the three SD types, SD-02 Shop Drawings, SD-03 Product Data, and SD-
08 Manufacturer's Instructions at the same time for each system.
SD-02 Shop Drawings
MICA Plates; G
Pipe Insulation Systems and Associated Accessories
Duct Insulation Systems and Associated Accessories
Recycled content for insulation materials; S
SD-03 Product Data
Pipe Insulation Systems; G
Duct Insulation Systems; G
Section 23 07 00 Page 5
SD-04 Samples
Thermal Insulation; G
Display Samples; G
SD-07 Certificates
Indoor air quality for adhesives; S
SD-08 Manufacturer's Instructions
Pipe Insulation Systems; G
Duct Insulation Systems; G
1.4 CERTIFICATIONS
1.4.1 Adhesives and Sealants
Provide products certified to meet indoor air quality requirements by UL
2818 (Greengard) Gold, SCS Global Services Indoor Advantage Gold or provide certification or validation by other third-party programs that products meet the requirements of this Section. Provide current product certification documentation from certification body. When product does not have certification, provide validation that product meets the indoor air quality product requirements cited herein.
1.5 QUALITY ASSURANCE
1.5.1 Installer Qualification
Qualified installers shall have successfully completed three or more similar type jobs within the last 5 years.
1.6 DELIVERY, STORAGE, AND HANDLING
Materials shall be delivered in the manufacturer's unopened containers.
Materials delivered and placed in storage shall be provided with protection from weather, humidity, dirt, dust and other contaminants. The Contracting
Officer may reject insulation material and supplies that become dirty, dusty, wet, or contaminated by some other means. Packages or standard containers of insulation, jacket material, cements, adhesives, and coatings delivered for use, and samples required for approval shall have manufacturer's stamp or label attached giving the name of the manufacturer and brand, and a description of the material, date codes, and approximate shelf life (if applicable). Insulation packages and containers shall be asbestos free.
PART 2 PRODUCTS
2.1 STANDARD PRODUCTS
Provide materials which are the standard products of manufacturers regularly engaged in the manufacture of such products and that essentially duplicate
Section 23 07 00 Page 6 items that have been in satisfactory use for at least 2 years prior to bid opening. Submit a complete list of materials, including manufacturer's descriptive technical literature, performance data, catalog cuts, and installation instructions. The product number, k-value, thickness and furnished accessories including adhesives, sealants and jackets for each mechanical system requiring insulation shall be included. The product data must be copyrighted, have an identifying or publication number, and shall have been published prior to the issuance date of this solicitation.
Materials furnished under this section shall be submitted together in a booklet.
2.1.1 Insulation System
Provide insulation systems in accordance with the approved MICA National
Insulation Standards plates as supplemented by this specification. Provide field-applied insulation for heating, ventilating, and cooling (HVAC) air distribution systems and piping systems that are located within, on, under, and adjacent to buildings; and for plumbing systems. Provide CFC and HCFC free insulation.
2.1.2 Surface Burning Characteristics
Unless otherwise specified, insulation must have a maximum flame spread
Index of 25 and a maximum smoke developed index of 50 when tested in accordance with ASTM E84. Flame spread, and smoke developed indexes, shall be determined by ASTM E84 or UL 723. Test insulation in the same density and installed thickness as the material to be used in the actual construction. Prepare and mount test specimens according to ASTM
E2231.
2.2 MATERIALS
Provide insulation that meets or exceed the requirements of [][ASHRAE 90.2].
Insulation exterior shall be cleanable, grease resistant, non-flaking and non-peeling. Materials shall be compatible and shall not contribute to corrosion, soften, or otherwise attack surfaces to which applied in either wet or dry state. Materials to be used on stainless steel surfaces shall meet ASTM C795 requirements. Calcium silicate shall not be used on chilled or cold water systems. Materials shall be asbestos free. Provide product recognized under UL 94 (if containing plastic) and listed in FM APP GUIDE.
2.2.1 Adhesives
Provide non-aerosol adhesive products used on the interior of the building
(defined as inside of the weatherproofing system) that meet either emissions requirements of CDPH SECTION 01350 (limit requirements for either office or classroom spaces regardless of space type) or VOC content requirements of
SCAQMD Rule 1168 (HVAC duct sealants must meet limit requirements of "Other" category within SCAQMD Rule 1168 sealants table). Provide aerosol adhesives used on the interior of the building that meet either emissions requirements of CDPH SECTION 01350 (use the office or classroom requirements, regardless of space type) or VOC content requirements of GS-36. Provide certification or validation of indoor air quality for adhesives.
2.2.1.1 Acoustical Lining Insulation Adhesive
Section 23 07 00 Page 7
Adhesive shall be a nonflammable, fire-resistant adhesive conforming to ASTM
C916, Type I.
2.2.1.2 Mineral Fiber Insulation Cement
Cement shall be in accordance with ASTM C195.
2.2.1.3 Lagging Adhesive
Lagging is the material used for thermal insulation, especially around a cylindrical object. This may include the insulation as well as the cloth/material covering the insulation. To resist mold/mildew, lagging adhesive shall meet ASTM D5590 with 0 growth rating. ]Lagging adhesives shall be nonflammable and fire-resistant and shall have a maximum flame spread index of 25 and a maximum smoke developed index of 50 when tested in accordance with ASTM E84. Adhesive shall be MIL-A-3316, Class 1, pigmented white and be suitable for bonding fibrous glass cloth to faced and unfaced fibrous glass insulation board; for bonding cotton brattice cloth to faced and unfaced fibrous glass insulation board; for sealing edges of and bonding glass tape to joints of fibrous glass board; for bonding lagging cloth to thermal insulation; or Class 2 for attaching fibrous glass insulation to metal surfaces. Lagging adhesives shall be applied in strict accordance with the manufacturer's recommendations for pipe and duct insulation.
2.2.1.4 Contact Adhesive
Adhesives may be any of, but not limited to, the neoprene based, rubber based, or elastomeric type that have a maximum flame spread index of 25 and a maximum smoke developed index of 50 when tested in accordance with ASTM
E84. The adhesive shall not adversely affect, initially or in service, the insulation to which it is applied, nor shall it cause any corrosive effect on metal to which it is applied. Any solvent dispersing medium or volatile component of the adhesive shall have no objectionable odor and shall not contain any benzene or carbon tetrachloride. The dried adhesive shall not emit nauseous, irritating, or toxic volatile matters or aerosols when the adhesive is heated to any temperature up to 212 degrees F. The dried adhesive shall be nonflammable and fire resistant. Flexible Elastomeric
Adhesive: Comply with MIL-A-24179, Type II, Class I. Provide product listed in FM APP GUIDE.
2.2.2 Caulking
ASTM C920, Type S, Grade NS, Class 25, Use A.
2.2.3 Corner Angles
Nominal 0.016 inch aluminum 1 by 1 inch with factory applied Kraft backing.
Aluminum shall be ASTM B209, Alloy 3003, 3105, or 5005.
2.2.4 Fittings
Fabricated Fittings are the prefabricated fittings for flexible elastomeric pipe insulation systems in accordance with ASTM C1710. Together with the flexible elastomeric tubes, they provide complete system integrity for retarding heat gain and controlling condensation drip from chilled-water and refrigeration systems. Flexible elastomeric, fabricated fittings provide thermal protection (0.25 k) and condensation resistance (0.05 Water Vapor
Section 23 07 00 Page 8
Transmission factor). For satisfactory performance, properly installed protective vapor retarder/barriers and vapor stops shall be used on high relative humidity and below ambient temperature applications to reduce movement of moisture through or around the insulation to the colder interior surface.
2.2.5 Finishing Cement
ASTM C450: Mineral fiber hydraulic-setting thermal insulating and finishing cement. All cements that may come in contact with Austenitic stainless steel must comply with ASTM C795.
2.2.6 Fibrous Glass Cloth and Glass Tape
Fibrous glass cloth, with 20X20 maximum mesh size, and glass tape shall have maximum flame spread index of 25 and a maximum smoke developed index of 50 when tested in accordance with ASTM E84. Tape shall be 4 inch wide rolls.
Class 3 tape shall be 4.5 ounces/square yard. Elastomeric Foam Tape: Black vapor-retarder foam tape with acrylic adhesive containing an anti-microbial additive.
2.2.7 Staples
Outward clinching type ASTM A167, Type 304 or 316 stainless steel.
2.2.8 Jackets
2.2.8.1 Aluminum Jackets
Aluminum jackets shall be corrugated, embossed or smooth sheet, 0.016 inch nominal thickness; ASTM B209, Temper H14, Temper H16, Alloy 3003, 5005, or
3105. Corrugated aluminum jacket shall not be used outdoors. Aluminum jacket securing bands shall be Type 304 stainless steel, 0.015 inch thick, 1/2 inch wide for pipe under 12 inch diameter and 3/4 inch wide for pipe over 12 inch and larger diameter. Aluminum jacket circumferential seam bands shall be 2 by 0.016 inch aluminum matching jacket material. Bands for insulation below ground shall be 3/4 by 0.020 inch thick stainless steel, or fiberglass reinforced tape. The jacket may, at the option of the
Contractor, be provided with a factory fabricated Pittsburgh or "Z" type longitudinal joint. When the "Z" joint is used, the bands at the circumferential joints shall be designed by the manufacturer to seal the joints and hold the jacket in place.
2.2.8.2 Polyvinyl Chloride (PVC) Jackets
Polyvinyl chloride (PVC) jacket and fitting covers shall have high impact strength, ultraviolet (UV) resistant rating or treatment and moderate chemical resistance with minimum thickness 0.030 inch.
2.2.8.3 Vapor Barrier/Weatherproofing Jacket
Vapor barrier/weatherproofing jacket shall be laminated self-adhesive, greater than 3 plies standard grade, silver, white, black and embossed or greater than 8 ply (minimum 2.9 mils adhesive); with 0.0000 permeability when tested in accordance with ASTM E96/E96M, using the water transmission rate test method; heavy duty, white or natural; and UV resistant. Flexible
Elastomeric exterior foam with factory applied, UV Jacket made with a cold
Section 23 07 00 Page 9 weather acrylic adhesive. Construction of laminate designed to provide UV resistance, high puncture, tear resistance and excellent Water Vapor
Transmission (WVT) rate.
2.2.8.4 Vapor Barrier/Vapor Retarder
Apply the following criteria to determine which system is required.
a. On ducts, piping and equipment operating below 55 degrees F or located outside shall be equipped with a vapor barrier.
b. Ducts, pipes and equipment that are located inside and that always operate above 55 degrees F shall be installed with a vapor retarder where required as stated in paragraph VAPOR RETARDER REQUIRED.
2.2.9 Vapor Retarder Required
ASTM C921, Type I, minimum puncture resistance 50 Beach units on all surfaces where a minimum puncture resistance of 25 Beach units is acceptable. Minimum tensile strength, 35 pounds/inch width. ASTM C921, Type II, minimum puncture resistance 25 Beach units, tensile strength minimum 20 pounds/inch width. Jackets used on insulation exposed in finished areas shall have white finish suitable for painting without sizing.
Based on the application, insulation materials that require manufacturer or fabricator applied pipe insulation jackets are cellular glass, when all joints are sealed with a vapor barrier mastic, and mineral fiber. All non-metallic jackets shall have a maximum flame spread index of 25 and a maximum smoke developed index of 50 when tested in accordance with ASTM E84.
Flexible elastomerics require (in addition to vapor barrier skin) vapor retarder jacketing for high relative humidity and below ambient temperature applications.
2.2.9.1 White Vapor Retarder All Service Jacket (ASJ)
ASJ is for use on hot/cold pipes, ducts, or equipment indoors or outdoors if covered by a suitable protective jacket. The product shall meet all physical property and performance requirements of ASTM C1136, Type I, except the burst strength shall be a minimum of 85 psi. ASTM D2863 Limited Oxygen
Index (LOI) shall be a minimum of 31.
In addition, neither the outer exposed surface nor the inner-most surface contacting the insulation shall be paper or other moisture-sensitive material. The outer exposed surface shall be white and have an emittance of not less than 0.80. The outer exposed surface shall be paintable.
2.2.9.2 Vapor Retarder/Vapor Barrier Mastic Coatings
2.2.9.2.1 Vapor Barrier
The vapor barrier shall be self-adhesive (minimum 2 mils adhesive, 3 mils embossed) greater than 3 plies standard grade, silver, white, black and embossed white jacket for use on hot/cold pipes. Permeability shall be less than 0.02 when tested in accordance with ASTM E96/E96M. Products shall meet
UL 723 or ASTM E84 flame and smoke requirements and shall be UV resistant.
2.2.9.2.2 Vapor Retarder
Section 23 07 00 Page 10
The vapor retarder coating shall be fire and water resistant and appropriately selected for either outdoor or indoor service. Color shall be white. The water vapor permeance of the compound shall be in accordance with ASTM C755, Section 7.2.2, Table 2, for insulation type and service conditions. The coating shall be nonflammable, fire resistant type. [To resist mold/mildew, coating shall meet ASTM D5590 with 0 growth rating. ]
Coating shall meet MIL-PRF-19565 Type II (if selected for indoor service) and be Qualified Products Database listed. All other application and service properties shall be determined pursuant to ASTM C647.
2.2.9.3 Laminated Film Vapor Retarder
ASTM C1136, Type I, maximum moisture vapor transmission 0.02 perms, minimum puncture resistance 50 Beach units on all surfaces except concealed ductwork; where Type II, maximum moisture vapor transmission 0.02 perms, a minimum puncture resistance of 25 Beach units is acceptable. Vapor retarder shall have a maximum flame spread index of 25 and a maximum smoke developed index of 50 when tested in accordance with ASTM E84. Flexible Elastomeric exterior foam with factory applied UV Jacket. Construction of laminate designed to provide UV resistance, high puncture, tear resistance and an excellent WVT rate.
2.2.9.4 Polyvinylidene Chloride (PVDC) Film Vapor Retarder
The PVDC film vapor retarder shall have a maximum moisture vapor transmission of 0.02 perms, minimum puncture resistance of 150 Beach units, a minimum tensile strength in any direction of 30 lb/inch when tested in accordance with ASTM D882, and a maximum flame spread index of 25 and a maximum smoke developed index of 50 when tested in accordance with ASTM E84.
2.2.9.5 Polyvinylidene Chloride Vapor Retarder Adhesive Tape
Requirements must meet the same as specified for Laminated Film Vapor
Retarder above.
2.2.9.6 Vapor Barrier/Weather Barrier
The vapor barrier shall be greater than 3 ply self-adhesive laminate -white vapor barrier jacket- superior performance (less than 0.0000 permeability when tested in accordance with ASTM E96/E96M). Vapor barrier shall meet UL
723 or ASTM E84 25 flame and 50 smoke requirements; and UV resistant.
Minimum burst strength 185 psi in accordance with [TAPPI T403 OM] [ISO
2758]. Tensile strength 68 lb/inch width (PSTC-1000). Tape shall be as specified for laminated film vapor barrier above.
2.2.10 Vapor Retarder Not Required
ASTM C921, Type II, Class D, minimum puncture resistance 50 Beach units on all surfaces except ductwork, where Type IV, maximum moisture vapor transmission 0.10, a minimum puncture resistance of 25 Beach units is acceptable. Jacket shall have a maximum flame spread index of 25 and a maximum smoke developed index of 50 when tested in accordance with ASTM E84.
2.2.11 Wire
Soft annealed ASTM A580/A580M Type 302, 304 or 316 stainless steel, 16 or 18 gauge.
Section 23 07 00 Page 11
2.2.12 Insulation Bands
Insulation bands shall be 1/2 inch wide; 26 gauge stainless steel.
2.2.13 Sealants
Sealants shall be chosen from the butyl polymer type, the styrene-butadiene rubber type, or the butyl type of sealants. Sealants shall have a maximum permeance of 0.02 perms based on Procedure B for ASTM E96/E96M, and a maximum flame spread index of 25 and a maximum smoke developed index of 50 when tested in accordance with ASTM E84.
2.3 PIPE INSULATION SYSTEMS
Conform insulation materials to Table 1 and minimum insulation thickness as listed in Table 2 and meet or exceed the requirements of [ASHRAE 90.1 -
SI][ASHRAE 90.2]. Limit pipe insulation materials to those listed herein and meeting the following requirements:
2.3.1 Recycled Materials
Provide insulation materials containing the following minimum percentage of recycled material content by weight:
Rock Wool: 75 percent slag of weight
Fiberglass: 20 percent glass cullet
Rigid Foam: 9 percent recovered material
Phenolic Rigid Foam: 9 percent recovered material
Provide data identifying percentage of recycled content for insulation materials.
2.3.2 Aboveground Cold Pipeline ( -30 to 60 deg. F)
Insulation for outdoor, indoor, exposed or concealed applications, shall be as follows:
2.3.2.1 Cellular Glass
ASTM C552, Type II, and Type III. Supply the insulation from the fabricator with (paragraph WHITE VAPOR RETARDER ALL SERVICE JACKET (ASJ)) ASJ vapor retarder and installed with all longitudinal overlaps sealed and all circumferential joints ASJ taped or supply the insulation unfaced from the fabricator and install with all longitudinal and circumferential joints sealed with vapor barrier mastic.
2.3.2.2 Flexible Elastomeric Cellular Insulation
Closed-cell, foam- or expanded-rubber materials containing anti-microbial additive, complying with ASTM C534/C534M, Grade 1, Type I or II.
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .