Attachment 12 - Division Cost Breakdown - 5-29-24.xlsx

XLSX spreadsheet 257 KB Posted

Attached to
Z2DA--674A4-21-700 EHRM Infrastructure Upgrades Construction - Waco, TX VAMC
Solicitation number
36C77626R0009
Issued by

About this file

This file is a blank construction cost estimate worksheet template (VA Form 6238) used by the Department of Veterans Affairs for organizing and calculating project costs across multiple construction divisions.

The template is structured as a 28-sheet workbook designed to break down construction costs by the 2020 MasterFormat divisions, including General Requirements, Concrete, Masonry, Metals, Wood/Plastics/Composites, Thermal and Moisture Protection, Openings, Finishes, Specialties, Equipment, Furnishings, Special Construction, Conveying Equipment, Fire Suppression, Plumbing, HVAC, Integrated Automation, Electrical, Communications, Electronic Safety and Security, Earthwork, Exterior Improvements, Utilities, Transportation, and Electrical Power Generation. Each division sheet contains columns for labor and materials costs organized by quantity, unit, unit price, and total. The first summary sheet aggregates all division costs and calculates overhead at 10 percent, profit at 10 percent, bonds at 3 percent, and a final project total. All cost fields in this template are blank (showing $0), indicating it is intended as a baseline form to be populated with actual project data during the estimation process for the EHRM Infrastructure Upgrades Construction project at Waco, TX VAMC.

View the file

Other files

File Type Posted
Technical Questions Spreadsheet - Waco - 4-30-2026.docx DOCX document
36C77626R0009 0008.pdf PDF
36C77626R0009 0007.pdf PDF
Technical Questions Spreadsheet - Waco - 4-27-2026.docx DOCX document
Specifications - REV 4-14-26.pdf PDF
Revised Price Schedule - 4-16-26.docx DOCX document
Technical Questions Spreadsheet - Waco - 4-16-2026.docx DOCX document
36C77626R0009 0006.pdf PDF
36C77626R0009 0005.pdf PDF
36C77626R0009 0004.pdf PDF
36C77626R0009 0003.pdf PDF
36C77626R0009 - Updated 3-23-26.pdf PDF
36C77626R0009 0002.pdf PDF
Sign-in Sheet - Waco.pdf PDF
36C77626R0009 0001.pdf PDF
Attachment 3 - Asbestos Report.pdf PDF
Attachment 8 - Limitations on Subcontracting - Construction.docx DOCX document
Attachment 9 - Site Visit Instructions.pdf PDF
Attachment 10 - PPQ.docx DOCX document
36C77626R0009.pdf PDF
Attachment 1 - Specifications.pdf PDF
Attachment 2 - Drawings.pdf PDF
Attachment 4 - Submittal Log.pdf PDF
Attachment 5 - Brand Name Justification - Redacted.pdf PDF
Attachment 11 - Project Information Sheet for Contractors.docx DOCX document
Attachment 6 - Pre-Construction Risk Assessment.pdf PDF
Attachment 7 - Construction Wage Rates - McLennan 1-2-2026.pdf PDF
Show all 27

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SUMMATION

CONSTRUCTION PROGRAM – ESTIMATE WORKSHEET DATE SHEET NO. 1 OF 28 SHEETS

PROJECT NO.LOCATIONPROJECT NAMETYPE OF ESTIMATE
NO DESIGN COMPLETEDPRELIMINARY DESIGN
ESTIMATORNEWALTINDEX NO.BUILDING NO(S).DRAWING NO.FINAL DESIGNOTHER (Specify)
CODESYSTEM/SUBSYSTEMNOTESTOTAL
ABCD
DIVISION 00-SPECIAL SECTIONS$ - 0
DIVISION 01-GENERAL REQUIREMENTS$ - 0
DIVISION 02-EXISTING CONDITIONS$ - 0
DIVISION 03-CONCRETE$ - 0
DIVISION 04-MASONRY$ - 0
DIVISION 05-METALS$ - 0
DIVISION 06-WOOD, PLASTICS, AND COMPOSITES$ - 0
DIVISION 07-THERMAL AND MOISTURE PROTECTION$ - 0
DIVISION 08-OPENINGS$ - 0
DIVISION 09-FINISHES$ - 0
DIVISION 10-SPECIALTIES$ - 0
DIVISION 11-EQUIPMENT$ - 0
DIVISION 12-FURNISHINGS$ - 0
DIVISION 13-SPECIAL CONSTRUCTION$ - 0
DIVISION 14-CONVEYING EQUIPMENT$ - 0
DIVISION 21-FIRE SUPPRESSION$ - 0
DIVISION 22-PLUMBING$ - 0
DIVISION 23-HEATING, VENTILATING, AND AIR CONDITIONING (HVAC)$ - 0
DIVISION 25-INTEGRATED AUTOMATION$ - 0
DIVISION 26-ELECTRICAL$ - 0
DIVISION 27-COMMUNICATIONS$ - 0
DIVISION 28-ELECTRONIC SAFETY AND SECURITY$ - 0
DIVISION 31-EARTHWORK$ - 0
DIVISION 32-EXTERIOR IMPROVEMENTS$ - 0
DIVISION 33-UTILITIES$ - 0
DIVISION 34-TRANSPORTATION$ - 0
DIVISION 48-ELECTRICAL POWER GENERATION$ - 0
SUBTOTAL$ - 0
OVERHEAD@10.00%$ - 0
PROFIT@10.00%$ - 0
BONDS@3.00%$ - 0
PROJECT TOTAL$ - 0

VA FORM 6238

&"Arial,Bold"&A

Department of Veterans Affairs

DIVISION 00

CONSTRUCTION PROGRAM – ESTIMATE WORKSHEET DATE SHEET NO. 2 OF 28 SHEETS

PROJECT NO.LOCATIONPROJECT NAMETYPE OF ESTIMATE
NO DESIGN COMPLETEDPRELIMINARY DESIGN
ESTIMATORNEWALTINDEX NO.BUILDING NO(S).DRAWING NO.FINAL DESIGNOTHER (Specify)
CODESYSTEM/SUBSYSTEMLABORMATERIALSTOTAL
ABCD
DIVISION 00-SPECIAL SECTIONSQTYUNIT$/UNITTOTALQTYUNIT$/UNITTOTAL
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
SECTION TOTAL$ - 0

VA FORM 6238

&"Arial,Bold"&A

DIVISION 01

CONSTRUCTION PROGRAM – ESTIMATE WORKSHEET DATE SHEET NO. 3 OF 28 SHEETS

PROJECT NO.LOCATIONPROJECT NAMETYPE OF ESTIMATE
NO DESIGN COMPLETEDPRELIMINARY DESIGN
ESTIMATORNEWALTINDEX NO.BUILDING NO(S).DRAWING NO.FINAL DESIGNOTHER (Specify)
CODESYSTEM/SUBSYSTEMLABORMATERIALSTOTAL
ABCD
DIVISION 01-GENERAL REQUIREMENTSQTYUNIT$/UNITTOTALQTYUNIT$/UNITTOTAL
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
SECTION TOTAL$ - 0

VA FORM 6238

&"Arial,Bold"&A

DIVISION 02

CONSTRUCTION PROGRAM – ESTIMATE WORKSHEET DATE SHEET NO. 4 OF 28 SHEETS

PROJECT NO.LOCATIONPROJECT NAMETYPE OF ESTIMATE
NO DESIGN COMPLETEDPRELIMINARY DESIGN
ESTIMATORNEWALTINDEX NO.BUILDING NO(S).DRAWING NO.FINAL DESIGNOTHER (Specify)
CODESYSTEM/SUBSYSTEMLABORMATERIALSTOTAL
ABCD
DIVISION 02-EXISTING CONDITIONSQTYUNIT$/UNITTOTALQTYUNIT$/UNITTOTAL
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
SECTION TOTAL$ - 0

VA FORM 6238

&"Arial,Bold"&A

DIVISION 03

CONSTRUCTION PROGRAM – ESTIMATE WORKSHEET DATE SHEET NO. 5 OF 28 SHEETS

PROJECT NO.LOCATIONPROJECT NAMETYPE OF ESTIMATE
NO DESIGN COMPLETEDPRELIMINARY DESIGN
ESTIMATORNEWALTINDEX NO.BUILDING NO(S).DRAWING NO.FINAL DESIGNOTHER (Specify)
CODESYSTEM/SUBSYSTEMLABORMATERIALSTOTAL
ABCD
DIVISION 03-CONCRETEQTYUNIT$/UNITTOTALQTYUNIT$/UNITTOTAL
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
SECTION TOTAL$ - 0

VA FORM 6238

&"Arial,Bold"&A

DIVISION 04

CONSTRUCTION PROGRAM – ESTIMATE WORKSHEET DATE SHEET NO. 6 OF 28 SHEETS

PROJECT NO.LOCATIONPROJECT NAMETYPE OF ESTIMATE
NO DESIGN COMPLETEDPRELIMINARY DESIGN
ESTIMATORNEWALTINDEX NO.BUILDING NO(S).DRAWING NO.FINAL DESIGNOTHER (Specify)
CODESYSTEM/SUBSYSTEMLABORMATERIALSTOTAL
ABCD
DIVISION 04-MASONRYQTYUNIT$/UNITTOTALQTYUNIT$/UNITTOTAL
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
SECTION TOTAL$ - 0

VA FORM 6238

&"Arial,Bold"&A

DIVISION 05

CONSTRUCTION PROGRAM – ESTIMATE WORKSHEET DATE SHEET NO. 7 OF 28 SHEETS

PROJECT NO.LOCATIONPROJECT NAMETYPE OF ESTIMATE
NO DESIGN COMPLETEDPRELIMINARY DESIGN
ESTIMATORNEWALTINDEX NO.BUILDING NO(S).DRAWING NO.FINAL DESIGNOTHER (Specify)
CODESYSTEM/SUBSYSTEMLABORMATERIALSTOTAL
ABCD
DIVISION 05-METALSQTYUNIT$/UNITTOTALQTYUNIT$/UNITTOTAL
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
SECTION TOTAL$ - 0

VA FORM 6238

&"Arial,Bold"&A

DIVISION 06

CONSTRUCTION PROGRAM – ESTIMATE WORKSHEET DATE SHEET NO. 8 OF 28 SHEETS

PROJECT NO.LOCATIONPROJECT NAMETYPE OF ESTIMATE
NO DESIGN COMPLETEDPRELIMINARY DESIGN
ESTIMATORNEWALTINDEX NO.BUILDING NO(S).DRAWING NO.FINAL DESIGNOTHER (Specify)
CODESYSTEM/SUBSYSTEMLABORMATERIALSTOTAL
ABCD
DIVISION 06-WOOD, PLASTICS, AND COMPOSITESQTYUNIT$/UNITTOTALQTYUNIT$/UNITTOTAL
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
SECTION TOTAL$ - 0

VA FORM 6238

&"Arial,Bold"&A

DIVISION 07

CONSTRUCTION PROGRAM – ESTIMATE WORKSHEET DATE SHEET NO. 9 OF 28 SHEETS

PROJECT NO.LOCATIONPROJECT NAMETYPE OF ESTIMATE
NO DESIGN COMPLETEDPRELIMINARY DESIGN
ESTIMATORNEWALTINDEX NO.BUILDING NO(S).DRAWING NO.FINAL DESIGNOTHER (Specify)
CODESYSTEM/SUBSYSTEMLABORMATERIALSTOTAL
ABCD
DIVISION 07-THERMAL AND MOISTURE PROTECTIONQTYUNIT$/UNITTOTALQTYUNIT$/UNITTOTAL
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
SECTION TOTAL$ - 0

VA FORM 6238

&"Arial,Bold"&A

DIVISION 08

CONSTRUCTION PROGRAM – ESTIMATE WORKSHEET DATE SHEET NO. 10 OF 28 SHEETS

PROJECT NO.LOCATIONPROJECT NAMETYPE OF ESTIMATE
NO DESIGN COMPLETEDPRELIMINARY DESIGN
ESTIMATORNEWALTINDEX NO.BUILDING NO(S).DRAWING NO.FINAL DESIGNOTHER (Specify)
CODESYSTEM/SUBSYSTEMLABORMATERIALSTOTAL
ABCD
DIVISION 08-OPENINGSQTYUNIT$/UNITTOTALQTYUNIT$/UNITTOTAL
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
SECTION TOTAL$ - 0

VA FORM 6238

&"Arial,Bold"&A

DIVISION 09

CONSTRUCTION PROGRAM – ESTIMATE WORKSHEET DATE SHEET NO. 11 OF 28 SHEETS

PROJECT NO.LOCATIONPROJECT NAMETYPE OF ESTIMATE
NO DESIGN COMPLETEDPRELIMINARY DESIGN
ESTIMATORNEWALTINDEX NO.BUILDING NO(S).DRAWING NO.FINAL DESIGNOTHER (Specify)
CODESYSTEM/SUBSYSTEMLABORMATERIALSTOTAL
ABCD
DIVISION 09-FINISHESQTYUNIT$/UNITTOTALQTYUNIT$/UNITTOTAL
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
SECTION TOTAL$ - 0

VA FORM 6238

&"Arial,Bold"&A

DIVISION 10

CONSTRUCTION PROGRAM – ESTIMATE WORKSHEET DATE SHEET NO. 12 OF 28 SHEETS

PROJECT NO.LOCATIONPROJECT NAMETYPE OF ESTIMATE
NO DESIGN COMPLETEDPRELIMINARY DESIGN
ESTIMATORNEWALTINDEX NO.BUILDING NO(S).DRAWING NO.FINAL DESIGNOTHER (Specify)
CODESYSTEM/SUBSYSTEMLABORMATERIALSTOTAL
ABCD
DIVISION 10-SPECIALTIESQTYUNIT$/UNITTOTALQTYUNIT$/UNITTOTAL
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
SECTION TOTAL$ - 0

VA FORM 6238

&"Arial,Bold"&A

DIVISION 11

CONSTRUCTION PROGRAM – ESTIMATE WORKSHEET DATE SHEET NO. 13 OF 28 SHEETS

PROJECT NO.LOCATIONPROJECT NAMETYPE OF ESTIMATE
NO DESIGN COMPLETEDPRELIMINARY DESIGN
ESTIMATORNEWALTINDEX NO.BUILDING NO(S).DRAWING NO.FINAL DESIGNOTHER (Specify)
CODESYSTEM/SUBSYSTEMLABORMATERIALSTOTAL
ABCD
DIVISION 11-EQUIPMENTQTYUNIT$/UNITTOTALQTYUNIT$/UNITTOTAL
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
SECTION TOTAL$ - 0

VA FORM 6238

&"Arial,Bold"&A

DIVISION 12

CONSTRUCTION PROGRAM – ESTIMATE WORKSHEET DATE SHEET NO. 14 OF 28 SHEETS

PROJECT NO.LOCATIONPROJECT NAMETYPE OF ESTIMATE
NO DESIGN COMPLETEDPRELIMINARY DESIGN
ESTIMATORNEWALTINDEX NO.BUILDING NO(S).DRAWING NO.FINAL DESIGNOTHER (Specify)
CODESYSTEM/SUBSYSTEMLABORMATERIALSTOTAL
ABCD
DIVISION 12-FURNISHINGSQTYUNIT$/UNITTOTALQTYUNIT$/UNITTOTAL
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
SECTION TOTAL$ - 0

VA FORM 6238

&"Arial,Bold"&A

DIVISION 13

CONSTRUCTION PROGRAM – ESTIMATE WORKSHEET DATE SHEET NO. 15 OF 28 SHEETS

PROJECT NO.LOCATIONPROJECT NAMETYPE OF ESTIMATE
NO DESIGN COMPLETEDPRELIMINARY DESIGN
ESTIMATORNEWALTINDEX NO.BUILDING NO(S).DRAWING NO.FINAL DESIGNOTHER (Specify)
CODESYSTEM/SUBSYSTEMLABORMATERIALSTOTAL
ABCD
DIVISION 13-SPECIAL CONSTRUCTIONQTYUNIT$/UNITTOTALQTYUNIT$/UNITTOTAL
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
SECTION TOTAL$ - 0

VA FORM 6238

&"Arial,Bold"&A

DIVISION 14

CONSTRUCTION PROGRAM – ESTIMATE WORKSHEET DATE SHEET NO. 16 OF 28 SHEETS

PROJECT NO.LOCATIONPROJECT NAMETYPE OF ESTIMATE
NO DESIGN COMPLETEDPRELIMINARY DESIGN
ESTIMATORNEWALTINDEX NO.BUILDING NO(S).DRAWING NO.FINAL DESIGNOTHER (Specify)
CODESYSTEM/SUBSYSTEMLABORMATERIALSTOTAL
ABCD
DIVISION 14-CONVEYING EQUIPMENTQTYUNIT$/UNITTOTALQTYUNIT$/UNITTOTAL
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
SECTION TOTAL$ - 0

VA FORM 6238

&"Arial,Bold"&A

DIVISION 21

CONSTRUCTION PROGRAM – ESTIMATE WORKSHEET DATE SHEET NO. 17 OF 28 SHEETS

PROJECT NO.LOCATIONPROJECT NAMETYPE OF ESTIMATE
NO DESIGN COMPLETEDPRELIMINARY DESIGN
ESTIMATORNEWALTINDEX NO.BUILDING NO(S).DRAWING NO.FINAL DESIGNOTHER (Specify)
CODESYSTEM/SUBSYSTEMLABORMATERIALSTOTAL
ABCD
DIVISION 21-FIRE SUPPRESSIONQTYUNIT$/UNITTOTALQTYUNIT$/UNITTOTAL
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
SECTION TOTAL$ - 0

VA FORM 6238

&"Arial,Bold"&A

DIVISION 22

CONSTRUCTION PROGRAM – ESTIMATE WORKSHEET DATE SHEET NO. 18 OF 28 SHEETS

PROJECT NO.LOCATIONPROJECT NAMETYPE OF ESTIMATE
NO DESIGN COMPLETEDPRELIMINARY DESIGN
ESTIMATORNEWALTINDEX NO.BUILDING NO(S).DRAWING NO.FINAL DESIGNOTHER (Specify)
CODESYSTEM/SUBSYSTEMLABORMATERIALSTOTAL
ABCD
DIVISION 22-PLUMBINGQTYUNIT$/UNITTOTALQTYUNIT$/UNITTOTAL
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
SECTION TOTAL$ - 0

VA FORM 6238

&"Arial,Bold"&A

DIVISION 23

CONSTRUCTION PROGRAM – ESTIMATE WORKSHEET DATE SHEET NO. 19 OF 28 SHEETS

PROJECT NO.LOCATIONPROJECT NAMETYPE OF ESTIMATE
NO DESIGN COMPLETEDPRELIMINARY DESIGN
ESTIMATORNEWALTINDEX NO.BUILDING NO(S).DRAWING NO.FINAL DESIGNOTHER (Specify)
CODESYSTEM/SUBSYSTEMLABORMATERIALSTOTAL
ABCD
DIVISION 23-HEATING, VENTILATING, AND AIR CONDITIONING (HVAC)QTYUNIT$/UNITTOTALQTYUNIT$/UNITTOTAL
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
SECTION TOTAL$ - 0

VA FORM 6238

&"Arial,Bold"&A

DIVISION 25

CONSTRUCTION PROGRAM – ESTIMATE WORKSHEET DATE SHEET NO. 20 OF 28 SHEETS

PROJECT NO.LOCATIONPROJECT NAMETYPE OF ESTIMATE
NO DESIGN COMPLETEDPRELIMINARY DESIGN
ESTIMATORNEWALTINDEX NO.BUILDING NO(S).DRAWING NO.FINAL DESIGNOTHER (Specify)
CODESYSTEM/SUBSYSTEMLABORMATERIALSTOTAL
ABCD
DIVISION 25-INTEGRATED AUTOMATIONQTYUNIT$/UNITTOTALQTYUNIT$/UNITTOTAL
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
SECTION TOTAL$ - 0

VA FORM 6238

&"Arial,Bold"&A

DIVISION 26

CONSTRUCTION PROGRAM – ESTIMATE WORKSHEET DATE SHEET NO. 21 OF 28 SHEETS

PROJECT NO.LOCATIONPROJECT NAMETYPE OF ESTIMATE
NO DESIGN COMPLETEDPRELIMINARY DESIGN
ESTIMATORNEWALTINDEX NO.BUILDING NO(S).DRAWING NO.FINAL DESIGNOTHER (Specify)
CODESYSTEM/SUBSYSTEMLABORMATERIALSTOTAL
ABCD
DIVISION 26-ELECTRICALQTYUNIT$/UNITTOTALQTYUNIT$/UNITTOTAL
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
SECTION TOTAL$ - 0

VA FORM 6238

&"Arial,Bold"&A

DIVISION 27

CONSTRUCTION PROGRAM – ESTIMATE WORKSHEET DATE SHEET NO. 22 OF 28 SHEETS

PROJECT NO.LOCATIONPROJECT NAMETYPE OF ESTIMATE
NO DESIGN COMPLETEDPRELIMINARY DESIGN
ESTIMATORNEWALTINDEX NO.BUILDING NO(S).DRAWING NO.FINAL DESIGNOTHER (Specify)
CODESYSTEM/SUBSYSTEMLABORMATERIALSTOTAL
ABCD
DIVISION 27-COMMUNICATIONSQTYUNIT$/UNITTOTALQTYUNIT$/UNITTOTAL
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
SECTION TOTAL$ - 0

VA FORM 6238

&"Arial,Bold"&A

DIVISION 28

CONSTRUCTION PROGRAM – ESTIMATE WORKSHEET DATE SHEET NO. 23 OF 28 SHEETS

PROJECT NO.LOCATIONPROJECT NAMETYPE OF ESTIMATE
NO DESIGN COMPLETEDPRELIMINARY DESIGN
ESTIMATORNEWALTINDEX NO.BUILDING NO(S).DRAWING NO.FINAL DESIGNOTHER (Specify)
CODESYSTEM/SUBSYSTEMLABORMATERIALSTOTAL
ABCD
DIVISION 28-ELECTRONIC SAFETY AND SECURITYQTYUNIT$/UNITTOTALQTYUNIT$/UNITTOTAL
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
SECTION TOTAL$ - 0

VA FORM 6238

&"Arial,Bold"&A

DIVISION 31

CONSTRUCTION PROGRAM – ESTIMATE WORKSHEET DATE SHEET NO. 24 OF 28 SHEETS

PROJECT NO.LOCATIONPROJECT NAMETYPE OF ESTIMATE
NO DESIGN COMPLETEDPRELIMINARY DESIGN
ESTIMATORNEWALTINDEX NO.BUILDING NO(S).DRAWING NO.FINAL DESIGNOTHER (Specify)
CODESYSTEM/SUBSYSTEMLABORMATERIALSTOTAL
ABCD
DIVISION 31-EARTHWORKQTYUNIT$/UNITTOTALQTYUNIT$/UNITTOTAL
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
SECTION TOTAL$ - 0

VA FORM 6238

&"Arial,Bold"&A

DIVISION 32

CONSTRUCTION PROGRAM – ESTIMATE WORKSHEET DATE SHEET NO. 25 OF 28 SHEETS

PROJECT NO.LOCATIONPROJECT NAMETYPE OF ESTIMATE
NO DESIGN COMPLETEDPRELIMINARY DESIGN
ESTIMATORNEWALTINDEX NO.BUILDING NO(S).DRAWING NO.FINAL DESIGNOTHER (Specify)
CODESYSTEM/SUBSYSTEMLABORMATERIALSTOTAL
ABCD
DIVISION 32-EXTERIOR IMPROVEMENTSQTYUNIT$/UNITTOTALQTYUNIT$/UNITTOTAL
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
SECTION TOTAL$ - 0

VA FORM 6238

&"Arial,Bold"&A

DIVISION 33

CONSTRUCTION PROGRAM – ESTIMATE WORKSHEET DATE SHEET NO. 26 OF 28 SHEETS

PROJECT NO.LOCATIONPROJECT NAMETYPE OF ESTIMATE
NO DESIGN COMPLETEDPRELIMINARY DESIGN
ESTIMATORNEWALTINDEX NO.BUILDING NO(S).DRAWING NO.FINAL DESIGNOTHER (Specify)
CODESYSTEM/SUBSYSTEMLABORMATERIALSTOTAL
ABCD
DIVISION 33-UTILITIESQTYUNIT$/UNITTOTALQTYUNIT$/UNITTOTAL
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
SECTION TOTAL$ - 0

VA FORM 6238

&"Arial,Bold"&A

DIVISION 34

CONSTRUCTION PROGRAM – ESTIMATE WORKSHEET DATE SHEET NO. 27 OF 28 SHEETS

PROJECT NO.LOCATIONPROJECT NAMETYPE OF ESTIMATE
NO DESIGN COMPLETEDPRELIMINARY DESIGN
ESTIMATORNEWALTINDEX NO.BUILDING NO(S).DRAWING NO.FINAL DESIGNOTHER (Specify)
CODESYSTEM/SUBSYSTEMLABORMATERIALSTOTAL
ABCD
DIVISION 34-TRANSPORTATIONQTYUNIT$/UNITTOTALQTYUNIT$/UNITTOTAL
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
SECTION TOTAL$ - 0

VA FORM 6238

&"Arial,Bold"&A

DIVISION 48

CONSTRUCTION PROGRAM – ESTIMATE WORKSHEET DATE SHEET NO. 28 OF 28 SHEETS

PROJECT NO.LOCATIONPROJECT NAMETYPE OF ESTIMATE
NO DESIGN COMPLETEDPRELIMINARY DESIGN
ESTIMATORNEWALTINDEX NO.BUILDING NO(S).DRAWING NO.FINAL DESIGNOTHER (Specify)
CODESYSTEM/SUBSYSTEMLABORMATERIALSTOTAL
ABCD
DIVISION 48-ELECTRICAL POWER GENERATIONQTYUNIT$/UNITTOTALQTYUNIT$/UNITTOTAL
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
SECTION TOTAL$ - 0

VA FORM 6238

&"Arial,Bold"&A image1.png