Attachment 12 - 3WeekLookahead_KamasBunkhouses_Template.xlsx

XLSX spreadsheet 77 KB Posted

Attached to
GAOA – Strawberry – Kamas Bunkhouse Renovations on the Uinta/Wasatch/Cache National Forest
Solicitation number
1240LU26Q0003
Issued by

About this file

This is a Three-Week Look Ahead Construction Schedule Template for the Kamas Bunkhouse Renovations project on the Uinta/Wasatch/Cache National Forest, covering the period from March 7, 2027 to March 28, 2027. The template provides scheduling frameworks for five building renovation efforts: All Buildings (combined activities), West Building (Project 19030601), East Building (19030405), North Building (19030501), and South Building (19060701), plus optional items applicable to all buildings. The document is designed to track construction activities on a daily basis across the three-week period with columns for completion status by percentage and notes.

The renovation work encompasses numerous construction and maintenance activities across all buildings, including: replacement of windows, doors, exterior frames, and hardware with electronic keypad entry locks; flooring work involving LVT, carpet, and hardwood floor refinishing; bathroom renovations including tile installation, fixture replacement, and elongated toilet installation; HVAC maintenance including furnace and water heater full service; electrical system updates including LED lighting fixtures, outlet/switch replacement, and smoke/carbon monoxide detector installation; concrete work for porches and sidewalks; cabinet refinishing and hardware replacement; masonry repair and repointing; and asbestos inspection and testing. Optional scope items include furnace replacement, water heater replacement, countertop replacement, soffit and fascia replacement, garage door system installation, and basement storage room construction. The template includes fields for responsible parties, original duration estimates, and activity tracking but does not contain pricing information or specific performance requirements beyond the construction activities listed.

View the file

Other files

Show all 11

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ALLKamas 3-Week LA

Three-Week Look Ahead Construction Schedule Template
Project NameProject Location
KAMAS BUNKHOUSE RENOVATIONS - ALL BUILDINGSWork Type 1
Project ManagerStart DateWork Type 2
03/07/27Work Type 3
Project NumberEnd DateWork Type 4
03/28/27Project Milestone
Pre-Construction Phase
Activity IDActivity NameResponsible PartyOriginal DurationSUNMONTUESWEDTHURFRISATSUNMONTUESWEDTHURFRISATSUNMONTUESWEDTHURFRISATCompletion Status
(BY PERCENT)Notes
03/07/2703/08/2703/09/2703/10/2703/11/2703/12/2703/13/2703/14/2703/15/2703/16/2703/17/2703/18/2703/19/2703/20/2703/21/2703/22/2703/23/2703/24/2703/25/2703/26/2703/27/27
11900Mobilization, including bonding, Measurement & Payment, Close Out Procedures0
013100Project Management & Utility Coordination0
099120-01Repair, patch & paint ALL surfaces.0
099120-02Repair and paint/stain All interior doors.0
081110-1Replace ALL exterior doors, frames & hardware, install electronic coded keypad entry locks.0
233713.23-01Replace vents, grills & cold air returns.0
081110-2Install door stop/protectors for ALL doors.
265000Replace ALL light fixtures & ceiling fans with LED Lights. Install new or replace old exhaust fans in all restrooms.
262726Inspect, update & replace ALL electrical outlets, switches & covers.
267500Provide and install smoke alarms and carbon monoxide detectors.
122113Provide & Install horizonal lift blinds.
159500.2Full Service ALL furnaces - describe 'full service' meaning in specs
223400.2Full Service ALL water heaters.
24230Asbestos Inspection/Testing (ALL except East Bunkhouse)

0601 KAMAS WEST 3-Week LA

Three-Week Look Ahead Construction Schedule Template
Project NameProject Location
KAMAS BUNKHOUSE RENOVATIONS - WEST BUILDING 19030601Work Type 1
Project ManagerStart DateWork Type 2
03/07/27Work Type 3
Project NumberEnd DateWork Type 4
03/28/27Project Milestone
Pre-Construction Phase
Activity IDActivity NameResponsible PartyOriginal DurationSUNMONTUESWEDTHURFRISATSUNMONTUESWEDTHURFRISATSUNMONTUESWEDTHURFRISATCompletion Status
(BY PERCENT)Notes
03/07/2703/08/2703/09/2703/10/2703/11/2703/12/2703/13/2703/14/2703/15/2703/16/2703/17/2703/18/2703/19/2703/20/2703/21/2703/22/2703/23/2703/24/2703/25/2703/26/2703/27/27
85413-601Replace ALL windows, finish inside of window frame.0
96519-601East entry way to Kitchen, Provide and install LVT, including PVC baseboard.0
96816-601Replace carpet flooring, in bedrooms & Living rm.0
093033-601.12West bathroom Re-tile floor, provide and install e-longated toilet.0
233113-601Rear entryway, re-route dryer exhaust through exterior wall. Furnace area move furnace exhaust from N side to S side of unit, construct linin shelving install folding door.0
061000-601Remove un-used door frame kitchen, Remove paneling, Remove center bedroom interior window. Finish to match.0
090190-601Kitchen, west batroom, rear hallway & utility areas, replace ALL cabinet hinges, door glides, and handles. Deep clean & paint/refinish all cabinetry
33000-601Replace rear concrete porch.

0405 KAMAS EAST 3-Week LA

Three-Week Look Ahead Construction Schedule Template
Project NameProject Location
KAMAS BUNKHOUSE RENOVATIONS - EAST BUILDING 19030405Work Type 1
Project ManagerStart DateWork Type 2
03/07/27Work Type 3
Project NumberEnd DateWork Type 4
03/28/27Project Milestone
Pre-Construction Phase
Activity IDActivity NameResponsible PartyOriginal DurationSUNMONTUESWEDTHURFRISATSUNMONTUESWEDTHURFRISATSUNMONTUESWEDTHURFRISATCompletion Status
(BY PERCENT)Notes
03/07/2703/08/2703/09/2703/10/2703/11/2703/12/2703/13/2703/14/2703/15/2703/16/2703/17/2703/18/2703/19/2703/20/2703/21/2703/22/2703/23/2703/24/2703/25/2703/26/2703/27/27
96400-405Living room, Repair, sand and, prep re-surface hardwood floors.0
90190-405Kitchen, entryway, hallway -deep clean, repair & refinish ALL shelves, drawers, doors. Remove door jam, laundry chute, old fuse box & other closets. Replace with wood drawers, cupboards, doors, add & extend more shelving, cupboards & doors.0
61000-405.10Remove Main floor & 2nd floor stair landing cold air return, repair floor, install in wall.0
61000-405.05Basement, rebuild lower wood section of stairs, frame & finish both sides of inside walls.0
96519-405Kitchen, rear entryway, stairs down & stairs to kitchen, hallway to stairs & ALL landings, stairs to second floor, remove, replace existing flooring with LVT flooring & PVC baseboard.0
96816-405All 4 bedrooms, replace/or supply carpet.0
049030-1Living rm replace broken bricks, clean all masonary, repoint joints & re-seal masonary, resurface mantel.
093033-405.101st floor east bathroom, prepare and install ceramic tile on floor and walls & inside tub/shower area
093033-405.202nd floor bathroom install, tile wall & flooring, sink & vanity, elongated toilet & 3 lg inset medicine cabinets,

0501 KAMAS NORTH 3-week LA

Three-Week Look Ahead Construction Schedule Template
Project NameProject Location
KAMAS BUNKHOUSE RENOVATIONS - NORTH BUILDING 19030501Work Type 1
Project ManagerStart DateWork Type 2
03/07/27Work Type 3
Project NumberEnd DateWork Type 4
03/28/27Project Milestone
Pre-Construction Phase
Activity IDActivity NameResponsible PartyOriginal DurationSUNMONTUESWEDTHURFRISATSUNMONTUESWEDTHURFRISATSUNMONTUESWEDTHURFRISATCompletion Status
(BY PERCENT)Notes
03/07/2703/08/2703/09/2703/10/2703/11/2703/12/2703/13/2703/14/2703/15/2703/16/2703/17/2703/18/2703/19/2703/20/2703/21/2703/22/2703/23/2703/24/2703/25/2703/26/2703/27/27
96530-501Reglaze bathtub, replace baseboard & trimboard in bathroom, hallway, kitchen & Utility room. Replace with PVC.0
49030-2Living rm replace broken bricks, clean all masonary, re-point joints, seal masonary, replace mantle.0
090190-501ALL Cabinetry & drawers deep clean & refinish to original, replace door glides, handles.0
33000-501Replace concrete side walks front & rear of house, replace rear porch.0
33000-501Replace concrete side walks front & rear of house, replace rear porch.0
0

0701 KAMAS SOUTH 3-week LA

Three-Week Look Ahead Construction Schedule Template
Project NameProject Location
KAMAS BUNKHOUSE RENOVATIONS - SOUTH BUILDING 19060701Work Type 1
Project ManagerStart DateWork Type 2
03/07/27Work Type 3
Project NumberEnd DateWork Type 4
03/28/27Project Milestone
Pre-Construction Phase
Activity IDActivity NameResponsible PartyOriginal DurationSUNMONTUESWEDTHURFRISATSUNMONTUESWEDTHURFRISATSUNMONTUESWEDTHURFRISATCompletion Status
(BY PERCENT)Notes
03/07/2703/08/2703/09/2703/10/2703/11/2703/12/2703/13/2703/14/2703/15/2703/16/2703/17/2703/18/2703/19/2703/20/2703/21/2703/22/2703/23/2703/24/2703/25/2703/26/2703/27/27
85413-701Replace ALL windows, finish inside of window frame.0
96530-701Replace baseboard & trimboard in Bathroom, Kitchen & Utility room. Replace with PVC.0
96816-701Replace Front Room carpet0
099300-701Remove carpet 4' wide walk way strip from front door to hallway & including halway, Re-finish hardwood flooring.0
099111-701Prepare, repaint backyard shed.0
33000-701Replace concrete under garage door & pad at rear exterior door, Replace front Porch, Replace front portion of sidewalk, remove dirt to slope exisiting ground away from concrete behind the house.0

0701 KAMAS OPTION 3-week LA

Three-Week Look Ahead Construction Schedule Template
Project NameProject Location
KAMAS BUNKHOUSE RENOVATIONS - ALL BLDGS OPTION ITEMSWork Type 1
Start DateWork Type 2
03/07/27Work Type 3
Project NumberEnd DateWork Type 4
03/28/27Project Milestone
Pre-Construction Phase
Activity IDActivity NameResponsible PartyOriginal DurationSUNMONTUESWEDTHURFRISATSUNMONTUESWEDTHURFRISATSUNMONTUESWEDTHURFRISATCompletion Status
(BY PERCENT)Notes
03/07/2703/08/2703/09/2703/10/2703/11/2703/12/2703/13/2703/14/2703/15/2703/16/2703/17/2703/18/2703/19/2703/20/2703/21/2703/22/2703/23/2703/24/2703/25/2703/26/2703/27/27
220500Replace tub, shower drains as needed0
235416.13Replace Furnace0
223400Replace Water Heater0
96816-01Demo and remove existing carpet, provide and install carpet flooring.0
123661.16Kitchen Remove and replace laminate countertops.0
74293Replace soffit and fascia.0
093033-601.10East bathroom, demolish & rebuild, as per specification.
151400-601.1Outside of SW bedroom remove shower, Relocate water heater to this area, extend piping to new location & frame in new water heater area, build catch pan to drain, install vent through roof, finish area, install door. Replace ALL water lines to entire house with Pex piping.
83613-501New Insulated Garage door system, with remotes and keypad.
83613-701New Insulated Garage door system, with remotes and keypad.
91110-405.05Build & finish Storage room Basement of East House.

EXAMPLE 3-Week LA

Three-Week Look Ahead Construction Schedule Template Example
Project NameProject Location
Project AlphaAddress, City, State ZIPWork Type 1
Project ManagerStart DateWork Type 2
Henry McNeal03/07/27Work Type 3
Project NumberEnd DateWork Type 4
001-ABC-DEF03/28/27Project Milestone
Pre-Construction Phase
Activity IDActivity NameResponsible PartyOriginal DurationSUNMONTUESWEDTHURFRISATSUNMONTUESWEDTHURFRISATSUNMONTUESWEDTHURFRISATCompletion Status
(BY PERCENT)Notes
03/07/2703/08/2703/09/2703/10/2703/11/2703/12/2703/13/2703/14/2703/15/2703/16/2703/17/2703/18/2703/19/2703/20/2703/21/2703/22/2703/23/2703/24/2703/25/2703/26/2703/27/27
A10300Prepare/Submit Project Scheduler QualificationsHenry McNeal335
A10301Prepare/Submit Insurance CertificatesBrent Williams522
A10302Prepare/Submit Preliminary Project ScheduleHenry McNeal510
A10303Prepare/Submit Quality Control PlanJason Desjardins37
A10304Review/Approve Health and Safety PlanJason Desjardins380Contact SSHO Manager
A10305Review/Approve List of Proposed ContractorsJason Desjardins530
A10305Mobilization0

CLICK HERE TO CREATE IN SMARTSHEET

http://bit.ly/2ZM77jmhttps://www.smartsheet.com/try-it?trp=10669&utm_source=template-excel&utm_medium=content&utm_campaign=Three-Week+Look+Ahead+Construction+Schedule-excel-10669&lpa=Three-Week+Look+Ahead+Construction+Schedule+excel+10669 BLANK 3-Week LA

Three-Week Look Ahead Construction Schedule Template
Project NameProject Location
Work Type 1
Project ManagerStart DateWork Type 2
03/07/27Work Type 3
Project NumberEnd DateWork Type 4
03/28/27Project Milestone
Pre-Construction Phase
Activity IDActivity NameResponsible PartyOriginal DurationSUNMONTUESWEDTHURFRISATSUNMONTUESWEDTHURFRISATSUNMONTUESWEDTHURFRISATCompletion Status
(BY PERCENT)Notes
03/07/2703/08/2703/09/2703/10/2703/11/2703/12/2703/13/2703/14/2703/15/2703/16/2703/17/2703/18/2703/19/2703/20/2703/21/2703/22/2703/23/2703/24/2703/25/2703/26/2703/27/27
0
0
0
0
0
0