Attachment 1 - SOI_Strawberry Renovations.xlsx

XLSX spreadsheet 26 KB Posted

Attached to
GAOA – Strawberry – Kamas Bunkhouse Renovations on the Uinta/Wasatch/Cache National Forest
Solicitation number
1240LU26Q0003
Issued by

About this file

This is a Schedule of Items (SOI) for renovation work at four bunkhouses (Buildings 1062, 1063, 1064, and 1065) located on the Uinta/Wasatch/Cache National Forest under GAOA funding. The solicitation number is 1240LT26Q0003, and one award will be made to a single contractor who must submit pricing for all base items and optional items.

The base scope of work includes priority tasks across all buildings such as asbestos and lead paint testing, mold testing, bat and mouse contamination treatment, and vegetation management. Common renovation work includes replacing windows with vinyl, installing new LED lighting, upgrading water heaters, replacing flooring (LVT and carpet), interior painting, installing new bathroom and kitchen fixtures with lever-handle faucets, replacing soffit and fascia, and installing smoke and carbon monoxide detectors. Building 1062 requires the most extensive work, including removal of a wood-burning stove, chimney flue removal, replacement of all bedframes and mattresses (Twin XL), new kitchen appliances (washer/dryer, refrigerator, microwave, and range), and kitchen countertop replacement. Buildings 1063 and 1065 include mattress and water heater replacements, while Building 1064 requires appliance and refrigeration updates. Optional items include replacing bathroom sinks, tub drains, tub/shower liners, and toilets across all buildings. Contractors must provide unit prices for all line items, with totals to be auto-calculated. Submission of the signed SOI certifies the contractor's commitment to the pricing data provided.

View the file

Other files

Show all 11

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Strawberry_SOI_Final

SCHEDULE OF ITEMS

SOLICITATION NO. 1240LT26Q0003
ITEM 0001 - STRAWBERRY BUNKHOUSES RENOVATIONS

UNITA/WASATCH/CACHE NATIONAL FOREST

ITEM/ SPECIFICATION
SUBITEM 1001 - All Buildings - BASEMETHOD OF MEASUREMENTPAY UNITEST QTYUnit PriceTotal
011900Mobilization including bondingLSQLS1$ - 0$ - 0
024230Priority Work - Asbestos and lead paint testing and reporting for all buildings prior to beginning work.AQEA4$ - 0$ - 0
028500Priority Work - Mold testing and reporting for all buildings prior to beginning work.AQEA4$ - 0$ - 0
017320Priority Work - Bat and mouse contamination treatment and mitigation for all buildings prior to beginning work.LSQLS1$ - 0$ - 0
311000Priority Work - Cut back overgrown shrubs/ underbrush for all buildings prior to beginning work.LSQLS1$ - 0$ - 0
087100Remove all existing interior door knobs and replace with lever type handles. Inspect interior door hardware, and consult COR for necessary repairs or replacements.AQEA20$ - 0$ - 0
017320Remove and dispose of all (4) exterior door screens. Do not replace.LSQLS1$ - 0$ - 0
090190Prep, paint, and seal all exterior doors per specifications.AQEA10$ - 0$ - 0
260533Inspect all interior and exterior electrical outlets, and consult COR for repairs or replacements per specifications.LSQLS1$ - 0$ - 0
074113Repair, replace, and secure metal roof rib covers, endcaps, and gable vent screens & frames per drawings.LSQLS1$ - 0$ - 0
TOTAL ALL BUILDINGS BASE$ - 0
ITEM/ SPECIFICATION
SUBITEM 1002 - Building 1062 - BASEMETHOD OF MEASUREMENTPAY UNITEST QTYUnit PriceTotal
085313Demo and remove all windows. Provide and install new vinyl windows, screens, and blinds per specifications.AQEA8$ - 0$ - 0
040322Replace detached brick window sill and seal all penetrations on the brick exterior per drawingsLSQLS1$ - 0$ - 0
017320Provide and install exterior dryer vent where missingLSQLS1$ - 0$ - 0
017320Remove and store wood burning stove in garage. Demo and remove protective ceramic layer at floor and ceiling. Remove chimney flue, repair ceiling, and seal roof penetrations.LSQLS1$ - 0$ - 0
096519Demo and remove existing rolled vinyl flooring. Provide and install LVT flooring per specifications.LSQLS1$ - 0$ - 0
096813Demo and remove existing carpet. Provide and install carpet flooring per specificationsLSQLS1$ - 0$ - 0
099123Prep and paint all interior walls and ceilings per specifications.LSQLS1$ - 0$ - 0
223400Demo and remove water heater. Provide and install new water heater per specifications.AQEA1$ - 0$ - 0
224213Provide and install toiletLSQLS1$ - 0$ - 0
102819Demo and remove existing shower door. Provide and install new shower door.LSQLS1$ - 0$ - 0
267500Provide and install smoke and carbon monoxide detectors.AQEA2$ - 0$ - 0
265000Replace all interior and exterior light fixtures with LED Lights per drawingsLSQLS1$ - 0$ - 0
062023Provide and install painted baseboard, to match existing as closely as possible.LSQLS1$ - 0$ - 0
092900Provide and install wall including sheetrock, framing, paint, double pocket door, and finish trim per drawings.LSQLS1$ - 0$ - 0
125000.13Replace all bedframes and mattresses (Twin XL) to match existing wood frames from buildings 1063/ 1065AQEA8$ - 0$ - 0
017320Replace all vent fans in restroomsAQEA2$ - 0$ - 0
224216Demo and remove existing bathroom and kitchen faucets. Provide and install lever handle type faucet per specificationsAQEA2$ - 0$ - 0
064113Replace kitchen cabinet hinges, drawer glides, and handles. Deep clean all cabinetryLSQLS1$ - 0$ - 0
113100Remove washer and dryer and properly dispose. Provide new washer and dryer with front facing controls per specifications.LSQLS1$ - 0$ - 0
113100Provide and replace UL listed electric microwave, range and range hood per specificationsLSQLS1$ - 0$ - 0
113100Provide and replace Energy Star rated refrigerator/ freezer per specificationsLSQLS1$ - 0$ - 0
123623Remove and replace kitchen laminate countertopsAQSF50$ - 0$ - 0
074293Replace soffit and fascia per drawingsAQLF220$ - 0$ - 0
TOTAL BUILDING 1062 BASE$ - 0
ITEM/ SPECIFICATION
SUBITEM 1003 - Building 1063 - BASEMETHOD OF MEASUREMENTPAY UNITEST QTYUnit PriceTotal
085313Demo and remove all windows. Provide and install new vinyl windows, screens, and blinds per specifications.AQEA3$ - 0$ - 0
096519Demo and remove existing rolled vinyl flooring. Provide and install LVT flooring per specifications.LSQLS1$ - 0$ - 0
096813Demo and remove existing carpet. Provide and install carpet flooring per specificationsLSQLS1$ - 0$ - 0
099123Prep and paint all interior walls and ceilings per specifications.LSQLS1$ - 0$ - 0
223400Demo and remove water heater. Provide and install new water heater per specifications. Room 3 will not need replacement.AQEA2$ - 0$ - 0
267500Provide and install smoke and carbon monoxide detectors.AQEA3$ - 0$ - 0
265000Replace all interior and exterior light fixtures with LED Lights per drawingsLSQLS1$ - 0$ - 0
062023Provide and install painted baseboard, to match existing as closely as possible.LSQLS1$ - 0$ - 0
125000.13Replace all mattresses (Twin XL)AQEA6$ - 0$ - 0
017320Replace all vent fans in restroomsAQEA3$ - 0$ - 0
224216Demo and remove existing faucets. Provide and install lever handle type faucet per specificationsAQEA3$ - 0$ - 0
074293Replace soffit and fascia per drawingsAQLF150$ - 0$ - 0
TOTAL BUILDING 1063 BASE$ - 0
ITEM/ SPECIFICATION
SUBITEM 1004 - Building 1064 - BASEMETHOD OF MEASUREMENTPAY UNITEST QTYUnit PriceTotal
085313Demo and remove all windows. Provide and install new vinyl windows, screens, and blinds per specifications.AQEA5$ - 0$ - 0
099123Prep and paint all interior walls, ceilings, and shelving per specifications.LSQLS1$ - 0$ - 0
223400Demo and remove water heater. Provide and install new water heater per specifications.AQEA1$ - 0$ - 0
267500Provide and install smoke and carbon monoxide detectors.AQEA2$ - 0$ - 0
265000Replace all interior and exterior light fixtures with LED Lights per drawingsLSQLS1$ - 0$ - 0
113100Remove washer and dryer and store in garage. Provide new washer and dryer with front facing controls per specifications.LSQLS1$ - 0$ - 0
113100Remove (2) existing fridges and install (2) new Energy Star rated refrigerator/ freezers and (1) freezer per specifciations.LSQLS1$ - 0$ - 0
113100Provide and replace UL listed electric microwave, range and range hood per specificationsLSQLS1$ - 0$ - 0
017320Replace all vent fans in restroomsAQEA1$ - 0$ - 0
064113Replace kitchen cabinet hinges, drawer glides, and handles. Deep clean all cabinetryLSQLS1$ - 0$ - 0
074293Replace soffit and fascia per drawingsAQLF140$ - 0$ - 0
TOTAL BUILDING 1064 BASE$ - 0
ITEM/ SPECIFICATION
SUBMITEM 1005 - Building 1065 - BASEMETHOD OF MEASUREMENTPAY UNITEST QTYUnit PriceTotal
085313Demo and remove all windows. Provide and install new vinyl windows, screens, and blinds per specifications.AQEA3$ - 0$ - 0
096519Demo and remove existing rolled vinyl flooring. Provide and install LVT flooring per specifications.LSQLS1$ - 0$ - 0
096813Demo and remove existing carpet. Provide and install carpet flooring per specificationsLSQLS1$ - 0$ - 0
099123Prep and paint all interior walls and ceilings per specifications.LSQLS1$ - 0$ - 0
223400Demo and remove water heater. Provide and install new water heater per specifications.AQEA3$ - 0$ - 0
267500Provide and install smoke and carbon monoxide detectors.AQEA3$ - 0$ - 0
265000Replace all interior and exterior light fixtures with LED Lights per drawingsLSQLS1$ - 0$ - 0
062023Provide and install painted baseboard, to match existing as closely as possible.LSQLS1$ - 0$ - 0
125000.13Replace all mattresses (Twin XL)AQEA6$ - 0$ - 0
017320Replace all vent fans in restroomsAQEA3$ - 0$ - 0
224216Demo and remove existing faucets. Provide and install lever handle type faucet per specificationsAQEA3$ - 0$ - 0
074293Replace soffit and fascia per drawingsAQLF150$ - 0$ - 0
TOTAL BUILDING 1065 BASE$ - 0

BASE TOTAL (SUBITEMS 1001-1005) $ - 0

ITEM/ SPECIFICATION
SUBITEM 1006 - All Buildings - OptionsMETHOD OF MEASUREMENTPAY UNITEST QTYUnit PriceTotal
224216Replace bathroom sinksAQEA9$ - 0$ - 0
220500Replace tub drainsAQEA8$ - 0$ - 0
102819Replace tub and/ or shower linersAQEA8$ - 0$ - 0
224216Replace toiletsAQEA8$ - 0$ - 0
TOTAL ALL BUILDINGS OPTIONS$ - 0

BASE + OPTION TOTAL (SUBITEMS 1001-1006) $ - 0

SOI NOTES:
NOTE 1: Offeror input Unit Prices
NOTE 2: Auto Calculated Values
NOTE 3: One award will be made from this solicitation. Contractors shall submit a quote for all Base Items and all Optional Items in the Schedule of Items. In the event of an error in extending the proposed prices, unit prices will govern, unless otherwise determined by the Contracting Officer, in accordance with applicable regulations.
NOTE 4: Submission of a signed SOI represents the Contractor's commitment to the data herein. It is the responsibility of the Contractor to verify that all values presented in the signature certified SOI, including auto-calculated cells, accurately represent the Contractor's intended price elements. The Government shall not be held liable for any errors in calculation or pricing data.

QUOTER NAME: BUSINESS EMAIL:

SAM UEI #: BUSINESS PHONE:

AUTHORIZED TO SIGN: (NAME & TITLE)

SIGNATURE: DATE:

File details come from the government source that posted it. Updated .