Attachment 11 - 3WeekLookahead_StrawberryBunkhouses_Template.xlsx
XLSX spreadsheet 69 KB Posted
- Attached to
- GAOA – Strawberry – Kamas Bunkhouse Renovations on the Uinta/Wasatch/Cache National Forest
- Solicitation number
- 1240LU26Q0003
- Issued by
-
Department of Agriculture Forest Service
About this file
This is a Three-Week Look Ahead construction schedule template for the Strawberry Bunkhouse Renovations project at Strawberry Reservoir Visitors Center on the Uinta/Wasatch/Cache National Forest. The template serves as a planning tool for contractors to track construction activities across multiple buildings (Buildings 1062, 1063, 1064, and 1065) during a three-week execution period from March 7-28, 2027. The document includes an all-buildings schedule covering pre-construction and priority work activities, with separate detailed schedules for each individual building unit.
The template outlines comprehensive renovation activities across all buildings, including mobilization, asbestos and lead paint testing, mold testing, pest mitigation, window replacement with vinyl windows and screens, flooring installation (LVT and carpet), interior and exterior painting, plumbing fixture replacement with lever-handle faucets, electrical outlet inspection and LED lighting upgrades, water heater replacement, smoke and carbon monoxide detector installation, bathroom and kitchen renovations, appliance replacement (washers, dryers, microwaves, ranges, refrigerators), roof rib cover repairs, soffit and fascia replacement, and mattress replacement. The template includes columns for activity identification, responsible party assignment, original duration, daily scheduling across the three-week period, completion percentage tracking, and notes for project-specific considerations such as Building 1063 not requiring water heater replacement in Room 3. The document also provides a blank template and example template for reference purposes.
View the file
Other files
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ALLStrawberry 3-Week LA
| Three-Week Look Ahead Construction Schedule Template | |||||||||||||||||||||||||||
| Project Name | Project Location | ||||||||||||||||||||||||||
| STRAWBERRY BUNKHOUSE RENOVATIONS - ALL BUILDINGS | STRAWBERRY RESERVOIR VISITORS CENTER | Work Type 1 | |||||||||||||||||||||||||
| Project Manager | Start Date | Work Type 2 | |||||||||||||||||||||||||
| 03/07/26 | Work Type 3 | ||||||||||||||||||||||||||
| Project Number | End Date | Work Type 4 | |||||||||||||||||||||||||
| 03/28/26 | Project Milestone | ||||||||||||||||||||||||||
| Pre-Construction Phase | |||||||||||||||||||||||||||
| Activity ID | Activity Name | Responsible Party | Original Duration | SUN | MON | TUES | WED | THUR | FRI | SAT | SUN | MON | TUES | WED | THUR | FRI | SAT | SUN | MON | TUES | WED | THUR | FRI | SAT | Completion Status | ||
| (BY PERCENT) | Notes | ||||||||||||||||||||||||||
| 03/07/26 | 03/08/26 | 03/09/26 | 03/10/26 | 03/11/26 | 03/12/26 | 03/13/26 | 03/14/26 | 03/15/26 | 03/16/26 | 03/17/26 | 03/18/26 | 03/19/26 | 03/20/26 | 03/21/26 | 03/22/26 | 03/23/26 | 03/24/26 | 03/25/26 | 03/26/26 | 03/27/26 | |||||||
| 011900 | Mobilization including bonding | 0 | |||||||||||||||||||||||||
| 024230 | Priority Work - Asbestos and lead paint testing and reporting for all buildings prior to beginning work. | 0 | |||||||||||||||||||||||||
| 028500 | Priority Work - Mold testing and reporting for all buildings prior to beginning work. | 0 | |||||||||||||||||||||||||
| 017320 | Priority Work - Bat and mouse contamination treatment and mitigation for all buildings prior to beginning work. | 0 | |||||||||||||||||||||||||
| 311000 | Priority Work - Cut back overgrown shrubs/ underbrush for all buildings prior to beginning work. | 0 | |||||||||||||||||||||||||
| 087100 | Remove all existing interior door knobs and replace with lever type handles. Inspect interior door hardware, and consult COR for necessary repairs or replacements | 0 | |||||||||||||||||||||||||
| 017320 | Remove and dispose of all (4) exterior door screens. Do not replace. | ||||||||||||||||||||||||||
| 090190 | Prep, paint, and seal all exterior doors per specifications. | ||||||||||||||||||||||||||
| 260533 | Inspect all interior and exterior electrical outlets, and consult COR for repairs or replacements per specifications | ||||||||||||||||||||||||||
| 74113 | Repair, replace, and secure metal roof rib covers, endcaps, and gable vent screens & frames per drawings |
1062Strawberry 3-Week LA
| Three-Week Look Ahead Construction Schedule Template | |||||||||||||||||||||||||||
| Project Name | Project Location | ||||||||||||||||||||||||||
| STRAWBERRY BUNKHOUSE RENOVATIONS - BUILDING 1062 | Work Type 1 | ||||||||||||||||||||||||||
| Project Manager | Start Date | Work Type 2 | |||||||||||||||||||||||||
| 03/07/27 | Work Type 3 | ||||||||||||||||||||||||||
| Project Number | End Date | Work Type 4 | |||||||||||||||||||||||||
| 03/28/27 | Project Milestone | ||||||||||||||||||||||||||
| Pre-Construction Phase | |||||||||||||||||||||||||||
| Activity ID | Activity Name | Responsible Party | Original Duration | SUN | MON | TUES | WED | THUR | FRI | SAT | SUN | MON | TUES | WED | THUR | FRI | SAT | SUN | MON | TUES | WED | THUR | FRI | SAT | Completion Status | ||
| (BY PERCENT) | Notes | ||||||||||||||||||||||||||
| 03/07/27 | 03/08/27 | 03/09/27 | 03/10/27 | 03/11/27 | 03/12/27 | 03/13/27 | 03/14/27 | 03/15/27 | 03/16/27 | 03/17/27 | 03/18/27 | 03/19/27 | 03/20/27 | 03/21/27 | 03/22/27 | 03/23/27 | 03/24/27 | 03/25/27 | 03/26/27 | 03/27/27 | |||||||
| Mobilization and Priority Work | 0 | ||||||||||||||||||||||||||
| 85313 | Demo and remove all windows. Provide and install new vinyl windows, screens, and blinds per specifications. | 0 | |||||||||||||||||||||||||
| 40322 | Replace detached brick window sill and seal all penetrations on the brick exterior per drawings | 0 | |||||||||||||||||||||||||
| 17320 | Provide and install exterior dryer vent where missing | 0 | |||||||||||||||||||||||||
| 017320 | Remove and store wood burning stove in garage. Demo and remove protective ceramic layer at floor and ceiling. Remove chimney flue, repair ceiling, and seal roof penetrations. | 0 | |||||||||||||||||||||||||
| 96519 | Demo and remove existing rolled vinyl flooring. Provide and install LVT flooring per specifications. | 0 | |||||||||||||||||||||||||
| 96813 | Demo and remove existing carpet. Provide and install carpet flooring per specifications | ||||||||||||||||||||||||||
| 99123 | Prep and paint all interior walls and ceilings per specifications. | ||||||||||||||||||||||||||
| 223400 | Demo and remove water heater. Provide and install new water heater per specifications. | ||||||||||||||||||||||||||
| 224213 | Provide and install toilet | ||||||||||||||||||||||||||
| 102819 | Demo and remove existing shower door. Provide and install new shower door. | ||||||||||||||||||||||||||
| 267500 | Provide and install smoke and carbon monoxide detectors. | ||||||||||||||||||||||||||
| 265000 | Replace all interior and exterior light fixtures with LED Lights per drawings | ||||||||||||||||||||||||||
| 62023 | Provide and install painted baseboard, to match existing as closely as possible. | ||||||||||||||||||||||||||
| 92900 | Provide and install wall including sheetrock, framing, paint, double pocket door, and finish trim per drawings. | ||||||||||||||||||||||||||
| 12500013 | Replace all bedframes and mattresses (Twin XL) to match existing frames | ||||||||||||||||||||||||||
| 017320 | Replace all vent fans in restrooms | ||||||||||||||||||||||||||
| 224216 | Demo and remove existing bathroom and kitchen faucets. Provide and install lever handle type faucet per specifications | ||||||||||||||||||||||||||
| 64113 | Replace kitchen cabinet hinges, drawer glides, and handles. Deep clean all cabinetry | ||||||||||||||||||||||||||
| 113100 | Remove washer and dryer and properly dispose. Provide new washer and dryer with front facing controls per specifications. | ||||||||||||||||||||||||||
| 113100 | Provide and replace UL listed electric microwave, range and range hood per specifications | ||||||||||||||||||||||||||
| 113100 | Provide and replace Energy Star rated refrigerator/ freezer per specifications | ||||||||||||||||||||||||||
| 123623 | Remove and replace kitchen laminate countertops | ||||||||||||||||||||||||||
| 74293 | Replace soffit and fascia per drawings |
1063Strawberry 3-Week LA
| Three-Week Look Ahead Construction Schedule Template | |||||||||||||||||||||||||||
| Project Name | Project Location | ||||||||||||||||||||||||||
| STRAWBERRY BUNKHOUSE RENOVATIONS - BUILDING 1063 | Work Type 1 | ||||||||||||||||||||||||||
| Project Manager | Start Date | Work Type 2 | |||||||||||||||||||||||||
| 03/07/27 | Work Type 3 | ||||||||||||||||||||||||||
| Project Number | End Date | Work Type 4 | |||||||||||||||||||||||||
| 03/28/27 | Project Milestone | ||||||||||||||||||||||||||
| Pre-Construction Phase | |||||||||||||||||||||||||||
| Activity ID | Activity Name | Responsible Party | Original Duration | SUN | MON | TUES | WED | THUR | FRI | SAT | SUN | MON | TUES | WED | THUR | FRI | SAT | SUN | MON | TUES | WED | THUR | FRI | SAT | Completion Status | ||
| (BY PERCENT) | Notes | ||||||||||||||||||||||||||
| 03/07/27 | 03/08/27 | 03/09/27 | 03/10/27 | 03/11/27 | 03/12/27 | 03/13/27 | 03/14/27 | 03/15/27 | 03/16/27 | 03/17/27 | 03/18/27 | 03/19/27 | 03/20/27 | 03/21/27 | 03/22/27 | 03/23/27 | 03/24/27 | 03/25/27 | 03/26/27 | 03/27/27 | |||||||
| Mobilization and Priority Work | 0 | ||||||||||||||||||||||||||
| 85313 | Demo and remove all windows. Provide and install new vinyl windows, screens, and blinds per specifications. | 0 | |||||||||||||||||||||||||
| 96519 | Demo and remove existing rolled vinyl flooring. Provide and install LVT flooring per specifications. | 0 | |||||||||||||||||||||||||
| 96813 | Demo and remove existing carpet. Provide and install carpet flooring per specifications | 0 | |||||||||||||||||||||||||
| 99123 | Prep and paint all interior walls and ceilings per specifications. | 0 | |||||||||||||||||||||||||
| 223400 | Demo and remove water heater. Provide and install new water heater per specifications. Room 3 will not need replacement. | 0 | |||||||||||||||||||||||||
| 267500 | Provide and install smoke and carbon monoxide detectors. | ||||||||||||||||||||||||||
| 265000 | Replace all interior and exterior light fixtures with LED Lights per drawings | ||||||||||||||||||||||||||
| 62023 | Provide and install painted baseboard, to match existing as closely as possible. | ||||||||||||||||||||||||||
| 12500013 | Replace all mattresses (Twin XL) | ||||||||||||||||||||||||||
| 017320 | Replace all vent fans in restrooms | ||||||||||||||||||||||||||
| 224216 | Demo and remove existing faucets. Provide and install lever handle type faucet per specifications | ||||||||||||||||||||||||||
| 74293 | Replace soffit and fascia per drawings |
1064Strawberry 3-week LA
| Three-Week Look Ahead Construction Schedule Template | |||||||||||||||||||||||||||
| Project Name | Project Location | ||||||||||||||||||||||||||
| STRAWBERRY BUNKHOUSE RENOVATIONS - BUILDING 1064 | Work Type 1 | ||||||||||||||||||||||||||
| Project Manager | Start Date | Work Type 2 | |||||||||||||||||||||||||
| 03/07/27 | Work Type 3 | ||||||||||||||||||||||||||
| Project Number | End Date | Work Type 4 | |||||||||||||||||||||||||
| 03/28/27 | Project Milestone | ||||||||||||||||||||||||||
| Pre-Construction Phase | |||||||||||||||||||||||||||
| Activity ID | Activity Name | Responsible Party | Original Duration | SUN | MON | TUES | WED | THUR | FRI | SAT | SUN | MON | TUES | WED | THUR | FRI | SAT | SUN | MON | TUES | WED | THUR | FRI | SAT | Completion Status | ||
| (BY PERCENT) | Notes | ||||||||||||||||||||||||||
| 03/07/27 | 03/08/27 | 03/09/27 | 03/10/27 | 03/11/27 | 03/12/27 | 03/13/27 | 03/14/27 | 03/15/27 | 03/16/27 | 03/17/27 | 03/18/27 | 03/19/27 | 03/20/27 | 03/21/27 | 03/22/27 | 03/23/27 | 03/24/27 | 03/25/27 | 03/26/27 | 03/27/27 | |||||||
| Mobilization and Priority Work | 0 | ||||||||||||||||||||||||||
| 85313 | Demo and remove all windows. Provide and install new vinyl windows, screens, and blinds per specifications. | 0 | |||||||||||||||||||||||||
| 99123 | Prep and paint all interior walls, ceilings, and shelving per specifications. | 0 | |||||||||||||||||||||||||
| 223400 | Demo and remove water heater. Provide and install new water heater per specifications. | 0 | |||||||||||||||||||||||||
| 267500 | Provide and install smoke and carbon monoxide detectors. | 0 | |||||||||||||||||||||||||
| 265000 | Replace all interior and exterior light fixtures with LED Lights per drawings | 0 | |||||||||||||||||||||||||
| 113100 | Remove washer and dryer and store in garage. Provide new washer and dryer with front facing controls per specifications. | ||||||||||||||||||||||||||
| 113100 | Remove (2) existing fridges and install (2) new Energy Star rated refrigerator/ freezers and (1) freezer per specifciations. | ||||||||||||||||||||||||||
| 113100 | Provide and replace UL listed electric microwave, range and range hood per specifications | ||||||||||||||||||||||||||
| 017320 | Replace all vent fans in restrooms | ||||||||||||||||||||||||||
| 64113 | Replace kitchen cabinet hinges, drawer glides, and handles. Deep clean all cabinetry | ||||||||||||||||||||||||||
| 74293 | Replace soffit and fascia per drawings |
1065Strawberry 3-week LA
| Three-Week Look Ahead Construction Schedule Template | |||||||||||||||||||||||||||
| Project Name | Project Location | ||||||||||||||||||||||||||
| STRAWBERRY BUNKHOUSE RENOVATIONS - BUILDING 1065 | Work Type 1 | ||||||||||||||||||||||||||
| Project Manager | Start Date | Work Type 2 | |||||||||||||||||||||||||
| 03/07/27 | Work Type 3 | ||||||||||||||||||||||||||
| Project Number | End Date | Work Type 4 | |||||||||||||||||||||||||
| 03/28/27 | Project Milestone | ||||||||||||||||||||||||||
| Pre-Construction Phase | |||||||||||||||||||||||||||
| Activity ID | Activity Name | Responsible Party | Original Duration | SUN | MON | TUES | WED | THUR | FRI | SAT | SUN | MON | TUES | WED | THUR | FRI | SAT | SUN | MON | TUES | WED | THUR | FRI | SAT | Completion Status | ||
| (BY PERCENT) | Notes | ||||||||||||||||||||||||||
| 03/07/27 | 03/08/27 | 03/09/27 | 03/10/27 | 03/11/27 | 03/12/27 | 03/13/27 | 03/14/27 | 03/15/27 | 03/16/27 | 03/17/27 | 03/18/27 | 03/19/27 | 03/20/27 | 03/21/27 | 03/22/27 | 03/23/27 | 03/24/27 | 03/25/27 | 03/26/27 | 03/27/27 | |||||||
| Mobilization and Priority Work | 0 | ||||||||||||||||||||||||||
| 85313 | Demo and remove all windows. Provide and install new vinyl windows, screens, and blinds per specifications. | 0 | |||||||||||||||||||||||||
| 96519 | Demo and remove existing rolled vinyl flooring. Provide and install LVT flooring per specifications. | 0 | |||||||||||||||||||||||||
| 96813 | Demo and remove existing carpet. Provide and install carpet flooring per specifications | 0 | |||||||||||||||||||||||||
| 99123 | Prep and paint all interior walls and ceilings per specifications. | 0 | |||||||||||||||||||||||||
| 223400 | Demo and remove water heater. Provide and install new water heater per specifications. | 0 | |||||||||||||||||||||||||
| 267500 | Provide and install smoke and carbon monoxide detectors. | ||||||||||||||||||||||||||
| 265000 | Replace all interior and exterior light fixtures with LED Lights per drawings | ||||||||||||||||||||||||||
| 62023 | Provide and install painted baseboard, to match existing as closely as possible. | ||||||||||||||||||||||||||
| 12500013 | Replace all mattresses (Twin XL) | ||||||||||||||||||||||||||
| 017320 | Replace all vent fans in restrooms | ||||||||||||||||||||||||||
| 224216 | Demo and remove existing faucets. Provide and install lever handle type faucet per specifications | ||||||||||||||||||||||||||
| 74293 | Replace soffit and fascia per drawings |
- Disclaimer -
Any articles, templates, or information provided by Smartsheet on the website are for reference only. While we strive to keep the information up to date and correct, we make no representations or warranties of any kind, express or implied, about the completeness, accuracy, reliability, suitability, or availability with respect to the website or the information, articles, templates, or related graphics contained on the website. Any reliance you place on such information is therefore strictly at your own risk.
BLANK 3-Week LA
| Three-Week Look Ahead Construction Schedule Template | |||||||||||||||||||||||||||
| Project Name | Project Location | ||||||||||||||||||||||||||
| Work Type 1 | |||||||||||||||||||||||||||
| Project Manager | Start Date | Work Type 2 | |||||||||||||||||||||||||
| 03/07/27 | Work Type 3 | ||||||||||||||||||||||||||
| Project Number | End Date | Work Type 4 | |||||||||||||||||||||||||
| 03/28/27 | Project Milestone | ||||||||||||||||||||||||||
| Pre-Construction Phase | |||||||||||||||||||||||||||
| Activity ID | Activity Name | Responsible Party | Original Duration | SUN | MON | TUES | WED | THUR | FRI | SAT | SUN | MON | TUES | WED | THUR | FRI | SAT | SUN | MON | TUES | WED | THUR | FRI | SAT | Completion Status | ||
| (BY PERCENT) | Notes | ||||||||||||||||||||||||||
| 03/07/27 | 03/08/27 | 03/09/27 | 03/10/27 | 03/11/27 | 03/12/27 | 03/13/27 | 03/14/27 | 03/15/27 | 03/16/27 | 03/17/27 | 03/18/27 | 03/19/27 | 03/20/27 | 03/21/27 | 03/22/27 | 03/23/27 | 03/24/27 | 03/25/27 | 03/26/27 | 03/27/27 | |||||||
| 0 | |||||||||||||||||||||||||||
| 0 | |||||||||||||||||||||||||||
| 0 | |||||||||||||||||||||||||||
| 0 | |||||||||||||||||||||||||||
| 0 | |||||||||||||||||||||||||||
| 0 |
EXAMPLE 3-Week LA
| Three-Week Look Ahead Construction Schedule Template Example | ||||||||||||||||||||||||||||
| Project Name | Project Location | |||||||||||||||||||||||||||
| Project Alpha | Address, City, State ZIP | Work Type 1 | ||||||||||||||||||||||||||
| Project Manager | Start Date | Work Type 2 | ||||||||||||||||||||||||||
| Henry McNeal | 03/07/27 | Work Type 3 | ||||||||||||||||||||||||||
| Project Number | End Date | Work Type 4 | ||||||||||||||||||||||||||
| 001-ABC-DEF | 03/28/27 | Project Milestone | ||||||||||||||||||||||||||
| Pre-Construction Phase | ||||||||||||||||||||||||||||
| Activity ID | Activity Name | Responsible Party | Original Duration | SUN | MON | TUES | WED | THUR | FRI | SAT | SUN | MON | TUES | WED | THUR | FRI | SAT | SUN | MON | TUES | WED | THUR | FRI | SAT | Completion Status | |||
| (BY PERCENT) | Notes | |||||||||||||||||||||||||||
| 03/07/27 | 03/08/27 | 03/09/27 | 03/10/27 | 03/11/27 | 03/12/27 | 03/13/27 | 03/14/27 | 03/15/27 | 03/16/27 | 03/17/27 | 03/18/27 | 03/19/27 | 03/20/27 | 03/21/27 | 03/22/27 | 03/23/27 | 03/24/27 | 03/25/27 | 03/26/27 | 03/27/27 | ||||||||
| A10300 | Prepare/Submit Project Scheduler Qualifications | Henry McNeal | 3 | 35 | ||||||||||||||||||||||||
| A10301 | Prepare/Submit Insurance Certificates | Brent Williams | 5 | 22 | ||||||||||||||||||||||||
| A10302 | Prepare/Submit Preliminary Project Schedule | Henry McNeal | 5 | 10 | ||||||||||||||||||||||||
| A10303 | Prepare/Submit Quality Control Plan | Jason Desjardins | 3 | 7 | ||||||||||||||||||||||||
| A10304 | Review/Approve Health and Safety Plan | Jason Desjardins | 3 | 80 | Contact SSHO Manager | |||||||||||||||||||||||
| A10305 | Review/Approve List of Proposed Contractors | Jason Desjardins | 5 | 30 | ||||||||||||||||||||||||
| A10305 | Mobilization | 0 |
CLICK HERE TO CREATE IN SMARTSHEET
http://bit.ly/2ZM77jmhttps://www.smartsheet.com/try-it?trp=10669&utm_source=template-excel&utm_medium=content&utm_campaign=Three-Week+Look+Ahead+Construction+Schedule-excel-10669&lpa=Three-Week+Look+Ahead+Construction+Schedule+excel+10669 image1.png image2.svg
.MsftOfcThm_Accent4_lumMod_75_Stroke_v2 { stroke:#BF9000;
File details come from the government source that posted it. Updated .