attachment-11-rfb-dmavs-2025-02.pdf
PDF 5 MB Posted
- Attached to
- NHARNG Strafford Water Disinfection
- Solicitation number
- RFB DMAVS 2025-02
- Issued by
- Strafford County, New Hampshire
About this file
This Request for Bid (RFB DMAVS 2025-02) document consists of technical drawings and specifications issued by the New Hampshire Department of Military Affairs and Veterans Services (DMAVS) for water disinfection system upgrades at the New Hampshire Army National Guard (NHARNG) Center Strafford facility located at 1 Austin Cate Drive in Center Strafford, NH. The project requires installation of a permanent sodium hypochlorite-based water disinfection system to replace temporary chlorination infrastructure. Key deliverables include demolition of existing equipment (35-gallon polyphosphate tank, 44-gallon spill containment pallet, existing chlorine storage tank), installation of a 45-gallon polyethylene sodium hypochlorite storage tank with 50-gallon containment pallet, peristaltic chemical metering pumps (one primary, one spare), an inline static mixer, flow meters, dual chlorine and pH analyzer boards, and a comprehensive control system utilizing a programmable logic controller (PLC). The technical specifications encompass mechanical, piping, process instrumentation, plumbing, and electrical systems with detailed design requirements for chemical feed systems, backflow prevention, secondary containment, sample taps, and emergency eyewash stations. Mandatory site visits are scheduled for March 28, 2025, and April 1, 2025, at 9:00 AM. Bids are due April 11, 2025, at 12:00 PM EST. The contract term extends from Governor and Council approval through November 28, 2025, with all work to be performed between 7:00 AM and 3:30 PM.
Contractors must be registered to do business in New Hampshire, possess a completed Vendor Application Package, and maintain good standing with the NH Secretary of State. General liability insurance of at least $1,000,000 per occurrence and $2,000,000 aggregate, along with workers' compensation insurance, is required. The project includes a $10,000 allowance for unforeseen conditions and applies a 5% retainage policy to project payments. Invoices will be processed via ACH transfer within 30 days of invoice receipt and service acceptance. Federal debarment compliance and environmental management protocols addressing energy conservation and pollution control are mandatory. The contract is non-exclusive, and the State reserves the right to retain additional contractors for related services. Specific pricing and budget information will be determined through the competitive bidding process outlined in the Request for Bid documentation.
View the file
Other files
Show all 26
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
NEW HAMPSHIRE ARMY NATIONAL GUARD
CENTER STRAFFORD
WATER DISINFECTION UPGRADES
DEPARTMENT OF MILITARY AFFAIRS AND VETERANS SERVICES
1 AUSTIN CATE DRIVE
CENTER STRAFFORD, NH 03815
R E V I S I O N S
DATE SYMBOL
DESCRIPTION
DATE SYMBOL
DESCRIPTION
P R O J E C T N A M E
DATE SYMBOL
DESCRIPTION
CENTER STRAFFORD WATER
DISINFECTION UPGRADES
I S S U E D A T E
S H E E T N U M B E R
3/12/2025
T-101
L O C U S M A P
Pl ot te d
O n:
M ar
4, 5- 1:
pm
B y:
J B ow m an
La st
S av ed :2
/2 4/
Ti gh e
B on d:
F:
\P ro je ct s\ N
\N
N
H A rm y
N at io na l G ua rd
O n
C al l S er vi ce s N
H A R N
G \0
C en te r
S tr af fo rd D is in fe ct io n\
D ra w in gs \A ut oC
A D
\S he et \N
-0
5_ G
-C O
V R .d w g
C I V I L
Tighe & Bond, Inc.
177 Corporate Drive Portsmouth, NH 03801
p. 603-433-8818
f. 603-433-8988
SITE
PROCESS MECHANICAL
Tighe & Bond, Inc.
177 Corporate Drive Portsmouth, NH 03801
p. 603-433-8818
f. 603-433-8988
E L E C T R I C A L
Tighe & Bond, Inc.
177 Corporate Drive Portsmouth, NH 03801
p. 603-433-8818
f. 603-433-8988
SCALE: 1" = 2000'
3/12/2025
MATTHEW
ROMANO
No.14059
03/12/2025
DEREK
BELANGER
No.17730
03/12/2025
FROM WELL #4
TO DISTRIBUTION SYSTEM
TO STORAGE TANK
FROM WELL #1
ET-1
FROM STORAGE TANK
SEE CIVIL PLANS
P
WH-1-1N WH-1-2N
V
FROM WELL #5
RESIN 1
BRINE 1 BRINE 2
RESIN 2
M
M
M
M
PP2C
RELOCATE EXISTING 35
GALLON POLYPHOSPHATE
TANK
DEMOLISH EXISTING 44
GALLON SPILL
CONTAINMENT PALLET
DEMOLISH EXISTING 2" PVC
PIPE AFTER PROPOSED PIPE
INSTALLATION
SELECTIVE DEMOLITION OF
PIPING, AS NEEDED TO INSTALL
PROPOSED PIPING
N
DESIGNED/CHECKED BY:MET
DRAWN BY:JRB
FILE:
APPROVED BY:JMP
Center Strafford, NH
Center Strafford Disinfection Upgrades
New Hampshire Army National Guard
DATE:
PROJECT NO:
MARK DATE DESCRIPTION
N0967-0105-C-DSGN.dwg
03/12/2025
N0967-0105
SCALE:
Pl ot te d
O n:
M ar
4, 5-
:5 6a m B y:
J
B ow m an
La st
S av ed
2/
/2
Ti gh e
B on d:
F:
\P ro je ct s\ N
\N
N
H A rm y
N at io na l G ua rd
O n
C al l S er vi ce s N
H A R N
G \0
C en te r
S tr af fo rd D is in fe ct io n\
D ra w in gs \A ut oC
A D
\S he et \N
-0
5- C -D
S G
N .d w g
MECHANICAL DEMOLITION
PLAN
D-101
AS SHOWN
RELOCATE EXISTING 35
GALLON POLYPHOSPHATE
TANK
REMOVE AND SALVAGE
EXISTING CHLORINE
STORAGE TANK
DEMOLISH EXISTING 44
GALLON CONTAINMENT
PALLET
EXISTING 35 GALLON POLYPHOSPHATE TANK AND SPILL
CONTAINMENT PALLET
EXISTING CHLORINE TANK
NOTES:
1. CONTRACTOR TO COORDINATE WITH THE OWNER FOR MATERIALS TO BE SAVED AND
TURNED OVER TO THE OWNER.
2. EXISTING POLYPHOSPHATE TANK TO BE RELOCATED IN EXISTING LOCATION ON A NEW
CHEMICAL CONTAINMENT PAD.
0 1' 2' 4'
1/2"=1'-0"
3/12/2025
DEREK
BELANGER
TO STORAGE TANK
FROM WELL #1
ET-1
FROM STORAGE TANK
SEE CIVIL PLANS
P
WH-1-1N WH-1-2N
V
FROM WELL #5
RESIN 1
BRINE 1 BRINE 2
RESIN 2
M
M
M
M
PROPOSED EYE WASH STATION
(COORDINATE FINAL LOCATION
WITH OWNER) (SEE SHEET
P-101 FOR PLUMBING)
PROPOSED ANALYZER BOARD (2
CHLORINE ANALYZERS AND 2 PH
ANALYZERS) (COORDINATE FINAL
LOCATION WITH OWNER)
PROPOSED INLINE STATIC
MIXER
PROPOSED CHEMICAL
INJECTION ASSEMBLY
DRAIN TO EXISTING 2"
PVC DRAIN LINE
PROPOSED 45 GAL
POLYETHYLENE
SODIUM
HYPOCHLORITE TANK
PROPOSED
CONTAINMENT
PALLET (50 GAL)
PERISTALTIC CHEMICAL
METERING PUMPS INSTALLED
IN PARALLEL (1 PRIMARY, 1
SPARE)
PROPOSED BALL
VALVE
PROPOSED
SECOND
CHEMICAL
INJECTION
ASSEMBLY
EXISTING 35 GALLON
POLYPHOSPHATE
TANK (RELOCATED
TO LOCATION
SHOWN)
PROPOSED FLOW METER FOR
SODIUM HYPOCHLORITE
INJECTION
INSTALL TUBING FOR
POST-INJECTION
SIDESTREAM TO
ANALYZER BOARD
INSTALL 2" PVC TANK VENT TO
BUILDING EXTERIOR (PLUMBING
TO BE DESIGNED BY OTHERS)
CONNECT TO
EXISTING 2" TREATED
WATER PIPE
INSTALL 25 GALLON
CONTAINER AND SUMP PUMP
INSTALL AIR CHECK
VALVE ON PVC
ANALYZER DRAIN PIPE
2" PVC FINISHED
WATER SAMPLE
TO ANALYZER
BOARD
N
DESIGNED/CHECKED BY:MET
DRAWN BY:JRB
FILE:
APPROVED BY:JMP
Center Strafford, NH
Center Strafford Disinfection Upgrades
New Hampshire Army National Guard
DATE:
PROJECT NO:
MARK DATE DESCRIPTION
N0967-0105-C-DSGN.dwg
03/12/2025
N0967-0105
SCALE:
Pl ot te d
O n:
M ar
2, 5- 4:
pm
B y:
J B ow m an
La st
S av ed
3/
/2
Ti gh e
B on d:
F:
\P ro je ct s\ N
\N
N
H A rm y
N at io na l G ua rd
O n
C al l S er vi ce s N
H A R N
G \0
C en te r
S tr af fo rd D is in fe ct io n\
D ra w in gs \A ut oC
A D
\S he et \N
-0
5- C -D
S G
N .d w g
PIPING FLOOR PLAN
M-101
AS SHOWN
NOTES:
1. CONTRACTOR SHALL DESIGN ANALYZER BOARD LAYOUT WITH ASSOCIATED
PROCESS FITTINGS FOR BACKFLOW PREVENTION AS REQUIRED FOR
REGULATORY COMPLIANCE AND SAFETY.
2. PROPOSED EQUIPMENT IS SHOWN DIAGRAMMATICALLY, CONTRACTOR
SHALL DETERMINE EQUIPMENT AND PIPING LOCATIONS BASED ON ACTUAL
FIELD CONDITIONS.
3. CONTRACTOR SHALL INSTALL A CHECK VALVE AND AIR GAP ON THE
ANALYZER DRAIN PIPE AT AN ELEVATION SUITABLE FOR GRAVITY DRAINAGE
TO THE EXISTING OVERHEAD DRAIN LINE.
4. COORDINATE WITH OWNER FOR FINAL LOCATION OF EYEWASH STATION
AND ASSOCIATED PIPING BASED ON EXISTING ROOM POTABLE WATER AND
DRAINAGE LOCATIONS. ASSOCIATED PLUMBING SYSTEMS SHALL BE
DESIGNED BY A MECHANICAL ENGINEER ONCE EYEWASH STATION
LOCATION IS DETERMINED.
5. METERING PUMPS SHALL BE INSTALLED WITH A FOOT VALVE ON THE
SUCTION PIPING AND DEGASSING VALVES ON SUCTION AND DISCHARGE
PIPING AT PIPE SYSTEM HIGH POINTS.
0 1' 2' 4'
1/2"=1'-0"
3/12/2025
DEREK
BELANGER
PIPING & INSTRUMENTATION
DIAGRAM LEGEND - WATER
TREATMENT
ELECTRICAL SIGNAL (ALL WIRE SHALL BE PROVIDED
IN CONDUIT AS SPECIFIED IN DIVISION 16)
LINE SYMBOLS
NEW PROCESS LINE
FUTURE PROCESS LINE
EXISTING PROCESS LINE
CAP OR PLUG
PIPE SYMBOLS
BALL VALVE
CHEMICAL INJECTOR
PIPE MATERIAL
LINE CODING
SIZE - A - CLASS
PIPE CLASS BREAK
PROGRAMMABLE LOGIC CONTROLLER
INSTRUMENTATION IDENTIFICATION
LEVEL INDICATING TRANSMITTERLIT
ZSO OPENED LIMIT SWITCH
PLC
MATERIAL CODES (A)
PRESSURE RELIEF VALVE
METERING PUMP
CU COPPER
SAMPLE TAP
CHECK VALVE
FLOW METER
PVC POLYVINYL CHLORIDE
PE POLYETHYLENE
DIRECTION OF FLOW
UNION
DESIGNED/CHECKED BY:MET
DRAWN BY:JRB
FILE:
APPROVED BY:JMP
Center Strafford, NH
Center Strafford Disinfection Upgrades
New Hampshire Army National Guard
DATE:
PROJECT NO:
MARK DATE DESCRIPTION
N0967-0105C-PID-101.dwg
03/12/2025
N0967-0105
SCALE:
Pl ot te d
O n:
M ar
4, 5-
:0 2p m B y:
J
B ow m an
La st
S av ed
2/
/2
Ti gh e
B on d:
F:
\P ro je ct s\ N
\N
N
H A rm y
N at io na l G ua rd
O n
C al l S er vi ce s N
H A R N
G \0
C en te r
S tr af fo rd D is in fe ct io n\
D ra w in gs \A ut oC
A D
\S he et \N
-0
5C -P
ID
-1
.d w g
AS SHOWN
1/2" TUBING WITH FOOTVALVE
M-201
GENERAL PROCESS NOTES:
1. PROCESS EQUIPMENT DIMENSIONS, LOCATION AND PIPING SYSTEM LAYOUTS ARE BASED ON EQUIPMENT SELECTED BY THE ENGINEER. ALTERNATIVES PROPOSED BY THE CONTRACTOR THAT REQUIRE AN ARRANGEMENT OR SPACE DIFFERING FROM THAT INDICATED ON THE DRAWINGS OR SPECIFIED SHALL BE SUBMITTED FOR APPROVAL TO THE ENGINEER AND SHALL BE AT NO EXTRA COST TO THE OWNER. THE CONTRACTOR SHALL ASSUME THE COST OF AND THE RESPONSIBILITY FOR SATISFACTORILY ACCOMPLISHING ALL THE NECESSARY CHANGES CORRESPONDING TO THE PROPOSED ALTERNATES.
2. All PIPE SUPPORTS SHALL BE DESIGNED, FURNISHED AND INSTALLED BY THE CONTRACTOR AS SPECIFIED IN SECTION 15060. THE DESIGN SHALL BE SUBMITTED TO THE ENGINEER PRIOR TO INSTALLATION. WHEN ENGINEERING SERVICES ARE SPECIFIED TO BE PROVIDED BY THE CONTRACTOR OR EQUIPMENT VENDORS; A LICENSED PROFESSIONAL ENGINEER SHALL PERFORM THE REQUIRED SERVICES.
3. ALL PIPING ADJACENT TO EQUIPMENT, VALVES, COUPLING, INSTRUMENTS AND OTHER APPURTENANCES SHALL BE PROPERLY SUPPORTED AND/OR ANCHORED SO AS NOT TO IMPOSE LOADS ON EQUIPMENT.
4. NOT ALL VALVE OPERATORS ARE SHOWN. OPERATORS SHALL BE LOCATED TO ALLOW CONVENIENT OPENING AND CLOSING OF VALVES. ORIENTATION OF OPERATORS SHALL BE APPROVED BY THE ENGINEER. NO VALVE SHALL BE INSTALLED WITH THE OPERATING STEM IN THE VERTICAL DOWNWARD POSITION. VALVE INDICATORS PROVIDED OVERHEAD SHALL BE VISIBLE FROM FINISHED FLOOR ELEVATION.
5. PVC PIPE FOR CHEMICAL FEED SYSTEMS SHALL BE SOLVENT WELDED IN ACCORDANCE WITH SECTION 15104.
6. PROVIDE PROCESS PIPING IDENTIFICATION AS INDICATED IN SECTION 15075. IDENTIFICATION USING A STENCIL AS INDICATED IN SECTION 15075.
7. SAMPLE TAPS SHALL BE PROVIDED SO THAT WATER SAMPLES MAY BE OBTAINED FROM EACH PROCESS PIPING DESIGNATION AND FROM BEFORE AND AFTER EACH EQUIPMENT STAGE . TAPS SHALL BE CONSISTENT WITH SAMPLING NEEDS AND SHALL NOT BE OF PETCOCK TYPE. TAPS SHALL BE OF THE SMOOTH-NOSED TYPE WITHOUT INTERIOR OR EXTERIOR THREADS AND SHALL NOT BE OF THE MIXING TYPE OR WITH A SCREEN, AERATOR OR
OTHER SUCH APPURTENANCE.
CHEMICAL STORAGE & FEED SYSTEM NOTES:
1. PIPING SHOWN IS GENERAL ARRANGEMENT ONLY. REFER TO PLAN FOR VARIOUS COMPONENT LOCATIONS.
REFER TO P&ID FOR PIPE SIZES, MATERIALS, VALVING ARRANGEMENT, AND OTHER MISCELLANEOUS PIPING
APPURTENANCES NOT SHOW.
2. THE SODIUM HYPOCHLORITE FEED SYSTEM SHALL BE EQUIPPED WITH A FOOT STRAINER AND DEGASSING VALVE IN ACCORDANCE WITH SECTION 11200. DEGASSING PIPE SHALL BE LOCATED NO MORE THAN 2 FEET
ABOVE THE STORAGE PLAN.
3. THE SODIUM HYPOCHLORITE STORAGE TANK SHALL BE EQUIPPED WITH A VENT WHICH EXHAUSTS TO THE
BUILDING EXTERIOR.
4. MOUNT METERING PUMPS ON UNISTRUT SUPPORTED SHELVES AND ADJACENT TO CURB. SUPPORT FRAMES
SHELVES SHALL BE COMPATIBLE WITH THE SERVICE CHEMICAL.
5. CHEMICAL PIPING FOR SODIUM HYPOCHLORITE SHALL BE SCHEDULE 80 PVC, UNLESS OTHERWISE NOTED.
6. PROVIDE LABELS AND SAFETY SIGNS FOR ALL NEW SYSTEMS COMPONENTS.
7. PROVIDE FRP OR PVC SUPPORTS FOR PIPE AND VALVES FOR SODIUM HYPOCHLORITE CHEMICAL FEED SYSTEM.
8. USE FLEXIBLE CONNECTIONS ON DAY TANKS TO JOIN TANK PIPING CONNECTIONS TO RIGID PIPING SYSTEM.
9. ROUTE AND SUPPORT PIPING ALONG WALL TO EXTENT FEASIBLE.
10. PROVIDE TANK HOUSE KEEPING TANK PAD FOR POTASSIUM HYDROXIDE BULK TANK WHICH SHALL
ACCOMMODATE THE TANKS INTEGRALLY MOLDED FLANGED OUTLET.
11. AVOID 90° BENDS FOR FILL AND FEED LINES TO EXTENT POSSIBLE.
12. FLEXIBLE CONNECTORS SHALL BE ON ALL VERTICAL CONNECTION TO TANKS.
13. ALL CHEMICAL METERING PUMP AND TRANSFER PUMP CONTROL PANELS SHALL NOT BE LOCATED IN FRONT OF
THE METERING PUMPS AND SHALL NOT OBSTRUCT ACCESS TO THE CHEMICAL STORAGE AREA.
14. ALL UNISTRUT WITHIN CONTAINMENT FOR SODIUM HYPOCHLORITE SHALL BE FULLY FRP.
15. CONTRACTOR TO PROVIDE PIPE SUPPORTS AS REQUIRED. PIPING AND UNI-STRUT SUPPORTS SHALL BE FRP.
ALL VERTICAL CHEMICAL AND RELATED PIPING SHALL BE SUPPORTED OR BRACED IN SUCH A MANNER AS TO PREVENT WHIPPING OF PIPE/TUBING. MOUNTING HARDWARE AND ANCHORS SHALL BE STAINLESS STEEL FOR ALL CHEMICALS OTHER THAN SODIUM HYPOCHORITE. MOUNTING HARDWARE FOR SODIUM HYPOCHLORITE
SHALL BE FRP OR EQUAL, AS APPROVED BY THE ENGINEER.
16. CONTRACTOR SHALL COORDINATE TUBING SIZES AS REQUIRED FOR CONNECTIONS TO PUMPS AND ANALYZERS. PROVIDE REDUCERS AND FITTINGS AS REQUIRED AT NO ADDITIONAL COST TO OWNER.
17. CHEMICAL FEED PIPIING SHALL BE INSTALLED IN SUCH A WAY AS TO ALLOW EQUIPMENT ACCESS AND SPACE FOR MAINTENANCE. PROVIDE PIPE PROTECTION TO PROTECT PIPING FROM PHYSICAL DAMAGE WHEN IN THE OPINION OF THE ENGINEER, THE POTENTIAL FOR DAMAGE EXISTS. PROTECTION SYSTEMS SHALL BE
CORROSION RESISTANT.
18. CONTRACTOR SHALL FIELD LOCATE/ROUTE ALL PIPING, EQUIPMENT AND APPURTENANCES AS REQUIRED TO ENSURE A FULL FUNCTIONAL AND INTEGRATED CHEMICAL FEED SYSTEM AS SPECIFIED. CONTRACTOR MUST REVIEW THE PROPOSED CHEMICAL FEED SYSTEM LAYOUT WITH THE ENGINEER AND OWNER IN THE FIELD
PRIOR TO INSTALLATION.
19. THE SYSTEM SCHEMATICS DO NO SHOW ALL UNIONS. CONTRACTOR IS RESPONSIBLE FOR PROVIDING SUFFICIENT UNIONS TO PERMIT THE REMOVAL OF EQUIPMENT, VALVES, ETC. FOR MAINTENANCE.
20. FIELD LOCATE CALIBRATION COLUMN SUCH THAT TOP OF COLUMN ELEVATION IS NO HIGHER THAN LIQUID
LEVEL IN THE STORAGE TANKS WHEN HALF FULL.
21. FOR INSTRUMENTATION ABBREVIATIONS AND LEGEND, REFER TO THE INSTRUMENTATION DRAWINGS.
22. REFER TO SPECIFICATION SECTIONS FOR CHEMICAL FEED SYSTEMS AND PIPE SPECIFICATIONS.
23. USE SWEEPS, LONG RADIUS BENDS, FOR CARRIER PIPE CONTAINING CHEMICAL FEED TUBING.
24. ALL BALL VALVES ON SUCTION AND DISCHARGE OF SODIUM HYPOCHLORITE PIPING SHALL BE BLEACH BALL
VALVE AND VENT PIPE.
MIXING VALVE
SUMP PUMP
INLINE STATIC MIXER
3/12/2025
DEREK
BELANGER
PLC
2"-PVC-RW
TK-2
RESIN
TANK
2"-PVC-DR
BRINE
TANK
2"-PVC-BW
TO
DRAIN
WATER STORAGE TANK
4"-DI-TW
BUILDING
INTERIOR
BUILDING
EXTERIOR
PI
3 8" -P
E
TU
B E-
PS
M
TK-3
RESIN
TANK
BRINE
TANK
DI
IX REGENERATION
CYCLE ACTIVE
AI
TANK
LEVEL
TK-1
CALCITE
TANK
ZSO
DI
TANK HATCH
OPEN
LIT
DI
TANK HATCH
OPEN
ZSO
8"-DI-TW
TO BOOSTER
PUMP
M
M
M
M M
M
1 12" MOTORIZED
ALTERNATING VALVE (TYP)
1 12" NO HARD WATER
BYPASS VALVE (TYP)
EXISTING 2" METER
CONTROL
EXISTING CHEMICAL INJECTOR
ASSEMBLY WITH CHECK VALVE
2" BALL VALVE AND CAP
FOR FUTURE CALCITE TANK
CONNECTION (TYP OF 4)
2"-PVC-TW
2" PVC BALL VALVE
INLINE STATIC MIXER
INJECT DIRECTLY IN
THE STATIC MIXER
HOUSING
ANALYZER
BOARD
CHEMICAL INJECTOR
INLINE STATIC
MIXER
PERISTALTIC CHEMICAL
DOSING PUMPS
INSTALLED IN PARALLEL
(1 PRIMARY, 1 SPARE) 1/2" TUBING WITH
FOOTVALVE (TYP. OF 2)
45 GAL POLYETHYLENE
SODIUM HYPOCHLORITE
TANK
50 GAL SPILL
CONTAINMENT
DI
RUNNING
DI
HAND
DI
AUTO
DO
START/
STOP
AI
SPEED
AO
SPEED
COMMAND
DI
FAULT
TYPICAL OF 2
pH 1
AI
CHLORINE
RESIDUAL
AI
CHLORINE
RESIDUAL
AI
pH2
AI
PUMP INTO EXISTING 2"
DRAIN PIPE (PLUMBING TO
BE DESIGNED BY OTHERS)
FROM
PRESSURE
TANK
OUTLET
M
EXISTING BALL VALVE
EXISTING
POLY
PHOSPHATE
TANK
2" METER CONTROL
AI
TANK
LEVEL
2" PVC TANK VENT TO
BUILDING EXTERIOR
(PLUMBING TO BE
DESIGNED BY OTHERS)
SUMP PUMP
AI
FLOW
FIT
FE
SODIUM
HYPOCHLORITE
METERING PUMP
CONTROL PANEL
P-201 P-202
LE LIT
AIT
AE
AIT
LIT
EYEWASH
ACTIVATED
DI
AIT
AE
AIT
LIT
FS
EMERGENCY EYE WASH
& SHOWER STATION
TEMP 1
AI
TEMP 2
AI
NOTES:
1. WHERE SPACE IS LIMITED, PIPING SHALL BE STACKED VERTICALLY (INSTEAD OF SPREAD ACROSS
HORIZONTALLY) TO PRESERVE SPACE.
2. PIPING IS SHOWN DIAGRAMMATICALLY. LOCATION AND CONFIGURATION TO BE DETERMINED IN THE
FIELD.
3. COORDINATE WITH OWNER FOR INSTRUMENTATION TAG NUMBERS.
DESIGNED/CHECKED BY:MET
DRAWN BY:JRB
FILE:
APPROVED BY:JMP
Center Strafford, NH
Center Strafford Disinfection Upgrades
New Hampshire Army National Guard
DATE:
PROJECT NO:
MARK DATE DESCRIPTION
N0967-0105C-PID-101.dwg
03/12/2025
N0967-0105
SCALE:
Pl ot te d
O n:
M ar
0, 5- 3:
pm
B y:
J B ow m an
La st
S av ed
3/
/2
Ti gh e
B on d:
F:
\P ro je ct s\ N
\N
N
H A rm y
N at io na l G ua rd
O n
C al l S er vi ce s N
H A R N
G \0
C en te r
S tr af fo rd D is in fe ct io n\
D ra w in gs \A ut oC
A D
\S he et \N
-0
5C -P
ID
-1
.d w g
PIPING & INSTRUMENTATION
DIAGRAM-WATER
TREATMENT
M-301
AS SHOWN
3/12/2025
DEREK
BELANGER
3" AIR GAP
7.0
PRESSURE REDUCING VALVE
DRAIN BUCKET WITH
SUMP
3" PRESSURE GAUGE WITH PETCOCK
BALL VALVE (TYP)
pH TRANSMITTER
(TYP)
INSTALL SAMPLE FLOW REGULATOR
2' ABOVE CHLORINE ANALYZER (TYP)
RAW OR FINISHED WATER
SAMPLE LINE
PROVIDE FLOW CELL
ASSEMBLY FOR pH SENSOR
RAW OR FINISHED
WATER SAMPLE LINE
BACKFLOW PREVENTER
CHLORINE
AND pH
ANALYZER
TO DRAIN PIPE
2'
BALL CHECK VALVE
3/8" PVC SUCTION TUBING TO CHEMICAL TANK
PROVIDE FOOT VALVE AND STRAINER AT THE TANK
1/2" PVC
TUBING ADAPTER (TYP)
TUBING
TO MATCH
PUMP ENDS
1/2" PVC
4-FUNCTION
VALVE
CALIBRATION COLUMN
1/2" PVC
CHEMICAL FEED PUMP
EXTERNAL FLOW SIGNAL (ALL PUMPS)
RELIEF RETURN CONNECT TO TANK
TUBING ADAPTER (TYP)
TO MAIN
DESIGNED/CHECKED BY:MET
DRAWN BY:JRB
FILE:
APPROVED BY:JMP
Center Strafford, NH
Center Strafford Disinfection Upgrades
New Hampshire Army National Guard
DATE:
PROJECT NO:
MARK DATE DESCRIPTION
N0967-0105C-DTLS.dwg
03/12/2025
N0967-0105
SCALE:
Pl ot te d
O n:
M ar
4, 5- 1:
pm
B y:
J B ow m an
La st
S av ed
3/ 4/
Ti gh e
B on d:
F:
\P ro je ct s\ N
\N
N
H A rm y
N at io na l G ua rd
O n
C al l S er vi ce s N
H A R N
G \0
C en te r
S tr af fo rd D is in fe ct io n\
D ra w in gs \A ut oC
A D
\S he et \N
-0
5C -D
TL
S .d w g
MECHANICAL DETAILS
SHEET
MD-101
AS SHOWN
ADAPTERS WHERE REQ'D
PROVIDE PIPE/TUBING
CHECK VALVE
PVC DIAPHRAGM
3/8" INJECTION TUBING
STAINLESS STEEL HOSE
CLAMP OR TUBING ADAPTER
SIZE AS INDICATED ON DRAWINGS
THRUST COLLAR
SCH. 80 PVC/CPVC PIPE
FLUSHING CONN
BALL VALVE
(TYP)
BRONZE CHAIN - LENGTH TO ALLOW
SOLUTION TUBE TO BE WITHDRAWN
BEYOND CORPORATION STOP
CLEAR PVC FOR MONITORING
LEAKS
2" CARRIER
TUBE PIPE
3" CONTAINMENT PIPE
PROVIDE SECONDARY
CONTAINMENT CAP
SODIUM HYPOCHLORITE INJECTION
EXAMPLE pH AND CHLORINE ANALYZER BOARD (TYP OF 2)
NO SCALE
NO SCALE
FRP/PLASTIC HOSE
CLAMP OR TUBING
ADAPTER
NOTES:
1. CONTRACTOR SHALL DESIGN ANALYZER BOARD LAYOUT, EXAMPLE PROVIDED FOR INFORMATIONAL
PURPOSES ONLY.
INJECTION POINT
TYPICAL CHEMICAL FEED PUMP PIPING
NO SCALE
3/12/2025
DEREK
BELANGER
TO STORAGE TANK
FROM WELL #1
ET-1
FROM STORAGE TANK
SEE CIVIL PLANS
P
WH-1-1N WH-1-2N
V
FROM WELL #5
RESIN 1
BRINE 1 BRINE 2
RESIN 2
M
M
M
M
PROPOSED EYE WASH STATION
(COORDINATE FINAL LOCATION
WITH OWNER) (SEE SHEET
P-101 FOR PLUMBING)
PROPOSED ANALYZER BOARD (2
CHLORINE ANALYZERS AND 2 PH
ANALYZERS) (COORDINATE FINAL
LOCATION WITH OWNER)
PROPOSED INLINE STATIC
MIXER
PROPOSED CHEMICAL
INJECTION ASSEMBLY
DRAIN TO EXISTING 2"
PVC DRAIN LINE
PROPOSED 45 GAL
POLYETHYLENE
SODIUM
HYPOCHLORITE TANK
PROPOSED
CONTAINMENT
PALLET (50 GAL)
PERISTALTIC CHEMICAL
METERING PUMPS INSTALLED
IN PARALLEL (1 PRIMARY, 1
SPARE)
PROPOSED BALL
VALVE
PROPOSED
SECOND
CHEMICAL
INJECTION
ASSEMBLY
EXISTING 35 GALLON
POLYPHOSPHATE
TANK (RELOCATED
TO LOCATION
SHOWN)
PROPOSED FLOW METER FOR
SODIUM HYPOCHLORITE
INJECTION
INSTALL TUBING FOR
POST-INJECTION
SIDESTREAM TO
ANALYZER BOARD
INSTALL 2" PVC TANK VENT TO
BUILDING EXTERIOR (PLUMBING
TO BE DESIGNED BY OTHERS)
CONNECT TO
EXISTING 2" TREATED
WATER PIPE
INSTALL 25 GALLON
CONTAINER AND SUMP PUMP
INSTALL AIR CHECK
VALVE ON PVC
ANALYZER DRAIN PIPE
INSTALL TAP OFF EXISTING
COLD WATER TO EYEWASH
STATION (PLUMBING TO BE
DESIGNED BY CONTRACTOR)
(SEE NOTE #1)
2" PVC FINISHED
WATER SAMPLE
TO ANALYZER
BOARD
INSTALL TAP OFF EXISTING COLD WATER TO
EYEWASH STATION MIXING VALVE (PLUMBING
TO BE DESIGNED BY CONTRACTOR) (SEE NOTE #1)
PROPOSED
MIXING
VALVE
INSTALL TAP OFF EXISTING HOT
WATER TO EYEWASH STATION
MIXING VALVE (PLUMBING TO BE
DESIGNED BY CONTRACTOR) (SEE NOTE #1)
N
DESIGNED/CHECKED BY:MET
DRAWN BY:JRB
FILE:
APPROVED BY:JMP
Center Strafford, NH
Center Strafford Disinfection Upgrades
New Hampshire Army National Guard
DATE:
PROJECT NO:
MARK DATE DESCRIPTION
N0967-0105-C-DSGN.dwg
03/12/2025
N0967-0105
SCALE:
Pl ot te d
O n:
M ar
2, 5- 4:
pm
B y:
J B ow m an
La st
S av ed
3/
/2
Ti gh e
B on d:
F:
\P ro je ct s\ N
\N
N
H A rm y
N at io na l G ua rd
O n
C al l S er vi ce s N
H A R N
G \0
C en te r
S tr af fo rd D is in fe ct io n\
D ra w in gs \A ut oC
A D
\S he et \N
-0
5- C -D
S G
N .d w g
PLUMBING PLAN
P-101
AS SHOWN
0 1' 2' 4'
1/2"=1'-0"
NOTES:
1. CONTRACTOR SHALL PREPARE PLUMBING DIAGRAM FOR INSTALLATION OF EYE
WASH STATION INCLUDING PIPING, VALVES, AND FITTINGS FOR REVIEW AND
APPROVAIL BY ENGINEER PIOR TO CONSTRUCTION.
HOMERUN TO EQUIPMENT. "L4A1" INDICATES EQUIPMENT ID, "1,3" INDICATES
PANELBOARD CIRCUIT NUMBERS, (20A, 1P, UNLESS INDICATED OTHERWISE)
SEE DRAWINGS FOR QUANTITY AND SIZE OF WIRE AND CONDUIT. MINIMUM
2#12,#12G, IN 34"C IF NOT INDICATED OR SCHEDULED OTHERWISE. DASHED
LINES INDICATE IN OR UNDER SLAB.
FEEDER TAG - REFER TO LEGEND OR TABLE OF FEEDER SIZES
L4A1-1,3
JUNCTION BOX WITH SINGLE POINT ELECTRICAL CONNECTION TO EQUIPMENT.J
1. WIRING IS SHOWN ON DRAWINGS ONLY FOR SPECIFIC ROUTES OR
SPECIAL CONDITIONS.
2. WIRING AND CONDUIT SHALL BE REQUIRED BETWEEN ALL OUTLETS
INDICATED WITH CIRCUIT NUMBERS AND PANEL DESIGNATIONS.
3. ALL SWITCH CONTROLS SHALL BE FURNISHED WITH WIRING AND
CONDUIT AS REQUIRED.
4. ALTHOUGH ALL BRANCH CIRCUIT WIRING AND CONDUIT IS NOT SHOWN,
IT IS THE INTENT OF THESE DOCUMENTS THAT A COMPLETE BRANCH
CIRCUIT WIRING SYSTEM BE INSTALLED.
5. A GREEN GROUNDING CONDUCTOR SHALL BE RUN WITH ALL CIRCUITS.
VERIFY CONDUIT SIZE TO ENSURE IT CAN ACCOMMODATE ALL PHASE,
NEUTRAL AND GROUND CONDUCTORS.
6. ALL BRANCH CIRCUITS SHALL HAVE INDIVIDUAL NEUTRALS AND GROUNDS.
BRANCH CIRCUITS SHALL NOT SHARE NEUTRALS OR GROUNDS.
RACEWAYS AND WIRING
RECEPTACLES
ABBREVIATIONS
BRANCH CIRCUIT WIRING NOTES
2#10,#10G,34"C
L4A1-1,3
GFI
DUPLEX RECEPTACLE.
NUMBERS/LETTERS SHOWN BESIDE RECEPTACLES SHALL INDICATED THE FOLLOWING:
"GFI" INDICATES INTEGRAL GROUND FAULT INTERRUPTER.
"2" (NUMBER OR PANELBOARD NAME AND NUMBER) INDICATES POWER CIRCUIT NUMBER.
"C" INDICATES CEILING MOUNTED.
SIMPLEX RECEPTACLE.
A
AF
AFF
AFG
AIC
AL
ARCH
AS
AT
ATS
AWG
BLDG
C
CB
CT
CAT
CIR, CKT
CP
CPT
COL
CU
DISC SW, DS
DWG
E
EC
EM
EXP
F
FU
FT
FVNR
FVR
G
GC
GFI, GFCI
ID
KCMIL, MCM
KVA
KVAR
KW
MC
MCB
MCC
MISC
MFR
MLO
NC, NC
NEC
NIC
NL
NO
NTS
OL
P
PH, Ø
PLC
PVC
PT
PVC
R
RGS
RVNR
S
SCCR, SCR
SCH 40
SP
SPD
SS
SW
TEL
TSP
TYP
UG
UPS
V
VFD
Y
W
WP
XFMR
WIRE SIZE OR IDENTIFICATION NUMBER
AMPERES
AMPERE FRAME (CIRCUIT BREAKER RATING)
ABOVE FINISHED FLOOR
ABOVE FINISHED GRADE
AMPERE INTERRUPTING CAPACITY
ALUMINUM
ARCHITECT
AMPERE SENSOR (CIRCUIT BREAKER RATING)
AMPERE TRIP (CIRCUIT BREAKER RATING)
AUTOMATIC TRANSFER SWITCH
AMERICAN WIRE GAUGE
BUILDING
CONDUIT
CIRCUIT BREAKER
CURRENT TRANSFORMER
CATALOG
CIRCUIT
CONTROL PANEL
CONTROL POWER TRANSFORMER
480 VOLTS - 120/240 VOLTS,
UNLESS OTHERWISE INDICATED
COLUMN
DELTA
COPPER
DISCONNECT SWITCH
DRAWING
WIRED ON EMERGENCY CIRCUIT
ELECTRICAL CONTRACTOR
EMERGENCY
EXPLOSION PROOF
FLUSH
FUSE
FEET
FULL VOLTAGE NON-REVERSING
FULL VOLTAGE REVERSING
GROUND
GENERAL CONTRACTOR
GROUND FAULT CIRCUIT INTERRUPTER
IDENTIFICATION
ONE THOUSAND CIRCULAR MILS
KILOVOLT-AMPERES
KILOVOLT-AMPERES REACTIVE
KILOWATTS
MECHANICAL CONTRACTOR
MAIN CIRCUIT BREAKER
MOTOR CONTROL CENTER
MISCELLANEOUS
MANUFACTURER
MAIN LUGS ONLY
NORMALLY CLOSED
NATIONAL ELECTRICAL CODE
NOT IN CONTRACT
NIGHT LIGHT
NORMALLY OPEN
NOT TO SCALE
OVERLOAD
POLE
PHASE
PROGRAMMABLE LOGIC CONTROLLER
POLYVINYL CHLORIDE
POTENTIAL TRANSFORMER
POLYVINYL CHLORIDE
RECESSED
RIGID GALVANIZED STEEL CONDUIT
REDUCED-VOLTAGE NON-REVERSING
SURFACE
SHORT CIRCUIT CURRENT INTERRUPTING RATING
SCHEDULE 40 PVC CONDUIT
SPARE
SURGE PROTECTION DEVICE
STAINLESS STEEL
SWITCH
TELEPHONE
TWISTED SHIELDED PAIR CABLE
TYPICAL
UNDERGROUND
UNINTERRUPTABLE POWER SUPPLY
VOLT
VARIABLE FREQUENCY DRIVE (ALSO REFERED
TO AS ADJUSTABLE FREQUENCY DRIVE)
WYE
WATT, WIRE
WEATHERPROOF
TRANSFORMER
MISCELLANEOUS
NOTES:
1. GREEN GROUND CONDUCTOR NOT INDICATED BUT SHALL BE INCLUDED IN
EACH RACEWAY. SIZE SHALL BE #12AWG UNLESS INDICATED OTHERWISE.
2. HOMERUNS TO PANELBOARDS SHALL HAVE A MAXIMUM OF THREE (3)
PHASE CONDUCTORS (ONE PER PHASE), (3) NEUTRALS AND (3) GROUND
CONDUCTORS IN EACH CONDUIT.
CONDUIT, CONCEALED IN FINISHED AREAS, EXPOSED IN UNFINISHED AREAS
SSL-2414 INSTRUMENT OR CONTROL DEVICE, SSL IS
DEVICE TYPE NUMERAL IS DEVICE NUMBER
MOUNTED AT 18" AFF UNLESS OTHERWISE NOTED.
LIT
INSTRUMENT OR CONTROL DEVICE.
"LIT-###" INDICATES INSTRUMENT OR DEVICE ID NUMBER/TAG.
JUNCTION BOX, SIZED PER NECJ
GENERAL DEMOLITION NOTES
1. DEMOLITION SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR. DISCONNECT
AND REMOVE EXISTING ELECTRICAL PANELBOARDS, JUNCTION BOXES, BRANCH
CIRCUITS, FEEDERS, RACEWAYS, DEVICES, ETC., AS REQUIRED TO ACCOMPLISH
THE NEW WORK AS SHOWN OR REASONABLY IMPLIED. THE CONTRACTOR SHALL
REFER TO THE ARCHITECTURAL, PLUMBING, MECHANICAL, AND ELECTRICAL
WORK SHOWN ON THE OTHER DRAWINGS OF THIS SET TO DETERMINE THE
EXTENT OF THE DEMOLITION WORK REQUIRED.
2. EXISTING BRANCH CIRCUITS NO LONGER SERVING ANY EQUIPMENT OR DEVICES
SHALL BE PULLED BACK TO AND DISCONNECTED FROM THE PANEL OF ORIGIN.
RE-LABEL EXISTING CIRCUIT BREAKERS AS SPARE AND PROVIDE A NEW
LABEL/NAMEPLATE OR TYPE-WRITTEN PANEL DIRECTORY.
3. BRANCH CIRCUITS SERVING EXISTING DEVICES TO REMAIN AND EXISTING
DEVICES TO BE REMOVED SHALL BE MAINTAINED AND RECONNECTED AS
REQUIRED AFTER REMOVAL OF THE EXISTING DEVICES, AS NECESSARY TO
ACCOMMODATE THE ALTERATIONS.
4. COORDINATE WITH THE OWNER'S RESPECTIVE DEPARTMENTS FOR THE
DISCONNECTION AND REMOVAL OF TELECOMMUNICATIONS, PROCESS,
EQUIPMENT, AND CABLING.
5. COORDINATE WITH THE ENGINEER, GENERAL, MECHANICAL, AND PLUMBING
CONTRACTORS FOR EXISTING EQUIPMENT TO BE DISCONNECTED AND REMOVED.
DISCONNECT AND REMOVE THE ELECTRIC CONDUIT AND WIRING BACK TO THE
POINT OF ORIGIN FOR EACH PIECE OF EQUIPMENT TO BE REMOVED.
6. THE CONTRACTOR SHALL REMOVE ALL WIRING/CABLING NO LONGER IN USE
FROM EXISTING RACEWAYS/CONDUITS. RACEWAYS/CONDUITS NO LONGER IN
USE THAT ARE EMBEDDED IN FLOOR SLABS SHALL BE CUT BACK AS REQUIRED
AND CAPPED. SURFACE-MOUNTED RACEWAYS/CONDUITS NO LONGER IN USE
SHALL BE REMOVED.
7. THE CONTRACTOR SHALL PROVIDE BLANK STAINLESS STEEL COVER PLATES FOR
ALL JUNCTION/DEVICE BOXES NO LONGER IN USE THAT ARE EMBEDDED IN
FLOOR SLABS OR MASONARY WALLS. ALL COVER PLATES SHALL BE PAINTED TO
MATCH EXISTING CONDITIONS.
8. REFER TO SPECIFICATIONS FOR ADDITIONAL DEMOLITION CRITERIA.
9. THE EXISTENCE OF UTILITIES AND APPURTENANCES AS SHOWN ON THESE
DRAWINGS ARE FOR REFERENCE ONLY, AND THE EXACT SIZE, TYPE, LOCATION
AND ELEVATION SHALL BE THOROUGHLY INVESTIGATED BY THE CONTRACTOR
PRIOR TO THE START OF CONSTRUCTION. FIELD MEASURE TO VERIFY EXISTING
AND CONTRACT INTERFACE DIMENSIONS, LOCATIONS, AND OTHER CONDITIONS.
THE CONTRACTOR SHALL BE FULLY RESPONSIBLE FOR ANY AND ALL DAMAGE
WHICH MIGHT BE OCCASIONED BY FAILURE TO EXACTLY LOCATE AND PRESERVE
ANY AND ALL UTILITIES.
10. CONTRACTOR SHALL ASSUME MATERIALS TO BE DEMOLISHED ARE POSITIVE FOR
HAZARDOUS MATERIALS AND DISPOSE OF AS NECESSARY IN ACCORDANCE WITH
APPLICABLE REGULATIONS. REFER TO SPECIFICATIONS FOR MORE DETAILS.
11. OWNER RETAINS RIGHT OF FIRST REFUSAL FOR ALL ITEMS TO BE REMOVED OR
DEMOLISHED. CONTRACTOR SHALL TAKE REASONABLE CARE TO AVOID DAMAGE
TO ITEMS TO BE RETAINED BY OWNER. NO ADDITIONAL CHARGE WILL BE
ALLOWED FOR REMOVAL OF SALVAGEABLE ITEMS.
12. FOR ITEMS BEING DEMOLISHED, REMOVE EXISTING SUPPORTS AND MOUNTING
HARDWARE. FILL OPENINGS FROM ANCHOR HOLES AND CONDUIT/PIPE
PENETRATIONS (UNLESS CONDUIT IS TO BE REUSED) WITH NON-SHRINK GROUT
AND PAINT TO MATCH WALL OR FLOOR.
13. PATCH HOLES IN CONCRETE FROM OLD EQUIPMENT SUPPORTS, CONDUITS,
PENETRATIONS, ETC. WITH NON-SHRINK GROUT.
14. PROPERLY DISPOSE OF DEMOLISHED EQUIPMENT IN COMPLIANCE WITH CODES,
REGULATIONS, AND DEEP STANDARDS.
GENERAL NOTES
1. BOLD TEXT AND LINES INDICATE PROPOSED WORK, LIGHT TEXT AND LINES INDICATE APPROXIMATE
EXISTING CONDITIONS.
2. PROVIDE TEMPORARY POWER AND EQUIPMENT AS REQUIRED TO KEEP SYSTEMS OPERATIONAL, SEE
16050 FOR SEQUENCING AND SCHEDULING.
3. FOR ELECTRICAL DETAILS, REFER TO DETAIL DRAWINGS.
4. REFER TO PROCESS MECHANICAL DRAWINGS AND VENDOR DRAWINGS FOR COORDINATION OF
EQUIPMENT LOCATIONS AND POWER REQUIREMENTS.
5. COORDINATE ALL DEVICE LOCATIONS WITH GC AND/OR OWNER PRIOR TO ROUGH-IN.
6. ALL PIPES OR OTHER UTILITIES DAMAGED DURING THE CONTRACTOR'S OPERATIONS SHALL BE THE
CONTRACTOR'S RESPONSIBILITY TO REPAIR OR REPLACE AT NO COST TO THE OWNER.
7. SUPPORT ALL UTILITIES AND STRUCTURES DURING CONSTRUCTION AND MAKE REPAIRS IF DAMAGED.
8. THE LOCATIONS OF EXISTING UTILITIES AND EQUIPMENT ARE APPROXIMATE. DETERMINE THE EXACT
LOCATION OF EXISTING UTILITIES AND STRUCTURES BEFORE COMMENCING WORK. BE FULLY
RESPONSIBLE FOR ANY AND ALL DAMAGE WHICH MIGHT BE OCCASIONED BY FAILURE TO EXACTLY
LOCATE AND PRESERVE ANY AND ALL UTILITIES AND STRUCTURES.
9. PREVENT DUST FROM BECOMING A NUISANCE OR HAZARD. CONTROL DUST DURING AND AFTER
CONSTRUCTION.
10. WHERE ROUTING IS SPECIFICALLY INDICATED, CONDUITS SHALL BE ROUTED AS INDICATED ON THE DRAWING. NO EXCEPTION WITHOUT PRIOR WRITTEN PERMISSION FROM THE PROJECT ELECTRICAL
ENGINEER.
11. ALL ENCLOSURES, INCLUDING JUNCTION BOXES, SHALL BE CLEARLY LABELED WITH THE
ASSOCIATED CIRCUIT(S) AND PANELBOARD DESIGNATIONS.
12. ALL POWER AND CONTROL CABLES SHALL BE CLEARLY LABELED WITH WIRE MARKERS AT EACH END
OF THE CABLE.
GENERAL WIRING DIAGRAM NOTES
1. DASHED LINES ON WIRING DIAGRAMS REPRESENT FIELD WIRING,
WHICH SHALL BE RUN IN CONDUIT (34" MINIMUM).
A. FIELD WIRING FOR DISCRETE/DIGITAL/DRY CONTACT TYPE SIGNALS
(SHOWN CONNECTED TO RELAY CONTACTS, SWITCHES, PUSHBUTTONS,
PILOT LIGHTS, ETC.) SHALL BE #14 WIRING RUN IN CONDUIT.
B. FIELD WIRING FOR EACH ANALOG/TRANSMITTER/SENSOR SIGNAL
SHOWN (INCLUDING THERMISTOR & SEAL LEAK/FAIL SENSOR) SHALL
BE A #18TSP CABLE (UNLESS OTHERWISE NOTED) RUN IN CONDUIT.
2. PRIOR TO INSTALLING ANY CONDUITS OR PULLING ANY WIRE, CONFIRM
WIRING REQUIREMENTS WITH THE EQUIPMENT AND/OR SYSTEM
SUPPLIER'S SUBMITTED WIRING DIAGRAMS. CONTACT THE ENGINEER TO
RESOLVE ANY DISCREPANCIES.
3. PRIOR TO PERFORMING WIRING ON VENDOR SUPPLIED CONTROL PANELS
AND VENDOR SUPPLIED EQUIPMENT, THE CONTRACTOR SHALL
COORDINATE EXACT WIRING CONNECTIONS FROM VENDOR SUPPLIED
WIRING DIAGRAMS. IF THERE ARE ANY DISCREPANCIES, REPORT THIS
TO THE ENGINEER AND THE ENGINEER WILL PROVIDE DIRECTION ON
HOW TO PROCEED.
4. FIELD WIRING REQUIREMENTS ARE NOT SHOWN ON THE DRAWING.
REFER TO SITE/FLOOR PLANS FOR ADDITIONAL FIELD WIRING
REQUIREMENTS.
DESIGNED/CHECKED BY:MET
DRAWN BY:JRB
FILE:
APPROVED BY:JMP
Center Strafford, NH
Center Strafford Disinfection Upgrades
New Hampshire Army National Guard
DATE:
PROJECT NO:
MARK DATE DESCRIPTION
N0967-0105-E-NOTES.dwg
03/12/2025
N0967-0105
SCALE:
Pl ot te d
O n:
M ar
4, 5- 2:
pm
B y:
J B ow m an
La st
S av ed
2/
/2
Ti gh e
B on d:
F:
\P ro je ct s\ N
\N
N
H A rm y
N at io na l G ua rd
O n
C al l S er vi ce s N
H A R N
G \0
C en te r
S tr af fo rd D is in fe ct io n\
D ra w in gs \A ut oC
A D
\S he et \N
-0
5- E-
N O
TE
S .d w g
ELECTRICAL LEGEND AND
GENERAL NOTES
E-0
3/12/2025
MATTHEW
ROMANO
No.14059
M
M
M
M
PP2C
MAKE SAFE EXISTING CIRCUIT FOR
TANK PUMP BEING RELOCATED.
COORDINATE SHUTDOWN AND
RE-ENERGIZING OF CIRCUIT
2 1
CP-2001
CP-2001
PLC
1 2 3
PLC
PLC
PP2C-6
PLC
SODIUM HYPOCHLORITE CONTROL
PANEL
CP-2001
PLC
PLC
PLC
EXISTING PUMP
CONTROL PANEL
PP2C-8
ANALYZER BOARD
EMERGENCY
EYEWASH &
SHOWER
DAMP
LOCATION
FLOW METER
LEVEL SENSOR
SUMP PUMP
PP2C-10
METERING
PUMPS
ELECTRICAL POWER BUILDING 1 - BASEMENT PLAN
DESIGNED/CHECKED BY:MET
DRAWN BY:JRB
FILE:
APPROVED BY:JMP
Center Strafford, NH
Center Strafford Disinfection Upgrades
New Hampshire Army National Guard
DATE:
PROJECT NO:
MARK DATE DESCRIPTION
N0967-0105-E-1.dwg
03/12/2025
N0967-0105
SCALE:
Pl ot te d
O n:
M ar
0, 5- 4:
pm
B y:
J B ow m an
La st
S av ed
3/
/2
Ti gh e
B on d:
F:
\P ro je ct s\ N
\N
N
H A rm y
N at io na l G ua rd
O n
C al l S er vi ce s N
H A R N
G \0
C en te r
S tr af fo rd D is in fe ct io n\
D ra w in gs \A ut oC
A D
\S he et \N
-0
5- E-
1.
dw g
N
ELECTRICAL POWER
BUILDING 1- BASEMENT
PLAN
E-1
AS SHOWN
KEY NOTES
1. PROVIDE 3/4" CONDUIT FOR MANUFACTURER CABLES (6 FT) FROM METERING PUMPS TO LOCAL
JUNCTION BOX (PROVIDE BOX NEARBY PUMP) TO TERMINATE AND ROUTE SIGNALS TO PLC, TYPICAL
OF 2 METERING PUMPS.
2. PROVIDE (2) SIMPLEX MOUNTED TO CEILING FOR METERING PUMPS.
3. PROVIDE PLC UPGRADE, MICROLOGIX 870 AND ASSOCIATED I/O CARDS, FOR REPLACEMENT OF EXISTING PLC IN THE EXISTING PUMP CONTROL PANEL. COORDINATE EXACT REQUIREMENTS WITH
THE OWNER AND OWNERS SYSTEMS INTEGRATOR.
WIRE AND CONDUIT CABLES
1 2#12, 1#12G, 3/4"C.
2 2#18 TSP, 3/4" C.
3 4#14, 1#14G, 3/4"C.
4 4#18 TSP, 3/4" C.
5 20#14, 1#14G, 1"C.
0 1' 2' 4'
SCALE: 1/2"=1'-0"
3/12/2025
MATTHEW
ROMANO
NOTES:
1. EXISTING CIRCUITS ARE MARKED AS 'EX', CIRCUITS 6,8,10 CONTAIN EXISTING SPARE 20A CIRCUIT BREAKERS.
PROVIDE SPARES ON CIRCUITS 7 AND 9.
2. PANELBOARD CONTAINS EXISTING SPARE 20A CIRCUIT BREAKERS FOR PROPOSED CIRCUITS 6 AND 8.
DESIGNED/CHECKED BY:MET
DRAWN BY:JRB
FILE:
APPROVED BY:JMP
Center Strafford, NH
Center Strafford Disinfection Upgrades
New Hampshire Army National Guard
DATE:
PROJECT NO:
MARK DATE DESCRIPTION
N0967-0105-E-2.dwg
03/12/2025
N0967-0105
SCALE:
Pl ot te d
O n:
M ar
0, 5- 4:
pm
B y:
J B ow m an
La st
S av ed
3/
/2
Ti gh e
B on d:
F:
\P ro je ct s\ N
\N
N
H A rm y
N at io na l G ua rd
O n
C al l S er vi ce s N
H A R N
G \0
C en te r
S tr af fo rd D is in fe ct io n\
D ra w in gs \A ut oC
A D
\S he et \N
-0
5- E-
2.
dw g
ELECTRICAL DETAILS
E-2
3-1/8"
1- 1/
2"
CONTROL PANEL
"C-1"
120/240V, 1ɸ, 3W
FED FROM "PP2C"
NOTES:
1. REFER TO SPECIFICATIONS FOR ADDITIONAL NAMEPLATE REQUIREMENTS.
2. NAMEPLATE TO BE 1/16" WHITE PLASTIC WITH BLACK CENTER LAMINATION. FACE TO BE WHITE, REVERSE ENGRAVED LETTERS TO BE BLACK.
3. IN PROCESS OR WET LOCATIONS, DO NOT SCREW IN PLACE.
1/4" LETTERS (TYPICAL)
NAMEPLATE DETAIL
NO SCALE
EXISTING PANELBOARD 'PP2C'
NO SCALE
120 VOLTS
FROM PANELBOARD 'PP2C'
(PROVIDE POWER USING 2#12,#12G, 3/4"C)
"CHEM PUMP
IN MANUAL"A
H-O-A
XOO
OOX
CR
G
CR-2
CR-1
"PUMP P-201
CALLED TO RUN"
PUMP P-201
MOTOR
"PUMP P-201 IN
AUTO"
TO PLC
"PUMP P-201
RUNNING"
TO PLC
OOX
'P-201 IN
HAND MODE'
TO PLC
CR-1
NOTES:
1. PROVIDE PERMANENT LABEL ON TOP OF PANEL COVER INDICATING PUMP ID AND
CHEMICAL NAME. PROVIDE PERMANENT LABELS FOR EACH LIGHT, SWITCH AND
TIMER. MOUNT IN NEMA 4X S.S. ENCLOSURE. SWITCHES AND LIGHTS SHALL BE
MOUNTED ON THE COVER OF THE PANEL.
2. PROVIDE HANDLE FOR DISCONNECT SWITCH ACCESSIBLE FROM EXTERIOR OF
ENCLOSURE.
3. PROVIDE A CURRENT RELAY THAT CLOSES A CONTACT WHEN CURRENT IS
DETECTED ABOVE 50% OF FULL LOAD AMPS.
4. TIMER SHALL BE SPRING WOUND-TYPE, 0-60 MINUTES, MOUNTED TO COVER OF
PANEL.
"CHEM PUMP
IN MANUAL"A
CR
H-O-A
XOO
OOX
CR
G
CR-4
CR-3
"PUMP P-202
CALLED TO RUN"
PUMP P-202
MOTOR
"PUMP P-202 IN
AUTO"
TO PLC
"PUMP P-202
RUNNING"
TO PLC
2#12,#12G,3/4"C
OOX
"USE TIMER WHEN IN
HAND MODE"
METERING PUMP
CONTROL PANEL WIRING DIAGRAM
'P-202 IN
HAND MODE'
TO PLC
CR-3
TYPICAL FOR SODIUM HYPOCHLORITE PUMP 1 (P-201) & 2 (P-202).
LOCKABLE DISCONNECT
SWITCH (HANDLE MOUNTED
ON PANEL COVER, NOTE 2)
`START PUMP'
FROM PLC
`START PUMP'
FROM PLC
CR
CR
CR-5
CR-6
24VDC COILS
NOTE 4
CR "USE TIMER WHEN IN
HAND MODE"
TIMER
TIMER
2#12,#12G
3/12/2025
MATTHEW
ROMANO
| Sheets and Views |
| D-1 |