Attachment 11 - RAC Request for Estimate_Draft.pdf
PDF 65 KB Posted
- Attached to
- FA8650-20-S-1958-Call-06-Simulation Environment for Technology Research and Assessments (SENTRA)
- Solicitation number
- FA2377-25-R-B009
About this file
This document is a SENTRA Rapid Assessment Capability (RAC) Estimate form with two pages of blank templates designed for the government and contractor to complete. The first page contains sections for Task Order details, RAC Desired Completion Date, Request Date, Description of Work to be Performed, Materials to be Delivered, and Required Deliverables. The second page includes a detailed cost estimate template with columns for Labor Category, Hours, Rate, Estimated Dollars, Hardware/Software/Materials, Unit Cost, Quantity, and Total Cost. The template is structured for the contractor to provide a comprehensive cost breakdown, with spaces for totaling labor and material expenses, and a section for an authorizing contractor representative's signature and date. Both pages indicate that specific sections will be filled out by either the Government or the Contractor.
View the file
Other files
Show all 14
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SENTRA Rapid Assessment Capability (RAC) Estimate
Task Order:
RAC Desired Completion Date:
Request Date:
Date Estimate Due:
**RAC Estimate Request tab will be filled out by the Government
Description of Work to be Performed:
Materials to be Delivered:
Required Deliverables:
RAC Estimate Date:
Labor Category Hours Rate Estimated Dollars Hardware/Software/Materials Unit Cost Quantity Total Cost
Total $ Total $
Total Estimate $
Authorizing Contractor Representative/Date
**RAC Estimate Tab will be filled out by the Contractor
File details come from the government source that posted it. Updated .