This document contains a pricing schedule template for the repair and renovation of the Cleveland Commercial Gate at Tyndall Air Force Base. The schedule includes line item descriptions, quantities, units, unit costs, and totals for tasks such as design and professional services, site preparation, signage and traffic control devices, utility installation, pavement and pad construction, and minor renovations to two guard shacks. Task categories include mobilization, equipment rental, superintendence, concrete removal, clearing and grubbing, utility removal, grading, asphalt paving, and ceiling, lighting, and window replacements. The schedule also includes line items for overhead, profit, and bond. The total proposed cost is to be provided at the bottom. The period of performance is unspecified. This pricing template corresponds to solicitation FA481920R0009 seeking offers for repair and renovation of the Cleveland Commercial Gate.
View the file
Other files
Show all 13
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
BID SCHEDULE (2)
2.1 DESIGN & PROFFESSIONAL SERVICES Subtotal: $0.00
| 2.1.1 TASK 1 - DESIGN & PROFESSIONAL SERVICES | SUB TOT | $0.00 | POP Design (Base) __________________ Days | ||||
| LINE ITEM | DESCRIPTION | UNIT | QUANTITY | UNIT COST | TOTAL | Notes | |
| A | Professional Design Services | Line item shall account for all costs associated with the permitting & professional services necessary to develop complete construction documents detailing the repair effort. | JOB | 1 | $ - 0 | ||
| B | Other Professional Services | Line item shall account for all costs associated with services to assess, survey and collect site information to support the design and construction of contracted work. Item will include material testing. | JOB | 1 | $ - 0 |
2.1 CONSTRUCTION Subtotal: $0.00
| 2.1.X GENERAL CONDITIONS | SUB TOT | $0.00 | POP Construction (Base) _________________Days | ||||
| LINE ITEM | DESCRIPTION | UNIT | QUANTITY | UNIT COST | TOTAL | Notes | |
| A | Mobilization/Demobilization | A mobilization cost will be given in order to get the contractor set up on Tyndall AFB. This shall include, but may not be limited to the fees associated in moving equipment, material, and personnel to this area. | JOB | 1 | $ - 0 | ||
| B | Equipment Rental | All costs associated with equipment rental to accomplish the work. Contractor to provide itemized list of equipment and associated cost. | MONTH | 3 | $ - 0 | ||
| C | Super Intendence | All costs associated with providing oversite during the performance of on site activities; demolition, construction. | DAY | 90 | $ - 0 | ||
| D | Other General Conditions | All other general condition costs associated with project performance | JOB | 1 | $ - 0 |
| 2.1.2 TASK 2 - SITE PREPERATION | SUB TOT | $0.00 | |||||
| LINE ITEM | DESCRIPTION | UNIT | QUANTITY | UNIT COST | TOTAL | Notes | |
| A | Concrete Pavement Removal | All costs associated with removal of the existing concrete pavement as defined in the Construction Documents. | SY | 1090 | $ - 0 | ||
| B | Clearing & Grubbing | All costs associated with removal of vegetation and rubbish from construction areas as defined in the Construction Documents. | SY | 28160 | $ - 0 | ||
| C | Utility Removal | All costs associated with removal/modification of conflicting utilities in the construction work areas as defined in the Construction Documents. | EA | 6 | $ - 0 | ||
| D | Stripping | All costs associated with removal of topsoil and deletarious materials from the construction work areas as defined in the Construction Documents. | SY | 21120 | $ - 0 | ||
| E | Cut & Fill | All costs associated with cut and fill operations as defined in the Construction Documents. | CY | 6336 | $ - 0 | ||
| F | Grading | All costs associated with grading operations as defined in the Construction Documents. | SY | 21120 | $ - 0 | ||
| G | Stabilization/ Site Restoration | All costs associated with stablization and site restoration such as vegetation and sod as defined in the Construction Documents. | SY | 16896 | $ - 0 |
| 2.1.3 TASK 3 - SIGNAGE AND TRAFFIC CONTROL DEVICES | SUB TOT | $0.00 | |||||
| LINE ITEM | DESCRIPTION | UNIT | QUANTITY | UNIT COST | TOTAL | Notes | |
| A | Gate Identification Sign | All costs associated with constructing a gate identification sign in accordance with the Construction Documents. | EA | 1 | $ - 0 | ||
| B | Guide Signs | All costs associated with installing MUTCD standard guide signs in accordance with the Construction Documents. | EA | 10 | $ - 0 | ||
| C | Lane Designation Signs | All costs associated with installing Lane Designation signs in accordance with the Construction Documents. | EA | 4 | $ - 0 | ||
| D | Gate Procedure Sign | All costs associated with installing Gate Procedure signs in accordance with the Construction Documents. | EA | 2 | $ - 0 | ||
| E | Traffic Control Devices | All costs associated with installing traffic control devices such as powered drop bars, jersey barriers & bollards in accordance with the Construction Documents. | LS | 1 | $ - 0 |
| 2.1.4 TASK 4 - UTILITY INSTALLATION | SUB TOT | $0.00 | |||||
| LINE ITEM | DESCRIPTION | UNIT | QUANTITY | UNIT COST | TOTAL | Notes | |
| A | Credential Check Point Utilities | All costs associated with installing utility infrastructure to planned new credential check point facilities in accordance with the Construction Documents. | LF | 1200 | $ - 0 | ||
| B | Mobile Inspection Utilities | All costs associated with installing utility infrastructure to planned new mobile inspection facilities in accordance with the Construction Documents. | LF | 400 | $ - 0 | ||
| C | VACIS Remote Operation | All costs associated with installing VACIS remote operation infrastructure to new mobile inspection shelter pad in accordance with the Construction Documents. | LS | 1 | $ - 0 | ||
| D | Site Lighting | All costs associated with installing site lighting to include wiring in accordance with the Construction Documents. This may be a privatized utility service cost. | EA | 10 | $ - 0 | ||
| E | Storm Water | All costs associated with installing new storm water structures and piping in accordance with the Construction Documents. | LS | 1 | $ - 0 |
| 2.1.5 TASK 5 - PAVEMENT & PAD CONSTRUCTION | SUB TOT | $0.00 | |||||
| LINE ITEM | DESCRIPTION | UNIT | QUANTITY | UNIT COST | TOTAL | Notes | |
| A | Prepare Subgrade | All costs associated with fine grading, compaction, stablization of subgrade in accordance with the Construction Documents. | SY | 5840 | $ - 0 | ||
| B | Base Materials | All costs associated with the install, grading and compaction of base materials in accordance with the Construction Documents. | CY | 1320 | $ - 0 | ||
| C | Milling /Pavement Removal | All costs associated with pavement removal and milling in accordance with the Construction documents. | SY | 14400 | $ - 0 | ||
| D | Surface Preperation | All costs associated with base rock and milled pavement surface prepartion for paving in accordance with the Construction Documents. | SY | 17300 | $ - 0 | ||
| E | Asphalt Pavement | All costs associated with installing new asphalt pavement in accordance with the Construction Documents. | TON | 2000 | $ - 0 | ||
| F | Pavement Marking | All costs associated with installing new pavement markings in accordance with the Construction Documents. | SF | 3480 | $ - 0 | ||
| 0 | 0 | 0 | 0 | 0 |
| 2.1.6 TASK 6 - B2600 GUARD SHACK MINOR RENOVATION | SUB TOT | $0.00 | |||||
| LINE ITEM | DESCRIPTION | UNIT | QUANTITY | UNIT COST | TOTAL | Notes | |
| A | Ceiling Tiles | All costs associated with the accoustical ceiling tile replacement in accordance with the Construction Documents. | SF | 500 | $ - 0 | ||
| B | Interior Lighting | All costs associated with removal and replacement of the interior lighting in accordance with the Construction Documents. | EA | 10 | $ - 0 | ||
| C | Exterior Lighting | All costs associated with removal and replacement of the exterior lighting in accordance with the Construction Documents. | EA | 3 | $ - 0 | ||
| D | VACIS Remote Operation | All costs associated with the installation/connection of VACIS remote operation components in accordance with the Construction Documents. | LS | 1 | $ - 0 |
| 2.1.7 TASK 7 - B26010 GUARD SHACK MINOR RENOVATION | SUB TOT | $0.00 | |||||
| LINE ITEM | DESCRIPTION | UNIT | QUANTITY | UNIT COST | TOTAL | Notes | |
| A | Ceiling Tiles | All costs associated with the accoustical ceiling tile replacement in accordance with the Construction Documents. | SF | 250 | $ - 0 | ||
| B | Interior Lighting | All costs associated with removal and replacement of the interior lighting in accordance with the Construction Documents. | EA | 4 | $ - 0 | ||
| C | Enterior Lighting | All costs associated with removal and replacement of the exterior lighting in accordance with the Construction Documents. | EA | 3 | $ - 0 | ||
| D | Service Window | All costs associated with removal and replacement of the ballistic glass service window in accordance with the Construction Documents. | SF | 13 | $ - 0 |
2.1 DESIGN & CONSTRUCTION SUB TOTAL Subtotal: $0.00
| 2.3.1 OVERHEAD, PROFIT, BOND | SUB TOT | $0.00 | |||||
| LINE ITEM | DESCRIPTION | UNIT | % OF PROJECT COST | TOTAL | Notes | ||
| 001 | Overhead | Overhead Costs | % | $ - 0 | |||
| 002 | Profit | Profit | % | $ - 0 | |||
| 003 | Bond | Actual Bond | % | $ - 0 |
| PROJECT TOTAL BID = | $0.00 |
| PERIOD OF PERFORMANCE = |
FOR OFFICIAL USE ONLY &"-,Bold"&20PRICING SCHEDULE&"-,Regular"&12 Repair / Renovate Cleveland Gate&"-,Bold" &"-,Regular"XLWU 20-8124 &12CONTRACTOR: ________________________________________
DATE: ________________________________________
&12CONTRACTOR PRICING SCHEDULE
&P of &N
File details come from the government source that posted it. Updated .