This document contains a pricing schedule template for the repair and renovation of the Cleveland Commercial Gate at Tyndall Air Force Base. The schedule includes line item descriptions, quantities, units, unit costs, and totals for tasks such as design and professional services, site preparation, signage and traffic control devices, utility installation, pavement and pad construction, and minor renovations to two guard shacks. Task categories include mobilization, equipment rental, superintendence, concrete removal, clearing and grubbing, utility removal, grading, asphalt paving, and ceiling, lighting, and window replacements. The schedule also includes line items for overhead, profit, and bond. The total proposed cost is to be provided at the bottom. The period of performance is unspecified. This pricing template corresponds to solicitation FA481920R0009 seeking offers for repair and renovation of the Cleveland Commercial Gate.

View the file

Other files

Show all 13

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

BID SCHEDULE (2)

2.1 DESIGN & PROFFESSIONAL SERVICES Subtotal: $0.00

2.1.1 TASK 1 - DESIGN & PROFESSIONAL SERVICESSUB TOT$0.00POP Design (Base) __________________ Days
LINE ITEMDESCRIPTIONUNITQUANTITYUNIT COSTTOTALNotes
AProfessional Design ServicesLine item shall account for all costs associated with the permitting & professional services necessary to develop complete construction documents detailing the repair effort.JOB1$ - 0
BOther Professional ServicesLine item shall account for all costs associated with services to assess, survey and collect site information to support the design and construction of contracted work. Item will include material testing.JOB1$ - 0

2.1 CONSTRUCTION Subtotal: $0.00

2.1.X GENERAL CONDITIONSSUB TOT$0.00POP Construction (Base) _________________Days
LINE ITEMDESCRIPTIONUNITQUANTITYUNIT COSTTOTALNotes
AMobilization/DemobilizationA mobilization cost will be given in order to get the contractor set up on Tyndall AFB. This shall include, but may not be limited to the fees associated in moving equipment, material, and personnel to this area.JOB1$ - 0
BEquipment RentalAll costs associated with equipment rental to accomplish the work. Contractor to provide itemized list of equipment and associated cost.MONTH3$ - 0
CSuper IntendenceAll costs associated with providing oversite during the performance of on site activities; demolition, construction.DAY90$ - 0
DOther General ConditionsAll other general condition costs associated with project performanceJOB1$ - 0
2.1.2 TASK 2 - SITE PREPERATIONSUB TOT$0.00
LINE ITEMDESCRIPTIONUNITQUANTITYUNIT COSTTOTALNotes
AConcrete Pavement RemovalAll costs associated with removal of the existing concrete pavement as defined in the Construction Documents.SY1090$ - 0
BClearing & GrubbingAll costs associated with removal of vegetation and rubbish from construction areas as defined in the Construction Documents.SY28160$ - 0
CUtility RemovalAll costs associated with removal/modification of conflicting utilities in the construction work areas as defined in the Construction Documents.EA6$ - 0
DStrippingAll costs associated with removal of topsoil and deletarious materials from the construction work areas as defined in the Construction Documents.SY21120$ - 0
ECut & FillAll costs associated with cut and fill operations as defined in the Construction Documents.CY6336$ - 0
FGradingAll costs associated with grading operations as defined in the Construction Documents.SY21120$ - 0
GStabilization/ Site RestorationAll costs associated with stablization and site restoration such as vegetation and sod as defined in the Construction Documents.SY16896$ - 0
2.1.3 TASK 3 - SIGNAGE AND TRAFFIC CONTROL DEVICESSUB TOT$0.00
LINE ITEMDESCRIPTIONUNITQUANTITYUNIT COSTTOTALNotes
AGate Identification SignAll costs associated with constructing a gate identification sign in accordance with the Construction Documents.EA1$ - 0
BGuide SignsAll costs associated with installing MUTCD standard guide signs in accordance with the Construction Documents.EA10$ - 0
CLane Designation SignsAll costs associated with installing Lane Designation signs in accordance with the Construction Documents.EA4$ - 0
DGate Procedure SignAll costs associated with installing Gate Procedure signs in accordance with the Construction Documents.EA2$ - 0
ETraffic Control DevicesAll costs associated with installing traffic control devices such as powered drop bars, jersey barriers & bollards in accordance with the Construction Documents.LS1$ - 0
2.1.4 TASK 4 - UTILITY INSTALLATIONSUB TOT$0.00
LINE ITEMDESCRIPTIONUNITQUANTITYUNIT COSTTOTALNotes
ACredential Check Point UtilitiesAll costs associated with installing utility infrastructure to planned new credential check point facilities in accordance with the Construction Documents.LF1200$ - 0
BMobile Inspection UtilitiesAll costs associated with installing utility infrastructure to planned new mobile inspection facilities in accordance with the Construction Documents.LF400$ - 0
CVACIS Remote OperationAll costs associated with installing VACIS remote operation infrastructure to new mobile inspection shelter pad in accordance with the Construction Documents.LS1$ - 0
DSite LightingAll costs associated with installing site lighting to include wiring in accordance with the Construction Documents. This may be a privatized utility service cost.EA10$ - 0
EStorm WaterAll costs associated with installing new storm water structures and piping in accordance with the Construction Documents.LS1$ - 0
2.1.5 TASK 5 - PAVEMENT & PAD CONSTRUCTIONSUB TOT$0.00
LINE ITEMDESCRIPTIONUNITQUANTITYUNIT COSTTOTALNotes
APrepare SubgradeAll costs associated with fine grading, compaction, stablization of subgrade in accordance with the Construction Documents.SY5840$ - 0
BBase MaterialsAll costs associated with the install, grading and compaction of base materials in accordance with the Construction Documents.CY1320$ - 0
CMilling /Pavement RemovalAll costs associated with pavement removal and milling in accordance with the Construction documents.SY14400$ - 0
DSurface PreperationAll costs associated with base rock and milled pavement surface prepartion for paving in accordance with the Construction Documents.SY17300$ - 0
EAsphalt PavementAll costs associated with installing new asphalt pavement in accordance with the Construction Documents.TON2000$ - 0
FPavement MarkingAll costs associated with installing new pavement markings in accordance with the Construction Documents.SF3480$ - 0
00000
2.1.6 TASK 6 - B2600 GUARD SHACK MINOR RENOVATIONSUB TOT$0.00
LINE ITEMDESCRIPTIONUNITQUANTITYUNIT COSTTOTALNotes
ACeiling TilesAll costs associated with the accoustical ceiling tile replacement in accordance with the Construction Documents.SF500$ - 0
BInterior LightingAll costs associated with removal and replacement of the interior lighting in accordance with the Construction Documents.EA10$ - 0
CExterior LightingAll costs associated with removal and replacement of the exterior lighting in accordance with the Construction Documents.EA3$ - 0
DVACIS Remote OperationAll costs associated with the installation/connection of VACIS remote operation components in accordance with the Construction Documents.LS1$ - 0
2.1.7 TASK 7 - B26010 GUARD SHACK MINOR RENOVATIONSUB TOT$0.00
LINE ITEMDESCRIPTIONUNITQUANTITYUNIT COSTTOTALNotes
ACeiling TilesAll costs associated with the accoustical ceiling tile replacement in accordance with the Construction Documents.SF250$ - 0
BInterior LightingAll costs associated with removal and replacement of the interior lighting in accordance with the Construction Documents.EA4$ - 0
CEnterior LightingAll costs associated with removal and replacement of the exterior lighting in accordance with the Construction Documents.EA3$ - 0
DService WindowAll costs associated with removal and replacement of the ballistic glass service window in accordance with the Construction Documents.SF13$ - 0

2.1 DESIGN & CONSTRUCTION SUB TOTAL Subtotal: $0.00

2.3.1 OVERHEAD, PROFIT, BONDSUB TOT$0.00
LINE ITEMDESCRIPTIONUNIT% OF PROJECT COSTTOTALNotes
001OverheadOverhead Costs%$ - 0
002ProfitProfit%$ - 0
003BondActual Bond%$ - 0
PROJECT TOTAL BID =$0.00
PERIOD OF PERFORMANCE =

FOR OFFICIAL USE ONLY &"-,Bold"&20PRICING SCHEDULE&"-,Regular"&12 Repair / Renovate Cleveland Gate&"-,Bold" &"-,Regular"XLWU 20-8124 &12CONTRACTOR: ________________________________________

DATE: ________________________________________

&12CONTRACTOR PRICING SCHEDULE

&P of &N

File details come from the government source that posted it. Updated .