This solicitation is for repair and renovation services at the Cleveland Commercial Gate at Tyndall Air Force Base. The scope of work includes minor renovations to the existing 2600 guard shack, including reference to historical plans. It also involves renovations to the credential checkpoint office and shelter, as well as upgrades to the mobile VACIS M6500 inspection system. The solicitation was released by the Department of the Air Force Air Combat Command with a response due date of August 19, 2022. The purpose is to upgrade security infrastructure at base entry points in order to meet current standards.

View the file

Other files

Show all 13

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

20 8124

/ RENOVATE CLEVELAND COMMERCIAL GATE

B

REFERENCE DOCUMENTS

B.1 2600 Guard Shack Historical Plans B.2 B2610 Guard Shack As-Built Plans B.3 Credential Checkpoint Office Concept B.4 Credential Checkpoint Shelter Concept Mobile Inspection Shelter Concept B.5 VACIS M6500 Mobile Inspection System Info

B.1

B2600 HISTORICAL PLANS

(Reference for B2600 minor renovation)

1 ' i.q 111�1111111111,11111 I� 11'11 I 11111�1 I 1�11 I l'I 111111�111111111 �11111111 lo) l"I II 11.

/ r:a:• : §1

/// :0 J � I i:i:i ', G / _J/ : �i REST�M MECH RM COMM/STOR. KENN�( '° 1<=�"1=!1 :::..LI __ ...... �1 1 �I '°l°'Q O (®

/ �I I

-·,� / !=II

! I 1® \ .. ',, � ® L "' _ si :

�----�, �� M �

/���"\-(i)-;jIS�H£S1=�.17, : ; �------------\, � � :: =I

//�v� ,._" I ,�· L ', �: :

"" --------,__ ----1 -- ---- ______ ,_ ---------- /� 15'--0'

NOm FENCE ..._ l'-4' IIGH

J �, LOBW/ 11 � ' AREA !:!:! I

I �I / nr ? ', STAGING !=! I ........i:;.��==-=:....:...._+,----!= 1 / 11 w--- - � �.-��·��===nr ..... "--------! 0 . �: ,l

/ ...:=--:: WORKA:E: •- ',

,, ptJ) � ]�

� I � I / II � I ' I I I // 11 ,._" ,·-0' ,._" '�....=1--'f----+,_ 11

I

I ' -· / 'I.I 'r I D ' I Jl 11111111,11111111,., I II I II 11• � I�"' 1<11111111;�1·1111111 1111

·------��----------�1 ·:� ,.� 1r--�-----�� _ __.,�

-O'

--I ,o,o •

L_ -- --------- ,__,_J 6'-<Y

If ROOM FlNISH SCHEDULE

I RI ill lli;;l 113--

I

DOOO S�EDUL£

I 1111,1111111•Ftf'IT IE

FLOOR PLAN

DESIGN REVISED 3 FEB. 04 BRE

REVISED 19 NOV. 03 BRE

REV1S1111 DATE IY

325th CIVIL ENGINEERING SQUADRON

TYNDALL A.F.B� FL 324413

VEHICLE INSPECTION

FACILITY CLEVELAND GATE

FLOOR PLAN ,,._.,5484

J. UTIU:TON ""'� 24 SEPT 03 ...,,_..,_ 03-1 140

A-1 --� B. EDSON """'1/2'= 1'--0" '"c=o 4 • 18

NC "11.:.)IJNC

D X..RJN TYt

SOUTH ELEVATION

EAST ELEVATION

WEST ELEVA Tl ON

--M.UII, POOT

NORTH ELEVATION

B REVISION.

A DESIGN. REVISED

Ill, REI/ISIIIN

24 AUG. 04 D.J.G.

3 FEB. 04 BRE

.. TE IY

325th CIVIL ENGINEERING SQUADRON

TYNDALL A.F.B, FL 324413

VEHICLE INSPECTION

FACILITY

CLEVELAND GATE

EXTERJOR EL.EVATION.S • "5434

_..., J. LITTU:TON ""'"' 24 SEP 03 """'«<>.03- I 140

A-2 °...,,"" B. EDSON ""'-" 3/IJ'= I '-Cl """'' 5 .- I IJ ri------l o

I I I I I l�I <D 0 r200

���=------- - --�-=-i"""-'./;ltl..LLLLL.LLLLLLLLLLLU..U.LLLL.LLLLLLL��i::;;:l�----+----t------i�.LLLJLJ..U.J..I..LI.LLLLLLL.L.1..LJLLLLLLLL.LLLLLLL�,1 �------------, r------------�

CEILING LEGEND:

... -(+).-'IRCIFFIR,120V

BAU.AST w/ 18 1.M1P5- •.,f LEfflR DESICIIA1ES IW10tllG

1°d" -(2) LM1P 120V, FWCIRESCENT 1RCIFFER

W/ ELEC1RCNC BAU.AST AND T-8 I.MIPS

LETTER DENCIIES ...,.,._

LED IAT1ERY PAaC DIT LIGHT, IH1E

VIII 1ED LET1ERS. CEIJNG ID.INT

I I

I I I I I I

L _______________ J

D

CD

r135

CD

r200

CD

R/f

RE1UON

8UPl'I.YGOII.

- HEAT DE1EC'R:IR. 131 DmR1ES FDED 1DIP.

(RA1E a, RISE) MCIIN1ED II CEIUNO -

- HEAT DE1EC'ltlR,, 2CX1 DmREE1 FDED 'IDIP, (RA1E a, RISE) MCIIN1ED II CEIUNO -

HEAT DEIEC'RJR 1315 DEGREES FDCED AND It.Al (RA1E a, RISE) MCIIN1ED .. - "'°'

REFLECTED CEILING PLAN

DESIGN RfVISED 3 fE6. 04 6R£

3251b CIVIL ENGINEERING SQUADRON

TYNDALL A.F.B., FL. 32403

VEHICLE INSPECTION

FACILITY

CLEVELAND GATE

II i-------?: II

/ ,1 �------------, r------------�

I I

I I

I I LIGHTING PLAN

I I L _______________ J

CEILING LEGEND:

II i-------?: II

Q9

BAU.AST w/ 111 LAIIP$. •.r LETTER DEIIGNA1EI

1'"" - (2) ,._ 120V, FWOIDCEIIT 'IRClffER

W/ D.EC1RCNC UIJ.ASI' AND T-1 LMIPS

LE11ERDENC11ES..-

LED IATIERY PAaC E>ff LIGHT, IHIE lffll RED LET1ERS, CEIJNQ MO.INT

70 WAff tFS IRONZE WALL PACK .zny lffll P.E. CB.L

1IRJ WALL EXHAUST FAN

E-3

Ill. AEVISD DATE 8Y

3251b CIVIL ENGINEERING SQUADRON

TYNDALL A.F.B, FI. 32403

VEHICLE INSPECTION

FACILITY

CLEVELAND GATE

LIGHTING PLAN

"°',_"" J. LITTl.ETON """' 24 SEPT 03 '"'·03-1 140 """""" El.EDSON ""'-'' 1/2'=1'-0" ,._, 16 • 18 u

�---�ElQSTING MANHOLE

P-1

Ill, AEVISD DATE 8Y

3251b CIVIL ENGINEERING SQUADRON

TYNDALL A.F.B, FI. 32403

VEHICLE INSPECTION

FACILITY

CLEVELAND GATE

_,... SITE PLUMl31NG PLAN "°',_"" J. LITTl.ETON """' 24 SEPT 03 '"'·03-1 140 """""" El. EDSON ""'-'' 1 '=30'-0" ,._, I I • 18

B.2

B2610 AS-BUILT PLANS

(Reference for B2610 minor renovations)

AB

S

ABS

EXISTIN

G TENT

EXISTIN

G ASPHALT DRIVE

EXISTING 32'-0"x20'-0" CONCRETE

PAD. NEW BLDG IS PARTIALLY TO BE

BUILT ON EXISTING PAD.

SITE PREP/CONCRETE

NOTE # 3 & 4

SITE PREP/CONCRETE

NOTE # 5

SITE PREP/CONCRETE

NOTE # 6SITE PREP/CONCRETE

NOTE # 7, 8 & 9

SITE PREP/CONCRETE

NOTE # 11

TYNDALL A.F.B., FL. 32403

SHEET:

PROJ. NO.

SCALE:

DATE:

Sheet Title

DRAWN BY:

DESIGNED BY:

TYNDALL A.F.B., FL. 32403

C-1 1311" = 100' - 0"A. KRINER

PROJECT LOCATION

CLEVELAND GATE

& CANOPY

CONSTRUCT GUARD SHACK

B. ROCHA 06 JUNE 12 11-1128

APPROVED PER CE

AS BUILTSb

A 9 JAN 13

6 AUG 13 AAB

AAB

PROJECT LOCATION

SCALE: 1"=100'-0"

A

B

C

D

OFFICE AREA

RESTROOM

COVERED PATIO

10'-6" 4'-6"

15'-0" 15'-0"

30'-0"

'-1

/2

4'

-9

/2

4' -1

'-0

10'-9 1/2" 4'-2 1/2"

6'-0"

6' -0

6'-6"

'-6

12'-6"

3'-6"

3' -6

4' -6

4'-0"

FD

EWC

ROOM FINISH SCHEDULE

ROOM NAME/# FLOORING BASE WALLS CEILING NOTES

RESTROOM

OFFICE AREA EPOXY PTD ACT

EPOXY PTD ACT WALLS TO BE LIGHT ORANGE PEEL FINISH

WALLS TO BE LIGHT ORANGE PEEL FINISHEPOXY

EPOXY

CROSS BRACING ea. 5' Ht.

TO CEILING HEIGHT, U-CHANNEL

6" 20 Ga. METAL STUDS AT 16" O.C.

R-19 FACED FIBER-

5/8 SHEETROCK TO 4"

TYVEK VAPOR BARRIER

#5 REBAR (VERTICAL) 3 @ EACH

CORNER & 32" O.C. THERE AFTER;

ALL CELLS FILLED SOLID w/3000 PSI CONC.

METAL TRUSS

GLASS INSULATION

ABOVE CEILING HEIGHT

8" SPLIT FACE CMU WALL

GROUT FILL EACH CELL w/

MIN 3000 PSI CONC.

9 GA. TRUSS TYPE HOT

DIPPED GALV. DUR-O-WALL

REINFORCEMENT @ 16" O.C.

(2) BOND BEAMS @ THE

TOP OF EACH WALL. EACH REINFORCED

w/(1) CONTINUOUS #7 BAR

TYVEK VAPOR BARRIER

5/8 SHEETROCK

5/8 SHEETROCK

6" 20 Ga. METAL STUDS AT

16" O.C., U-CHANNEL CROSS

R-19 FIBERGLASS

INSULATION

DOOR SCHEDULE

DOOR # SIZE FIRE RATING FRAME MAT JAMB DEPTH HEAD DR MAT'L DOOR TYPE SOUND RATING HINGES LOCK CLOSER THRESHOLD STOP

HM WELD 5-3/4"3070

4" SOLID CORE METAL

SOLID CORE WOOD

FLUSH

FLUSH

BALL BRG ENTRY LEVER-

YES NONE

HM WELD 5-3/4" 4" BALL BRG PRIVATE

YES

NO FLOORYES

WINDOW SCHEDULE

WINDOW # SIZE FRAME MAT NOTES

A

B

HM WELD4'x3'

HM WELD

C

D

4x3'

4'x3'

4'x3'

HM WELD

HM WELD

SERVICE WINDOW w/CLASS 5 BALLISTIC RESISTANT GLASS

CLASS 5 BALLISTIC RESISTANT GLASS

CLASS 5 BALLISTIC RESISTANT GLASS

CLASS 5 BALLISTIC RESISTANT GLASS

TYNDALL A.F.B., FL. 32403

SHEET:

PROJ. NO.

SCALE:

DATE:

Sheet Title

DRAWN BY:

DESIGNED BY:

TYNDALL A.F.B., FL. 32403

A-1 1331/2" = 1' - 0"A. KRINER

PROPOSED GUARD SHACK

CLEVELAND GATE

& CANOPY

CONSTRUCT GUARD SHACK

B. ROCHA 06 JUNE 12 11-1128

APPROVED PER CE

AS BUILTSB

A 9 JAN 13

8 AUG 13 AAB

AAB

FLOOR PLAN

SCALE: 1/2"=1'-0"

EXTERIOR WALL DETAIL

INTERIOR WALL DETAIL

B2610 AS-BUILT PLANS

B2610 AS-BUILT PLANS

1515703183C Callout

DAMAGED SERVICE WINDOW

1515703183C Callout

DAMAGED SERVICE WINDOW

H

M

M

M

M

M

MINI

SPLIT

UNIT

TOILET PAPER

DISPENSER

PAPER TOWEL DISPENSER

w/WASTE RECEPTACLE

36"x36" MIRRIR w/

SS FRAME

WANITY CABINET w/MEGANITE w/MEGANITE TOP, INTEGRAL

SINK, & 4" BACK SPLASH

SOAP

DISPENSER

TYNDALL A.F.B., FL. 32403

SHEET:

PROJ. NO.

SCALE:

DATE:

Sheet Title

DRAWN BY:

DESIGNED BY:

TYNDALL A.F.B., FL. 32403

A-2 1341/2" = 1' - 0"A. KRINER

REFLECTED CEILING PLAN/RR LAYOUT

CLEVELAND GATE

& CANOPY

CONSTRUCT GUARD SHACK

B. ROCHA 06 JUNE 12 11-1128

APPROVED PER CE

REVISED CEILING

AS BUILTS

B A

C

9 JAN 13

14 JUNE 13

8 AUG 13

AAB

AAB

AAB

REFLECTED CEILING PLAN

SCALE: 1/2"=1'-0"

RESTROOM LAYOUT

SCALE: 1/2"=1'-0"

E L E C T R I C A L L E G E N D

-SINGLE POLE LIGHT SWITCH @ 46" A.F.F.

-DUPLEX OUTLET @ 16" A.F.F.

-GFI DUPLEX OUTLET @ 46" A.F.F.

L I G H T F I X T U R E L E G E N D

- 2x4 LAY-IN LIGHT FIXUTRE w/T8 LAMPS

- 2x4 LAY-IN LIGHT FIXUTRE w/T8 LAMPS

AND EMERGENCY BATTERY PACK

- 2x2 LAY-IN LIGHT FIXUTRE w/T8 LAMPS

AND EMERGENCY BATTERY PACK

F I R E A L A R M L E G E N D

- 2 ZONE FIRE CONTROL PANEL w/ANTENNA

- HORN/STROBE @ 80" A.F.F.

- PULL STATION @ 46" A.F.F.

- HEAT DETECTOR, ATTIC MOUNT

F

H

H S

FACP

- PHONE/DATA RECEPTACLES @ 16" A.F.F.

- EXTERIOR WALL PACK- METAL HALIDE

NOTES:

1) FURNISH & INSTALL RACEWAY FOR BARRIER

SYSTEM CABLES

2) PULL BARRIER SYSTEM CABLES

3) BARRIER SYSTEM CABLES TO BE TERMINATED

& TESTED BY TAFB

PANEL 'A' SCHEDULE

CKT LABEL #POLES #POLES LABEL CKT

1 RECEPTACLE 20/ 1 20/ 1 TOILET GFCI 2

3 RECEPTACLE 20/ 1 20/ 1 EWC GFCI 4

5 COMMON LIGHTING 20/ 1

15/ 2 CONDENSING UNIT

7 EXTERIOR LIGHTING 20/ 1 8

9 FA PANEL 20/ 1

15/ 2 SPARE

11 COMM PANEL 20/ 1 12

13 IWH 25/ 1 15/ 1 TOILET LIGHT/ EF 14

15 SPARE - - SPARE 16

17 SPARE - - SPARE 18

19 SPARE - - SPARE 20 -QUADRUPLEX OUTLET @ 16" A.F.F.

-EXIT LIGHT

- SMOKE DETECTOR, CEILING MOUNTS

- REMOTE INDICATORRI

- HEAT DETECTOR, CEILING MOUNTH

- JUNCTION BOXJ

COVERED PORCH

OFFICE

8' CLG.

TLT.

8' CLG.

POWER/ COMM FLOOR PLAN

4" = 1'

PANEL 'A'

'A' 5 'A' 3

'A' 2

'A' 14

COVERED PORCH

OFFICE

8' CLG.

TLT.

8' CLG.

FIRE ALARM/ BARRIER CONTROL FLOOR PLAN

4" = 1'

H S

FACP

F

COMM PANEL

H 'A' 4

'A' 7

'A' 9

'A' 11

'A' 6,8

'A' 13

EF

CU

AHU

INTERIOR BARRIER CONTROL

EXTERIOR BARRIER CONTROL

ANTENNA

IWH

'A' 1

S

H

H

RI

1 - POWER FOR "AHU"

COMES FROM "CU"

J

J J

EXISTING POWER PANEL

2" CONDUIT w/(3) #2 &

(1) #6 GRD

NO. REVISION DATE BY

SHEET:

PROJ. NO.

OF

SCALE:

DATE:

Sheet Title

DRAWN BY:

DESIGNED BY:

SHT. REF. NO.

TYNDALL A.F.B., FL. 32403

TYNDALL A.F.B., FL. 32403

E-1.1 13

CONSTRUCT GUARD SHACK

& CANOPY

CLEVELAND GATE

D. LINDSEY

D. LINDSEY

ELECTRICAL FLOOR PLAN & SCHEDULES

17 JAN 13

AS NOTED

11-1128

DL

AAB

APPROVED PER CE

AS BUILTS

A B

9 JAN 13

8 AUG 13

REVIEWED ACKNOWLEDGEMENT

POSITION INITIALS DATE

PM

HVAC SUPER

PIPING SUPER

PLUMBING SUPER

ELECTRICAL SUPER

AS BUILTS

EXISTING TENT

EXISTING ASPHALT DRIVE

NEW GUARD SHACK LOCATION

(SEE E-1.1 FOR ELECTRICAL

FLOOR PLAN)

ELECTRICAL SITE PLAN

16" = 1'

EXISTING 225A PANEL

NEW 100A SERVICE

IN 2" CONDUIT

EXISTING 12 X 12 QUAZITE

REROUTE WIRING TO NEW

GUARD SHACK LOCATION

NO. REVISION DATE BY

SHEET:

PROJ. NO.

OF

SCALE:

DATE:

Sheet Title

DRAWN BY:

DESIGNED BY:

SHT. REF. NO.

TYNDALL A.F.B., FL. 32403

TYNDALL A.F.B., FL. 32403

E-1.2 13

CONSTRUCT GUARD SHACK

& CANOPY

CLEVELAND GATE

D. LINDSEY

D. LINDSEY

ELECTRICAL SITE PLSN

17 JAN 13

AS NOTED

11-1128

DL

AAB

APPROVED PER CE

AS BUILTS

A B

9 JAN 13

8 AUG 13

REVIEWED ACKNOWLEDGEMENT

POSITION INITIALS DATE

PM

HVAC SUPER

PIPING SUPER

PLUMBING SUPER

ELECTRICAL SUPER

AS BUILTS

VALV

E REMOVED

"S

S ( X)

6"W (X)

8" W

EXISTING TENT

EXISTING ASPHALT DRIVE

NEW 4" PVC SEWER

TAP EXISTING MANHOLE

VERIFY LOCATION & WORKING

CONDITION OF MANHOLE

EXISTING MANHOLE

EXISTING MANHOLE

NEW GUARD SHACK LOCATION

(SEE P-1.1 FOR PLUMBING

FLOOR PLAN)

PLUMBING SITE PLAN

16" = 1'

GCO

VALVE

IN BOX

EXISTING

MH

GCO

80'-0" B

ORE

NEW 1" W

ATER LINE

2" VALVE

& TAP

NO. REVISION DATE BY

SHEET:

PROJ. NO.

OF

SCALE:

DATE:

Sheet Title

DRAWN BY:

DESIGNED BY:

SHT. REF. NO.

TYNDALL A.F.B., FL. 32403

TYNDALL A.F.B., FL. 32403

P-1.2 13

CONSTRUCT GUARD SHACK

& CANOPY

CLEVELAND GATE

D. LINDSEY

D. LINDSEY

PLUMBING SITE PLAN

17 JAN 13

AS NOTED

11-1128

DL

AAB

APPROVED PER CE

AS BUILTS

A B

9 JAN 13

6 AUG 13

DESIGN BUILD REVIEWED

ACKNOWLEDGEMENT

TRADE INITIALS DATE

HVAC

PLUMBING

PIPING

FIRE SPRINKLER

ELECTRICAL

AS BUILTS

B.3

CREDENTIAL CHECKPOINT OFFICE

CONCEPT

(Reference for design of new pad and infrastructure)

Mobile Checkpoint and Visitor Unit 8x40 Insulated with Finished Interior Container

1515703183C Typewritten Text

CREDENTIAL CHECKPOINT OFFICE CONCEPT

**PAD AND UTILITY ONLY - VERTICAL STRUCTURE NOT IN CONTRACT**

B.4

CREDENTIAL CHECKPOINT SHELTER

MOBILE INSPECTION SHELTER CONCEPT

(Reference for design of new pads and infrastructure)

Cleveland Gate Shelter

2-Sided Temp M Shelter. QTY. 2 54x51x19 Exterior Dimensions

1515703183C Typewritten Text

CREDENTIAL CHECK POINT SHELTER CONCEPT

MOBILE INSPECTION SHELTER CONCEPT

**PAD AND UTILITY ONLY - VERTICAL STRUCTURE NOT IN CONTRACT**

B.5

VACIS M6500 MOBILE INSPECTION

SYSTEM INFORMATION

(Reference for design of new mobile inspection system shelter)

EBS_TCGS-01_Rev.pdf
Sheets
TCGS-01 - FLOOR PLAN - ELEVATIONS, SECTIONS AND 3D IMAGE
EBS_OFF_WAIT-40.pdf
Sheets
OWV-01 - FLOOR PLAN, SECTIONS, 3D AND ELEVATIONS

File details come from the government source that posted it. Updated .