This is a Unified Facilities Guide Specification (UFGS) Section 02 82 00 for Asbestos Remediation, effective August 2025, prepared by NAVFAC for use across USACE, NAVFAC, and AFCEC projects. The specification establishes comprehensive safety procedures, requirements, and technical standards for the demolition, removal, encapsulation, and disposal of asbestos-containing materials (ACM). The document serves as a template for project-specific contract specifications and requires editing by qualified asbestos abatement designers who must be accredited and licensed per EPA Model Accreditation Plan requirements.

The specification covers extensive technical and procedural requirements organized into three main parts: General (definitions, requirements, submittals, quality assurance), Products (encapsulants, disposal containers, sheet plastic, duct tape, wetting agents), and Execution (equipment, work procedures, cleanup, and disposal). Key requirements include engagement of a Private Qualified Person (PQP) for oversight and air monitoring, establishment of regulated asbestos control areas with negative pressure enclosures or alternative containment methods, personal protective equipment and respiratory protection programs, pre-clearance and final clearance air sampling using NIOSH PCM Method 7400 or EPA TEM Method per 40 CFR 763, worker medical surveillance and training per 29 CFR 1926.1101, permits and notifications to EPA or state environmental agencies, and detailed procedures for Class I, II, and III asbestos work. Encapsulants must meet specific performance standards including flame spread ratings of 25, smoke emission ratings of 50 per ASTM E84, and 20-year durability warranties. All asbestos waste must be contained in 0.15 mm (6 mil) thick disposal bags, properly labeled per DOT requirements, transported by certified transporters, and disposed of at EPA or state-approved landfills. The specification mandates wet removal procedures in nearly all cases, prohibits dry removal except where wet methods create electrical hazards or equipment damage, and requires continuous 24-hour local exhaust system operation with automatic pressure differential monitoring maintaining minus 0.51 mm (0.02 inch) of water column in negative pressure enclosures.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

USACE / NAVFAC / AFCEC UFGS-02 82 00 (August 2025)

Preparing Activity: NAVFAC Superseding UFGS-02 82 00 (November 2018)

UNIFIED FACILITIES GUIDE SPECIFICATIONS

References are in agreement with UMRL dated October 2025

SECTION TABLE OF CONTENTS

DIVISION 02 - EXISTING CONDITIONS

SECTION 02 82 00

ASBESTOS REMEDIATION

08/25

PART 1 GENERAL

1.1 REFERENCES

1.2 DEFINITIONS

1.2.1 Amended Water

1.2.2 Area Sampling

1.2.3 Asbestos

1.2.4 Asbestos Containing Material (ACM)

1.2.5 Asbestos Containing Construction Material (ACCM)

1.2.6 Asbestos Control Area

1.2.7 Asbestos Fibers

1.2.8 Asbestos Permissible Exposure Limit

1.2.9 Authorized Person

1.2.10 Background

1.2.11 Competent Person (CP)

1.2.12 Contractor

1.2.13 Disposal Bag

1.2.14 Disturbance

1.2.15 Encapsulation

1.2.16 Encapsulants

1.2.17 Friable Asbestos Material

1.2.18 Glovebag Technique

1.2.19 HEPA Filter Equipment

1.2.20 Model Accreditation Plan (MAP)

1.2.21 Negative Pressure Enclosure (NPE)

1.2.22 NESHAP

1.2.23 Nonfriable Asbestos Material

1.2.24 Permissible Exposure Limits (PELs)

1.2.24.1 PEL-Time Weighted Average(TWA)

1.2.24.2 PEL-Excursion Limit

1.2.25 Personal Sampling

1.2.26 Presumed ACM

1.2.27 Private Qualified Person (PQP)

SECTION 02 82 00 Page 1

1.2.28 TEM

1.2.29 Thermal System Insulation

1.2.30 Time Weighted Average (TWA)

1.2.31 Transite

1.2.32 Wetting Agent

1.2.33 Worker

1.3 REQUIREMENTS

1.3.1 Description of Work

1.3.1.1 Wallboard/Joint Compound

1.3.2 Unexpected Discovery of Asbestos

1.3.3 Medical Requirements

1.3.3.1 Medical Examinations

1.3.3.2 Medical Records

1.3.4 Employee Training

1.3.5 Permits[, Licenses,] and Notifications

1.3.6 Environment, Safety and Health Compliance

1.3.7 Respiratory Protection Program

1.3.7.1 Respirator Program Records

1.3.7.2 Respirator Fit Testing

1.3.7.3 Respirator Selection and Use Requirements

1.3.8 Asbestos Hazard Control Supervisor

1.3.9 Hazard Communication

1.3.10 Asbestos Hazard Abatement Plan

1.3.11 Testing Laboratory

1.3.12 Landfill Approval

1.3.13 Transporter Certification

1.3.14 Medical Certification

1.4 SUBMITTALS

1.5 QUALITY ASSURANCE

1.5.1 Private Qualified Person Documentation

1.5.2 Designated Competent Person Documentation

1.5.3 Worker's License

1.5.4 Contractor's License

1.5.5 Air Sampling Results

1.5.6 Pressure Differential Recordings for Local Exhaust System

1.5.7 Federal, State or Local Citations on Previous Projects

1.5.8 Preconstruction Conference

1.6 SECURITY

1.7 EQUIPMENT

1.7.1 Rental Equipment

PART 2 PRODUCTS

2.1 ENCAPSULANTS

2.1.1 Removal Encapsulants

2.1.2 Bridging Encapsulant

2.1.3 Penetrating Encapsulant

2.1.4 Lock-down Encapsulant

2.2 ENCASEMENT PRODUCTS

2.3 DUCT TAPE

2.4 DISPOSAL CONTAINERS

2.5 SHEET PLASTIC

2.5.1 Flame Resistant

2.5.2 Reinforced

2.6 MASTIC REMOVING SOLVENT

2.7 LEAK-TIGHT WRAPPING

2.8 VIEWING INSPECTION WINDOW

2.9 WETTING AGENTS

SECTION 02 82 00 Page 2

PART 3 EXECUTION

3.1 EQUIPMENT

3.1.1 Air Monitoring Equipment

3.1.2 Respirators

3.1.2.1 Respirators for Handling Asbestos

3.1.3 Exterior Whole Body Protection

3.1.3.1 Outer Protective Clothing

3.1.3.2 Work Clothing

3.1.3.3 Personal Decontamination Unit

3.1.3.4 Eye Protection

3.1.4 Regulated Areas

3.1.5 Load-out Unit

3.1.6 Warning Signs and Labels

3.1.6.1 Warning Sign

3.1.6.2 Warning Labels

3.1.7 Local Exhaust System

3.1.8 Tools

3.1.9 Rental Equipment

3.1.10 Glovebags

3.1.11 Single Stage Decontamination Area

3.1.12 Decontamination Area Exit Procedures

3.2 WORK PROCEDURE

3.2.1 Building Ventilation System and Critical Barriers

3.2.2 Protection of Existing Work to Remain

3.2.3 Furnishings

3.2.4 Precleaning

3.2.5 Asbestos Control Area Requirements

3.2.5.1 Negative Pressure Enclosure

3.2.5.2 Glovebag

3.2.5.3 Regulated Area for Class II Removal

3.2.6 Removal Procedures

3.2.6.1 Sealing Contaminated Items Designated for Disposal

3.2.6.2 Exposed Pipe Insulation Edges

3.2.6.3 Presumed ACM

3.2.7 Methods of Compliance

3.2.7.1 Mandated Practices

3.2.7.2 Control Methods

3.2.7.3 Unacceptable Practices

3.2.8 Class I Work Procedures

3.2.9 Specific Control Methods for Class I Work

3.2.9.1 Negative Pressure Enclosure (NPE) System

3.2.9.2 Glovebag Systems

3.2.9.3 Mini-Enclosure

3.2.9.4 Wrap and Cut Operation

3.2.9.5 Class I Removal Method

3.2.10 Class II Work Procedures

3.2.11 Specific Control Methods for Class II Work

3.2.11.1 [Vinyl and Asphaltic Flooring Materials ][Carpet and

Mastic]

3.2.11.2 Sealants and Mastic

3.2.11.3 Suspect Fire Doors

3.2.11.4 Roofing Materials

3.2.11.5 Cementitious Siding and Shingles or Transite Panels

3.2.11.6 Gaskets

3.2.12 Encapsulation Procedures

3.2.12.1 Preparation of Test Patches

3.2.12.2 Field Testing

3.2.12.3 Large-Scale Application

SECTION 02 82 00 Page 3

3.2.13 Abatement of Asbestos Contaminated Soil

3.2.14 Air Sampling

3.2.14.1 Sampling Prior to Asbestos Work

3.2.14.2 Sampling During Asbestos Work

3.2.14.3 Final Clearance Requirements, NIOSH PCM Method

3.2.14.4 Final Clearance Requirements, EPA TEM Method

3.2.14.5 Sampling After Final Clean-Up (Clearance Sampling)

3.2.14.6 Air Clearance Failure

3.2.15 Lock-Down

3.2.16 Site Inspection

3.3 CLEAN-UP AND DISPOSAL

3.3.1 Housekeeping

3.3.2 Title to Materials

3.3.3 Disposal of Asbestos

3.3.3.1 Procedure for Disposal

3.3.3.2 Asbestos Disposal Quantity Report

-- End of Section Table of Contents --

SECTION 02 82 00 Page 4

USACE / NAVFAC / AFCEC UFGS-02 82 00 (August 2025)

Preparing Activity: NAVFAC Superseding UFGS-02 82 00 (November 2018)

UNIFIED FACILITIES GUIDE SPECIFICATIONS

References are in agreement with UMRL dated October 2025

SECTION 02 82 00

ASBESTOS REMEDIATION

08/25

NOTE: This guide specification covers the requirements for safety procedures and requirements for the demolition, removal, encapsulation, and disposal of asbestos containing materials (ACM).

This specification is used in conjunction with Section 01 35 26 GOVERNMENT SAFETY REQUIREMENTS.

Adhere to UFC 1-300-02 Unified Facilities Guide Specifications (UFGS) Format Standard when editing this guide specification or preparing new project specification sections. Edit this guide specification for project specific requirements by adding, deleting, or revising text. For bracketed items, choose applicable item(s) or insert appropriate information.

Remove information and requirements not required in respective project, whether or not brackets are present.

Comments, suggestions and recommended changes for this guide specification are welcome and should be submitted as a Criteria Change Request (CCR) .

NOTE: Federal regulations require EPA model accreditation plan training to edit this document.

Furthermore, asbestos abatement designers must be accredited and licensed to design asbestos work in the location of the construction.

Nonfriable asbestos containing materials do not always require special handling. However, during demolition and removal of this material dust and airborne asbestos fibers are sometimes released. If the project contains nonfriable asbestos which may release fibers when demolished and removed, the

SECTION 02 82 00 Page 5 nonfriable asbestos must be removed in the same way as friable asbestos. Friable ACM must always be removed prior to any building demolition. Any presumed ACM must be managed as ACM until proven otherwise through testing by a certified asbestos professional following applicable local, state and federal regulations.

In 1994, the EPA clarified for multi-layered systems (other than wallboard systems where asbestos containing joint compounds is used only at the joints and nail holes) to follow NESHAP and Asbestos Hazard Emergency Response Act (AHERA) (40 CFR Part

763) programs.

OSHA regulations address worker protection, NESHAPS (EPA), state, and locat regulations address emission controls and disposal requirements, and they have different definitions as to what constitutes ACM in wallboard/joint compound systems. Therefore, where wallboard/joint compound are suspected to contain ACM, analyze both discrete samples (separate samples from wallboard and joint compound) to address worker protection and composite samples (wallboard system as a whole) to address disposal requirements. It is not unusual for the wallboard itself and the wallboard system (taken as a whole) to contain less than 1 percent asbestos, but the discrete joint compound samples to contain greater than 1 percent asbestos. Problems can arise if these materials are not properly categorized in the design.

Asbestos operations do not always indicate negative pressure enclosure type asbestos control with all of its attendant requirements. The location of the area, type of material, and initial as well as other exposure assessments for abatement workers and the environment must be reviewed and a judgment made by the designer as to the precise asbestos control techniques described herein that may be safely and legally used.

The designer must not use asbestos containing materials wherever a substitute exists.

The limits and conditions of asbestos hazard abatement efforts must be indicated on the drawings or in the specification in sufficient detail for the Contractor to submit an accurate bid. Portions of the building where asbestos work takes place must be unoccupied during the removal operation. It is highly recommended that the entire building be unoccupied during asbestos hazard abatement operations. If portions of the building where asbestos hazard abatement is not taking place must remain occupied, additional requirements must be added for providing temporary heating/cooling and other utilities to the occupied portions of the

SECTION 02 82 00 Page 6 building. The building heating/cooling system for example cannot be operated in the asbestos control area and due to wet removal procedures, electrical service to the asbestos control area may need to be shut off and resupplied through a ground fault circuit interrupter. In addition, the rooms with openings into the room undergoing asbestos abatement must be empty with critical barriers installed to provide a buffer zone.

NOTE: Provide the following information on the project drawings:

1. Clearly show location, extent, condition and form of asbestos materials to be controlled or in contact with other non-ACM removals or new work.

NOTE: The work may involve a historic property.

The designer must coordinate review of the proposed work with the appropriate cultural resources manager (CRM) and cultural resource laws and regulations, as part of the environmental review and permitting process. Consultation with stakeholders, including the state historic preservation office, may be required, and work involving historic properties will likely be required to confirm to the Secretary of the Interior's Standards for the Treatment of Historic Properties (usually at the REHABILITATION level). See https://www.nps.gov/tps/standards/four-treatments/ treatment-rehabilitation.htm .

PART 1 GENERAL

1.1 REFERENCES

NOTE: This paragraph is used to list the publications cited in the text of the guide specification. The publications are referred to in the text by basic designation only and listed in this paragraph by organization, designation, date, and title.

Use the Reference Wizard's Check Reference feature when you add a Reference Identifier (RID) outside of the Section's Reference Article to automatically place the reference in the Reference Article. Also use the Reference Wizard's Check Reference feature to update the issue dates.

References not used in the text will automatically be deleted from this section of the project specification when you choose to reconcile

SECTION 02 82 00 Page 7 references in the publish print process.

The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.

AMERICAN SOCIETY OF SAFETY PROFESSIONALS (ASSP)

ASSP Z9.2 (2018) Fundamentals Governing the Design and Operation of Local Exhaust Ventilation Systems

ASTM INTERNATIONAL (ASTM)

ASTM D522/D522M (2017; R 2021) Mandrel Bend Test of Attached Organic Coatings

ASTM D2794 (1993; R 2024) Standard Test Method for Resistance of Organic Coatings to the Effects of Rapid Deformation (Impact)

ASTM D4397 (2016; R 2023) Standard Specification for Polyethylene Sheeting for Construction, Industrial, and Agricultural Applications

ASTM E84 (2024) Standard Test Method for Surface Burning Characteristics of Building Materials

ASTM E96/E96M (2024a) Standard Test Methods for Gravimetric Determination of Water Vapor Transmission Rate of Materials

ASTM E119 (2024) Standard Test Methods for Fire Tests of Building Construction and Materials

ASTM E736/E736M (2019) Standard Test Method for Cohesion/Adhesion of Sprayed Fire-Resistive Materials Applied to Structural Members

ASTM E1368 (2023) Standard Practice for Visual Inspection of Asbestos Abatement Projects

ASTM E1494 (2025) Standard Practice for Encapsulants for Spray- or Trowel-Applied Friable Asbestos-Containing Building Materials

COMPRESSED GAS ASSOCIATION (CGA)

CGA G-7 (2019) Standard for Compressed Air for Human Respiration; 6th Edition

INTERNATIONAL SAFETY EQUIPMENT ASSOCIATION (ISEA)

ANSI/ISEA Z87.1 (2020) Occupational and Educational Personal Eye and Face Protection Devices

SECTION 02 82 00 Page 8

NATIONAL FIRE PROTECTION ASSOCIATION (NFPA)

NFPA 701 (2023; ERTA 1 2023) Standard Methods of Fire Tests for Flame Propagation of Textiles and Films

NATIONAL INSTITUTE FOR OCCUPATIONAL SAFETY AND HEALTH (NIOSH)

NIOSH NMAM (2020; 5th Ed) NIOSH Manual of Analytical Methods

U.S. ARMY CORPS OF ENGINEERS (USACE)

EM 385-1-1 (2024) Safety -- Safety and Occupational Health (SOH) Requirements

U.S. ENVIRONMENTAL PROTECTION AGENCY (EPA)

EPA 340/1-90-018 (1990) Asbestos/NESHAP Regulated Asbestos Containing Materials Guidance

EPA 560/5-85-024 (1985) Guidance for Controlling Asbestos-Containing Materials in Buildings (Purple Book)

U.S. NATIONAL ARCHIVES AND RECORDS ADMINISTRATION (NARA)

29 CFR 1910.147 The Control of Hazardous Energy (Lock Out/Tag Out)

29 CFR 1926.51 Sanitation

29 CFR 1926.59 Hazard Communication

29 CFR 1926.103 Respiratory Protection

29 CFR 1926.200 Accident Prevention Signs and Tags

29 CFR 1926.1101 Asbestos

40 CFR 61-SUBPART A General Provisions

40 CFR 61-SUBPART M National Emission Standard for Asbestos

40 CFR 763 Asbestos

42 CFR 84 Approval of Respiratory Protective Devices

49 CFR 107 Hazardous Materials Program Procedures

49 CFR 171 General Information, Regulations, and Definitions

49 CFR 172 Hazardous Materials Table, Special Provisions, Hazardous Materials Communications, Emergency Response Information, and Training Requirements

SECTION 02 82 00 Page 9

49 CFR 173 Shippers - General Requirements for Shipments and Packagings

49 CFR 174 Carriage by Rail

U.S. NAVAL FACILITIES ENGINEERING SYSTEMS COMMAND (NAVFAC)

NAVFAC P-502 (2017) Asbestos Program Management

ND OPNAV M-5100.23 (2020; Rev G) Navy Safety and Occupational Health Manual

UL SOLUTIONS (UL)

UL 586 (2009; Reprint Sep 2022) UL Standard for Safety High-Efficiency Particulate, Air Filter Units

1.2 DEFINITIONS

1.2.1 Amended Water

Water containing a wetting agent or surfactant with a maximum surface tension of 2.9 Pa 0.00042 psi .

1.2.2 Area Sampling

Sampling of asbestos fiber concentrations which approximates the concentrations of asbestos in the theoretical breathing zone but is not actually collected in the breathing zone of an employee.

1.2.3 Asbestos

The term asbestos includes chrysotile, amosite, crocidolite, tremolite, anthophyllite, and actinolite and any of these minerals that have been chemically treated or altered.

1.2.4 Asbestos Containing Material (ACM)

Any material which contains greater than 1 percent asbestos.

[ 1.2.5 Asbestos Containing Construction Material (ACCM)

Any manufactured construction material which contains more than 1/10th of 1 percent asbestos by weight.

] 1.2.6 Asbestos Control Area

That area where asbestos removal operations are performed which is isolated by physical boundaries which assist in the prevention of the uncontrolled release of asbestos dust, fibers, or debris.

1.2.7 Asbestos Fibers

Those fibers having an aspect ratio of at least 3:1 and longer than 5 micrometers as determined by National Institute for Occupational Safety and Health (NIOSH) Method 7400.

SECTION 02 82 00 Page 10

1.2.8 Asbestos Permissible Exposure Limit

0.1 fibers per cubic centimeter of air as an 8-hour time weighted average measured in the breathing zone as defined by 29 CFR 1926.1101 or other Federal legislation having legal jurisdiction for the protection of workers health.

1.2.9 Authorized Person

Any person authorized by the Contractor and required by work duties to be present in the regulated areas.

1.2.10 Background

The ambient airborne asbestos concentration in an uncontaminated area as measured prior to any asbestos hazard abatement efforts. Background concentrations for other (contaminated) areas are measured in similar but asbestos free locations.

1.2.11 Competent Person (CP)

NOTE: Check state requirements for licensing and edit appropriately.

A person meeting the requirements for competent person as specified in 29 CFR 1926.1101 including a person capable of identifying existing asbestos hazards in the workplace and selecting the appropriate control strategy for asbestos exposure, who has the authority to take prompt corrective measures to eliminate them, and is specifically trained in a training course which meet the criteria of EPA's Model Accreditation Plan ( 40 CFR 763 ) for project designer or supervisor, or its equivalent.[ The competent person must have a current State of [_____] asbestos contractors or supervisors license.]

1.2.12 Contractor

The Contractor is that individual, or entity under contract to perform the herein listed work.

1.2.13 Disposal Bag

A 0.15 mm 6 mil thick, leak-tight plastic bag, pre-labeled in accordance with 29 CFR 1926.1101 [ or applicable state regulations], used for transporting asbestos waste from containment to disposal site.

1.2.14 Disturbance

Activities that disrupt the matrix of ACM[ and][ or][ ACCM], crumble or pulverize ACM[ and][ or][ ACCM], or generate visible debris from ACM[ and][ or][ ACCM]. Disturbance includes cutting away small amounts of ACM[ and][ or][ ACCM], no greater than the amount which can be contained in one standard sized glovebag or waste bag, not larger than 1.5 m 60 inches in length and width or as required by state or local regulations in order to access a building component.

SECTION 02 82 00 Page 11

1.2.15 Encapsulation

The abatement of an asbestos hazard through the appropriate use of a physical barrier or chemical encapsulants.

1.2.16 Encapsulants

Specific materials in various forms used to chemically or physically entrap asbestos fibers in various configurations to prevent these fibers from becoming airborne. There are four types of encapsulants as follows which must comply with performance requirements as specified herein.

a. Removal Encapsulant (can be used as a wetting agent)

b. Bridging Encapsulant (used to provide a tough, durable surface coating to asbestos containing material)

c. Penetrating Encapsulant (used to penetrate the asbestos containing material encapsulating all asbestos fibers and preventing fiber release due to routine mechanical damage)

d. Lock-Down Encapsulant (used to seal off or "lock-down" minute asbestos fibers left on surfaces from which asbestos containing material has been removed).

1.2.17 Friable Asbestos Material

A term defined in 40 CFR 61-SUBPART M and EPA 340/1-90-018 meaning any material which contains more than 1 percent asbestos, as determined using the method specified in 40 CFR 763 , Polarized Light Microscopy (PLM), that when dry, can be crumbled, pulverized, or reduced to powder by hand pressure.

1.2.18 Glovebag Technique

NOTE: Verify with the State regulations that glovebag removal is an acceptable technique.

Those asbestos removal and control techniques put forth in 29 CFR 1926.1101 .

1.2.19 HEPA Filter Equipment

High efficiency particulate air (HEPA) filtered vacuum and exhaust ventilation equipment with a filter system capable of collecting and retaining asbestos fibers. Filters must retain 99.97 percent of particles

0.3 microns or larger as indicated in UL 586 .

1.2.20 Model Accreditation Plan (MAP)

USEPA training accreditation requirements for persons who work with asbestos as specified in 40 CFR 763 .

1.2.21 Negative Pressure Enclosure (NPE)

That engineering control technique described as a negative pressure enclosure in 29 CFR 1926.1101 or applicable state regulations.

SECTION 02 82 00 Page 12

1.2.22 NESHAP

National Emission Standards for Hazardous Air Pollutants. The USEPA NESHAP regulation for asbestos is at 40 CFR 61-SUBPART M . Requirements associated with demolition and renovation activities are found in Section

61.145 of the NESHAP while requirements associated with waste disposal are found in Section 61.150.

1.2.23 Nonfriable Asbestos Material

Material that contains asbestos in which the fibers have been immobilized by a bonding agent, coating, binder, or other material so that the asbestos fibers are not normally released during appropriate use, handling, storage or transportation. It is understood that asbestos fibers may be released under other conditions such as demolition, removal, or mishap.

1.2.24 Permissible Exposure Limits (PELs)

1.2.24.1 PEL-Time Weighted Average(TWA)

Concentration of asbestos not in excess of 0.1 fibers per cubic centimeter of air (f/cc) as an 8-hour time weighted average (TWA).

1.2.24.2 PEL-Excursion Limit

An airborne concentration of asbestos not in excess of 1.0 f/cc of air as averaged over a sampling period of 30 minutes.

1.2.25 Personal Sampling

Air sampling which is performed to determine asbestos fiber concentrations within the breathing zone of a specific employee, as performed in accordance with 29 CFR 1926.1101 .

1.2.26 Presumed ACM

Any material which cannot be sampled at the time of the initial inspection due to inaccessibility, structural or safety concerns (such as charged electrical components), or could void active warranties (such as roofing materials). Presumed ACM must be managed as ACM unless proven to not be ACM through testing by a qualified and certified asbestos professional.

1.2.27 Private Qualified Person (PQP)

A Registered Architect, Professional Engineer, Certified Industrial Hygienist, consultant or other qualified person who has successfully completed training and is therefore accredited under a legitimate State Model Accreditation Plan as described in 40 CFR 763 as a Building Inspector, Contractor/Supervisor Abatement Worker, and Asbestos Project Designer. The PQP that collects samples and elects to analyze samples on site must successfully complete the National Institute of Occupational Safety and Health (NIOSH) 582 course "Sampling and Evaluating Airborne Asbestos Dust" or equivalent, and must participate in the American Industrial Hygiene Association (AIHA) Asbestos Analysis Registry (AAR).[ The PQP must be appropriately licensed in the State of [_____].]

SECTION 02 82 00 Page 13

1.2.28 TEM

Refers to Transmission Electron Microscopy.

1.2.29 Thermal System Insulation

Thermal system insulation (TSIACM applied to pipes, fittings, boilers, breeching, tanks, ducts or other structural components to prevent heat loss or gain.

1.2.30 Time Weighted Average (TWA)

The TWA is an 8-hour time weighted average airborne concentration of asbestos fibers.

1.2.31 Transite

A generic name for asbestos cement wallboard and pipe.

1.2.32 Wetting Agent

A chemical added to water to reduce the water's surface tension thereby increasing the water's ability to soak into the material to which it is applied. An equivalent wetting agent must have a surface tension of at most 2.9 Pa 0.00042 psi .

1.2.33 Worker

Individual (not designated as the Competent Person or a supervisor) who performs asbestos work and has completed asbestos worker training required by 29 CFR 1926.1101 , to include EPA Model Accreditation Plan (MAP) "Worker" training; accreditation, if required by the OSHA Class of work to be performed or by the state where the work is to be performed.[ The worker must be appropriately licensed in the State of [_____].]

1.3 REQUIREMENTS

1.3.1 Description of Work

NOTE: Specify the form, condition and approximate quantity square meters or linear meters square feet or linear feet of asbestos material to be controlled in the first blank and the location of the material in the second blank. Example: "The asbestos work includes the demolition and removal of 90 m of 200 mm 300 feet of 8 inch diameter asbestos insulation located on existing steam piping indicated to be removed in the boiler room." or "The asbestos work includes the encapsulation of 270 square meters 3,000 square feet of sprayed on asbestos containing fire proofing materials located above the ceiling throughout the structure."

The use of this section in the contract specification means that known asbestos material is involved. Estimate the quantity and specify as unit price items in Section 00 21 13, INSTRUCTIONS TO BIDDERS or Section 01 20 00 Price and Payment

SECTION 02 82 00 Page 14

Procedures per standard practice of the activity preparing the contract.

NOTE: Include reference to 40 CFR 763 when asbestos work occurs in a public or private school Grades K thru 12.

NOTE: Nonfriable ACM may not require special handling. However, during demolition and removal of this material dust and airborne asbestos fibers are sometimes released. If the project contains nonfriable asbestos which may release fibers when demolished and removed, the nonfriable asbestos must be removed in the same way as friable asbestos.

Include "Under normal ... specified herein.", if material traditionally defined as non-friable asbestos materials are to be removed.

NOTE: The appropriate engineering control technique must comply with the requirements outlined in 29 CFR

1926.1101 which is selected based on existing conditions, but must be that technique that provides the best control during abatement at most reasonable cost.

The work covered by this section includes the handling and control of asbestos containing materials and describes some of the resultant procedures and equipment required to protect workers, the environment and occupants of the building or area, or both, from contact with airborne asbestos fibers. The work also includes the disposal of any asbestos containing materials generated by the work. More specific operational procedures must be outlined in the Asbestos Hazard Abatement Plan called for elsewhere in this specification. The asbestos work includes the[ demolition and removal][ encapsulation] of [_____] located [_____][ which is governed by 40 CFR 763 and NAVFAC P-502 ].[ Under normal conditions non-friable or chemically bound materials containing asbestos would not be considered hazardous; however, this material may release airborne asbestos fibers during demolition and removal and therefore must be handled in accordance with the removal and disposal procedures as specified herein.] Provide[ negative pressure enclosure] [_____] techniques as outlined in this specification. The[ building][ work area] must be evacuated during the asbestos abatement work. A competent person must supervise asbestos removal work as specified herein.

1.3.1.1 Wallboard/Joint Compound

NOTE: When both composite and discrete sampling and testing is done on wallboard/joint compound, include and edit the following to address the site specific situation:

SECTION 02 82 00 Page 15

[ Both composite samples of the wallboard and discrete samples of the components (wallboard and joint compound) have been tested and results are attached.

][ Composite samples of the wallboard system were tested and found to contain[ less than one percent asbestos] [_____]. Discrete samples of the wallboard were tested and found to contain[ less than one percent asbestos] [_____]. Discrete samples of the joint compound were tested and found to contain[ greater than one percent asbestos] [_____].

] 1.3.2 Unexpected Discovery of Asbestos

NOTE: Discovery of Unexpected Asbestos: Suspect asbestos containing material or PACM that is discovered during demolition (in particular buildings constructed no later than 1980), which was previously inaccessible, must be sampled and analyzed for its asbestos content or classified as PACM. The Designer should anticipate additional sampling and analysis. The Designer should provide Unit Price options in the Bid Form. Coordinate with the Designer of Record. The number of additional samples should be based on the extent of demolition and previous survey data. Sampling activities undertaken to determine the presence of additional ACM should be conducted by personnel who have successfully completed the EPA Model Accreditation (MAP) training course and have EPA/State certification/license as an Asbestos Inspector.

Notify the Contracting Officer if any previously untested building components suspected to contain asbestos are impacted by the work.

1.3.3 Medical Requirements

Provide medical requirements including but not limited to medical surveillance and medical record keeping as listed in 29 CFR 1926.1101 .

1.3.3.1 Medical Examinations

Contractor must submit documentation of workers who perform activities potentially impacted[ ACM][ ACCM] including the name of each employee, type of exam received, and date of the exam. The documentation must also include a signed statement that the medical examination was reviewed by the contractor's[ Safety Manager][ and][ Industrial Hygienist] stating that the listed personnel have received the required medical examination in accordance with 29 CFR 1926.1101 and the exam results are saved. This requirement must have been satisfied within the 12 months prior to the start of work on this contract. The same medical examination must be given on an annual basis to employees engaged in an occupation involving asbestos and within 30 calendar days before or after the termination of employment in such occupation. Specifically identify x-ray films of asbestos workers to the consulting radiologist and mark medical record jackets with the word "ASBESTOS."

SECTION 02 82 00 Page 16

1.3.3.2 Medical Records

NOTE: Medical records must be retained at least 30 years after termination of employment. Some States require longer retention periods. Check with the State in which the project is located for the required retention time.

Maintain complete and accurate records of employees' medical examinations, medical records, and exposure data for a period of[ 30 years][ indefinite time] after termination of employment and make records of the required medical examinations and exposure data available for inspection and copying to: The Assistant Secretary of Labor for Occupational Safety and Health (OSHA), or authorized representatives of them, and an employee's physician upon the request of the employee or former employee.

1.3.4 Employee Training

NOTE: Include bracketed sentence where required by law, regulation or statute.

Submit certificates, prior to the start of work but after the main abatement submittal, signed by each employee indicating that the employee has received training in the proper handling of materials and wastes that contain asbestos in accordance with 40 CFR 763 ; understands the health implications and risks involved, including the illnesses possible from exposure to airborne asbestos fibers; understands the use and limits of the respiratory equipment to be used; and understands the results of monitoring of airborne quantities of asbestos as related to health and respiratory equipment as indicated in 29 CFR 1926.1101 on an initial and annual basis. Organize certificates by individual worker, not grouped by type of certification.[ Make training requirement records readily available in accordance with 40 CFR 763 .] Train personnel involved in the asbestos control work in accordance with United States Environmental Protection Agency (USEPA) Asbestos Hazard Emergency Response Act (AHERA) training criteria or State training criteria whichever is more stringent.

Document the training by providing: dates of training, training entity, course outline, names of instructors, and qualifications of instructors upon request by the Contracting Officer. Furnish each employee with respirator training and fit testing administered by the PQP as required by 29 CFR 1926.1101 and 29 CFR 1926.103 . Fully cover engineering and other hazard control techniques and procedures.[ Asbestos workers must have a current State of [_____] asbestos worker's license.]

1.3.5 Permits[, Licenses,] and Notifications

NOTE: The USEPA has delegated the responsibility of notification requirements to most States. Verify with the State and local authorities where the project is located whether the city, county, State, or USEPA has jurisdiction and whether a license is required.

Verify the specific notification requirements for

SECTION 02 82 00 Page 17 the state where the work is being performed.

Prior to the start of work, obtain necessary permits[ and licenses] in conjunction with asbestos removal, encapsulation, hauling, and disposition, and furnish notification of such actions required by Federal, State, regional, and local authorities. Notify the[ Regional Office of the United States Environmental Protection Agency (USEPA)][ State's environmental protection agency][ local air pollution control district/agency][ local/City Asbestos Control Bureau] and the Contracting Officer in writing [10][20][_____] working days prior to commencement of work in accordance with 40 CFR 61-SUBPART M [ and [_____]]. Notify the Contracting Officer and other appropriate Government agencies in writing 20 working days prior to the start of asbestos work as indicated in applicable laws, ordinances, criteria, rules, and regulations. Submit copies of all Notifications to the Contracting Officer.[ Notify the local fire department 3 days prior to removing fire-proofing material from the building including notice that the material contains asbestos.]

1.3.6 Environment, Safety and Health Compliance

NOTE: The designer must research the State, regional and local laws, regulations, statutes, and list by authority and document number in the blank spaces provided those which apply to the asbestos work to be performed by the Contractor.

In addition to detailed requirements of this specification, comply with those applicable laws, ordinances, criteria, rules, and regulations of Federal, State, regional, and local authorities regarding handling, storing, transporting, and disposing of asbestos waste materials. Comply with the applicable requirements of the current issue of EM 385-1-1 , 29 CFR 1926.1101 , 40 CFR 61-SUBPART A , 40 CFR 61-SUBPART M , 40 CFR 763 and ND OPNAV M-5100.23 . Submit matters of interpretation of standards to the appropriate administrative agency for resolution before starting the work. Where the requirements of this specification, applicable laws, rules, criteria, ordinances, regulations, and referenced documents vary, the most stringent requirement as defined by the Government apply. The following laws, ordinances, criteria, rules and regulations regarding removal, handling, storing, transporting and disposing of asbestos materials apply:

a. [_____]

b. [_____]

c. [_____].

1.3.7 Respiratory Protection Program

Establish and implement a respirator program as required by 29 CFR 1926.1101 , and 29 CFR 1926.103 and applicable state and local regulations. Submit a written description of the program to the Contracting Officer. Submit a written program manual or operating procedure including methods of compliance with regulatory statutes.

SECTION 02 82 00 Page 18

1.3.7.1 Respirator Program Records

Submit records of the respirator program as required by 29 CFR 1926.103 , and 29 CFR 1926.1101 .

1.3.7.2 Respirator Fit Testing

The Contractor's PQP must conduct a qualitative or quantitative fit test conforming to 29 CFR 1926.103 for each worker required to wear a respirator, and any authorized visitors who enter a regulated area where respirators are required to be worn. A respirator fit test must be performed prior to initially wearing a respirator and every 12 months thereafter. If physical changes develop that affects the fit, a new fit test must be performed. Functional fit checks must be performed each time a respirator is put on and in accordance with the manufacturer's recommendation.

1.3.7.3 Respirator Selection and Use Requirements

Provide respirators, and ensure that they are used as required by 29 CFR 1926.1101 and in accordance with CGA G-7 and the manufacturer's recommendations. Respirators must be approved by the National Institute for Occupational Safety and Health NIOSH, under the provisions of 42 CFR 84 , for use in environments containing airborne asbestos fibers. For air-purifying respirators, the particulate filter must be high-efficiency particulate air (HEPA)/(N-,R-,P-100). The initial respirator selection and the decisions regarding the upgrading or downgrading of respirator type must be made by the Contractor's Designated IH based on the measured or anticipated airborne asbestos fiber concentrations to be encountered.

1.3.8 Asbestos Hazard Control Supervisor

The Contractor must be represented on site by a supervisor, trained using the model Contractor accreditation plan as indicated in the Federal statutes for all portions of the herein listed work.

1.3.9 Hazard Communication

Adhere to all parts of 29 CFR 1926.59 and provide the Contracting Officer with a copy of the Safety Data Sheets (SDS) for all materials brought to the site.

1.3.10 Asbestos Hazard Abatement Plan

Submit a detailed plan of the safety precautions such as lockout, tagout, tryout, fall protection, and confined space entry procedures and equipment and work procedures to be used in the[ encapsulation][ removal][ and demolition] of materials containing asbestos. The plan, not to be combined with other hazard abatement plans, must be prepared, signed, and sealed by the PQP. Provide a Table of Contents for each abatement submittal, which follows the sequence of requirements in the contract.

The plan must include but not be limited to the precise personal protective equipment to be used including, but not limited to, respiratory protection, type of whole-body protection[ and if reusable coveralls are to be employed, an outer disposable layer such as disposable whole body cover must be employed over the top of the coveralls], the location of asbestos control areas including clean and dirty areas, buffer zones, showers, storage areas, change rooms,[ removal][ encapsulation] method, interface of trades involved in the construction, sequencing of asbestos

SECTION 02 82 00 Page 19 related work, disposal plan, type of wetting agent and asbestos sealer to be used, locations of local exhaust equipment, planned air monitoring strategies, and a detailed description of the method to be employed in order to control environmental pollution. The plan must also include (both fire and medical emergency) response plans and an Activity Hazard Analyses (AHAs) in accordance with EM 385-1-1 . The Asbestos Hazard Abatement Plan must be approved in writing prior to starting any asbestos work. The Contractor, Asbestos Hazard Control Supervisor, CP and PQP must meet with the Contracting Officer prior to beginning work, to discuss in detail the Asbestos Hazard Abatement Plan, including work procedures and safety precautions. Once approved by the Contracting Officer, the plan will be enforced as if an addition to the specification. Any changes required in the specification as a result of the plan must be identified specifically in the plan to allow for free discussion and approval by the Contracting Officer prior to starting work.

1.3.11 Testing Laboratory

Submit the name, address, telephone number, and appliable laboratory certification(s) of each testing laboratory selected for the[ sampling,] analysis, and reporting of airborne concentrations of asbestos fibers along with[ evidence that each laboratory selected holds the appropriate State license and permits and] certification that each laboratory is American Industrial Hygiene Association (AIHA) accredited and that persons counting the samples have been judged proficient by current inclusion on the AIHA Asbestos Analysis Registry (AAR) and successful participation of the laboratory in the Proficiency Analytical Testing (PAT) Program. Where analysis to determine asbestos content in bulk materials or transmission electron microscopy is required, submit evidence that the laboratory is accredited by the National Institute of Science and Technology (NIST) under National Voluntary Laboratory Accreditation Program (NVLAP) for asbestos analysis. The testing laboratory firm must be independent of the asbestos contractor and must have no employee or employer relationship which could constitute a conflict of interest.

1.3.12 Landfill Approval

NOTE: The USEPA has delegated the responsibility of approving landfills for the disposal of asbestos to most States. Verify with the State in which the project is located whether the State or USEPA has jurisdiction and what laws apply. Use the open bracket to add specific applicable state [and][or] local regulation(s).

Submit written evidence that the landfill is approved for asbestos disposal by the[ U.S. Environmental Protection Agency, Region [_____], Air Enforcement Section [(38W12)][_____],][ and][ local regulatory authority [_____], regulation [_____]]. Within three working days after delivery, submit detailed delivery tickets , prepared, signed, and dated by an agent of the landfill, certifying the amount of asbestos materials delivered to the landfill. Submit a copy of the waste shipment records within one day of the shipment leaving the project site.

1.3.13 Transporter Certification

SECTION 02 82 00 Page 20

NOTE: Designer should utilize and reference, where appropriate, Section 02 81 00 TRANSPORTATION AND DISPOSAL OF HAZARDOUS MATERIALS as a part of the contract documents or include the appropriate Department of Transportation (DOT) requirements from 49 CFR 107, 171, 172, and 173. If Section 02 81 00 is not included, edit this paragraph to include the DOT references. The contract documents must address all applicable DOT requirements including those for shipping, training, certifications, packaging, markings, labelings, and placards for shippers and transporters in addition to Government, OSHA and EPA requirements.

Submit written evidence that the transporter is approved to transport asbestos waste in accordance with the DOT requirements of 49 CFR 171 , 49 CFR 172 , 49 CFR 173 ,[ and][ 49 CFR 174 and IMDG DGR for water transportation][ and][ IATA DGR for air transportation] as well as registration requirements of 49 CFR 107 and all other State and local regulatory agency requirements.

1.3.14 Medical Certification

Provide a written certification for each worker and supervisor, signed by a licensed physician indicating that the worker and supervisor has met or exceeded all of the medical prerequisites listed herein and in 29 CFR 1926.1101 and 29 CFR 1926.103 as prescribed by law. Submit certificates prior to the start of work but after the main abatement submittal.

1.4 SUBMITTALS

NOTE: Review Submittal Description (SD) definitions in Section 01 33 00 SUBMITTAL PROCEDURES and edit the following list, and corresponding submittal items in the text, to reflect only the submittals required for the project. The Guide Specification technical editors have classified those items that require Government approval, due to their complexity or criticality, with a "G." Generally, other submittal items can be reviewed by the Contractor's Quality Control System. Only add a "G" to an item if the submittal is sufficiently important or complex in context of the project.

For Army projects, fill in the empty brackets following the "G" classification, with a code of up to three characters to indicate the approving authority. Codes for Army projects using the Resident Management System (RMS) are: "AE" for Architect-Engineer; "DO" for District Office (Engineering Division or other organization in the District Office); "AO" for Area Office; "RO" for Resident Office; and "PO" for Project Office. Codes following the "G" typically are not used for Navy and Air Force projects.

SECTION 02 82 00 Page 21

The "S" classification indicates submittals required as proof of compliance for sustainability Guiding Principles Validation or Third Party Certification and as described in Section 01 33 00 SUBMITTAL

PROCEDURES.

Government approval is required for submittals with a "G" or "S" classification. Submittals not having a "G" or "S" classification are for Contractor Quality Control approval. Submittals not having a "G" or "S" classification are for information only. When used, a code following the "G" classification identifies the office that will review the submittal for the Government. Submit the following in accordance with Section

01 33 00 SUBMITTAL PROCEDURES:

NOTE: The submittals required for each project are very dependent upon the removal method to be used.

Edit the submittals paragraph accordingly.

SD-03 Product Data

Amended Water ; G, [_____]

Safety Data Sheets (SDS) for All Materials ; G, [_____]

Encapsulants ; G, [_____]

Respirators ; G, [_____]

Local Exhaust Equipment ; G, [_____]

Pressure Differential Automatic Recording Instrument ; G, [_____]

Vacuums; G, [_____]

[ Glovebags ; G, [_____]

] SD-06 Test Reports

Air Sampling Results ; G, [_____]

Pressure Differential Recordings for Local Exhaust System ; G, [ Encapsulation Test Patches ; G, [_____]

] Clearance Sampling ; G, [_____]

Asbestos Disposal Quantity Report ; G, [_____]

SD-07 Certificates

NOTE: Verify and include contractor's and worker's licenses as required for the state where the work is being performed.

SECTION 02 82 00 Page 22

Employee Training ; G, [_____]

Notifications ; G, [_____]

Respiratory Protection Program ; G, [_____]

Asbestos Hazard Abatement Plan ; G, [_____]

Testing Laboratory ; G, [_____]

Landfill Approval ; G, [_____]

Delivery Tickets ; G, [_____]

Waste Shipment Records ; G, [_____]

Transporter Certification ; G, [_____]

Medical Certification ; G, [_____]

Private Qualified Person Documentation ; G, [_____]

Designated Competent Person ; G, [_____]

Worker's License ; G, [_____]

Contractor's License ; G, [_____]

Federal, State or Local Citations on Previous Projects ; G, [_____]

Encapsulants ; G, [_____]

Equipment Used to Contain Airborne Asbestos Fibers ; G, [_____]

Water Filtration Equipment ; G, [_____]

Vacuums; G, [_____]

Ventilation Systems ; G, [_____]

SD-11 Closeout Submittals

Permits[ and Licenses] ; G, [_____]

Notifications ; G, [_____]

Respirator Program Records ; G, [_____]

Rental Equipment ; G, [_____]

1.5 QUALITY ASSURANCE

1.5.1 Private Qualified Person Documentation

NOTE: Edit requirement for private qualified person to have licensing.

SECTION 02 82 00 Page 23

Submit the name, address, and telephone number of the PQP selected to prepare the Asbestos Hazard Abatement Plan, direct monitoring and training, and documented evidence that the PQP has successfully completed training in and is accredited and where required is certified as, a Building Inspector, Contractor/Supervisor Abatement Worker, and Asbestos Project Designer as described by 40 CFR 763 and has successfully completed the National Institute of Occupational Safety and Health (NIOSH) 582 course "Sampling and Evaluating Airborne Asbestos Dust" or equivalent.[ The PQP must be appropriately licensed in the State of [_____] as a Project Monitor]. The PQP and the asbestos contractor must not have an employee/employer relationship or financial relationship which could constitute a conflict of interest. The PQP must be a first tier subcontractor.

1.5.2 Designated Competent Person Documentation

NOTE: Edit requirement for licensing.

The Designated Competent Person must be experienced in the administration and supervision of asbestos abatement projects including exposure assessment and monitoring, work practices, abatement methods, protective measures for personnel, setting up and inspecting asbestos abatement work areas, evaluating the integrity of containment barriers, placement and operation of local exhaust systems, ACM generated waste containment and disposal procedures, decontamination units installation and maintenance requirements, site safety and health requirements, notification of other employees onsite, [_____]. The Designated Competent Person must be on-site at all times when asbestos abatement activities are underway.Submit training certification and a current State of [_____] Asbestos Contractor's and Supervisor's License. Submit evidence that the Designated Competent Person has a minimum of [2][_____] years of on-the-job asbestos abatement experience relevant to OSHA designated competent person requirements. The Designated Competent Person must be a first tier subcontractor.

1.5.3 Worker's License

NOTE: Edit requirement for licensing.

Submit documentation that workers meet the requirements of 29 CFR 1926.1101 , 40 CFR 61-SUBPART M and have a current State of [_____] Asbestos Workers License.

1.5.4 Contractor's License

NOTE: Edit requirement for licensing.

Submit a copy of the asbestos contractor's license issued by the State of [_____]. Submit the following certification along with the license: "I certify that the personnel I am responsible for during the course of this project fully understand the contents of 29 CFR 1926.1101 , 40 CFR 61-SUBPART M EM 385-1-1 , and the Federal, State and local requirements for those asbestos abatement activities that they will be

SECTION 02 82 00 Page 24 involved in." This certification statement must be signed by the Company's President or Chief Executive.

1.5.5 Air Sampling Results

NOTE: Normal practice is to have the Contractor hire one independent Private Qualified Person (the PQP) to perform all required functions. However, some applicable laws forbid this approach and dictate when the PQP is required to perform the function involved. However, the Contractor must always hire a PQP.

Complete fiber counting and provide results to the PQP for review within 16 hours of the "time off" of the sample pump. Notify the Contracting Officer immediately of any airborne levels of asbestos fibers in excess of the acceptable limits.

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .