Attachment 1 - Statement of Work (SOW).pdf
PDF 5 MB Posted
- Attached to
- Tombs Field Locker Rooms Renovation
- Solicitation number
- 6923G224B000001
About this file
This document is a Statement of Work (SOW) for the renovation of the Tomb Memorial Field Men's Locker Room at the U.S. Merchant Marine Academy (USMMA) in Kings Point, New York. The SOW details the scope of work, required deliverables, and project activities, including pre-submission site visits, contractor proposal submission, weekly progress meetings, final inspection, and warranty verification.
The related federal contract opportunity is a solicitation (6923G224B000001) issued as an Invitation for Bids (IFB) for the Tombs Field Locker Rooms Renovation project. This is a total small business set-aside with a NAICS code of 238990. The solicitation requires the services of a qualified contractor capable of performing mason, plumbing, and electrical work at the USMMA in Kings Point, NY. A single firm, fixed-price award will be made to the responsible offeror whose conforming, lowest-priced, technically acceptable quote has no adverse past performance. A site visit is scheduled for August 15, 2024, and the Davis-Bacon Act wage determination is applicable.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STATEMENT OF WORK
Tomb Memorial Field
Men’s Locker Room- Renovation
U.S. MERCHANT MARINE ACADEMY
KINGS POINT, NEW YORK 11024
FY July 2024
U.S. DEPARTMENT OF TRANSPORTATION
MARITIME ADMINISTRATION
U.S. MERCHANT MARINE ACADEMY
BACKGROUND
The United States Merchant Martine Academy (USMMA) is an agency of the Maritime
Administration (MARAD) managed by the United States Department of Transportation.
The USMMA is listed on the National Register of Historic Places. Therefore, all work shall be consistent with the Secretary of the Interior's Standards for the Treatment of Historic Properties
(36 CFR part 68) http://www.nps.gov/tps/standards/four-treatments/treatment-guidelines.pdf.
All work shall meet or exceed the standards provided in the Secretary of the Interior’s Standards for Rehabilitation and guidelines for applying the standards published by the National Park
Service, U.S. Department of the Interior 36 CFR 67.7 - Standards for rehabilitation.
The contractor shall be aware of the potential presence of hazardous materials, specifically lead-based paint and/or asbestos, in any buildings located at the USMMA. It is the responsibility of the contractor to take appropriate measures in accordance with all local, state, and federal environmental and occupational safety and health laws and regulations.
SCOPE
The USMMA seeks a qualified, experienced and insured contractor to provide labor, material, transportation, tools, equipment and supervision to perform renovations and repairs at the Tomb
Memorial Field Men’s Locker Room.
This project does not appear to be a Lead Abatement or Asbestos Abatement project. If at any time the contractor comes across suspected lead paint, asbestos or any other hazardous material, the contractor is to immediately contact the designated government representative.
DELIVERABLES
The Contractor is responsible for all of the work areas outlined below:
1. Entrance Foyer
1.1 Repair and patch all holes and imperfections in the walls. Patch cracks in the walls as necessary and clean steel joists of rust and debris.
1.2 Install complete steam trap to include isolation valve and strainer for existing Modine hydronic heat fan
1.3 Apply Benjamin Moore Fresh Start Primer # 046-00, or equivalent, to the walls, steel joists, the door frame to the main locker room, entry door and frame interior only, Storage
Room door and frame both sides, ductwork, kindorf, electrical pipes and pipe insulation.
1.4 Apply two coats of Benjamin Moore White Satin Latex Eggshell #2067-70 paint or equivalent to the walls.
1.5 Apply two coats of Benjamin Moore Sea Haze Oil Based #2137-50 paint or equivalent to the door and door frame to the Main Locker Room and Storage Room.
1.6 Apply two coats of Benjamin Moore Sea Haze Oil Based #2137-50 paint or equivalent to the entrance door interior side only.
1.7 Apply two coats of Benjamin Moore Super Hide Latex Flat White #282.01 paint or equivalent to the steel joists, ductwork, kindorf, electrical pipes and pipe insulation.
1.8 Remove one ceiling light fixture. Furnish and install new LED ceiling light fixture, Lithonia Lighting 4-ft 4188-Lumen Neutral White LED Wraparound Light, or equivalent light fixture.
1.9 Remove existing wall base and completely clean surface of any residual adhesive. Furnish and install new 6” vinyl cove base, Roppe - #100 in black or approved equal, approximately 30 LFT.
1.10 Remove existing rubber tile floor completely.
1.11 Clean, repair and prepare concrete floor for new rubber floor tiles.
1.12 Furnish and and install new rubber floor, Regupol Aktiv 3/8 flooring, 48” wide with
Reguseal sealer or approved equivalent.
1.13 Inspect and repair/replace as needed, all electrical switches, outlets and wiring to ensure
NFPA 70 compliance.
2. Main Locker Room
2.1 Furnish and install pipe insulation and tape mechanical pipes as needed.
2.2 Remove rust and clean steel ceiling joists. Apply Benjamin Moore Fresh Start Primer #
046-00, or equivalent, to the steel joists, kindorf, electrical pipes, ductwork, pipe insulation and secondary entrance door interior side only.
2.3 Repair and patch all holes and imperfections in the walls. Patch cracks in the walls as necessary. Apply Benjamin Moore Fresh Start Primer # 046-00, or equivalent, to the walls and mechanical room door and frame.
2.4 Apply two coats of Benjamin Moore White Satin Latex Eggshell #2067-70 paint or equivalent to the walls.
2.5 Apply two coats of Benjamin Moore Super Hide Latex Flat White #282.01 paint or equivalent to the steel joists, kindorf, electrical pipes, ductwork and pipe insulation.
2.6 Apply two coats of Benjamin Moore Sea Haze Oil Based #2137-50 paint or equivalent to the mechanical room entrance door and frame (both sides).
2.7 Apply two coats of Benjamin Moore Sea Haze Oil Based #2137-50 paint or equivalent to the secondary entrance door and frame interior side only.
2.8 Remove existing wall base. Furnish and install new 6” vinyl cove base, Roppe Vinyl
Wall Base - #100 in black or approved equal, approximately 140 LFT.
2.9 Remove existing rubber tile floor completely.
2.10 Clean, repair and prepare concrete floor for new rubber floor tiles.
2.11 Furnish and install new rubber floor, Regupol Aktiv 3/8 flooring, 48” wide with Reguseal sealer or approved equivalent.
2.12 Remove two Modine vertical heating units and cap lines
2.13 Furnish and install new 5 Ton AC hotizontal split system including all electrical connections
2.13.1 Furnish and install a steam heating coil located at the ductwork horizontal unit. Install complete steam trap to include isolation valve and strainer
2.13.2 Supply and install all ductwork and diffusers
2.13.3 Insulate all ductwork
2.13.4 Modify existing exhaust system to provide main locker room with 270 CFM, the bathroom 80 CFM and the shower room 150 CFM
2.13.5 Connect existing outside air damper and extend to new horizontal unit intake. Ensure actuator is functioning properly. Replace actuator if needed
2.13.6 Installation per NY State building code
2.13.7 Contractor to provide system layout plan for approval. Contractor to provide 7 day notice prior to start of installation.
2.14 Remove ten (10) ceiling light fixtures. Furnish and install ten (10) new LED ceiling light fixtures, Lithonia Lighting 4-ft 4188-Lumen Neutral White LED Wraparound Light, or equivalent light fixture. Contractor to provide system layout plan for approval.
2.15 Remove and dispose of 46 lockers.
2.16 Furnish and Install 70 custom lockers.
2.17 Inspect and repair/replace as needed, all electrical switches, outlets and wiring to ensure
NFPA 70 compliance.
3. Mechanical Room
3.1 Remove ceiling fan coil heating unit.
3.2 Furnish and install, including electric, High performance horizontal deluxe heating fan coil unit with bottom supply and return. Unit size/model subject to government approval.
Install complete steam trap to include isolation valve and strainer
3.3 Repair missing CMU wall sections. Patch all holes, cracks and imperfections in the CMU walls. Clean walls and apply Benjamin Moore Fresh Start Primer # 046-00, or equivalent, to the walls.
3.4 Apply two coats of Benjamin Moore Linen White Latex #OC-146 paint or equivalent to the walls
3.5 Remove rust and clean steel ceiling joists and pump equipment. Apply Benjamin Moore
Fresh Start Primer # 046-00, or equivalent, to the steel joists, kindorf, electrical pipes, pipe insulation and pump equipment.
3.6 Apply two coats of Benjamin Moore Super Hide Latex Flat White #282.01 paint or equivalent to the ceiling joists, kindorf, electrical pipes, pipe insulation and pump equipment.
3.7 Remove and dispose of lockers and shelf.
3.8 Remove exhaust fan and housing. Furnish and install new exhaust fan, damper, actuator and housing.
3.9 Furnish and install pipe insulation and tape mechanical pipes as needed.
NarineA Highlight
3.10 Remove ceiling light fixtures. Furnish and install three (3) new LED ceiling light fixture, Lithonia Lighting 4-ft 4188-Lumen Neutral White LED Wraparound Light, or equivalent light fixtures
3.11 Clean, repair, patch and prepare concrete floor for painting. Apply concrete sealant and primer.
3.12 Apply two coats of Battle Ship Grey paint to the floor.
3.13 Install metal door threshold approved by government representative.
3.14 Clean and install a proper floor drain cover.
3.15 Inspect and repair/replace as needed, all electrical switches, outlets and wiring to ensure
NFPA 70 compliance.
4. Bathroom
4.1 Remove ceiling fan coil heating unit.
4.2 Furmish and install including electric, one High Performance horizontal deluxe heating fan coil unit with bottom supply and return. Unit size/model subject to government approval. Install complete steam trap to include isolation valve and strainer
4.3 Remove ceiling light fixture. Furnish and install six (6) new 13” LED Ceiling Flush
Mount Disk Lights, wet location rated.
4.4 Inspect and repair/replace as needed, all electrical switches, outlets and wiring to ensure
NFPA 70 compliance.
4.5 Remove ceiling. Furnish and install new dropped ceiling using Trusscore PVC panels, or equivalent.
4.6 Remove bathroom toilet partitions and urinal partition. Furnish and install new floor mounted black powder coated steel toilet partition and wall mounted urinal partition.
4.7 Clean, seal and polish floor tiles and wall base tiles.
4.8 Apply Benjamin Moore Fresh Start Primer # 046-00, or equivalent, to the walls.
4.9 Apply two coats of Benjamin Moore White Satin Latex Eggshell # 2067-70 paint or equivalent to the walls
5. Shower Room
5.1 Remove light fixtures. Furnish and install six (6) new 13” LED Ceiling Flush Mount Disk
Lights, wet location rated.
5.2 Replace two (2) ceiling vent covers.
5.3 Install duct ventiliation connection to the third vent, and install vent cover.
5.4 Remove ceiling. Furnish and install new dropped ceiling using Trusscore PVC panels, or equivalent.
5.5 Clean, seal and polish tile floor and wall tiles.
5.6 Furnish and install nine Shower dividers with front doors. Proposed configuration needs to be approved by government representative before proceeding.
5.7 Remove existing shower fixtures and install nince shower fixtures and plumb as needed.
5.8 Inspect and repair/replace as needed, all electrical switches, outlets and wiring to ensure
NFPA 70 compliance.
5.9 Furnish and install heavy duty drain cover.
6. Shower Changing Room
6.1 Remove two ceiling fan coil heating units and cap one of the units.
6.2 Furnish and install including electric, one High Performance horizontal deluxe heating fan coil units with bottom supply and return. Unit size/model subject to government approval.
Install complete steam trap to include isolation valve and strainer
6.3 Remove existing light fixture. Furnish and Install six(6) new 13” LED Ceiling Flush
Mount Disk Lights, wet location rated.
6.4 Inspect and repair/replace as needed, all electrical switches, outlets and wiring to ensure
NFPA 70 compliance.
6.5 Remove ceiling. Furnish and install new dropped ceiling using Trusscore PVC Panels
6.6 Replace missing wall tiles with matching color, style and size.
6.7 Clean, seal and polish floor tile and wall tiles.
6.8 Apply Benjamin Moore Fresh Start Paint Primer # 046-00, or equivalent, to the walls.
6.9 Apply two coats of Benjamin Moore White Satin Latex Eggshell #2067-70 paint or equivalent to the walls
7. Storage Room
7.1 Furnish and install pipe insulation and tape as needed.
7.2 Install complete steam trap to include isolation valve and strainer for Modine hydronic heat fan
7.3 Remove rust, remove loose paint and clean steel ceiling joists, kindorf, ductwork, pipe insulation and walls.
7.4 Apply Benjamin Moore Fresh Start Primer # 046-00, or equivalent, to the steel joists, kindorf, ductwork, pipe insulation and walls.
7.5 Apply two coats of Benjamin Moore Super Hide Latex Flat White #282.01 paint to the steel joists, kindorf, ductwork, and pipe insulation.
7.6 Apply two coats of Benjamin Moore White Satin Latex Eggshell #2067-70 paint to the walls.
7.7 Remove mirror and hand towel dispenser. Furnish and install a new mirror and hand towel dispenser.
7.8 Inspect and repair/replace as needed, all electrical switches, outlets and wiring to ensure
NFPA 70 compliance.
7.9 Clean, repair, patch and prepare concrete floor for painting. Apply concrete sealant and primer.
7.10 Apply two coats of Battleship Grey paint to the floor.
7.11 Repair/replace exterior vent fan motor.
7.12 Remove ceiling light fixture. Furnish and install new Lithonia Lighting 8 foot 4188-
Lumen Neutral White LED Wraparound Light, or equivalent light fixture
8. Paint and Trim Colors
Location Color Color Code Manufacturer
1 Entrance Foyer Wall White Satin Latex Eggshell 2067-70 Benjamin
Moore
Foyer Door Frame & Door - Interior Only See Haze - Oil Based 2137-50
Benjamin Moore
Storage Room Frame & Door See Haze - Oil Based 2137-50
Benjamin Moore
4 Storage Room Wall White Satin Latex Eggshell 2067-70 Benjamin
Moore
Ceiling Steel Joists, Kindorf, Ductwork Super Hide Latex Flat White 282.01
Benjamin Moore
Main Locker Room Walls White Satin Latex Eggshell 2067-70
Benjamin Moore
Main Locker Room - Secondary Entrance Door & Frame Interior See Haze - Oil Based 2137-50
Benjamin Moore
Mechanical Room Door & Frame See Haze - Oil Based 2137-50
Benjamin Moore
9 Mechanical Room Walls Linen White Latex OC-146 Benjamin
Moore
10 Mechanical Room Floor Concrete & Garage Floor
Paint 1-Part Epoxy Slate Gray KILZ
11 Bathroom Wall White Satin Latex Eggshell 2067-70 Benjamin
Moore
Shower Changing Room Wall White Satin Latex Eggshell 2067-70
Benjamin Moore
Entrance Doors & Frames Interior Only See Haze - Oil Based 2137-50
Benjamin Moore
14 6" Vinyl Cove Base Black 100 Roppe
PROJECT ACTIVITIES
1. Pre-Submission Site Visit
2. Contractor Proposal Submission
3. Award
4. Post Award Kick Off Meeting
5. Submission of Equipment Cut Sheets, Materials Safety Data Sheets and schedule
6. Approval of Materials, Equipment and schedule
7. Notice to Proceed
8. Work commencement
9. Weekly Progress Meeting & Report
10. Final Inspection
11. Acceptance
12. Operations and Maintenance Manuals submitted
13. Warranty Verification
14. Final Payment
SUBMITTALS
1. Project Schedule
2. HVAC system layout
3. Samples of all paint colors
4. Sample of vinyl 6” wall base
5. Sample of PVC ceiling panels
6. Sample of rubber floor tiles
7. Sample Vent covers
8. Sample Mechanical Room threshold
9. Cut Sheet for Mechanical Room drain cover
10. Cut Sheet for Shower Room drain cover
11. Cut Sheet for proposed HVAC Split Unit System
12. Cut Sheet for Ceiling Fan Coil Unit
13. Cut Sheet for mirror and paper towel dispenser
14. Cut Sheet for proposed Light Fixtures
15. Cut Sheet for Mechanical Room Exhaust Motor & Housing
16. Cut Sheet for Bathroom Toilet Dividers
17. Cut Sheet for Bathroom Urinal Divider
18. Cut Sheet for Shower Room Dividers
19. MSDS and specifications for pipe insulation
20. MSDS for floor sealant and floor paint
21. MSDS for tile floor cleaner and polish
GOVERNMENT FURNISHED PROPERTY, MATERIAL, EQUIPMENT OR
INFORMATION.
- Not Applicable
CONSIDERATIONS
Maintain communication with the Contracting Officer's Representative (COR) and immediately inform them of any unforeseen issues or problems that arise.
Inform COR of any anticipated disruption in services for construction at least three (3) days in advance.
PLACE OF PERFORMANCE
Contractor will perform the task located at Tomb Field Men’s Locker Room on the campus of
USMMA, 300 Steamboat Road, Kings Point, N.Y. 11024
PERIOD OF PERFORMANCE
Work is to be completed within 60 calendar days after NTP is approved. Work is to be performed during normal business hours 0700 to 1630, Monday through Friday unless approval is granted by the Contracting Officer.
ADDITIONAL NOTES
1. A full work plan must be prepared in advance and submitted to the Contracting Officer
Representative (COR) for approval. The plan must be approved at least one (1) week prior to commencement of work.
2. All work must be scheduled with the COR at least 72 hours prior to commencement.
3. The academy must be immediately notified of any service and/or activity interruptions. Any potential unforeseen interruptions or issues must be immediately relayed to the COR and
Public Safety Department.
4. A pre-bid onsite walkthrough with the Department of Public Works (DPW), COR, and
Public Safety Department will be conducted to survey the work area and identify any potential issues with commencement of work.
5. All mechanical equipment to be inspected and tested prior to contract close-out
6. Any debris generated during construction activities will be removed by the contractor (and subcontractors) daily from the affected area(s) and academy premises. Area(s) will be left neat and clean after work is completed, suitable for all normal academy activities.
7. Contractor must properly dispose of waste in accordance with all RCRA requirements.
Documentation of this disposal shall be provided to the COR, Public Safety and the contracted IH firm.
CLOSE OUT
The contractor shall provide a signed warranty of any damage, defective material and improper workmanship on any material provided in this contract. Materials and labor to be warranted for one year after installation, and equipment to be warranted per manufacturer's specifications.
NarineA Highlight
Entrance Foyer
Main Locker Room
Mechanical Room
Bathroom
Shower Room
Shower Changing Room
Storage Room
Storage Room
File details come from the government source that posted it. Updated .