Attachment_1_Statement_of_Work.pdf

PDF 729 KB Posted

Attached to
AZSO PHYSICAL SECURITY SERVICE CONTRACT Federal contract opportunity
Solicitation number
140L6425Q0003
Issued by
Department of the Interior Bureau of Land Management Arizona Region

About this file

This is a Statement of Work (SOW) for physical security system maintenance services at the Bureau of Land Management Arizona State Office in Phoenix. The contractor will maintain, monitor, and test three security systems: a Video Surveillance System (VSS) with 5 cameras and Milestone Husky recording system, a Physical Access Control System (PACS) with 37 card readers using AMAG Symmetry, and a duress alarm system with 4 activation buttons.

Key requirements include 24/7 response capability with 4-hour response time, annual updates and licensing, system testing, and repairs/replacements as needed. The contract will be a Firm Fixed Price award for a base year plus four option years. Work must be performed during business hours (7am-4pm Monday-Friday) unless otherwise coordinated. All materials must meet FIPS-201 and GSA approval requirements. Detailed equipment lists are provided in attachments for the VSS (including Milestone NVR and cameras), PACS (including Symmetry controllers and card readers), and duress system components. The contractor must provide project management, quality control, warranties, and meet all relevant security and safety standards.

View the file

Other files for this federal contract opportunity

Other files attached to AZSO PHYSICAL SECURITY SERVICE CONTRACT, newest first.
File Type Posted
Sol_140L6425Q0003_Amd_0001.pdf PDF
Attachment_5_Bid_Schedule.docx DOCX document
Attachment_3_Wage_Determination_-_Maricopa_County.pdf PDF
Combined_Synopsis_and_Solicitation.pdf PDF
Attachment_4_Instructions_to_Offerors.pdf PDF
Attachment_2_Clauses_and_Provisions.pdf PDF
Sol_140L6425Q0003.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Statement of Work

Bureau of Land Management Arizona State Office

1. OBJECTIVE

The Bureau of Land Management (BLM), Arizona State Office (AZSO), located at One North Central Ave, Phoenix AZ, 85004 is looking to secure services to maintenance, maintain operation, monitor, as needed, and test the Bureaus Physical Security systems, to include the Video Surveillance System (VSS), Physical Access Control System (PACS) and duress alarm. This will include annual updates and licenses, annual testing to ensure operation, replacement and/or repair of inoperative or defective parts and monitoring services as required.

2. SCOPE

Contractor shall provide services and personnel to include labor, equipment, and materials (unless otherwise provided herein) necessary to meet the requirements of this Statement of Work (SOW).

There are three systems comprising the Physical Security system at the AZSO. The VSS consisting of 5 cameras, all indoors, Milestone Husky M50, head end digital recorder, and Milestone O/S with two client servers and monitors. The PACS system has 37 card readers, two client servers operating AMAG Symmetry, and all associated components. The IDS has 4 activation buttons, located on two floors, and a security system panel with all associated components.

The government is seeking a contractor to keep all components at full functionality, updated and tested as needed or required. As part of the contract, the contractor will provide 24-hour, 7-day response to maintenance issues as they arise. Arriving within 4 hours to any service call, to ensure all systems are always fully functional.

Contractor will also provide any licenses needed for all components to operate and meet all product manufacturer’s recommendations, the attachments to the Scope of Work, and applicable industry standards. The contractor shall work closely with the Contracting Officer’s Representatives (CORs) to ensure that the objective of this SOW is executed in accordance with the terms and conditions of this contract. Work shall be completed in a professional manner according to standard industry practices.

Under the terms of this contract, the Contractor is not an agent of the United States Government and shall not in any way represent that it is an agent of the Government. It shall not obligate the United States Government or Bureau of Land Management in any way.

The Contractor further acknowledges that any/all risk of loss for any Contractor-owned and or leased materials, inventory, furnishings, fixtures, equipment, and supplies are the sole responsibility of the Contractor.

All materials and/or parts must meet FIPS-201 and be General Schedule Agency (GSA) approved and approved by the COR prior to procurement and installation.

3. SPECIFICATIONS

The Contractor shall maintain, update, monitor and repair as needed the systems identified herein.

1. Video Surveillance System (VSS)

a. Milestone XProtect

i. See Attachment A (items are listed but not limited to)

2. Physical Access Control System (PACS)

a. AMAG Symmetry

i. See Attachment B (items are listed but not limited to)

3. Duress Alarm System

a. Honeywell

i. See Attachment C (items are listed but not limited to)

4. CONTRACT TYPE

The government anticipates awarding one Firm Fixed Priced (FFP) contract to the vendor that meets all the requirements herein.

5. PERIOD OF PERFORMANCE

Services will run from initial award year and include four (4) option years to run consecutively with zero break in service.

6. DELIVERY AND PERFORMANCE LOCATION

Work shall be accomplished during normal business hours. Any work required to be performed outside normal business hours shall be discussed and coordinated with the Contracting Officer Representative (COR) prior to work being performed.

All work shall be completed Monday – Friday from 7 am – 4pm.

7. PROJECT MANAGEMENT

The contractor will provide overall project management and coordination to remove, replace, and upgrade all identified items.

The Contractor shall identify and provide a single point of contact (POC) to provide overall management and supervision during the period of performance of this contract. The single POC will communicate and manage the relationship between BLM Contracting Officer (CO), Contracting Specialist (CS), and the Contracting Officer Representative (COR) associated with this requirement.

The POC will ensure the coordination, delivery, and installation of furniture.

All pertinent communications should be written or confirmed in writing. The single POC shall attend and participate in necessary progress meetings and write notes pertaining to the meeting(s). The notes shall be scribed into meeting minutes with action items clearly defined, with distinct due dates, and distributed to all designated BLM representatives.

8. SITE VISIT

All contractors are encouraged to attend a site visit prior to submitting a proposal. Please contact Rachel Henriques, rhenriques@blm.gov, for site visit details

9. KICK-OFF MEETING

The Contractor and the COR shall meet for a mandatory kick-off meeting upon execution of the award. During this meeting all questions shall be addressed along with determination of execution of the requirements. The contractor shall provide to the COR a list of personnel who will be working at the job site within three (3) calendar days from award. The contractor shall work with the COR to coordinate access to each location.

The contractor is required to familiarize themselves with the conditions at each location to determine the best route for loading and unloading. The contractor shall be responsible for assessing, evaluating, verifying, and confirming the conditions of the building, accessibility, site restrictions, parking, deliveries, loading dock, elevator, storage and staging, hours of availability/accessibility of all the above and any other conditions associated with, and which may affect cost of delivery and installation.

10. INSTALLATION SERVICES

The contractor shall coordinate all deliveries and installation schedules with the COR. The contractor is responsible to ensure that all phases of the contract are managed and communicated with the COR.

For any missing or damaged products, the appropriate products must be replaced within a 4 (four) week period. The contractor shall reimburse the BLM for costs associated with damage cause by the installers and any repairs due to the installation effort. The contractor will be responsible for any damage to the building which occurs during delivery and installation. It is incumbent upon the contractor to identify any existing damage to the building by means of a pre-installation and delivery through daily submissions of checklists to the task order COR. Proper measures (protective runner, pads, etc.) will be utilized by the selected contractor to protect the building (elevators, walls, floors etc.).

It is the contractor's responsibility to provide an adequate work force to ensure that the required schedule is met.

Any unexpected conflicts during product installation must be brought to the individual task order CORs and/or CO for resolution.

The contractor shall correct (at the contractor’s expense) any installation problems, which are the result of incorrect layouts, insufficient field verification, delivery errors, and damaged product.

Damaged and/or missing product will be replaced by means that will prevent installation delays.

Damaged product replacements will be at the contractor’s expense. All damaged products shall be removed from the job site immediately and disposed of in the government approved dumpster.

11. GOVERNMENT HOLIDAYS

The Contractor agrees to observe the following Government holidays for onsite personnel:

New Year’s Day Labor Day Martin Luther King’s Birthday Columbus Day President’s Day Veteran’s Day Memorial Day Thanksgiving Day

Juneteenth Day Christmas Day Independence Day

The Contractor shall observe any other day designated by Federal statute, Executive Order or the Presidential proclamation.

When any such day falls on a Saturday, the preceding Friday is observed; when any such day falls on a Sunday, the following Monday is observed. All personnel assigned to perform under this contract shall limit their observation of holidays to those set forth above.

12. RECYCLING, TRASH REMOVAL AND DISPOSAL

The contractor shall clean up and dispose of waste materials or trash in accordance with this paragraph and full applicable federal, state, and local regulations, standards, codes and laws. The selected contractor shall, at all times, keep the job site clean, including staging and storage areas used by the contractor, free from accumulations of waste material or trash. This material must be removed daily as to deter accumulation of debris. Prior to completion of the work, the selected contractor shall remove from the vicinity of the work, all shipping containers, packing, trash, unused materials, and other like material, belonging to the selected contractor or used under the selected contractor 's direction.

Waste material shall be disposed of by removal from job site. Waste materials removed from the job site shall be disposed of in accordance with the above paragraph. The selected contractor shall make any necessary arrangements with private parties and with local jurisdictions pertinent to locations and regulations of such disposal. Any fees or charges to be paid for disposal of materials shall be paid by the contractor. It is the contractor’s option to furnish a dumpster on site to contain their debris. This dumpster shall be emptied regularly, and location of the dumpster must be coordinated with the individual task order CORs and the building manager or building owner representative.

The contractor shall dispose of recyclables, trash, and packing materials away from the installation site. For example, no recyclables, trash, or packing materials will be disposed of or discarded in facility-provided recycling or trash containers or dumpsters.

The contractor will be required to investigate and obtain proper permits for any parking, furniture installation and any other necessary permits as required.

The contractor could be required to disassemble, remove and dispose of existing equipment at all locations where deemed necessary. The Contractor must comply and follow government rules and regulations for disposal of government property.

13. PROTECTION

Particular attention shall be given to the protection of existing structure and finishes to prevent any damage of existing finishes.

The contractor shall furnish padding and/or other protective material for the interior of the buildings, including protection pads for the elevators. Furnish plywood, vinyl, heavy gauge plastic or Masonite runners as required to provide protection to the floors.

Any accidental damage incurred to existing conditions will be responsibility of the contractor to repair or correct.

14. STANDARDS OF CONDUCT

The contractor shall maintain satisfactory standards of employee competency conduct cleanliness, appearance and integrity and shall be responsible for taking such disciplinary action with respect to employees as many be necessary. Each contractor employee shall adhere to standards of conduct that reflect credit on themselves, their employer, and the BLM. The BLM reserves the right to direct the contractor to remove an employee from the worksite for failure to comply with the standards of conduct. The contractor shall immediately replace such an employee to maintain continuity of services at no additional cost to the BLM.

15. SAFETY, HEALTH AND ENVRONMENTAL MANAGEMENT

The contractor shall take all reasonable and proper safety precautions to prevent death or injury to any person or damage to any property at the specific location, and in particular all equipment used by the Contractor shall be used in such a manner and maintained so as to minimize the danger of accident, death, injury, loss or damage arising from the use of such equipment. In addition to relevant statutory requirements, standards and other provisions of this Contract, the Contractor shall have the following requirements:

The Contractor’s personnel shall be knowledgeable with and adhere to all relevant occupational health and safety regulations.

Ensure that the Contractor’s personnel comply with all safety procedures and requirements.

Ensure that the Contractor’s personnel are adequately trained and instructed in the safe and correct usage, handling and operation of materials and equipment relevant to the task order requirements.

Ensure the Contractor’s personnel are certified as having completed occupational health and safety training and have been issued all the necessary Personal Protection Equipment (PPE).

16. QUALITY CONTROL PLAN

The contractor shall develop and maintain an effective quality control program to ensure requirements are provided in accordance with this SOW. The plan shall address the contractor's processes to ensure quality control during performance of services. The contractor shall develop and implement procedures to identify, prevent, and ensure non-recurrence of defective services. The contractor’s quality control program is the means to assure work complies with the SOW and terms and conditions on contract/task orders. Throughout the life of this contract any proposed changes will be provided to the CO for written approval.

17. INSPECTION

Individual task order CORs will be responsible for inspection and acceptance upon completion of work.

18. WARRANTY

Disclaimers and Limitations: Manufacturer's disclaimers and limitations on product warranties do not relieve contractor of warranty on Work that incorporates products. Manufacturer's disclaimers and limitations on product warranties do not relieve suppliers, manufacturers, and subcontractors required to countersign special warranties with contractor.

Related Damages and Losses: When correcting failed or damaged warranted product, the contractor will be responsible for removing and replacing.

Reinstatement of Warranty: When work covered by warranty has failed and been corrected by replacement or rebuilding, reinstate warranty by written endorsement. Reinstated warranty shall be equal to original warranty with equitable adjustment for depreciation.

Replacement Cost: Upon determination that work covered by warranty has failed, replace or rebuild work to acceptable condition complying with requirements of contract terms and conditions.

Contractor is responsible for cost of replacing or rebuilding defective work regardless of whether BLM has benefitted from use of work through portion of its anticipated useful service life.

Expressed Warranties: Expressed warranties made to BLM are in addition to implied warranties and shall not limit duties, obligations, rights, and remedies otherwise available under law. Expressed warranty periods shall not be interpreted as limitations on time in which BLM can enforce such other duties, obligations, rights, or remedies. Expressed warranties made to BLM shall not deprive BLM of other rights the BLM may have under other provisions of contract documents and are in addition to and run concurrent with other warranties made by contractor under requirements of contract documents.

Rejection of Warranties: BLM reserves right to reject warranties and to limit selection to products with warranties not in conflict with requirements of contract documents.

Contract Documents: Where contract documents require special warranty, or similar commitment on work or part of work, Government reserves right to refuse to accept work, until contractor presents written evidence that entities required to countersign such commitments have done so or are willing to do so.

19. CONTRACTING OFFICER AUTHORITY

The BLM Arizona State office CO shall be the only individual authorized to modify any terms and conditions of this contract.

20. CONTRACTING OFFICER REPRESENTATIVE (COR)

Designated COR/POC will be appointed at each location will participate in administration of this contract specifically to evaluate contractor performance and inspect and accept the final product for the Government. This designation does not include authority to modify or amend the terms of this contract. In no event shall any understanding or agreement, contract modification, change order, waiver, or other matter in deviation from the terms of this contract between the Contractor and a person other than then a warranted CO be effective or binding upon the Government. All such actions must be formalized by a proper contractual document executed by the CO. The contractor shall not take direction of any contract revisions without the written authority of the CO. Upon designation the CO will notify the contractor in writing of names, duties, and limitations of appointed CORs.

Acceptance of all work and effort under this contract (including “Reporting Requirements”, if any) shall be accomplished by the CO or the designated COR.

All technical questions concerning this requirement shall be directed to the designated COR. The CO and the COR are the sole point of contacts for all technical and contractual discussions or issues regarding task order requirements and its intent and execution. The contractor shall take no direction verbal or otherwise from any other BLM employee other than the CO and/or COR. The COR(s) do not have the authority to modify, or in any way amend the prices, terms, or conditions of the contract.

The Contractor shall be responsible for notifying the COR of any work or situation to be performed in a functional area under his/her control that would tend to disrupt the conduct of normal Government business or the normal operation of equipment or systems. The Contractor shall notify the COR at least two working days in advance of such work. Notification of such work shall include the type of work to be done and the estimated completion date. The Contractor shall reschedule any work that the COR deems necessary to avoid unnecessary disruptions in the Government’s business.

21. CHANGES

Any changes or alterations requesting additional items to be moved or additional services must be approved by the CO in writing prior to acceptance and performance by the contractor.

22. KEY PERSONNEL

The contractor shall assign a Project/Program Manager designated as key personnel on this contract.

the contractor shall make no substitution of this key personnel unless the substitution is necessitated by illness, death, termination of employment, or otherwise approved by the CO. The contractor shall notify the CO within one (1) business day after the occurrence of any of these events and provide information required below. The contractor shall provide an explanation of the circumstances necessitating the proposed substitution, complete resume for the proposed substitutes and any additional information requested by the CO. Proposed substitutions should have comparable qualifications to those of the persons being replaced. The CO will notify the contractor within one (1) business day after receipt of all required information of the decision on substitutions.

23. BADGING REQUIREMENTS

All contractors will be issued a visitors’ badge while on location. The government COR will work with the contractor and COR/POC for each government location to ensure that all contract employees have a visitors’ badge, and all performance is being completed in accordance with this contract.

24. REGULATORY REQUIREMENTS

Project materials and execution shall comply with the following:

1. Americans with Disabilities Act (ADA)

2. All documents must be 508 Compliant

3. NFPA 70 - National Electrical Code (NEC)

4. NFPA 101 - National Life Safety Code

5. Federal Communications Commission (FCC)

6. FCC 47 CER 68

7. Department of Interior’s Manual 444, Chapter 3, Closed Circuit Television

8. Applicable laws, rules, mandates, directives and regulations of federal and state and local governmental agencies

9. FISMA, Federal Information Security Management Act,

10. NIST, National Institute of Standards and Technology

11. DHS, Department of Homeland Security

12. FICAM, Federal Government’s implementation of Identity, Credential and Access Management

13. HSPD-12, Homeland Security Presidential Directive 12

14. FIPS-201, Personal Identity Verification (PIV) of Federal Employees and Contractors

The Contractor shall follow Section 889 of the John S. McCain National Defense Authorization Act (NDAA) for Fiscal Year 2019 (P.L. 115-232 [PDF, 789 pages]) and the Federal Acquisition Regulation (FAR) Case 2018-017 prohibit the purchase of covered telecommunications equipment and services from vendors who sell products containing spyware. These devices could pose a threat to U.S. security by spying on or disrupting communications within the U.S. when procuring materials for this project.

25. DELIVERABLES

1. Certificate of Insurance (COI): Contractor shall submit their COI

2. Product data sheets and specifications: Contractor shall submit all proposed product data sheets and product specifications prior to procurement.

3. Training materials

4. Annual license (when due or applicable)

26. ATTACHMENTS

Attachment A: Video Surveillance System (VSS)

QTY Manufacturer Part # Description 1 Milestone HM507281R10010 NVR with 6 IP license 1 Milestone Y2XPPBL Base software Upgrade 6 Milestone Y2XPPCL Camera software Upgrade 1 IFS S30-RJ MiniGBIC RJ-45 1 IFS S35-2MLC Mini GBIC LC 4 Samsung SNV-6013 Indoor camera wide 2 Samsung SNV-6084 Indoor Camera varifocal 2 Pelco Sales PMCLNBWMT Monitor wall mount 2 Startech MDISPLAYPORT2HDMIW Display port to HDMI 1 IFS MC252-1 P-1CX POE over coax receiver 1 IFS MC252-1T-1CXP POE over coax transmitter 1 IFS ES2402-16P-2C 16 Port POE switch 2 Pelco Sales PMCL542BL LED Monitor, 42 inch, Industrial 2 Startech HDMM10 HDMI cable 1 Dell 462-9662 Video client 2 Tripp Lite P167-000 HDMI over CATS 3 Windy City VEX-555619-671 Cable, Cat5e 1 1LOT 1Lot Lot: fasteners, connectors and misc.

1 Tripp Lite N052-024 24-Port Cat5E Patch Panel 6 Tripp Lite V7N3C5E-05F Cat5E Patch Cable, Blue 5 Feet 1 Tripp Lite SRCABLEDUCT2UHD Cable Manager 2U 1 APC BE750G Small UPS 1 Microsoft M7J-00001 Wireless Keyboard & Mouse

1 APC SMT2200RM2U UPS 2000VA

Attachment B: Physical Access Control System (PACS)

QTY PART # ITEM

1 PRO-PLAT-V9.3-HSE

Symmetry Professional Homeland Platform Software Database (SQL Express) & 1 Client. Includes License & 1 Year Gold SSA

1 PRO-LIC-032-V9 Symmetry Professional 32

2 PRO-CLIENT-V9.3

Symmetry Professional Client Software - Includes License

1 DATA-CONNECT-V9 Symmetry Data Connect Module

2 EN-DBU-20K-MK2-HSE

Symmetry EdgeNetwork 20K Mk-2 DBU Board Only Onboard NIC, Supports 128-bit card number for FICAM when used with M2150-4DC-F-HSE

8 M2150-4DCF-HSE

Symmetry M2150 4DC HSE 4 Reader Panel. F Supports 128-bit card number for FICAM. Board Only

8 WIM4 Symmetry Wiegand Interface Module (WIM) 4

4 MN-CAB4A+PSU-KIT

Symmetry CAB4A Enclosure Kit - Lock, Tamper, AC Mon., PSU-6.

8 MN-TRANS-150-ul Symmetry 150VA UL Transformer - 110v/18VAC, 150VA.

2 TAR KPD

Targus Numeric Keyboard - External USB keypad to allow cardholders to confidentially enter PINs

2 MSO 1350 E-3

MSO 1350 E-3 - MorphoSmart™ Optic 1350 E-3 Plastic Housing, USB Scanner and Built-In Contactless Smart Card Reader For Small System Enrollment or PC Login.

(293664695)

2 NPB1 R31210349-1_____OMNIKEY 3121 TAA

16 PVC-PAM-B

M2000 - pivCLASS Authentication Module (PAM) Universal FIPS-201 hardware module, preloaded firmware and documentation (with plastic enclosure back plate & cover). First year maintenance included.

New revision, release may 2019 Gigabit Ethernet port, enhanced grounding management, PoE Filter (not PoE capable) (91000BBNNN)

37 IC-RKCL40-K-PAM

pivCLASS RKCL40-P, Contactless and Contact Smart Card Reader, Wall Switch Keypad & LCD, No Prox, US Double-Gang Size, FDX (923NPRTEK0032V)

6 IC-RPK40-K-SE-PIV

HID multiCLASS RPK40 SE KeyPad Reader – (Black) Reads Prox, iClass, PIV,5-16VDC*

(921PHRNEK0002H)

2 M2150-ELEV-HSE

Symmetry M2150 HSE Elevator Node with Enclosure – 20K cards.

1 M2150-ELEV-EXT-HSE

Symmetry M2150 HSE Elevator Extender with Enclosure - Requires M2150-ELEV & 18VAC trans

6 650 Wiegand Line Extender. Converts Wiegand to 20 ma.

Includes enclosure. Required for elevator nodes.

1 PVC-CM

HID Federal Identity pivCLASS Certificate Manager Software-Provides regular updates of registered card validation (caching status proxy) and updates Symmetry.

Includes first year of manufacturer technical support.

Includes software only. One license per PACS

1 PVCP-D/S

HID Federal Identity pivCLASS Registration Engine- Includes Validation Workstation license, Audit Trail w/ 1 PACS Plug-in. Includes first year of manufacturer technical support. pivCLASS Registration Engine.

Includes software that interfaces with one (1) specific PACS and supporting documentation. One license per workstation. Requires a USB contact reader (OMNIKEY 3622 recommended) and USB biometric sensor HID part

# PVCP-D/S-01-00.

2 COMPUTER1-HSE

Small Form Factor Tower - Dell OptiPlex 3060, Intel Core i5-8500 Processor, 3.0GHz, 8GB RAM, MD Radeon R5 430 (2GB 2xDP) dual monitor support, 1TB HDD, DVD+/-RW, Gigabit NIC, keyboard/mouse 1EA 24" LCD monitor (P2419H) or equivalent, 1 COMPUTER3-HSE

Rack mount 1U – PowerEdge R240 Intel Xeon E-2124 3.3GHz, 16GB RAM, 1TB SATA HDD, DVD+/-RW, Windows Server 2016 Standard Embedded with 5 CALS, Rail kit, Standard, 3-year 5x10 NBD

1 SSA-ADD-YEARS

GOLD Level SSA Estimate for additional years beyond first year of inital purchase. For SSA renewal please contact AMAG Technology, 16 NP712 Yuasa 12VDC 7AH Battery 1 PRO-LIC-008-V9 Symmetry Professional 8 Reader License add-on 1 MN-CAB-FIX Symmetry Mounting Kit for the M2150 1 5000 HES 24VDC Electric Door Strike 1 AL600ULX Honeywell Power Supply 12/24 VDC 6amp 6 947 Honeywell 3/4" Recessed Door Contact 6 DS1501 Detection Systems Request to Exit PIR

Attachment C: Duress Alarm System:

1. Five (5) duress buttons located across two floors.

2. Ten (10) Strobe lights

3. Three (3) audible alarms

4. One (1) Honeywell Control Panel and associated hardware (see pictures)