This Statement of Work outlines requirements for converting existing barbed wire fence to wildlife-friendly fence at the Muddy Creek Individual Fence project in Pinedale Field Office for 2025. The project involves removing and constructing 3.63 miles (19,166 linear feet) of fence in Sections 24, 25, 36 of T30N, R111W and Section 1 of T110N, R111W.

The new construction requires installation of a 4-wire, all-wood post fence with eight stress panels (H-Braces), zero end panels, five 3-post corners, six 16-foot wire gates, and thirteen new X-gate wildlife crossing gates. Each wildlife crossing gate must include two H-braces and specific wiring per provided drawings. The contractor is responsible for preventing livestock crossings during the transition between old fence removal and new fence construction. All work must follow attached specifications and drawings under a single contract.

View the file

Other files

Show all 11

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Statement of Work:

2025 Pinedale Field Office – Muddy Creek Individual Fence

Muddy Creek Individual Fence STATEMENT OF WORK

SOW - 1

Introduction The work includes converting existing barbed wire fence to a wildlife friendly fence.

The project consists of the removal and construction of 3.63 miles of fence.

It is the Contractor’s responsibility to ensure that livestock does not cross through the opening between when the old fence is removed, and the new fence is constructed.

Specifics for Muddy Creek Individual Fence:

There are approximately 19,166 linear feet in this segment of fence that need to be removed and disposed of in accordance with all applicable specifications for fence removal—see Section 02827.

There are approximately 19,166 linear feet of new 4-wire, all-wood post fence to be constructed in accordance with the drawings and Work Data Sheet. It is estimated to have each of the following:

• Eight (8) stress panels (H-Braces),

• Zero (0) End Panels,

• Five (5) 3-Post Corners,

• Six (6) 16-foot wire gates, and

• Thirteen (13) new X-gate wildlife crossing gates.

Each wildlife crossing gate includes two (2) H-braces and wiring shown in the drawing. Leave any existing X-gate wildlife crossing gates.

Statement of Work:

2025 Pinedale Field Office – Muddy Creek Individual Fence

Muddy Creek Individual Fence STATEMENT OF WORK

SOW - 2

Location: T30N, R111W, Sections 24, 25, 36 T110N, R111W, Section 1

Muddy Creek Individual Fence STATEMENT OF WORK

SOW - 3

Statement of Work:

2025 Pinedale Field Office – Muddy Creek Individual Fence

Deliverables All work will be completed under one contract. All work shall follow the attached specifications and drawings.

mailto:askordas@blm.gov mailto:jcantrel@blm.gov

File details come from the government source that posted it. Updated .