Attachment_1_-_Statement_of_Work.docx

DOCX document 28 KB Posted

Attached to
LCB RE-KEY CORE REPLACEMENT
Solicitation number
140R3026Q0073
Issued by

About this file

This is a Statement of Work (SOW) for master key system replacement and lock core/cylinder furnish and installation services at the Department of the Interior Bureau of Reclamation Lower Colorado Basin (LCB) facility in Boulder City, Nevada. The contractor shall re-key, re-pin, replace cylinders, and/or replace interchangeable cores for approximately 362 doors, padlocks, and associated locking devices across eleven main campus buildings and three additional buildings. The work encompasses office doors, exterior perimeter doors, mechanical rooms, electrical rooms, telecommunications/IT server rooms, storage rooms, secure and restricted-access areas, utility spaces, and cabinet locks. All materials shall be commercial-grade and compatible with existing Assa Abloy and Best hardware systems, meeting applicable ANSI/BHMA standards.

The contractor must establish a new facility-wide master key system including Grand Master Keys, Master Keys, Sub-Master Keys, and Individual Change Keys, with keying hierarchy subject to Contracting Officer Representative (COR) approval prior to implementation. All work must be completed within 90 calendar days of award during normal business hours, with after-hours or weekend work possible for sensitive areas. The contractor is responsible for all labor, supervision, materials, tools, equipment, transportation, and incidental expenses. Key control requirements include stamping all keys "DO NOT DUPLICATE," maintaining strict accountability, and delivering a complete key inventory upon project completion. The contractor shall provide a minimum one-year warranty on all workmanship and installed materials. Contractor personnel must wear visible identification badges at all times and be escorted by Government personnel while in secured or restricted areas. All facility documentation, deliverables, and warranty information shall be submitted electronically unless otherwise directed.

View the file

Other files

Show all 11

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

140R3026Q0073 Attachment 1 Statement of Work Master Key System Replacement and Lock Core/Cylinder Furnish and Installation Department of the Interior – Bureau of Reclamation Lower Colorado Basin Campus Facility

1. Background The Department of Interior (DOI), Bureau of Reclamation (BOR), Lower Colorado Basin (LCB), operates a campus-style federal facility consisting of eleven (11) buildings located within a secured fenced compound, as well as three (3) additional buildings located approximately 0.1 miles from the main campus.

The facility currently utilizes multiple commercial-grade locking systems including Assa Abloy and Best hardware. Approximately three hundred and sixty-two (362) doors, padlocks, and associated locking devices require re-keying and/or re-coring. Please reference Attachment 2 Core Breakout by buildings.

Due to the critical nature of the LCB facility and its role in supporting water and power delivery operations, maintaining strict physical security and key control is essential.

2. Purpose The purpose of this Statement of Work (SOW) is to obtain all labor, supervision, materials, tools, equipment, transportation, and incidentals necessary to re-key and/or re-core designated locks and cylinders throughout the DOI BOR LCB facility.

The contractor shall establish a new master key system that enhances facility security, restores key accountability, and renders all previously issued keys inoperable.

3. Objective The contractor shall:

· Re-key, re-pin, replace, or re-core existing lock cylinders and interchangeable cores.

· Establish a new facility-wide master key system.

· Maintain strict key control throughout the project.

· Ensure all work complies with DOI physical security requirements and applicable industry standards.

4. Tasks A. Facility Survey The contractor shall:

· Conduct an on-site survey of all doors, locking hardware, cylinders, padlocks, and keyways included within the project scope.

· Verify quantities, hardware types, cylinder compatibility, and operational condition.

· Identify defective or damaged hardware requiring replacement.

· Coordinate all access requirements and work schedules with the Contracting Officer Representative (COR) or designated Government representative.

· Provide recommendations regarding incompatible or obsolete hardware discovered during the survey.

· Coordinate work to minimize disruption to Government operations.

· Ensure all work areas remain clean, safe, and operational at the conclusion of each workday.

B. Re-Keying / Re-Coring Services The contractor shall re-key, re-pin, replace cylinders, and/or replace interchangeable cores for all designated locking devices, including but not limited to:

· Office doors

· Exterior perimeter doors

· Mechanical rooms

· Electrical rooms

· Telecommunications and IT/server rooms

· Storage rooms

· Secure and restricted-access areas

· Utility spaces

· Interior offices

· Padlocks

· Cabinet locks (if applicable)

Additional requirements:

· All locks shall be tested after servicing to ensure proper operation.

· Existing hardware shall remain functional and compatible with the new keying system.

· Any defective cylinders or hardware identified during the project shall be reported immediately to the COR.

· Replacement of defective hardware shall only occur upon Government approval.

Estimated quantity:

· Approximately 362 doors/padlocks.

C. Master Key System The contractor shall develop and implement a new master key system in accordance with DOI security requirements.

The master key system shall include, as required:

· Grand Master Keys

· Master Keys

· Sub-Master Keys

· Individual Change Keys Requirements:

· Keying hierarchy shall be reviewed and approved by the COR prior to implementation.

· Contractor shall maintain confidentiality of all key bitting and key code information.

· Key duplication shall be restricted and controlled.

· All cores and cylinders shall be keyed to prevent unauthorized interchangeability unless otherwise directed by the Government.

· Coordinate work to minimize disruption to Government operations.

· Ensure all work areas remain clean, safe, and operational at the conclusion of each workday.

D. Key Control and Accountability The contractor shall:

· Stamp or permanently mark all keys “DO NOT DUPLICATE.”

· Maintain strict accountability for all issued and unissued keys during the project.

· Secure all keys, cores, and related materials while on-site.

· Immediately report any lost keys, compromised hardware, or security incidents to the COR.

· Provide a complete written key inventory upon project completion.

Deliverables shall include:

· Key inventory list

· Key assignment records

· Core/cylinder identification schedule

· Master key schedule

· Door-to-key matrix (if required) All keys shall be delivered directly to the COR or authorized Government representative.

5. Materials The contractor shall provide all necessary materials including, but not limited to:

· Lock cylinders

· Interchangeable cores

· Keys

· Pins and springs

· Replacement hardware (as approved)

· Identification labels or tags

· Associated locksmith consumables Requirements:

· All materials shall be commercial-grade and compatible with existing hardware.

· Substitute materials shall not be used without Government approval.

· All products shall meet applicable ANSI/BHMA standards where applicable.

6. Security Contract personnel will be provided detailed information regarding authorized parking locations at each site while performing work under this contract.

The following security requirements shall apply to all contractor personnel:

· Contractor-issued or Government-issued identification badges shall be worn and visible at all times while on Government property.

· Badges will be issued and collected daily by LCB Security personnel.

· Contractor personnel shall comply with all DOI, BOR, and LCB security procedures and access requirements.

· Escorted by Government personnel is required at all times while contractor personnel are within secured or restricted areas.

· If the contractor requires more than one escort, advance notice shall be provided to the COR or designated Government representative so arrangements can be made for additional escort personnel.

· Contractor personnel shall only access areas authorized for performance of work under this contract.

· Any lost badges, keys, or security incidents shall be reported immediately to the COR and LCB Security personnel.

· Photography, video recording, or disclosure of sensitive facility information is prohibited unless specifically authorized by the Government.

7. Deliverables Upon completion of work, the contractor shall provide:

· Complete key inventory list

· Final master key schedule

· Record of all locks/cylinders re-keyed or replaced

· Door/cylinder identification list

· Documentation of defective or replaced hardware

· Warranty information for installed components

· As-built keying documentation (if applicable) All documentation shall be submitted electronically unless otherwise directed by the COR.

8. Warranty The Contractor shall provide a minimum one (1) year warranty on all workmanship and installed materials from the date of Government acceptance. The warranty shall include, but is not limited to, improperly pinned or keyed cylinders, defective interchangeable cores, improperly installed hardware, malfunctioning locks resulting from installation, and defects in keys or keying performed by the Contractor. This warranty does not cover damage resulting from misuse, vandalism, unauthorized modifications, or normal wear and tear.

All warranty documentation shall be submitted electronically unless otherwise directed by the COR.

9. Period of Performance The contractor shall complete all work within 90 calendar days after award.

Work hours:

· Normal business hours unless otherwise coordinated with the COR.

· After-hours, weekend, or phased work may be required for sensitive or high-traffic areas.

10. Place of Performance All work under this contract shall be performed at DOI BOR LCB facilities located 500 Date St. in Boulder City Nevada 89005.

The contractor shall be responsible for all travel, lodging, transportation, meals, parking, labor, equipment, tools, and incidental expenses necessary for performance of the work under this contract.

11. Government-Furnished Information and Support The Government will provide:

· Facility access

· Escort personnel (if required)

· Existing keying information, if available

· Points of contact for coordination

· Access scheduling for secured spaces

12. Acceptance Criteria Work shall be considered complete when:

· All designated locks have been successfully re-keyed or re-cored.

· All new keys and master keys function properly.

· Previously issued keys no longer operate affected locks.

· Required documentation has been submitted and approved.

· All work areas are restored to operational condition.

· Final inspection has been completed and accepted by the COR.

13. Point of Contact Names will be provided at time of award

COR

Name: ___________________________ Phone: __________________________ Email: ___________________________

File details come from the government source that posted it. Updated .