This is a Statement of Work for master key system replacement and lock core/cylinder furnish and installation services at the Department of the Interior Bureau of Reclamation Lower Colorado Basin (LCB) facility in Boulder City, Nevada. The contractor must re-key, re-pin, replace cylinders, and/or replace interchangeable cores for approximately 362 doors, padlocks, and associated locking devices across eleven buildings in the main campus and three additional buildings located 0.1 miles away. The facility currently operates multiple commercial-grade locking systems including Assa Abloy and Best hardware. The contractor shall provide all labor, supervision, materials, tools, equipment, transportation, and incidentals necessary to establish a new facility-wide master key system that enhances security, restores key accountability, and renders all previously issued keys inoperable.

The contractor must complete all work within 90 calendar days after award during normal business hours, unless otherwise coordinated with the Contracting Officer Representative (COR), with after-hours or weekend work potentially required for sensitive areas. All materials must be commercial-grade and compatible with existing hardware, meeting applicable ANSI/BHMA standards. Key deliverables include a complete key inventory list, final master key schedule, door/cylinder/core identification list, bitting map, documentation of defective or replaced hardware, and warranty information. The contractor shall maintain strict key control, stamp all keys "DO NOT DUPLICATE," provide a one-year warranty on workmanship and materials, and comply with all DOI physical security requirements. Contractor personnel must wear visible identification badges at all times, comply with security procedures, and be escorted by Government personnel in secured or restricted areas. All work shall be performed at the specified Boulder City, Nevada locations, with the contractor responsible for all associated travel, lodging, transportation, meals, parking, and incidental expenses.

View the file

Other files

Show all 11

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

140R3026Q0073 00002 Attachment 1 Statement of Work Master Key System Replacement and Lock Core/Cylinder Furnish and Installation Department of the Interior – Bureau of Reclamation Lower Colorado Basin Campus Facility

1. Background The Department of Interior (DOI), Bureau of Reclamation (BOR), Lower Colorado Basin (LCB), operates a campus-style federal facility consisting of eleven (11) buildings located within a secured fenced compound, as well as three (3) additional buildings located approximately 0.1 miles from the main campus.

The facility currently utilizes multiple commercial-grade locking systems including Assa Abloy and Best hardware. Approximately three hundred and sixty-two (362) doors, padlocks, and associated locking devices require re-keying and/or re-coring. Please reference Attachment 2 Core Breakout by buildings.

Due to the critical nature of the LCB facility and its role in supporting water and power delivery operations, maintaining strict physical security and key control is essential.

2. Purpose The purpose of this Statement of Work (SOW) is to obtain all labor, supervision, materials, tools, equipment, transportation, and incidentals necessary to re-key and/or re-core designated locks all doors and cylinders throughout the DOI BOR LCB facility.

The contractor shall establish a new master key system that enhances facility security, restores key accountability, and renders all previously issued keys inoperable.

3. Objective The contractor shall:

· Re-key, re-pin, replace, or re-core existing lock cylinders and interchangeable cores.

· Provide new pinned inter-changeable cores and keys.

· Establish a new facility-wide master key system.

· Maintain strict key control throughout the project.

· Ensure all work complies with DOI physical security requirements and applicable industry standards.

4. Tasks A. Facility Survey The contractor shall:

· Conduct an on-site survey of all doors, locking hardware, cylinders, padlocks, and keyways included within the project scope.

· Verify quantities, hardware types, cylinder compatibility, and operational condition.

· Identify defective or damaged hardware requiring replacement.

· Coordinate all access requirements and work schedules with the Contracting Officer Representative (COR) or designated Government representative.

· Provide recommendations regarding incompatible or obsolete hardware discovered during the survey.

· Coordinate work to minimize disruption to Government operations.

· Ensure all work areas remain clean, safe, and operational at the conclusion of each workday.

· A Gantt chart illustrating project timelines, key milestones, and the phasing of work (identified buildings and schedule).

B. Re-coring and Re-keying Services The contractor shall re-key, re-pin, replace cylinders, and/or replace interchangeable cores for all designated locking devices, including but not limited to:

The contractors shall provide new pinned interchangeable cores and keys including but not limited to:

· Office doors

· Exterior perimeter doors

· Mechanical rooms

· Electrical rooms

· Telecommunications and IT/server rooms

· Storage rooms

· Secure and restricted-access areas

· Utility spaces

· Interior offices

· Padlocks

· Cabinet locks (if applicable) Additional requirements:

· All locks shall be tested after servicing to ensure proper operation.

· Existing hardware shall remain functional and compatible with the new keying system.

· Any defective cylinders or hardware identified during the project shall be reported immediately to the COR.

· Replacement of defective hardware shall only occur upon Government approval.

Estimated quantity:

· Approximately 362 doors/padlocks.

C. Master Key System The contractor shall develop and implement a new master key system in accordance with DOI security requirements.

The master key system shall include, as required:

· Grand Master Keys

· Master Keys

· Sub-Master Keys

· Individual Change Keys Requirements:

· Keying hierarchy shall be reviewed and approved by the COR prior to implementation.

· Contractor shall maintain confidentiality of all key bitting and key code information.

· Key duplication shall be restricted and controlled.

· All cores and cylinders shall be keyed to prevent unauthorized interchangeability unless otherwise directed by the Government.

· Coordinate work to minimize disruption to Government operations.

· Ensure all work areas remain clean, safe, and operational at the conclusion of each workday.

D. Key Control and Accountability The contractor shall:

· Stamp or permanently mark all keys “DO NOT DUPLICATE.”

· Maintain strict accountability for all issued and unissued keys during the project.

· Secure all keys, cores, and related materials while on-site.

· Immediately report any lost keys, compromised hardware, or security incidents to the COR.

· Provide a complete written key inventory upon project completion.

Deliverables shall include:

· Key inventory list

· Key assignment records

· Core/cylinder identification schedule

· Master key schedule

· Door-to-key matrix (if required) All keys shall be delivered directly to the COR or authorized Government representative.

5. Materials The contractor shall provide all necessary materials including, but not limited to:

· Lock cylinders

· Interchangeable cores

· Keys

· Pins and springs

· Replacement hardware (as approved)

· Identification labels or tags

· Associated locksmith consumables Requirements:

· All materials shall be commercial-grade and compatible with existing hardware.

· Substitute materials shall not be used without Government approval.

· All products shall meet applicable ANSI/BHMA standards where applicable.

6. Security Contract personnel will be provided detailed information regarding authorized parking locations at each site while performing work under this requirement.

The following security requirements shall apply to all contractor personnel:

· Contractor-issued or Government-issued identification badges shall be worn and visible at all times while on Government property.

· Badges will be issued and collected daily by LCB Security personnel.

· Contractor personnel shall comply with all DOI, BOR, and LCB security procedures and access requirements.

· Escorted by Government personnel is required at all times while contractor personnel are within secured or restricted areas.

· If the contractor requires more than one escort, advance notice shall be provided to the COR or designated Government representative so arrangements can be made for additional escort personnel.

· Contractor personnel shall only access areas authorized for performance of work under this requirement.

· Any lost badges, keys, or security incidents shall be reported immediately to the COR and LCB Security personnel.

· Security incidents shall be reported immediately to the COR and LCB Security personnel.

· Photography, video recording, or disclosure of sensitive facility information is prohibited unless specifically authorized by the Government.

7. Deliverables Upon completion of work, the contractor shall provide:

· Complete key inventory list

· Provide a complete written key inventory list

· Final master key schedule

· Record of all locks/cylinders re-keyed or replaced

· Door/cylinder/Core identification list

· Documentation of defective or replaced hardware

· Warranty information for installed components

· As-built keying documentation (if applicable)

· Provide bitting map All documentation shall be submitted electronically unless otherwise directed by the COR.

All keys shall be delivered directly to the COR or authorized Government representative.

8. Warranty The Contractor shall provide a minimum one (1) year warranty on all workmanship and installed materials from the date of Government acceptance. The warranty shall include, but is not limited to, improperly pinned or keyed cylinders, defective interchangeable cores, improperly installed hardware, malfunctioning locks resulting from installation, and defects in keys or keying performed by the Contractor. This warranty does not cover damage resulting from misuse, vandalism, unauthorized modifications, or normal wear and tear.

When warranty related issue has occurred, the contractor shall be notified and/or provide warranty service within 72 hours.

All warranty documentation shall be submitted electronically unless otherwise directed by the COR.

9. Period of Performance The contractor shall complete all work within 90 calendar days after award.

Work hours:

· Normal business hours unless otherwise coordinated with the COR.

· After-hours, weekend, or phased work may be required for sensitive or high-traffic areas.

10. Place of Performance All work under this requirement shall be performed at DOI BOR LCB facilities located 500 Date St. 1402 Colorado St and 1200 Park St in Boulder City Nevada 89005.

The contractor shall be responsible for all travel, lodging, transportation, meals, parking, labor, equipment, tools, and incidental expenses necessary for performance of the work under this requirement.

11. Government-Furnished Information and Support The Government will provide:

· Facility access

· Escort personnel at all times

· Existing keying information, if available

· Points of contact for coordination

· Access scheduling for secured spaces

12. Acceptance Criteria Work shall be considered complete when:

· All designated locks have been successfully re-keyed or re-cored.

· All new keys and master keys function properly.

· Previously issued keys no longer operate affected locks.

· Required documentation has been submitted and approved.

· All work areas are restored to operational condition.

· Final inspection has been completed and accepted by the COR.

13. Point of Contact Names will be provided at time of award

COR

Name: ___________________________ Phone: __________________________ Email: ___________________________