Attachment 1 - Statement of Work 65th SOS Security System Install Revision Date 1.15.25.pdf
PDF 154 KB Posted
- Attached to
- 65th SOS MGCS Security System Installation
- Solicitation number
- FA441725Q0045
About this file
This Statement of Work outlines requirements for installing a security system for a 5th Mobile Ground Control Station (MGCS) at Hurlburt Field FL, building 90131. The installation includes connecting to an existing Honeywell-Vindicator alarm panel and must meet DNSSI-7003 T-SCIF standards and other security certifications.
The contractor must install a three-segment fabric innerduct (Maxcell MXC3456BK-250 or similar) running approximately 250 feet, a security system with balance magnetic switches, high security switches, 360-degree motion sensors, tamper switches, and alarm keypad, and an eight-port CS-OPTIGUARD-M8 Protected Distribution System from Cybersecure IPS, LLC. Additional requirements include installing new fiber optic cabling with LC connectors, providing a one-year service plan with 24-hour response time, and having personnel with TS-SCI clearance to access the building SCIF. The system must connect to four existing PDS system fiber cables plus the new fiber being installed.
View the file
Other files
Show all 13
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
UNCLASSIFIED//FOR OFFICIAL USE ONLY (FOUO)
65SOS
5th Mobile GCS installation
Hurlburt RPA Operations Center (H-ROC)
Statement Of Work
Version 4 /15 Jan 2025
Table of Contents 1 Executive Summary
2 Assumptions & Questions ...........................................................................Error!
Bookmark not defined.
3 Exterior GCS Pad Requirements .................................................................Error!
Bookmark not defined.
3.1 GCS Pad Layout ....................................................................................Error!
Bookmark not defined.
4 GCS Alarm system installation
4.1 System Requirements
4.2 Equipment placement
Basic services .............................................................................Error!
Bookmark not defined.
List of Figures Figure 1: 5 GCS Pad Layout ...................................................................................Error!
Bookmark not defined.
1 Executive Summary This specific project plan is to cover the installation of a 5th Mobile Ground Control Station (MGCS) security system install and upgrade on the exterior pad area behind building 90131 at Hurlburt Field FL. This pad area was designed for five MGCS and completed in 2001, and at that time only four MGCS units were available and installed.
The mobile units are deployable shelters that require the installation and certification of an alarm system and upgrade to a PDS Alram control box. This SOW is for items needed to complete installation of the fifth MGCS.
The security alarm system actions are planned to be managed by the 65SOS through the 1SOW.
The contractor will install a security system in the MGCS, install a three-segment fabric innerduct in the existing conduit, run an additional fiber line in the existing conduit, and upgrade and install a PDS alarm system.
The PDS alarm installation requires the purchase, installation and configure of an eight port CS CS-OPTIGUARD-M8 Protected Distribution System (PDS) alarmed conduit system from Cybersecure IPS, LLC.
The Contractor shall complete installation, testing, and certification of the MGCS three-segment fabric innerduct, security system, fiber line and PDS Alarm system.
The Contractor will need a member with TS-SCI security clearance for access to existing alarm panel within build 90131 to do work internal to the building SCIF.
2 Background
• All aspects of this installation will align with the current install MGCSs.
• The GCS alarm system will connect to the existing alarm panel within build
90131.
3 Basic services
• A 1-year service plan will be provided by the installer for the new security system for servicing within 24 hours of system failure or error.
• Provide CS-OPTIGUARD-M8:
o Testing, and Inspection o Server software installation o End to end system commissioning o End to end system acceptance testing o Automated periodic testing configuration o (1) on-site user training course during the initial site visit.
4 Installation Requirements
4.1 Alarm System
1. The MGCS shall be IAW DNSSI-7003 T-SCIF standards.
The Alarm system must meet the following certification standards:
2. DAFI 31-101, Security Procedures for Headquarters 25th Air Force
3. TIA/EIA-570, Residential Telecommunications Cabling Standards,
4. TIA/EIA-607, Commercial Building Grounding and bonding requirements for
Telecommunications
5. NFPA 70 National Electric Code (NEC)
6. NFPA 101, Life Safety Code
7. NFPA 780, Standard for the installation of Lightning Protection Systems,
8. ICD/ICS 705, and the Security Forces Non-Nuclear Configuration Management
Equipment Approval (CMD) list, date 29 April 2024.
9. Applicable UFC guidance will apply to this installation.
10. The Intrusion detection system (IDS) for the MGCS will be connected to an existing
Honeywell-Vindicator panel within building 90131. All required cabling will need to be installed though existing conduit, fabric innerduct.
11. The platform shall meet USAF Authority to Operate (ATO).
12. The IDE components must be on the current AFSFC Non-Nuclear CMD Equipment Approval List.
4.2 Fabric Innerduct:
1. The security system install will include one by three segment fabric innerduct:
Maxcell MXC3456BK-250, MXE86383BK-250 or similar and utilize for security system cabling. This fabric innerduct will run from security server room to the GCS approximately 250 FT. Two of the three sleeves will remain empty for further upgrades.
4.3 GCS Alarm:
1. The IDS system will connect to the existing IDS System Master and include Balance
Magnetic Switches, High Security Switches, 360 Degree Motion Sensor, Tamper Switches, alarm Keypad, and all hardware, fittings, wire, backup power supplies and firmware to complete the requirement.
4.4 PDS Fiber Run:
1. A 250 FT fiber MM or SM run will need to span the entirety of the Conduit. The termination type must be LC connectors. The new fiber optic cable should be terminated in a fiber optic patch panel and LC-LC patch cords should be provided for each fiber pair.
4.5 PDS Alarm:
1. The PDS alarm installation requires the purchase, installation and configure of an eight port CS-OPTIGUARD-M8 Protected Distribution System (PDS) alarmed conduit system from Cybersecure IPS, LLC.
2. The PDS system will connect to the four existing PDS system fiber cabling and the addition fiber being installed.
4.6 Equipment placement
3. The MGCS alarm system will require installation of approximately 200ft to 250ft run.
4. The installation and wiring will be for one (1) individual alarm activation/deactivation keypad within the MGCS, one (1) motion sensor, two (2) Balanced Magnetic Switch (BMS) door sensors and two (2) tamper switches that operate independently from other currently installed units.
5. The keypad and sensors located within the alarmed mobile container shall be connected to the existing alarm panel within building 90131 room A43 and configure the alarm panel for the new hardware.
6. The conduit is elevated at 17 ft and has four(4) alarmed pull boxes currently installed.
7. The additional fiber will be required as part of the CS-OPTIGUARD-M8 installation.
8. All writing will run through the contractor installed fabric innerduct: Maxcell MXC3456BK-250, MXE86383BK-250 or similar This fabric innerduct will run from the enclosure entrance of the server room to the GCS approximately 200 FT in the existing conduit.
9. The equipment listed may be adjusted to meet performance standards
10. Expected equipment:
• Mobile container will consist of the following:
o Keypad inside of primary door o 2 BMS, one for each container door o 1 PIR motion sensor o 2 tamper protection switches
• Room A43 equipment will consist of the following:
o Wiring to existing alarm Panel from mobile container o Configuration of existing alarm panel o CS-OPTIGUARD-M8-Eight port o 200 Ft fiber run for CS-OPTIGUARD-M8-Eight port
• Miscellaneous Equipment:
o Power Supply o Fuse Panel o Circuit Breaker for power cutoff in the IDB o Rechargeable Back up Batteries o Power Surge Protector o 2 person lift (for 17 Ft Pull box access)
| 1 Executive Summary |
| 2 Background |
| 3 Basic services |
| 4 Installation Requirements |
| 4.1 Alarm System |
| 4.2 Fabric Innerduct: |
| 4.3 GCS Alarm: |
| 4.4 PDS Fiber Run: |
| 4.5 PDS Alarm: |
| 4.6 Equipment placement |
File details come from the government source that posted it. Updated .