This is a Statement of Work (SOW) for the installation, relocation, upgrade, and repair of Early Warning Systems (EWS) on eighteen dams across seven National Forests operated by the U.S. Department of Agriculture Forest Service. The project encompasses work on dams within the Hoosier, Huron-Manistee, Mark Twain, Monongahela, Shawnee, Wayne, and White Mountain National Forests, all classified as having high or significant hazard potential. The contractor is responsible for providing all equipment and materials necessary to complete the work unless specifically designated as government-furnished. Key deliverables include installing water level sensors, rain gauges (Sutron 0.5 mm/tip models), upgrading battery and solar panel systems (27Ah batteries and 20W solar panels), verifying satellite or cellular communications, calibrating systems with service providers on-site, and confirming sensor and alarm system functionality. The Forest Service retains responsibility for data transmission fees and obtaining activated SIM cards where required. Work locations span multiple states with specific latitude and longitude coordinates provided for each dam site.

The SOW specifies distinct tasks by forest location: Hoosier National Forest requires installation and upgrades across six dams (Deer Creek, Indian Lake, Lake Celina, Saddle Lake, Springs Valley, and Tipsaw); Huron-Manistee requires a complete new EWS installation at Wakeley Lake Dam in a NEMA 4x/6P enclosure with remote monitoring capabilities; Mark Twain requires cleaning and calibration of five existing Adcon Telemetry RG1 rain gauges according to manufacturer specifications; Monongahela requires repair and upgrade of an existing EWS at Lake Sherwood; Shawnee requires a new EWS installation at Structure #12 (Dutchman) in a NEMA 4x/6P enclosure; Wayne requires repair of two systems and relocation of one complete system from Tecumseh Dam to Sand Run Dam, including site restoration; and White Mountain requires a new EWS installation at Campton Pond Dam near Campton, New Hampshire. The contractor is responsible for all travel-related expenses and must identify a representative as the main point of contact with the government.

View the file

Other files for this federal contract opportunity

Show all 14

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

US Department of Agriculture (USDA)

Statement of Work

Contents

1Project3
2Scope of Work3
3Background3
4Technical Requirements / Tasks4
4.1.1Hoosier National Forest4
4.1.2Huron-Manistee National Forest5
4.1.3Mark Twain National Forest5
4.1.4Monongahela National Forest5
4.1.5Shawnee National Forest6
4.1.6Wayne National Forest6
4.1.7White Mountain National Forest7
5Travel7
67.0 Contractor’s Representative7

Project Dams Early Warning System (EWS) Installation, Relocation, Upgrade and Repair.

Scope of Work The Hoosier, Huron-Manistee, Mark Twain, Monongahela, Shawnee, Wayne, and White Mountain National Forests have a need to upgrade, install, relocate, and/or repair early warning systems on eighteen (18) dams that are classified as having a high or significant hazard potential.

Table 1: USFS Dam Work Items

Install
Repair
Relocate
Install
Install
Upgrade
Install
Service
Water
EWS
EWS
Repaired
New
Existing
Rain
Rain

Level

EWS
EWS
EWS
Gauge
Gauge

Sensor

Hoosier National Forest

Deer Creek Dam

x
x
Indian Lake Dam
x
x
x

Lake Celina Dam x

x
x
Saddle Lake Dam
x
x
x

Springs Valley Dam

x
x

Tipsaw Lake Dam x

x
x

Huron-Manistee National Forest

Wakely Lake Dam x x

Mark Twain National Forest

Crane Lake x

Council Bluff x

Fourche x

Huzzah x

Loggers x

Monongahela National Forest

Lake Sherwood x

Shawnee National Forest

Structure #12 (Dutchman) x x

Wayne National Forest

Tecumseh Dam x

x
x

Timber Ridge Dam x

x
x

Vesuvius Dam x

x
x

White Mountain National Forest

Compton Pond x x

Background To afford the maximum opportunity to alleviate problems that could threaten the integrity or operation of a dam, remote sensing is required on all Forest Service operated dams with a high hazard potential classification.

Technical Requirements / Tasks Hoosier National Forest Tasks on the Hoosier National Forest include installing a repaired EWS, installing depth sensors, upgrading existing systems, and installing rain gauges. The contractor is responsible for all equipment and material necessary to repair, relocate, and install all three of the systems. Photos are attached in the contract package showing each existing station. The US Forest Service will be responsible for the fees associated with data transmission. Unless a material is stated as government-furnished, the contractor is responsible for all equipment and material to complete tasks.

Indian (Lat 38.190414, Lon -86.655866) The contractor is responsible for the following tasks at Indian Lake dam

· Install Water Level Sensor

· Installation and setup of a Sutron 0.5 mm/tip rain gauge.

· Upgrade to 27Ah battery and 20W solar panel

· Verification of satellite communications.

· Calibration with the service provider while on-site.

· Confirmation that the sensors and communications are working correctly.

· Confirmation that the alarm system is working correctly.

Celina (Lat 38.179864, Lon -86.627987) The contractor is responsible for the following tasks at Celina Lake dam

· Install government furnished Water Level Sensor

· Installation and setup of a Sutron 0.5 mm/tip rain gauge.

· Upgrade to 27Ah battery and 20W solar panel

· Verification of satellite communications.

· Calibration with the service provider while on-site.

· Confirmation that the sensors and communications are working correctly.

· Confirmation that the alarm system is working correctly.

Tipsaw (Lat 38.124364, Lon -86.649156) The contractor is responsible for the following tasks at Tipsaw Lake dam

· Install repaired EWS

· Installation and setup of a Sutron 0.5 mm/tip rain gauge.

· Upgrade to 27Amp-hour (Ah) battery and 20 watt (W) solar

· Verification of satellite communications.

· Calibration with the service provider while on-site.

· Confirmation that the sensors and communications are working correctly.

· Confirmation that the alarm system is working correctly.

Saddle (Lat 38.064336, Lon -86.665333) The contractor is responsible for the following tasks at Saddle Lake dam

· Install government furnished Water Level Sensor

· Installation and setup of a Sutron 0.5 mm/tip rain gauge.

· Upgrade to 27Ah battery and 20W solar panel

· Verification of satellite communications.

· Calibration with the service provider while on-site.

· Confirmation that the sensors and communications are working correctly.

· Confirmation that the alarm system is working correctly.

Deer Creek (Lat 37.999959, Lon -86.624711)

· Installation and setup of a Sutron 0.5 mm/tip rain gauge.

· Upgrade to 27Amp-hour (Ah) battery and 20 watt (W) solar

· Verification of satellite communications.

· Calibration with the service provider while on-site.

· Confirmation that the sensors and communications are working correctly.

· Confirmation that the alarm system is working correctly.

Springs Valley (Lat 38.482235, Lon -86.568464)

· Installation and setup of a Sutron 0.5 mm/tip rain gauge.

· Upgrade to 27Amp-hour (Ah) battery and 20 watt (W) solar

· Verification of satellite communications.

· Calibration with the service provider while on-site.

· Confirmation that the sensors and communications are working correctly.

· Confirmation that the alarm system is working correctly.

Huron-Manistee National Forest Tasks on the Huron-Manistee National Forest consist of installing a new EWS at Wakeley Lake Dam. The contractor is responsible for all equipment and material to install the new early warning system. Forest Service staff will work with the contractor to determine the exact location on site.

The EWS shall be able to:

-collect and transmit water level data and rainfall data via satellite or cellular communications for the reservoir.
-shall be available for remote monitoring at any time and provide real time data to the Forest Service.
-alarm shall be sent instantly by email/text when parameters are met, Forest Service will determine the required parameters.
-operate on solar power sufficient to always provide power to the unit with a battery backup device.
-shall be installed in NEMA 4x/6P enclosure.

Forest Service will be responsible for obtaining an activated SIM card (if needed) and the fees associated with data transmission

Wakeley Lake Dam (Lat 44.639711, Lon -84.512796) The contractor is responsible for the following tasks at Wakey Lake Dam:

· Mounting hardware and installation

· Ensuring that all exposed wires and boxes are protected from the elements.

· Installation of water level sensor in protected conduit and protection of the sensor

· Installation and setup of a Sutron 0.5 mm/tip rain gauge.

· Setup of satellite or cellular communications

· Instructions on how to collect data on a computer remotely

· The contractor shall confirm that the sensors and communications are working correctly.

· The contractor shall confirm that the alarm system is working correctly.

Mark Twain National Forest The Mark Twain has 5 tipping rain bucket sensors that need to be cleaned and calibrated. The sensors are Adcon Telemetry RG1 Rain Gauges and are installed on metal poles at varying heights (4-10ft). The sensors are to be cleaned and calibrated according to the manufacturer’s recommendations. Contact Rachel Uetrecht (Rachel.Uetrecht@usda.gov 573-308-5798) for site access and location information. Rain Gauge locations are in Table 2.

Table 2: Mark Twain National Forest Rain Gauge Locations

Latitude
Longitude
Crane Lake
37.418915
-90.616266
Council Bluff
37.729434
-90.908256
Fourche
36.635697
-91.050514
Huzzah
37.630247
-91.278307
Loggers Lake
37.386670
-91.263277

Monongahela National Forest Tasks on the Monongahela National Forest include repairing and upgrading an EWS and installing a rain gauge. The contractor is responsible for all equipment and material necessary to complete these tasks.

Lake Sherwood (Lat 38.001181, Lon -80.010373) The contractor is responsible for the following tasks at Lake Sherwood dam

-Repair existing EWS
-Installation and setup of a Sutron 0.5 mm/tip rain gauge.
-Upgrade to 27Ah battery and 20W solar panel
-Verification of satellite communications.
-Calibration with the service provider while on-site.
-Confirmation that the sensors and communications are working correctly.
-Confirmation that the alarm system is working correctly.

Shawnee National Forest Tasks on the Shawnee Forest consist of installing a new EWS and rain gauge at Structure #12 (Dutchman). The contractor is responsible for all equipment and material for installation. Forest Service staff will work with the contractor to determine the exact location on site.

The EWS shall be able to:

-collect and transmit water level data and rainfall data via satellite or cellular communications for the reservoir.
-shall be available for remote monitoring at any time and provide real time data to the Forest Service.
-alarm shall be sent instantly by email/text when parameters are met, Forest Service will determine the required parameters.
-operate on solar power sufficient to always provide power to the unit with a battery backup device.
-shall be installed in NEMA 4x/6P enclosure.

Forest Service will be responsible for obtaining an activated SIM card (if needed) and the fees associated with data transmission

Structure #12 (Dutchman) (Lat 37.490110, Lon -88.914856) The contractor is responsible for the following tasks at Structure #12 (Dutchman):

-Mounting hardware and installation
-Ensuring that all exposed wires and boxes are protected from the elements.
-Installation of water level sensor in protected conduit and protection of the sensor
-Installation and setup of a Sutron 0.5 mm/tip rain gauge.
-Setup of satellite communications
-Instructions on how to collect data on a computer remotely
-Contractor shall confirm that the sensors and communications are working correctly.
-Contractor shall confirm that the alarm system is working correctly.

Wayne National Forest Tasks on the Wayne National Forest consist of repairing two early warning monitoring systems (EWS) and relocating one complete EWS. The two systems requiring repairs, Timer Ridge and Vesuvius Dam, are in the Ironton Ranger District in Lawrence County, Ohio. The system to be relocated is in the Athens Ranger District. This system is currently located at Tecumseh Dam near Shawnee, Ohio located in Perry County. It is to be relocated to Sand Run Dam in Hocking County, east of Logan, Ohio.

The US Forest Service will work with the contractor to determine the exact location on-site for the relocated system. The contractor is responsible for all equipment and material necessary to repair, relocate, and install all three of the systems. The US Forest Service will be responsible for the fees associated with data transmission.

Tecumseh (Lat 39.599268°, Lon -82.211882°) relocation to Sand Run (approx. Lat 39.526010°, Lon -82.261125°) The contractor is responsible for the following tasks at the relocation sites (Tecumseh and Sand Run):

· Removal of the complete system from Tecumseh dam, including site restoration (consisting of the removal of any concrete or burial in-place a minimum of 12” below grade, fill holes with suitable native soil)

· If the existing post and/or conduit cannot be salvaged and reused, supply a new post and conduit for the relocated system.

· Relocation of all equipment to Sand Run Dam and reinstallation according to manufacturer’s instructions

· Installation and setup of a Sutron 0.5 mm/tip rain gauge.

· Upgrade to 27 Ah battery and 20 W solar panel

· Verification of satellite communications

· Calibration with the service provider while on-site

· Confirmation that the sensors and communications are working correctly.

· Confirmation that the alarm system is working correctly.

Timber Ridge (Lat 38.655002°, Lon -82.381868°) The contractor is responsible for the following tasks at Timber Ridge Dam

· Replace water level sensor and cable in protective conduit for protection of the sensor (utilize galvanized rigid conduit at the Timber Ridge site).

· Installation and setup of a Sutron 0.5 mm/tip rain gauge.

· Upgrade to 27Ah battery and 20W solar panel

· Verification of satellite communications.

· Calibration with the service provider while on-site.

· Confirmation that the sensors and communications are working correctly.

· Confirmation that the alarm system is working correctly.

Vesuvius (Lat 38.606671°, Lon -82.630546°) The contractor is responsible for the following tasks at Vesuvius Dam

· Replace water level sensor and cable in protective conduit for protection of the sensor.

· Installation and setup of a Sutron 0.5 mm/tip rain gauge

· Upgrade to 27 Ah battery and 20 W solar panel

· Verification of satellite communications

· Calibration with the service provider while on-site

· Confirmation that the sensors and communications are working correctly.

· Confirmation that the alarm system is working correctly.

White Mountain National Forest Tasks on the White Mount National Forest consist of installing a new EWS at Campton Pond Dam on the White Mountain National Forest. Campton Pond Dam is located near the intersection of NH-175 and NH-49 in Campton, NH. The contractor is responsible for all equipment and material to install the new early warning system.

Forest Service will work with the contractor to determine the exact location on site. Campton Pond reservoir depth is approximately 2 feet.

The EWS shall be able to:

· collect and transmit water level data and rainfall data via satellite or cellular communications for the reservoir.

· shall be available for remote monitoring at any time and provide real time data to the Forest Service.

· alarm shall be sent instantly by email/text when parameters are met, Forest Service will determine the required parameters.

· operate on solar power sufficient to always provide power to the unit with a battery backup device.

· shall be installed in NEMA 4x/6P enclosure.

Forest Service will be responsible for obtaining an activated SIM card (if needed) and the fees associated with data transmission.

Campton Pond (Lat 43.862199°, Long -71.631992°) The contractor is responsible for the following tasks at Campton Pond:

· Mounting hardware and installation

· Ensuring that all exposed wires and boxes are protected from the elements.

· Installation of water level sensor in protected conduit and protection of the sensor

· Installation and setup of a Sutron 0.5 mm/tip rain gauge.

· Setup of satellite or cellular communications; cellular preferred

· Instructions how to collect data on a computer remotely (at Forest Service office in Campton)

· Contractor shall confirm that the sensors and communications are working correctly.

· Contractor shall confirm that the alarm system is working correctly.

Travel Contractor is responsible for all travel related expenses to project locations

7.0 Contractor’s Representative

A representative from the contractor will be identified as the main point of contact between the contractor and the government.

image1.png